Exhibit 2 Technical Specification Division 02 Existing Conditions

View the file

Other files

File Type Posted
Q As _v2_Revised.xlsx XLSX spreadsheet
Q As _v3.xlsx XLSX spreadsheet
Exhibit_35-4 _10_Nov_15.pdf PDF
Q As _v2.xlsx XLSX spreadsheet
W911S8-14-R-0003-0003.docx DOCX document
Exhibit_35-3 _10_Nov_15.pdf PDF
Exhibit_35 _10_Nov_15_.pdf PDF
W911S8-14-R-0003-0002.docx DOCX document
Site_Visit_Sign-In_Roster.pdf PDF
Exhibit_35-3 _27_Oct_15.pdf PDF
Exhibit_35-4 _27_Oct_15.pdf PDF
Q As _27_Oct_15.pdf PDF
Exhibit_35-5 _27_Oct_15.pdf PDF
W911S8-14-R-0003-0001.docx DOCX document
Exhibit_35 _27_Oct_15.pdf PDF
Exhibit_3 _1_Oct_15.pdf PDF
Exhibit_9 _1_Oct_15.pdf PDF
Exhibit_31 _1_Oct_15.pdf PDF
Exhibit_17 _1_Oct_15.pdf PDF
Exhibit_4 _1_Oct_15.pdf PDF
Exhibit_11 _1_Oct_15.pdf PDF
Exhibit_14 _1_Oct_15.pdf PDF
Exhibit_28 _1_Oct_15.docx DOCX document
Exhibit_29 _1_Oct_15.docx DOCX document
Exhibit_35-3 _1_Oct_15.pdf PDF
Exhibit_22 _1_Oct_15.pdf PDF
Exhibit_30 _1_Oct_15.docx DOCX document
Exhibit_15 _1_Oct_15.pdf PDF
Exhibit_38 _21_Aug_15.pdf PDF
Exhibit_37 _4_Sep_15.pdf PDF
Exhibit_6 _1_Oct_15.pdf PDF
Exhibit_25 _1_Oct_15.pdf PDF
Exhibit_18 _1_Oct_15.pdf PDF
Exhibit_24 _1_Oct_15.pdf PDF
Exhibit_35 _1_Oct_2015.pdf PDF
Exhibit_33 _1_Oct_15.pdf PDF
Exhibit_5 _1_Oct_15.pdf PDF
Exhibit_26 _1_Oct_15.pdf PDF
Exhibit_39 _21_Aug_15.pdf PDF
Exhibit_19 _1_Oct_15.pdf PDF
Exhibit_16 _1_Oct_15.pdf PDF
Exhibit_35-1 _1_Oct_15.pdf PDF
Exhibit_36 _4_Sep_15.pdf PDF
Exhibit_21 _1_Oct_15.pdf PDF
W911S8-14-R-0003.docx DOCX document
Exhibit_40 _1_Oct_15.docx DOCX document
Attachment_1.docx DOCX document
Exhibit_1 _1_Oct_15.pdf PDF
Exhibit_7 _1_Oct_15.pdf PDF
Attachment_2.docx DOCX document
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02 41 00 Page 1

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)

ARI Guideline K (2005) Guideline for Containers for Recovered Non-

Flammable Fluorocarbon Refrigerants

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 145 (1991; R 2004) Classification of Soils and Soil-

Aggregate Mixtures for Highway Construction Purposes

AASHTO T 180 (2001; R 2004) Moisture-Density Relations of Soils

Using a 4.54-kg (10-lb) Rammer and an 457-mm (18-in) Drop

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations

CARPET AND RUG INSTITUTE (CRI)

CRI 104 (2002) Standard for Installation Specification of

Commercial Carpet

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008) Safety and Health Requirements Manual

U.S. DEFENSE LOGISTICS AGENCY (DLA)

DLA 4145.25 (June 2000) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 4000.25-1-M (2006; Notice 1) Requisitioning and Issue Procedures

MIL-STD-129 (Rev P; Notice 3; Change 4) Military Marking for

Shipment and Storage

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

SECTION 02 41 00 Page 2

40 CFR 82 Protection of Stratospheric Ozone

49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels

1.2 GENERAL REQUIREMENTS

Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations. The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris.

