TE-05 Facilities to Receive Services (2 of 3).pdf
PDF 9 MB Posted
- Attached to
- BASEWIDE CUSTODIAL SERVICES
- Solicitation number
- W911QY-26-CUSTODIAL
About this file
This document is Technical Exhibit TE-05, a set of architectural floor plans for a multi-story facility. The exhibit contains ten detailed floor plans labeled as pages 3 through 10 (pg 3 through pg 10), each showing the layout of different floors or sections of the building. The plans are drawn to scale and include construction details, room designations, and square footage measurements for individual spaces. Key elements visible across the plans include office spaces, meeting rooms, corridors, mechanical areas, restrooms, and various support spaces. Each plan includes a title block with project information, a north arrow for orientation, and reference callouts with detailed specifications. Room areas range from small spaces of 50 square feet to large open areas exceeding 2,400 square feet, indicating a complex, multi-functional facility with diverse spatial requirements.
The floor plans are part of a larger contract documentation package designated as Technical Exhibit TE-05 (2 of 3), suggesting this is one component of a three-part technical exhibit. The drawings use standard architectural conventions with walls depicted in black lines, plumbing and mechanical systems indicated through specialized symbols, and interior spaces labeled with precise square footage measurements. The plans appear to represent a complete building design suitable for bid or construction purposes, with sufficient detail for estimating, permitting, and execution. The consistent formatting and professional presentation indicate these are finalized contract documents intended for contractor proposals or project implementation.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
sf s f sf sf sf sf s f s f s f s f s f sf sf sf sf s f pg s f
Te ch ni ca l E xh ib it
TE
-0
(2 o f 3 pg
Te ch ni ca l E xh ib it
TE
-0
(2 o sf sf s f pg
Te ch ni ca l E xh ib it
TE
-0
(2 o sf sf sf sf s f
Te ch ni ca l E xh ib it
TE
-0
(2 o s f sf s f sf sf sf sf sf s f s f sf sf sf sf sf sf s f
Te ch ni ca l E xh ib it
TE
-0
(2 o sf sf sf sf sf85 sf sf s f s f sf sf50 s f s f sf s f sf s f sf s f
Te ch ni ca l E xh ib it
TE
-0
(2 o sf sf sf s f s f s f sf s f sf sf sf sf sf
Te ch ni ca l E xh ib it
TE
-0
(2 o s f s f sf sf sf sf s f s f s f sf s f s f sf sf
Te ch ni ca l E xh ib it
TE
-0
(2 o
File details come from the government source that posted it. Updated .