Exhibit_22 _1_Oct_15.pdf
PDF 535 KB Posted
- Solicitation number
- W911S814R0003
About this file
Exhibit 22 Technical Specification Division 32 Exterior Improvements
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 32 01 13 Page 1
SECTION 32 01 13
BITUMINOUS SEAL AND FOG COATS
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT PROCEDURES
Measure the quantities of bituminous material and aggregate used in the accepted work and to be paid for, provided that the measured quantities are not more than 10 percent over the specified application rate. Any amount of bituminous material and aggregate more than 10 percent over the specified application rate for each application will be deducted from the measured quantities except for irregular areas where hand spraying of the bituminous material and hand spreading of the aggregate is necessary.
1.1.1 Bituminous Material Measurement Methods
The amount of bituminous material to be paid for will be measured in gallons at 60 degrees F. Correct volumes measured at temperatures other than 60 degrees F in accordance with ASTM D 633 and ASTM D 1250.
1.1.2 Aggregate Measurement Methods
The amount of aggregate to be paid for will be measured in tons of dry aggregate. Measurement of the materials shall be by determining the volume capacity of each vehicle delivering the material to the site of the work or stockpiles.
1.1.3 Payment
The quantities of aggregate and bituminous material, determined as specified above, will be paid for at the respective contract unit prices. Payment will constitute full compensation for all operations necessary to complete the work as specified herein.
1.1.4 Waybills and Delivery Tickets
Do not remove bituminous material from the tank car or storage tank until measurements of the remaining quantity have been taken.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 81 (1992; R 2004) Cut-Back Asphalt (Rapid-Curing Type)
AASHTO T 182 (1984; R 2002) Coating and Stripping of Bitumen-
Aggregate Mixtures
AASHTO T 40 (2002; R 2006) Sampling Bituminous Materials
ASTM INTERNATIONAL (ASTM)
SECTION 32 01 13 Page 2
ASTM C 131 (2006) Standard Test Method for Resistance to
Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
ASTM C 136 (2006) Standard Test Method for Sieve Analysis of
Fine and Coarse Aggregates
ASTM C 142 (1997; R 2004) Standard Test Method for Clay Lumps and Friable Particles in Aggregates
ASTM C 29/C 29M (2007) Standard Test Method for Bulk Density ("Unit
Weight") and Voids in Aggregate
ASTM D 1250 (2007) Standard Guide for Use of the Petroleum
Measurement Tables
ASTM D 140 (2001; R 2007) Sampling Bituminous Materials
ASTM D 2397 (2005) Standard Specification for Cationic Emulsified
Asphalt
ASTM D 2995 (1999; R 2004) Determining Application Rate of
Bituminous Distributors
ASTM D 4791 (2005e1) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate
ASTM D 490 (1992; R 2005) Road Tar
ASTM D 633 (1997; R 2005) Volume Correction Table for Road Tar
ASTM D 75 (2003) Standard Practice for Sampling Aggregates
ASTM D 977 (2005) Emulsified Asphalt
U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)
MUTCD (2000) Manual of Uniform Traffic Control Devices
1.3 SYSTEM DESCRIPTION
1.3.1 Equipment, Plant, and Tools
Equipment, plant, and tools used in the work are subject to approval and shall be maintained in a satisfactory working condition at all times.
Provide equipment which is adequate and has the capability of producing the results specified. Provide calibrated equipment, such as asphalt distributors, scales, batching equipment, spreaders and similar equipment that has been recalibrated by an approved calibration laboratory within 12 months prior to commencing work. Submit an equipment list with calibration reports.
1.3.2 Bituminous Distributors
Provide distributors that have pneumatic tires of sufficient size and number to prevent rutting, shoving, or otherwise damaging any part of the pavement
SECTION 32 01 13 Page 3 structure. Design and equip the distributor to distribute the bituminous material in a uniform double or triple lap at the specified temperature, at readily determined and controlled rates from 0.05 to 2.0 gallons/square yard, with a pressure range of 25 to 75 psi with an allowable variation from the specified rate of not more than plus or minus 5 percent, and at variable widths. Include in the distributor equipment a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand-held hose attachment suitable for applying bituminous material manually to areas inaccessible to the distributor.
Equip the distributor to circulate and agitate the bituminous material during the heating process. Provide distributor with an adjustable, both horizontally and vertically, spray nozzle bar. Make normal width of bar application at least 12 feet, with provisions for lesser or larger width when necessary. Equip distributor with a meter having a dial registering feet of travel/min. Make both dials visible to the distributor driver.
Provide a thermometer and well, not in contact with any heating tubes, for accurately indicating temperature of asphalt emulsion.
1.3.3 Aggregate Spreader
The aggregate-spreading equipment shall be adjustable and capable of uniformly spreading aggregate at the specified rate in a single-pass operation over the surface to be sealed.
1.3.4 Pneumatic-Tired Roller
Provide a pneumatic-tired roller of sufficient size to seat the cover aggregate into the bituminous material without fracturing the aggregate particles. The rollers shall have a total compacting width of not less than5 feet. The gross weight shall be adjustable within 200 to 350 psi of compacting width.
1.3.5 Power Brooms and Power Blowers
Provide power brooms and power blowers suitable for cleaning surfaces to which the seal coat is to be applied.