Remove rubbish and debris from Government property daily, unless otherwise directed, to avoid accumulation at the demolition site. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable sections. In the interest of conservation, salvage shall be pursued to the maximum extent possible; salvaged items and materials shall be disposed of as specified.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Existing Conditions; G

SD-03 Product Data

Work Plan;

The procedures proposed for the accomplishment of the work. The procedures shall provide for safe conduct of the work, including procedures and methods to provide necessary supports, lateral bracing and shoring when required, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations in accordance with EM 385-1-1.

SD-07 Certificates

Demolition Plan; G Notifications; G

Submit proposed salvage, demolition, and removal procedures for approval before work is started.

SD-11 Closeout Submittals

SECTION 02 41 00 Page 3

Receipts

Receipts or bills of lading, as specified.

1.4 REGULATORY AND SAFETY REQUIREMENTS

Comply with Federal, State, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6.

1.4.1 Notifications

1.4.1.1 General Requirements

Furnish timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M.

Notify the local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M.

1.4.2 Receipts

Submit a shipping receipt or bill of lading for all containers of ozone depleting substance (ODS) shipped to the Defense Depot, Richmond, Virginia.

1.5 DUST AND DEBRIS CONTROL

Prevent the spread of dust and debris to occupied portions of the construction site and avoid the creation of a nuisance in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris.

1.6 PROTECTION

1.6.1 Traffic Control Signs

Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement. Notify the Contracting Officer prior to beginning such work.

1.6.2 Existing Conditions Documentation

Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work.

Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages that will be required during the course of work, and to note these outages on the record document.

SECTION 02 41 00 Page 4

1.6.3 Items to Remain in Place

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements or pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

1.6.4 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.

1.6.5 Weather Protection

For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.

1.6.6 Trees

Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees.

Any tree designated to remain that is damaged during the work under this contract shall be replaced in kind or as approved by the Contracting Officer. Care shall be exercised when excavating in the vicinity of trees indicated to be left in place. Where roots 2 inches in diameter or greater are found, the soils shall be excavated by hand and tunneled. When large roots are exposed, they shall be wrapped with a heavy burlap for protection and to prevent drying. Excavations dug by machines adjacent to trees having roots less than 2 inches in diameter shall have the sides hand trimmed, making a clean cut of the roots. Excavations having exposed tree roots shall be backfilled within 24 hours unless roots are adequately protected by moist burlap or canvas.

1.6.7 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition operations. Prior to start of work, utilities

SECTION 02 41 00 Page 5 serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.

1.6.8 Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished, unless directed otherwise by the Contracting Officer. The Contractor shall ensure that no elements determined to be unstable are left unsupported and shall be responsible for placing and securing bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

1.6.9 Protection of Personnel

Before, during and after the demolition work, the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.6.10 Protection From the Weather

The interior of buildings to remain; salvageable materials and equipment shall be protected from the weather at all times.

1.7 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.8 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Items to be relocated which are damaged by the Contractor shall be repaired or replaced with new undamaged items as approved by the Contracting Officer.

1.9 REQUIRED DATA

Prepare a Demolition Plan. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, and a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Coordinate with Waste Management Plan in accordance with Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTER MANAGEMENT. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a

SECTION 02 41 00 Page 6 safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by the Contracting Officer prior to work beginning.

1.10 ENVIRONMENTAL PROTECTION

Comply with the Environmental Protection Agency requirements specified.

1.11 USE OF EXPLOSIVES

Use of explosives will not be permitted.

1.12 AVAILABILITY OF WORK AREAS

Areas in which the work is to be accomplished will be available in accordance with the schedule established during preconstruction coordination for the Delivery Order.

PART 2 PRODUCTS

2.1 FILL MATERIAL

Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures.

Fill material shall be waste soil from demolition or deconstruction until all waste soil appropriate for this purpose is consumed. Fill material shall not be trash, wood, unprocessed concrete or asphalt or any other unsuitable waste from the demolition or deconstruction of structures and buildings.

Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:

Soil classification AASHTO M 145 Moisture-density relations AASHTO T 180, Method B or D

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Inspect and evaluate existing structures on site for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.

Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified. Materials shall be designated for reuse on site whenever possible.

3.1.1 Structures

Remove existing structures as indicated on the contract drawings.

SECTION 02 41 00 Page 7

3.1.2 Utilities and Related Equipment

3.1.2.1 General Requirements

Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.

3.1.2.2 Disconnecting Existing Utilities

Remove existing utilities as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered that are not indicated on the drawings, the Contracting Officer shall be notified prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.

