This is a Questions and Answers document (Q&A No. 4) issued as an update to Solicitation W911QY-26-R-CUSTODIAL for basewide custodial services. The document addresses four key inquiries from potential contractors regarding service requirements and contract terms.

The questions and answers cover the following matters: (1) service frequency levels for installation facilities are denoted by color coding (green, amber, red, and black) corresponding to different funding levels, with detailed floor plans available in TE-07; (2) corridors and all required service areas are documented in the referenced technical exhibits, and contractors should verify these listings during facility tours; (3) contract price increases are not permitted for wage and benefit cost increases, and contractors must factor forecasted cost increases into their initial proposals; and (4) all buildings are cleaned during specific operating hours defined in Section 1.7.5 of the Performance Work Statement (PWS). Additionally, the document notes that the U.S. AbilityOne Commission has determined this requirement is suitable for addition to the Procurement List under the JWOD Act, and the work will transition to the AbilityOne Program upon completion of the current commercial contract.

View the file

Other files

File Type Posted
QA No. 6 W911QY-26-R-CUSTODIAL.pdf PDF
Attachment 4 NSSC Bldg SF (ARCH NET SF).pdf PDF
Combined Synopsis Solicitation Custodial Services.pdf PDF
QA No. 5 W911QY-26-R-CUSTODIAL.pdf PDF
Combined Synopsis Solicitation Custodial Services.pdf PDF
QA No. 3 W911QY-26-R-CUSTODIAL.pdf PDF
Attachment 3 NSSC Bldg 14 Fitness Cleaning Floor Plans.pdf PDF
Attachment 2 DBA Wage Determination No. 2015-4047.pdf PDF
QA No. 2 W911QY26CUSTODIAL.pdf PDF
(Updated) Site Visit Instructions_5MAR2026.pdf PDF
Site Visit Instructions_26FEB2026.pdf PDF
QA No. 1 W911QY26RCUSTODIAL.pdf PDF
Attachment 1 NSSC Contractor Access Form.pdf PDF
Combined Synopsis Solicitation Custodial Services.pdf PDF
Combined Synopsis Solicitation Custodial Services.pdf PDF
TE-03 Installation Recycle Services.pdf PDF
TE-05 Facilities to Receive Services (2 of 3).pdf PDF
TE-07 Floor Plans.pdf PDF
TE-04 Custodial Services Performance Standards.xlsx XLSX spreadsheet
TE-01 Performance Requirements Summary.pdf PDF
TE-05 Facilities to Receive Services (3 of 3).pdf PDF
TE-02 Deliverables Schedule.pdf PDF
TE-05 Facilities to Receive Services (1 of 3).pdf PDF
PWS BASEWIDE CUSTODIAL SERVICES.pdf PDF
TE-06 Installation Map.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A No. 4 to Solicitation W911QY-26-R-CUSTODIAL

BASEWIDE CUSTODIAL SERVICES

UPDATE 6: Special Contract Requirements

The U.S. AbilityOne Commission's authority has determined this requirement is suitable for addition to the Procurement List under the authority of the JWOD Act. Therefore, this requirement will be moved to the AbilityOne Program at the end of this commercial (non-AbilityOne) contract.

Question: Regarding TE-04, please explain the frequency of service for the “All other installation facilities” column, specifically which areas/buildings correlate to the Green, amber, red, and black service frequencies.

Answer: Green, amber, red and black correlate to the different service levels of funding for all the installation facilities.

Question: Regarding TE-05(1 of 3), I don’t see any corridors listed in building 1 and various other areas that we walked in our tour. Can you verify the listed buildings and rooms are the only areas we need to include in our service area?

Answer: TE-07 Building Floor Plans shows corridors.

Question: Are contract price increases allowed when the required wage and/or benefit costs increases?

Answer: No, this should be factored into your proposal for forecasted wage/benefit cost increases.

Question: Are all buildings cleaned during a specific window of time?

Answer: Section 1.7.5 in the PWS shows the hours of operation.