1.3.6 Scales
Use scales of sufficient size and capacity to accommodate all trucks hauling aggregates in the job. All scales shall be tested and approved by an inspector of the state inspection bureau charged with scales inspection within the State in which the project is located. If an official of the inspection bureau is not available, test the scales in accordance with the State specifications in the presence of the Contracting Officer. Keep the necessary number of standard weights on hand at all times for testing the scales.
1.3.7 Weighhouse
Provide a weatherproof weighhouse, constructed in a manner that will afford adequate protection for the recording devices on the scales, of a suitable size with one sliding window facing the scales platform, one end window, and a desk-type area at least 2 feet wide by 6 feet long.
SECTION 32 01 13 Page 4
1.3.8 Storage Tanks
Provide tanks capable of heating the bituminous material, under effective and positive control at all times, to the required temperature. Accomplish heating by steam coils, hot oil, or electricity. Affix to the tank an armored thermometer with a range from 100 to 300 degrees F so that the temperature of the bituminous material may be read at all times.
1.3.9 Power Rollers
Provide self-propelled tandem and three-wheel type rollers, weighing not less than 5 tons and suitable for rolling bituminous pavements. The wheels of the rollers shall be equipped with adjustable scrapers. Equip the rollers with water tanks and sprinkling apparatus for keeping the wheels wet in order to prevent adherence of the bituminous material to the wheels.
1.3.10 Single-Pass, Surface-Treatment Machines
Provide machines capable of spraying bituminous material and spreading aggregate in one pass; of distributing the bituminous material uniformly, at even heat, and in controlled amounts; and immediately spreading aggregates uniformly, in controlled amounts, over the surface to be sealed.
1.3.11 Vacuum Sweepers for Fog Seal
Provide self-propelled, vacuum pickup sweeper capable of removing loose sand, water, and debris from pavement surface.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Waybills and Delivery Tickets
Waybills and delivery tickets, during the progress of the work.
Before the final statement is allowed, file certified waybills and delivery tickets for all materials used in the work covered by this section.
Equipment List
List of equipment used in the project along with calibration reports.
Inspection Reports
Reports of climatic temperature during application of fog seal, emulsion temperature and rate.
SD-04 Samples
SECTION 32 01 13 Page 5
Bituminous Materials Aggregates
From each source of supply, a one gallon sample of bituminous material and a 50 pound sample of aggregate for each aggregate size.
Fog Seal; G
Submit in accordance with paragraph titled "Sample Application", for approval and selection of one of the trial application rates.
SD-06 Test Reports
Tests
Copies of the test results, within 24 hours of the completion of the test. Certified copies of the aggregate test results, not less than 30 days before the material is required in the work. Certified copies of the bituminous materials test reports indicating compliance with applicable specified requirements, not less than 30 days before the material is required in the work. A copy of the calibration test results, before the bituminous distributor and aggregate spreader are used on the job.
1.5 QUALITY ASSURANCE
Perform sampling and testing using an approved commercial testing laboratory or facilities furnished by the contractor. No work requiring testing will be permitted until the facilities have been inspected and approved. The first inspection will be at the expense of the Government. Costs incurred for any subsequent inspection will be charged to the contractor. Perform tests in sufficient numbers, and at the location and times directed, to ensure that the materials meet specified requirements.
1.5.1 Samples
Take aggregate samples for laboratory tests in accordance with ASTM D 75.
Take samples of bituminous material in accordance with AASHTO T 40 or ASTM D 140.
1.5.2 Aggregates Source
Select sources from which aggregates are to be obtained and notify the Contracting Officer within 15 days after the award of the Contract. Perform tests for the evaluation of aggregates by using an approved commercial laboratory at no expense to the Government. Tests for determining the suitability of aggregate shall include, but not limited to: gradation in accordance with ASTM C 136, abrasion resistance in accordance with ASTM C 131, clay lumps and friable particles in accordance with ASTM C 142, unit weight and voids in accordance with ASTM C 29/C 29M, and flat and elongated particles in accordance with ASTM D 4791. The use of an antistripping agent is subject to approval by the Contracting Officer.
1.5.3 Bituminous Material Source
Select sources from which bituminous materials are to be obtained and notify the Contracting Officer within 15 days after the award of the contract.
SECTION 32 01 13 Page 6
1.5.4 Equipment Calibration
Furnish all equipment, materials and labor necessary to calibrate the bituminous distributor and the aggregate spreader. Perform all calibrations with the approved job materials and prior to applying the specified coatings to the prepared surface. Perform calibration of the bituminous distributor in accordance with ASTM D 2995. Inspect all equipment prior to application of fog seal. Perform work to calibrate tank and measuring devices of the distributor. Perform inspection and calibration at the beginning of the work and at least once a day during construction.
1.6 DELIVERY, STORAGE, AND HANDLING
Deliver emulsified asphalt (fog seal) to the site in a homogenous and undamaged condition. Inspect the materials for contamination and damage.
Unload and store the materials with a minimum of handling. Protect stored aggregate from contamination and segregation. Replace defective or damaged materials.
1.7 ENVIRONMENTAL REQUIREMENTS
Apply the coating when the existing surface is dry, and when the weather is not foggy, rainy, or when the wind velocity will prevent the uniform application of the bitumen. Apply fog seal when atmospheric temperature is above 50 degrees F and rising or when pavement temperature is above 60 degrees F, unless otherwise directed.