3.1.3 Chain-link Fencing

Remove chain-link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas. Remove gates as whole units.

Cut chain-link fabric to 25 foot lengths and store in rolls off the ground.

3.1.4 Paving and Slabs

Pavement and slabs designated to be recycled and used in this project shall be moved, crushed and stored as directed by the Contracting Officer.

Pavement and slabs not to be used in this project shall be removed from the site and taken to the Joint Base Lewis-McChord Sequalitchew Training Area and Center for Environmental Education & Earthworks (Earthworks) or removed from the Installation at Contractors expense. POC at Earthworks: RCRA Program Manager 253-967-3803, Solid Waste and Recycling Program Manager 253- 966-6452. Concrete and asphaltic concrete taken to the Earthworks must not be larger than 2 foot by 2 foot by the slab thickness (varies) in size and rebar or reinforcing metal must be cut at no longer than 6 inches from the edge of the slab.

3.1.5 Roofing

a. Remove existing roof system and associated components in their entirety down to existing roof deck.

b. Remove roofing to effect the connections with new flashing or roofing.

c. Remove gravel surfacing from existing roofing felts for a minimum distance of 18 inches back from the cut. Remove gravel without damaging felts.

d. Salvage asphalt roofing materials.

e. Cut existing felts or membrane and insulation along straight lines.

SECTION 02 41 00 Page 8

f. Remove roofing system and insulation without damaging the roof deck.

g. Sequence work to minimize building exposure between demolition or deconstruction and new roof materials installation.

3.1.5.1 Temporary Roofing

Install temporary roofing and flashing as necessary to maintain a watertight condition throughout the course of the work. Remove temporary work prior to installation of permanent roof system materials unless approved otherwise by the Contracting Officer. Make provisions for worker safety during demolition, and installation of new materials as described in paragraphs entitled "Statements" and "Regulatory and Safety Requirements."

3.1.5.2 Reroofing

When removing the existing roofing system from the roof deck, remove only as much roofing as can be recovered by the end of the work day, unless approved otherwise by the Contracting Officer. Do not attempt to open the roof covering system in threatening weather. Reseal all openings prior to suspension of work the same day.

3.1.6 Masonry

Sawcut and remove masonry so as to prevent damage to surfaces to remain and to facilitate the installation of new work. Where new masonry adjoins existing, the new work shall abut or tie into the existing construction as indicated. Provide square, straight edges and corners where existing masonry adjoins new work and other locations. Masonry removed in whole blocks shall be salvaged and stored for reuse. Masonry removed in pieces shall be crushed for use as aggregate. Whole or broken masonry may be brought to the Earthworks for recycling/reuse or removed from the installation at Contractors expense. POC at the Earthworks: RCRA Program Manager 253-967- 3803, Solid Waste and Recycling Program Manager 253-966-6452.

3.1.7 Concrete and Asphaltic Concrete

Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete, provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete. Salvage removed concrete.

Existing pavements designated for removal shall be saw cut and removed in accordance with the details shown on the drawings and to the limits and depths indicated.

Concrete and asphaltic concrete may be brought to the Earthworks for recycling/reuse or removed from the installation at contractors expense.

Concrete and asphaltic concrete taken to the Earthworks must not be larger than 2 foot by 2 foot by the slab thickness (varies) in size and rebar or reinforcing metal must be cut at no longer than 6 inches from the edge of the slab. POC at the Earthworks: RCRA Program Manager 253-967-3803, Solid Waste and Recycling Program Manager 253-966-6452.

SECTION 02 41 00 Page 9

3.1.8 Structural Steel

Dismantle structural steel at field connections and in a manner that will prevent bending or damage. Salvage for reuse or recycle structural steel, steel joists, girders, angles, plates, columns, and shapes. Do not use flame-cutting torches unless approved by the Contracting Officer. Transport steel joists and girders as whole units and not dismantled. Transport structural steel shapes to a designated area as directed by the Contracting Officer, stacked according to size, type of member and length, and stored off the ground, protected from the weather.

3.1.9 Miscellaneous Metal

Salvage shop-fabricated items such as access doors and frames, steel gratings, metal ladders, wire mesh partitions, metal railings, metal windows and similar items as whole units. Salvage light-gage and cold-formed metal framing, such as steel studs, steel trusses, metal gutters, roofing and siding, metal toilet partitions, toilet accessories and similar items. Scrap metal shall become the Contractor's property. Recycle scrap metal as part of demolition operations. Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility, in accordance with the Waste Management Plan.