PART 2 PRODUCTS
2.1 BITUMINOUS MATERIAL FOR SEAL COAT
Bituminous material shall conform to AASHTO M 81 or ASTM D 490.
2.2 AGGREGATE FOR SEAL COAT
Provide aggregate consisting of crushed stone, crushed gravel, crushed slag, sand and screenings. The moisture content of the aggregate shall be not greater than 1 to 3 percent. Drying may be required, as directed. The aggregate shall conform to the gradation shown in TABLE I. The aggregate gradation shall be allowed the tolerances given in TABLE II.
TABLE I. AGGREGATE GRADATIONS
(Percent by Weight Passing Square-Mesh Sieves)
Gradation Gradation Gradation Sieve Size No. 1 No. 2 No. 3
1/2 in. 100 -- -- 3/8 in. 85-100 100 -- No. 4 10-30 85-100 100 No. 8 0-10 10-40 10-40 No. 16 0-5 0-10 0-10 No. 50 -- 0-5 0-5
SECTION 32 01 13 Page 7
TABLE II. AGGREGATE GRADATION TOLERANCES
Material Tolerances
Aggregate passing the 3/8-in. sieve Plus or minus and larger sieves 5 percent
Aggregate passing the No. 4 and Plus or minus smaller sieves 3 percent
2.2.1 Coarse Aggregate
Coarse aggregate shall consist of clean, sound, durable particles meeting the following requirements.
2.2.1.1 Film Retention
The aggregate shall exhibit not less than 95 percent retention of bituminous film.
2.2.1.2 Particle Shapes
The quantity of flat and elongated particles on any sieve shall not exceed 20 percent by weight when determined in accordance with ASTM D 4791. A flat particle is one having a ratio of width to thickness greater than 3; an elongated particle is one having a ratio of length to width greater than 3.
2.2.1.3 Weight Loss
The percent weight loss shall not exceed 40 after 500 revolutions, as determined in accordance with ASTM C 131.
2.2.1.4 Friable Particles
The amount of friable particles shall not exceed 0.1 percent of the total weight of aggregate sample when tested in accordance with ASTM C 142.
2.2.1.5 Crushed Slag
The dry weight of crushed slag shall not be less than 75 pcf, as determined in accordance with ASTM C 29/C 29M.
2.2.1.6 Crushed Aggregate
Crushed aggregate retained on the No. 4 sieve and each coarser sieve shall contain at least 75 percent by weight of crushed pieces having one or more fractured faces with the area of each face equal to at least 75 percent of the smaller midsection area of the aggregate particle. When two fractures are contiguous, the angle between the planes of fractures shall be at least 30 degrees to count as two fractured faces.
2.2.2 Fine Aggregate
Fine aggregate shall consist of clean, sound, durable particles of crushed stone, durable particles of crushed stone, slag, or gravel. The aggregate
SECTION 32 01 13 Page 8 shall meet its requirements for stripping, abrasion resistance and percent friable particles as specified for coarse aggregate.
2.3 ANTISTRIPPING AGENT
The use of antistripping agent is subject to prior approval by the Contracting Officer.
2.4 EMULSIFIED ASPHALT FOR FOG SEAL
Emulsified asphalt for Fog Seal shall conform to ASTM D 977, SS-1h for anionic and ASTM D 2397 CSS-1h for cationic materials.
2.5 WATER
Provide fresh, clean, and potable water.
PART 3 EXECUTION
3.1 PREPARATION OF SURFACE
Repair damaged surface and fill cracks before starting work. Immediately before starting work, remove all loose material, dirt, clay, or other objectionable material from the surface to be treated with power brooms or power blowers, if needed. Paint firmly bonded to the surface that has the chalk removed may remain. Material removed from the surface shall not be mixed with the cover aggregate.
3.2 SEAL COAT APPLICATION
3.2.1 Rate
Spread the bituminous material in the quantities shown in TABLE III. The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the contractor and approved by the Contracting Officer prior to use.
TABLE III. APPLICATION OF MATERIAL
(Quantities Per Square Yard)
Gradation No. Bitumen, gallons Aggregate, pounds
1 0.15-0.20 15-20 2 0.10-0.15 10-15 3 0.10-0.15 10-15
3.2.2 Temperature
Asphalt application temperature shall provide an application viscosity between 10 and 60 seconds, Saybolt Furol, or between 20 and 120 centistokes, kinematic. Furnish the temperature viscosity relation to the Contracting Officer. Tar application temperature shall be within the following ranges as directed:
SECTION 32 01 13 Page 9
RT-6 -------------------- 80-150 degrees F RT-7 -------------------- 150-225 degrees F RT-8 -------------------- 150-225 degrees F RT-9 -------------------- 150-225 degrees F RT-10 -------------------- 125-250 degrees F RT-11 -------------------- 125-250 degrees F.