3.1.10 Carpentry

Salvage for reuse or recycle lumber, millwork items, and finished boards, and sort by type and size. Chip or shred and recycle salvaged wood unfit for reuse, except stained, painted, or treated wood. Salvage windows, doors, frames, and cabinets, and similar items as whole units, complete with trim and accessories. Salvage hardware attached to units for reuse. Brace the open end of door frames to prevent damage.

3.1.11 Carpet

Remove existing carpet for reclamation in accordance with manufacturer recommendations and as follows. Remove used carpet in large pieces, roll tightly, and pack neatly in a container. Remove adhesive according to recommendations of the Carpet and Rug Institute (CRI). Adhesive removal solvents shall comply with CRI 104. Recycle removed carpet cushion. For recycling refer to Public Works Technical Bulletin 200-1-17, 10 March 2003, Recycling Interior Finish Materials - Carpet and Ceiling Tiles.

3.1.12 Acoustic Ceiling Tile

Remove, neatly stack, and recycle acoustic ceiling tiles. Recycling may be available with manufacturer. Otherwise, priority shall be given to a local recycling organization. For recycling refer to Public Works Technical Bulletin 200-1-17, 10 March 2003, Recycling Interior Finish Materials - Carpet and Ceiling Tiles.

3.1.13 Airfield Lighting

Remove edge lights, associated transformers and other components, and dispose of as indicated in the Delivery Order.

SECTION 02 41 00 Page 10

3.1.14 Patching

Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces, using on-site materials when available. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated on the contract drawings.

3.1.15 Air-Conditioning Equipment

Turn in salvaged Class I ODS refrigerants as specified in paragraph, "Salvaged Materials and Equipment."

3.1.16 Cylinders and Canisters

Remove all fire suppression system cylinders and canisters and dispose of in accordance with the paragraph entitled "Disposal of Ozone Depleting Substance (ODS)."

3.1.17 Locksets on Swinging Doors

The Contractor shall remove all locksets from all swinging doors indicated to be removed and disposed of. Deliver the locksets and related items to a designated location for receipt by the Contracting Officer after removal.

3.1.18 Mechanical Equipment and Fixtures

Disconnect mechanical hardware at the nearest connection to existing services to remain, unless otherwise noted. Mechanical equipment and fixtures must be disconnected at fittings. Remove service valves attached to the unit. Salvage each item of equipment and fixtures as a whole unit;

listed, indexed, tagged, and stored. Salvage each unit with its normal operating auxiliary equipment. Transport salvaged equipment and fixtures, including motors and machines, to a designated storage area as directed by the Contracting Officer. Do not remove equipment until approved. Do not offer low-efficiency equipment for reuse; provide to recycling service for disassembly and recycling of parts.

3.1.18.1 Preparation for Storage

Remove water, dirt, dust, and foreign matter from units; tanks, piping and fixtures shall be drained; interiors, if previously used to store flammable, explosive, or other dangerous liquids, must be steam cleaned. Seal openings with caps, plates, or plugs. Secure motors attached by flexible connections to the unit. Change lubricating systems with the proper oil or grease.

3.1.18.2 Piping

Disconnect piping at unions, flanges and valves, and fittings as required to reduce the pipe into straight lengths for practical storage. Store salvaged piping according to size and type. If the piping that remains can become pressurized due to upstream valve failure, end caps, blind flanges, or other types of plugs or fittings with a pressure gage and bleed valve shall be

SECTION 02 41 00 Page 11 attached to the open end of the pipe to ensure positive leak control.

Carefully dismantle piping that previously contained gas, gasoline, oil, or other dangerous fluids, with precautions taken to prevent injury to persons and property. Store piping outdoors until all fumes and residues are removed. Box prefabricated supports, hangers, plates, valves, and specialty items according to size and type. Wrap sprinkler heads individually in plastic bags before boxing. Classify piping not designated for salvage, or not reusable, as scrap metal.

3.1.18.3 Ducts

Classify removed duct work as scrap metal.