3.2.3 Application of Bituminous Material
Following the preparation and inspection of the pavement surface, apply the seal coat material at the specified rates. Uniformly apply the bituminous material in a single pass of the distributor and with either a double or triple lap spray over the surface to be sealed. Spread building paper on the surface for a sufficient distance back from the ends of each application so that flow through the spray bar may be started and stopped on the paper and so that all sprays will be operating at the proper pressure on the surface to be sealed. Immediately after the application, remove the building paper. Properly treat with bituminous material spots missed by the distributor. No smoking, fires, or flames, other than the heaters that are a part of the equipment, will be permitted within 25 feet of heating, distributing, and transferring operations of bituminous material other than bituminous emulsions. If tar is used, a full-face organic vapor-type respirator and protective creams shall be used by personnel exposed to fumes. Protective creams shall not be used as a substitute for cover clothing.
3.2.4 Aggregate Application Rate
Spread the aggregate in the quantities shown in TABLE III. The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the contractor, and approved by the Contracting Officer prior to use. The aggregate weights shown in this table are those of aggregate having a specific gravity of 2.65. If the specific gravity of the aggregate to be used is less than 2.55 or greater than 2.75, make adjustments in the number of pounds of aggregate required per square yard to insure a constant volume of aggregate per square yard of treatment.
3.2.5 Application of Aggregate
Spread the specified quantity of cover aggregate uniformly over the bituminous material. Before the bituminous material is applied, sufficient aggregate to cover the distributor load of bituminous material shall be on trucks at the site of the work. No bituminous material shall be down more than 3 minutes before it is covered with aggregate. Spreading shall be done uniformly with aggregate-spreading equipment. Trucks spreading aggregate shall be operated backwards, covering the bituminous material ahead of the truck wheels. Areas having insufficient cover shall be lightly recovered with additional aggregate by hand during the operations whenever necessary.
3.2.6 Rolling and Brooming
Begin rolling operations immediately following the application of cover aggregate. Perform rolling using pneumatic-tired rollers. Operate the rollers at a speed that will not displace the aggregate. Continue rolling until the aggregate is uniformly distributed and keyed into the bituminous material. All surplus aggregate shall be swept off the surface and removed not less than 24 hours nor more than 4 days after rolling is completed.
SECTION 32 01 13 Page 10
3.3 FIELD QUALITY CONTROL - SEAL COAT
3.3.1 Tests
Perform field tests in sufficient numbers to assure that the specifications are being met. Testing is the responsibility of the contractor and shall be performed by an approved commercial laboratory. The following number of tests, if performed at the appropriate time, will be the minimum acceptable for each type of operation.
3.3.1.1 Gradation
Perform gradation tests in accordance with ASTM C 136. Perform a minimum of one gradation for every 1,000 cubic yards of aggregate to be placed, with a minimum of three gradations for each day's run. When deficiencies are found, the gradation shall be repeated and the material already placed shall be retested to determine the extent of the unacceptable material. Replace all in-place unacceptable material at no additional expense to the Government.
3.3.1.2 Abrasion Resistance
Perform abrasion resistance tests in accordance with ASTM C 131. Perform one test for every 1,000 cubic yards of aggregate placed.
3.3.1.3 Stripping
Perform stripping test on aggregate from each source, in accordance with AASHTO T 182, prior to incorporation into the work and when the source is changed.
3.3.2 Bituminous Material Sample
Obtain a sample of the bituminous material used under the supervision of the Contracting Officer. The sample will be retained by the Government.
3.4 TRIAL APPLICATION - SEAL COAT
Prior to applying the seal coat, place a test section at least 100 feet long by 20 feet wide using the approved job materials and roll them in accordance with the specified requirements. Perform tests to determine the application rates of the bitumen and aggregate. If the tests indicate that the seal coat test section does not conform to the specification requirements, make necessary adjustments to the application equipment and to the spreading and rolling procedures, and construct additional test sections for conformance to the specifications. Where test sections do not conform to specification requirements, remove seal coat at no expense to the Government; no separate payment will be made for seal coat materials and labor, either in placement or removal of any test section. Perform quality control sampling and testing during construction as required in paragraph FIELD QUALITY CONTROL above.
3.5 FOG SEAL APPLICATION
3.5.1 Sample Application
SECTION 32 01 13 Page 11
Determine the required application rate from a sample installation. Select an area of the prepared pavement at least 300 feet long and as wide as the distributor spray bar. Dilute emulsified asphalt with an equal part of water or as recommended by the manufacturer. Apply the water diluted asphalt emulsion in at least three test sections; each a minimum of 100 feet long. The trial applications shall be made at the rates of 0.08, 0.14, and
0.20 gallons/square yard. The trial application rates may be modified if approved by the Contracting Officer. Additional trial applications may be made if warranted by pavement surface conditions. Use the rate which has been satisfactorily applied without leaving an excess of asphalt residue on the surface and has been approved, for the fog seal.
3.5.2 Application Inspection
Inspect application of fog seal for uniformity. During application, take 1 sample for each 500 square yards of surface area to receive emulsified asphalt. Weigh samples to determine conformance with application rate.
3.5.3 Inspection Reports
Furnish a written report citing climatic temperature during application, emulsion temperature during application, and rate of emulsion application.
3.5.4 Application
Following preparation of the surface, apply the water diluted asphalt emulsion at the rate determined from the trial application. Maintain application temperature of emulsified asphalt between 75 and 160 degrees F.