3.1.18.4 Fixtures, Motors, and Machines

Remove and salvage fixtures, motors and machines associated with plumbing, heating, air conditioning, refrigeration, and other mechanical system installations. Salvage, box and store auxiliary units and accessories with the main motor and machines. Tag salvaged items for identification, storage, and protection from damage. Classify broken, damaged, or otherwise unserviceable units and not caused to be broken, damaged, or otherwise unserviceable as debris to be disposed of by the Contractor. Salvage and crush porcelain plumbing fixtures unsuitable for reuse.

3.1.19 Electrical Equipment and Fixtures

Salvage motors, motor controllers, and operating and control equipment that are attached to the driven equipment. Salvage wiring systems and components.

Box loose items and tag for identification. Disconnect primary, secondary, control, communication, and signal circuits at the point of attachment to their distribution system.

3.1.19.1 Fixtures

Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately. Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts manufactured prior to 1978, boxed and tagged for identification, and protected from breakage.

3.1.19.2 Electrical Devices

Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.

3.1.19.3 Wiring Ducts or Troughs

Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths. Remove plug-in or disconnecting devices from the busway and store separately.

3.1.19.4 Conduit and Miscellaneous Items

Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and

SECTION 02 41 00 Page 12 undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.

3.1.20 Elevators and Hoists

Remove elevators, hoists, and similar conveying equipment and salvage as whole units, to the most practical extent. Remove and prepare items for salvage without damage to any of the various parts. Salvage and store rails for structural steel with the equipment as an integral part of the unit.

3.2 CONCURRENT EARTH-MOVING OPERATIONS

Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition or deconstruction work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.

3.3 DISPOSITION OF MATERIAL

3.3.1 Title to Materials

Except for salvaged items specified in related sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

3.3.2 Reuse of Materials and Equipment

Remove and store materials and equipment indicated to be reused or relocated to prevent damage, and reinstall as the work progresses.

3.3.3 Salvaged Materials and Equipment

Remove materials and equipment that are indicated to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site as directed by the Contracting Officer.

a. Salvage items and material to the maximum extent possible.

b. Store all materials salvaged for the Contractor as approved by the

Contracting Officer and remove from Government property before completion of the contract. Material salvaged for the Contractor shall not be sold on the site.

c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers. Deliver items

SECTION 02 41 00 Page 13 reserved as property of the Government to the areas designated by the Contracting Officer.

d. Remove historical items in a manner to prevent damage. Deliver the following historical items to the Government for disposition: corner stones, contents of corner stones, and document boxes wherever located on the site.

3.3.4 Disposal of Ozone Depleting Substance (ODS)

Class I and Class II ODS are defined in Section, 602(a) and (b), of The Clean Air Act. Prevent discharge of Class I and Class II ODS to the atmosphere. Place recovered ODS in cylinders meeting ARI Guideline K suitable for the type ODS (filled to no more than 80 percent capacity) and provide appropriate labeling. Recovered ODS shall be put back into the existing equipment, turned over to the Contracting Officer or removed from Government property and disposed of in accordance with 40 CFR 82, as described on the Delivery Order. Products, equipment, and appliances containing ODS in a sealed, self-contained system (e.g. residential refrigerators and window air conditioners) shall be disposed of in accordance with 40 CFR 82.

3.3.4.1 Special Instructions

No more than one type of ODS is permitted in each container. A warning/hazardous label shall be applied to the containers in accordance with Department of Transportation regulations. All cylinders including but not limited to fire extinguishers, spheres, or canisters containing an ODS shall have a tag with the following information:

a. Activity name and unit identification code

b. Activity point of contact and phone number

c. Type of ODS and pounds of ODS contained

d. Date of shipment

e. Naval stock number (for information, call (804) 279-4525).

3.3.4.2 Fire Suppression Containers

Deactivate fire suppression system cylinders and canisters with electrical charges or initiators prior to shipment. Also, safety caps must be used to cover exposed actuation mechanisms and discharge ports on these special cylinders.

3.3.5 Transportation Guidance

Ship all ODS containers in accordance with MIL-STD-129, DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction 4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR 173.301, and DOD 4000.25-1-M.

SECTION 02 41 00 Page 14

3.3.6 Unsalvageable and Non-Recyclable Material

Dispose of unsalvageable and non-recyclable material in an off-site permitted Municipal Solid Waste Landfill. Clean uncontaminated soil may be placed in Joint Base Lewis-McChord borrow source pits for reclamation and reuse or taken to the Earthworks at Contractor expense. A Borrow Source Entry Notification form must be completed prior to placement of soil in borrow source pits. POC at the Earthworks: RCRA Program Manager 253-967- 3803, Solid Waste and Recycling Program Manager 253-966-6452.