To obtain uniform application of the fog seal at the junction of previous and subsequent applications, spread building paper on the surface of the applied material for a sufficient distance back from the ends of each application so that flow from the spray bar may be started and stopped on the paper, and so that all sprayers will operate at full force. Immediately after application, remove and properly dispose of the building paper. Treat spots unavoidably missed with the hand spray equipment. Base bids on application of diluted emulsion at 0.14 gsy. If the actual amount required is more or less than 0.14 gsy, an adjustment in the contract price will be made as provided by the contract.
3.6 SITE PROTECTION
During applications, protect adjacent buildings, structures, vehicles, manhole covers, inlet grates, and trees to prevent being spattered or marred.
3.7 TRAFFIC CONTROL
Protect freshly placed coatings from damage by traffic. Provide sufficient warning signs and barricades to prevent traffic over freshly treated surfaces. Protect treated areas from traffic for at least 24 hours after final application of coatings, or for such time as necessary to prevent picking up. Immediately prior to opening to traffic, roll the entire treated area with a self-propelled pneumatic-tired roller. Provide warning signs and barricades for proper traffic control, in accordance with MUTCD.
-- End of Section --
SECTION 32 05 33 Page 1
SECTION 32 05 33
LANDSCAPE ESTABLISHMENT
1.1 REFERENCES
The publications listed below form a part of this specification to the
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z133.1 (2006) Arboricultural Operations - Safety
Requirements for Pruning, Repairing, Maintaining, and Removing Trees, and Cutting Brush
ASTM D 2103 (2005) Standard Specification for Polyethylene Film and Sheeting
ASTM D 5851 (1995; R 2006) Planning and Implementing a Water
Monitoring Program
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED (2009 Version 3) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)
1.2 DEFINITIONS
1.2.1 Pesticide
Any substance or mixture of substances, including biological control agents, that may prevent, destroy, repel, or mitigate pests and are specifically labeled for use by the U.S. Environmental Protection Agency (EPA). Also, any substance used as a plant regulator, defoliant, disinfectant, or biocide. Examples of pesticides include fumigants, herbicides, insecticides, fungicides, nematicides, molluscicides and rodenticides.
1.2.2 Stand of Turf
95 percent ground cover of the established species.
1.2.3 Planter Beds
A planter bed is defined as an area containing one or a combination of the following plant types: shrubs, vines, wildflowers, annuals, perennials, ground cover, and a mulch topdressing excluding turf. Trees may also be found in planter beds.
1.3 RELATED REQUIREMENTS
SECTION 32 05 33 Page 2
Section 32 84 24 IRRIGATION SPRINKLER SYSTEM applies to this section for installation of irrigation equipment requirements, with additions and modifications herein.
Section 32 92 23 SEEDING Section 32 92 23 SODDING applies to this section for installation of seed, sod, and sprigging requirements, with additions and modifications herein.
Section 32 93 00 EXTERIOR PLANTS applies to this section for installation of trees, shrubs, ground cover, vines, and wildflower, with additions and modifications herein.
1.4 SUBMITTALS
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Integrated Pest Management Plan; G
Local/Regional Materials; (LEED)
Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.
Fertilizer; G
Hose; (LEED) Mulches Topdressing; (LEED)
Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.
Organic Mulch Materials
Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project.
SD-07 Certificates
Maintenance inspection report Plant quantities; G
SD-10 Operation and Maintenance Data
SECTION 32 05 33 Page 3
Maintenance
SD-11 Closeout Submittals
Tree, staking and guying removal
1.5 DELIVERY, STORAGE AND HANDLING
1.5.1 Delivery
Deliver fertilizer, gypsum, and iron to the site in original containers bearing manufacturer's chemical analysis, name, trade name, or trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum may be furnished in bulk with a certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Fertilizer, Lime, Iron, and Mulch Storage
Material shall be stored in designated areas. Lime and fertilizer shall be stored in cool, dry locations away from contaminants.
1.5.2.2 Antidessicants Storage
Do not store with fertilizers or other landscape maintenance materials.
1.5.3 Handling
Do not drop or dump materials from vehicles.
1.6 SUSTAINABLE DESIGN REQUIREMENTS
1.6.1 Local/Regional Materials
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements. Landscaping materials may be locally available.
1.7 MAINTENANCE
Submit two complete hard copies and one electronic copy in Adobe Acrobat (.pdf) format on CD or DVD of Operation and Maintenance (O&M) Manuals for planting materials. Include instructions indicating procedures during one typical year including variations of maintenance for climatic conditions throughout the year. Provide instructions and procedures for watering;
promotion of growth, including fertilizing, pruning, and mowing; and integrated pest management. O&M Manuals shall include pictures of planting materials cross referenced to botanical and common names, with a description of the normal appearance in each season.
Develop a water monitoring program for surface and ground water on the project site in accordance with ASTM D 5851 and consistent with the water management program utilized during construction operations.
SECTION 32 05 33 Page 4
2.1 POST-PLANT FERTILIZER
Fertilizer for groundcover, wildflowers, and grasses is not permitted.
Fertilizer for trees, plants, and shrubs shall be as recommended by plant supplier, except synthetic chemical fertilizers are not permitted.
Fertilizers containing petrochemical additives or that have been treated with pesticides or herbicides are not permitted.