3.4 CLEANUP

Remove debris and rubbish from basement and similar excavations. Remove and transport the in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

3.5 DISPOSAL OF REMOVED MATERIALS

3.5.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable Federal, State and local regulations as contractually specified. Storage of removed materials on the project site is prohibited.

3.5.2 Burning on Government Property

Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.

3.5.3 Removal to Spoil Areas on Government Property

Clean uncontaminated soil may be placed in Joint Base Lewis-McChord borrow source pits for reclamation and reuse or taken to the Earthworks at Contractor expense. A Borrow Source Entry Notification form must be completed prior to placement of soil in borrow source pits. POC at the Earthworks: RCRA Program Manager 253-967-3803, Solid Waste and Recycling Program Manager 253-966-6452.

3.5.4 Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal.

Dispose of waste soil as directed.

3.6 REUSE OF SALVAGED ITEMS

Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

-- End of Section --

SECTION 02 42 91 Page 1

SECTION 02 42 91

REMOVAL AND SALVAGE OF HISTORIC BUILDING MATERIALS

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will

Work Plan; G

The procedures proposed for the accomplishment of the work. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged or recycled, dust control, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations.

1.2 GENERAL REQUIREMENTS

The work includes removal and salvage of identified historic items and materials, and removal of resulting rubbish and debris. The contractor shall submit a Work Plan as specified in the Submittals paragraph. General demolition of non-historic materials and removal of resulting rubbish and debris shall comply with the requirements of Section 02 41 00 DEMOLITION.

Materials to be salvaged or recycled shall be stored daily in areas and manner specified by the Contracting Officer. In the interest of conservation, salvage and recycling shall be pursued to the maximum extent possible.

1.3 QUALIFICATIONS

The contractor shall provide qualified workers trained and experienced in whole-building recycling, including removal and salvage of historic materials and shall submit documentation of five consecutive years of work of this type. A list of similar projects shall be provided identifying when, where, and for whom the work was done. A current point-of-contact for identified references shall be provided.

1.4 DUST CONTROL

The amount of dust resulting from removal, salvage and demolition operations shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. Use of water to control dust will not be permitted when it will result in, or create, damage to existing building materials and hazardous or objectionable conditions such as ice, flooding and pollution.

SECTION 02 42 91 Page 2

1.5 PROTECTION

1.5.1 Protection of Existing Historic Property

Before beginning any removal, salvage or demolition work, the contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damage to existing historic items that are to remain in place, to be reused, or to remain the property of the Government. Items damaged by the contractor shall be repaired and restored to original condition, or replaced, as approved by the Contracting Officer. The contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports, as required.

The contractor shall ensure that structural elements are not overloaded and shall provide additional supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

1.5.2 Protection From the Weather

The interior of buildings to remain and salvageable materials shall be protected from the weather at all times. Salvaged historic materials shall be stored out of contact with the ground and under weather tight covering.

1.5.3 Environmental Protection

The work shall comply with the requirements of Section 02 82 14.00 10 ASBESTOS ABATEMENT and/or Section 02 83 19.00 10 LEAD BASED PAINT HAZARD

ABATEMENT, TARGET HOUSING & CHILD OCCUPIED FACILITIES.

PART 2 PRODUCTS (NOT APPLICABLE)

3.1 SALVAGED ITEMS

contractor shall salvage items to the maximum extent possible. Prior to any demolition work, historic items to be salvaged shall be removed from the structure. Removal of salvageable items shall be accomplished by hand labor to the maximum extent possible. Care shall be taken to not damage historic portions of the structure to remain or items identified for salvage.

Furnishings, equipment, and materials not scheduled for salvage or recycling shall be removed prior to any salvaging procedures. Contractor shall keep a complete recording of all salvaged materials including the condition of such materials before, and after, salvage operations.

3.1.1 Site Work

Site items described in the Delivery Order shall be removed intact and salvaged.

3.1.2 Concrete

Concrete items described in the Delivery Order shall be removed intact and

SECTION 02 42 91 Page 3

3.1.3 Masonry

Masonry items described in the Delivery Order shall be removed intact and

3.1.4 Metals

Metal items described in the Delivery Order shall be removed intact and

3.1.5 Wood

Wood materials described in the Delivery Order shall be removed intact and

3.1.6 Thermal and Moisture Protection

Roofing materials described in the Delivery Order shall be removed intact and salvaged.