2.1.1 Granular Fertilizer
Organic, granular controlled release fertilizer containing the following minimum percentages indicated, by weight, of plant food nutrients including nitrogen, phosphorus, potassium, sulfur and iron.
2.2 WATER
Source of water shall be approved by the Contracting Officer, and be of suitable quality for irrigation. Use collected storm water or gray water when available.
2.2.1 Hose
Hoses used for watering shall be the minimum percent post-consumer rubber or plastic as indicated.
2.3 MULCHES TOPDRESSING
Free from noxious weeds, mold, pesticides, or other deleterious materials.
2.3.1 Inert Mulch Materials
Recycled porcelain, concrete, stone, or other recycled material complying with ASTM D 6155; riverbank stone, crushed pit-run rock, granite chips, marble chips, crushed bricks, and volcanic rock, ranging in sizes indicated.
Provide materials from site and construction waste to the greatest extent possible. Mulch shall contain a minimum of 10 percent post-consumer recycled content, or a minimum of 40 percent post-industrial recycled content. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total recycled content requirements. Mulch may contain post-consumer or post-industrial recycled content.
2.3.2 Organic Mulch Materials
Wood cellulose fiber, wood chips, ground or shredded bark, shredded hardwood, bark peelings, pine straw mulch, and pine needles recycled from site when available. Biobased content shall be a minimum of 100 percent.
Wood cellulose fiber shall be processed to contain no growth or germination-inhibiting factors, dyed with non-toxic, biodegradable dye to an appropriate color to facilitate visual metering of materials application. Paper-based hydraulic mulch shall contain a minimum of 100 percent post-consumer recycled content. Wood-based hydraulic mulch shall contain a minimum of 100 percent recycled material.
SECTION 32 05 33 Page 5
2.3.3 Recycled Organic Mulch
Recycled mulch may include compost, tree trimmings, or pine needles with a gradation that passes through a 2-1/2 by 2-1/2 inch screen. It shall be cleaned of all sticks a minimum 1 inch in diameter and plastic materials a minimum 3 inch length. The material shall be treated to retard the growth of mold and fungi.
2.4 PESTICIDES
Pesticides and herbicides are not permitted. Use black sheet polyethylene conforming to ASTM D 2103, minimum thickness 5/32 inch. Submit an Integrated Pest Management Plan, including weed and pest management strategies and proposed alternatives to herbicides and pesticides. Use biological pest controls as approved in the Plan.
3.1 EXTENT OF WORK
Provide landscape construction maintenance to include irrigation equipment cleaning and adjustments, mowing, edging, overseeding, aeration, fertilizing, watering, weeding, and pruning, stake and guy adjusting, for all newly installed or renovated landscape areas and existing plant material, unless indicated otherwise, and at all areas inside or outside the limits of the construction that are disturbed by the contractor's operations.
3.1.1 Policing
The contractor shall police all landscaped areas. Policing includes removal of leaves, branches and limbs regardless of length or diameter, dead vegetation, paper, trash, cigarette butts, garbage, rocks or other debris.
Policing shall extend to both sides of fencing or walls. Collected debris shall be promptly removed and disposed of at an approved disposal site.
3.1.2 Drainage System Maintenance
The contractor shall remove all obstructions from surface and subsurface drain lines to allow water to flow unrestricted in swales, gutters, catch basins, storm drain curb inlets, and yard drains. Remove grates and clear debris in catch basins. Open drainage channels are to be maintained free of all debris and vegetation at all times. Edges of these channels shall be clear of any encroachment by vegetation.
3.2 IRRIGATION ESTABLISHMENT PERIOD
The irrigation establishment period will commence on the date that inspection by the Contracting Officer shows that the new or repaired irrigation equipment furnished under this contract have been satisfactorily installed and is functional and shall continue for a period of 365 days.
3.2.1 Maintenance During the Irrigation Establishment Period
Begin maintenance immediately after irrigation equipment has been installed and is functional. Inspect irrigation equipment at least once a week during the installation and establishment period and perform needed maintenance
SECTION 32 05 33 Page 6 promptly. Automatic controllers not equipped with rain shut-off sensors shall be turned off during periods of rain that exceed twelve hours of continuous rainfall in one day or during rain storms of one day or more.
Once the rain has subsided timers shall be reactivated. Irrigation controllers shall be inspected and reprogrammed after power outages.
Contractor shall be responsible for winterization and startup. Sprinkler heads shall direct water away from buildings and hard surfaced areas.
3.2.2 Water Restrictions
The contractor shall abide by state, local or other water conservation regulations in force during the establishment period. Automatic controller shall be adjusted to comply with the water conservation regulations schedule.
3.2.3 Fire Hydrants
To use a fire hydrant for irrigation, the contractor shall obtain prior clearance from the Contracting Officer and provide the tools and connections approved for use on fire hydrants. If a fire hydrant is used, contractor shall provide a reduced pressure backflow preventer for each connection between hose and fire hydrant. Backflow preventer used shall be tested once per month by a certified backflow preventer tester.
3.2.4 Final Acceptance
Upon completion of the irrigation establishment period and final acceptance of groundcover and exterior plants, irrigation equipment shall be removed.
Operation and coverage test is acceptable if system operates through at least one complete cycle for areas to be irrigated and all leaks or repairs have been completed.
3.2.5 Controller Charts
Provide one chart for each controller supplied. Indicate in chart area controlled by the automatic controller. The chart is a reduction of the actual plans that will fit the maximum dimensions inside the controller housing. Use a black line print for the chart and a different pastel or transparent color to indicate each station zone of coverage. After chart is completed and approved for final acceptance, seal chart between two 20 mil pieces of clear plastic.
3.3 GROUNDCOVER ESTABLISHMENT PERIOD
Groundcover establishment period will commence on the date that inspection by the Contracting Officer shows that the new renovated turf furnished under this contract has been satisfactorily installed to a 95 percent stand of coverage. The establishment period shall continue for a period of 365 days.
3.3.1 Frequency of Maintenance
Begin maintenance immediately after turf has been installed or fully renovated. Inspect areas once a week during the installation and establishment period and perform needed maintenance promptly.
3.3.2 Promotion of Growth
SECTION 32 05 33 Page 7
Groundcover shall be maintained in a manner that promotes proper health, growth, natural color. Turf shall have a neat uniform manicured appearance, free of bare areas, ruts, holes, weeds, pests, dead vegetation, debris, and unwanted vegetation that present an unsightly appearance. Mow, remove excess clippings, eradicate weeds, water, fertilize, overseed, aerate, or topdress as indicated and perform other operations necessary to promote growth, as approved by Contracting Officer and consistent with approved Integrated Pest Management Plan. Remove noxious weeds common to the area from planting areas by mechanical means.
3.3.3 Mowing
3.3.3.1 Turf
Turf shall be mowed at a uniform finished height. Mow turfed areas to a minimum average height of 4 inches when average height of grass becomes 4 inches for spring/summer maintenance and to a minimum average height of 3 inches when the average height of grass reaches 4 inches for fall or winter maintenance. The height of turf is measured from the soil. Mowing of turf shall be performed in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Prior to mowing, all rubbish, debris, trash, leaves, rocks, paper, and limbs or branches on a turf area shall be picked up and disposed. Adjacent paved areas shall be swept/vacuumed clean.
3.3.3.2 Native Grasses
Mow above height of native grass seedlings (approximately 3.5 to 4 inches).
Mow during spring or early summer. Do not mow after early summer during the second growing season.
3.3.3.3 Wildflowers
Mow three times per season above height of the wildflowers (approximately 12 to 15 inches).
3.3.4 Turf Edging and Trimming
Perimeter of planter bed edges, sidewalks, driveways, curbs, and other paved surfaces shall be edged. Uniformly edge these areas to prevent encroachment of vegetation onto paved surfaces and to provide a clear cut division line between planter beds, turf, and ground cover. Edging is to be accomplished in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Edging shall be performed on the same day that turf is mowed. Use of string line trimmers is permitted in "soft" areas such as an edge between turfgrass and a planter bed. Care shall be exercised to avoid damage to any plant materials, structures, and other landscape features.
Trimming around trees, fences, poles, walls, irrigation valve boxes and other similar objects is to be accomplished to match the height and appearance of surrounding mowed turf growth. Trimming shall be performed on the same day the turf is mowed. Care shall be exercised to avoid "Girdling" trees located in turf areas. The use of protective tree collars on trees in turf areas may be utilized as a temporary means to avoid injury to tree trunks. At the end of the plant establishment period contractor will be responsible for removing all protective tree collars.
SECTION 32 05 33 Page 8
3.3.5 Post-Fertilizer Application
Do not fertilize wildflowers, groundcover, and grasses. Apply turf fertilizer in a manner that promotes health, growth, vigor, color and appearance of cultivated turf areas. The method of application, fertilizer type and frequencies shall be determined by the laboratory soil analysis results the requirements of the particular turf species. Organic fertilizer shall be used. In the event that organic fertilizer is not producing the desired effect, the contractor shall contract the Contracting Officer for approval prior to the use of a synthetic type of fertilizer. Fertilizer shall be applied by approved methods in accordance with the manufacturer's recommendations.
3.3.6 Turf Watering
The contractor shall perform irrigation in a manner that promotes the health, growth, color and appearance of cultivated vegetation and that complies with all Federal, State, and local water agencies and authorities’ directives. The contractor shall be responsible to prevent over watering, water run-off, erosion, and ponding due to excessive quantities or rate of application. The contractor shall abide by state, local or other water conservation regulations or restrictions in force during the establishment period. Irrigation controllers shall be adjusted to comply with the water conservation regulations schedule.
3.3.7 Turf Aeration
Upon completion of weed eradication operations and Contracting Officer's approval to proceed, aerate turf areas by approved device. Core, by pulling soil plugs, to a minimum depth indicated. Leave all soil plugs that are produced in the turf area. After aeration operations are complete, topdress entire area as indicated
Blend all parts of topdressing mixture to a uniform consistency throughout.
Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean all soil plugs off of other paving when work is complete. This work shall commence 10 days prior final acceptance of the maintenance establishment period.
3.3.8 Turf Clearance Area
Trees located in turf areas shall be maintained with a growth free clearance of 18 inches from the tree trunk base. The use of mechanical weed whips to accomplish the turf growth free bed area is prohibited.