3.1.7 Doors and Windows

Doors and windows described in the Delivery Order with associated hardware and operating mechanisms shall be removed intact (including glass) and salvaged per schedule.

3.1.8 Finishes

Special or historic finishes described in the Delivery Order shall be protected, removed, and remain intact.

3.1.9 Equipment and Specialty Items

The following equipment and specialty items described in the Delivery Order shall be removed intact and salvaged.

3.1.10 Mechanical Equipment

Mechanical equipment described in the Delivery Order shall be removed intact and salvaged.

3.1.11 Electrical Equipment

Electrical fixtures and equipment described in the Delivery Order shall be removed intact and salvaged.

3.2 RECYCLED MATERIALS

contractor shall recycle materials to the maximum extent possible. Removal of recyclable materials shall be accomplished by hand labor wherever possible. Historic portions of the structure to remain and items identified for salvage shall not be damaged while removing materials for recycling.

3.3 DISPOSITION OF MATERIALS

Title to materials and equipment to be demolished, except Government and using service salvage and historical items, is vested in the contractor upon

SECTION 02 42 91 Page 4 receipt of notice to proceed. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed.

3.3.1 Material Salvaged for the contractor

Material salvaged for the contractor shall be temporarily stored as approved by the Contracting Officer and shall be removed from Government property before completion of the contract. Material salvaged for the contractor shall not be sold on the site.

3.3.2 Items Salvaged for the Government

Salvaged items to remain the property of the Government shall be removed in a manner to prevent damage and as directed by the Contracting Officer, shall be packed or crated to protect the items from damage. Items damaged during removal or storage shall be repaired or replaced to match existing items.

Containers shall be properly identified as to contents. Items reserved as property of the Government shall be delivered to the areas designated.

3.4 CLEAN-UP

Upon completion of the work, portions of structure to remain and adjacent areas and structures shall be cleaned of dust, dirt, and debris caused by salvage and demolition operations. Debris and rubbish shall be removed and transported in a manner that prevents spillage on streets or adjacent areas.

Local regulations regarding hauling and disposal shall apply.

SECTION 02 61 13 Page 1

SECTION 02 61 13

EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

The publications listed below form a part of this specification to the

ASTM INTERNATIONAL (ASTM)

ASTM D 1556 (2007) Density and Unit Weight of Soil in Place by the

Sand-Cone Method

ASTM D 1557 (2007) Standard Test Methods for Laboratory Compaction

Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D 2167 (2008) Density and Unit Weight of Soil in Place by the

Rubber Balloon Method

ASTM D 2487 (2006e1) Soils for Engineering Purposes (Unified Soil

Classification System)

ASTM D 422 (1963; R 2007) Particle-Size Analysis of Soils

ASTM D 4318 (2005) Liquid Limit, Plastic Limit, and Plasticity

Index of Soils

ASTM D 5434 (2003) Field Logging of Subsurface Explorations of Soil and Rock

ASTM D 6938 (2007a) Standard Test Method for In-Place Density and

Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)

ASTM D 698 (2007e1) Laboratory Compaction Characteristics of Soil

Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))

29 CFR 1926 Safety and Health Regulations for Construction

40 CFR 302 Designation, Reportable Quantities, and Notification

SECTION 02 61 13 Page 2

1.2 MEASUREMENT AND PAYMENT

1.2.1 Measurement

Measurement for excavation and on-site transportation shall be based on the actual number of cubic yards of contaminated material in-place prior to excavation. Determination of the volume of contaminated material excavated shall be based on cross-sectional volume determination reflecting the differential between the original elevations of the top of the contaminated material and the final elevations after removal of the contaminated material. Measurement for backfilling of excavated areas shall be based on in-place cubic yards of compacted fill. Measurement for construction of stockpile areas shall be based on the number of square yards of stockpile liner constructed.

1.2.2 Payment

1.2.2.1 Excavation and Transportation

Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost. This unit cost shall include any other items incidental to excavation and handling not defined as having a specific unit cost.

1.2.2.2 Backfilling

Compensation for backfill soil, transportation of backfill, backfill soil conditioning, backfilling, compaction, and geotechnical testing will be paid as a single unit cost.

1.2.2.3 Stockpiling

Compensation for construction of stockpile areas will be paid for as a unit cost. This unit cost shall include all aspects of grading, preparation, handling, placement, maintenance, removal, treatment, and disposal of stockpile cover materials and liner materials and all other items incidental to construction of stockpiles.

1.3 SUBMITTALS

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will

SD-02 Shop Drawings

Surveys; G

Separate cross-sections of each area before and after excavation and after backfilling.

Work Plan; G

SECTION 02 61 13 Page 3

Work Plan within 30 calendar days after notice to proceed. No work at the site, with the exception of site inspections and surveys, shall be performed until the Work Plan is approved. The contractor shall allow 30 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. At a minimum, the Work Plan shall include:

a. Schedule of activities.

b. Method of excavation and equipment to be used.

c. Shoring or side-wall slopes proposed.

d. Dewatering plan.

e. Storage methods and locations for liquid and solid contaminated material.

f. Borrow sources and haul routes.

g. Decontamination procedures.

h. Spill contingency plan.

Closure Report; G

6 copies of the Closure Report within 14 calendar days of work completion at the site.

SD-06 Test Reports

Backfill; G

Surveys; G

Confirmation Sampling and Analysis; G

Sampling of Stored Material; G

Sampling Liquid; G

Compaction; G

Test results.

1.4 SURVEYS

Surveys shall be performed immediately prior to and after excavation of contaminated material to determine the volume of contaminated material removed. Surveys shall also be performed immediately after backfill of each excavation. The contractor shall provide cross-sections on 25-foot intervals and at break points for all excavated areas. Locations of confirmation samples shall also be surveyed and shown on the drawings.

SECTION 02 61 13 Page 4

1.5 REGULATORY REQUIREMENTS

1.5.1 Permits and Licenses

The contractor shall obtain required federal, state, and local permits for excavation and storage of contaminated material. Permits shall be obtained at no additional cost to the Government.

1.5.2 Air Emissions

Air emissions shall be monitored and controlled in accordance with Section

01 57 20.00 10 ENVIRONMENTAL PROTECTION.

1.6 DESCRIPTION OF WORK

The work shall consist of excavation and temporary storage of contaminated material as indicated on the Delivery Order. Approximate locations of contaminated material are shown on the drawings. Chemical analysis of contaminated material and description of subsurface conditions, if performed by the Government, is shown in the Appendix. The contractor shall submit a Work Plan as specified in the Submittal's paragraph. The Contracting Officer shall be notified within 48 hours if contaminated material is discovered which has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered. Backfill material availability and groundwater conditions shall be indicated on the Delivery Order.

1.7 CHEMICAL TESTING

Required sampling and chemical analysis shall be conducted in accordance with Section 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL.

1.8 SCHEDULING

The contractor shall notify the Contracting Officer 15 calendar days prior to the start of excavation of contaminated material. The contractor shall be responsible for contacting regulatory agencies in accordance with the applicable reporting requirements.

2.1 BACKFILL

Backfill material shall be obtained offsite. Backfill shall be classified in accordance with ASTM D 2487 as GW, GP, GM, GC, SW, SP, SM, SC, ML, MH, CL, or CH, and shall be free from roots and other organic matter, trash, debris, snow, ice or frozen materials. Backfill material shall be tested for Atterberg limits ASTM D 4318, grain-size distribution ASTM D 422 compaction characteristics ASTM D 698 ASTM D 1557 at a frequency of once per 3000 cubic yards. A minimum of one set of classification tests shall be performed per borrow source and 1 backfill sample shall be collected and tested for contaminants as indicated on the Delivery Order. Backfill shall not be used until borrow source chemical and physical test results have been submitted and approved.

SECTION 02 61 13 Page 5

2.2 SPILL RESPONSE MATERIALS

The contractor shall provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials shall be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of materials and contaminants being handled.

3.1 EXISTING STRUCTURES AND UTILITIES

No excavation shall be performed until site utilities have been field located. The contractor shall take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the contractor's operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without approval from the Contracting Officer.

3.2 CLEARING

Clearing shall be performed to the limits shown on the drawings in accordance with Section 31 11 00 CLEARING AND GRUBBING.

3.3 CONTAMINATED MATERIAL REMOVAL

3.3.1 Excavation

Areas of contamination…