3.3.9 Replanting
Replant in accordance with Section 32 92 23 SEEDING and Section 32 92 23 SODDING and within specified planting dates areas which do not have a satisfactory stand of turf. Replant areas which do not have a satisfactory stand of other groundcover and grasses.
3.3.10 Final Inspection and Acceptance
Final inspection will be make upon written request from the contractor at least 10 days prior to the last day of the turf establishment period. Final turf acceptance will be based upon a satisfactory stand of turf. Final
SECTION 32 05 33 Page 9 acceptance of wildflower and grass areas will be based upon a stand of 95 percent groundcover of established species.
3.3.11 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD
The exterior plant establishment period will commence on the date that inspection by the Contracting Officer shows that the new and transplanted plants furnished under this contract have been satisfactorily installed and shall continue for a period of 365 days.
3.4.1 Frequency of Maintenance
Begin maintenance immediately after plants have been installed. Inspect exterior plants at least once a week during the installation and establishment period and perform needed maintenance promptly.
3.4.2 Promotion of Plant Growth and Vigor
Water, prune, fertilize, mulch, adjust stakes, guys and turnbuckles, eradicate weeds and perform other operations necessary to promote plant growth, and vigor.
3.4.3 Planter Bed Maintenance
Planter beds shall be weeded, fertilized, irrigated, kept pest free, turf free, pruned, and mulch levels maintained. Planter beds will not be allowed to encroach into turf areas. A definite break shall be maintained between turf areas and planter beds. Fertilize exterior planting materials to promote healthy plant growth without encouraging excessive top foliar growth. Remove noxious weeds common to the area from planting areas by mechanical means.
3.4.3.1 Shrub Selective Maintenance
In addition to the above requirements, shrubs shall be selectively pruned, and shaped for health and safety when the following conditions exist:
Remove growth in front of windows, over entrance ways or walks, and any growth which will obstruct vision at street intersections or of security personnel; Remove dead, damaged or diseased branches or limbs; where shrub growth obstructs pedestrian walkways; where shrub growth is found growing against or over structures; where shrub growth permits concealment of unauthorized persons. All pruning debris shall be disposed of in a proper manner.
3.4.3.2 Tree Maintenance
Tree maintenance shall include adjustment of stakes, ties, guy supports and turnbuckles, watering, fertilizing, pest control, mulching, pruning for health and safety and fall leaf cleanup. Fertilize exterior trees to promote healthy plant growth without encouraging excessive top foliar growth. Stakes, ties, guy supports and turnbuckles shall be inspected and
SECTION 32 05 33 Page 10 adjusted to avoid girdling and promote natural development. All trees within the project boundaries, regardless of caliper, shall be selectively pruned for safety and health reasons. These include but are not limited to removal of dead and broken branches and correction of structural defects.
Prune trees according to their natural growth characteristics leaving trees well shaped and balanced. Pruning of all trees including palm trees shall be accomplished by or in the presence of a certified member of the International Society of Arboriculture and in accordance with ANSI Z133.1.
All pruning debris generated shall be disposed of in a proper manner.
3.4.4 Slope Erosion Control Maintenance
The contractor shall provide slope erosion control maintenance to prevent undermining of all slopes in newly landscaped and natural growth areas.
Maintenance tasks include immediate repairs to weak spots in sloped areas, and maintaining clean, clear culverts, and graded berms, and terraces to intercept and direct water flow to prevent development of large gullies and slope erosion and during periods of extended rainfall, irrigation systems shall be secured. Eroded areas shall be filled with amended topsoil and replanted with the same plant species. Erosion control netting or blankets damaged due to slope erosion shall be reinstalled.
3.4.5 Removal of Dying or Dead Plants
Remove dead and dying plants and provide new plants immediately upon commencement of the specified planting season, and replace stakes, mulch and eroded earth mound water basins. No additional plant establishment period will be required for replacement plants beyond the original warranty period.
A tree shall be considered dying or dead when the main leader has died back, or a minimum of 20 percent of the crown has died. A shrub or ground cover shall be considered dying or dead when a minimum of 20 percent of the plant has died. This condition shall be determined by scraping on a branch an area 1/16 inch square, maximum, to determine the cause for dying plant material and shall provide recommendations for replacement. The contractor shall determine the cause for dying plant material and provide recommendations for replacement.
3.4.6 Tracking of Unhealthy Plants
Note plants not in healthy growing condition, as determined by the Contracting Officer, and as soon as seasonal conditions permit, remove and replace with plants of the same species and sizes as originally specified.
Install replacement plantings in accordance with Section 32 93 00 EXTERIOR
PLANTS.
3.4.7 Final Inspection
Final inspection will be made upon written request from the contractor at least 10 days prior to the last day of the establishment period. Final inspection will be based upon satisfactory health and growth of plants and on the following:
3.4.7.1 Total Plants on Site
Plants have been accepted and required number of replacements have been installed.
SECTION 32 05 33 Page 11
3.4.7.2 Mulching and Weeding
Planter beds and earth mound water basins are properly mulched and free of weeds.
3.4.7.3 Tree Supports
Stakes and guys and turnbuckles are in good condition.
3.4.7.4 Remedial Work
Remedial measures directed by the Contracting Officer to ensure plant material survival and promote healthy growth have been completed.
3.4.8 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.5 FIELD QUALITY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .