Draft_solicitation,_W91151-18-R-0107,_20_Nov_2018.pdf
PDF 806 KB Posted
- Attached to
- Base and Test Support Services
- Solicitation number
- W91151-19-R-0003
About this file
This is a draft solicitation for base and test support services. The solicitation seeks proposals to provide data management, data collection, logistics, and field operations support to operational tests conducted by the U.S. Army Operational Test Command. Services include preparation and maintenance of test sites and use of government furnished property, maintenance and operation of test support vehicles and generators, data entry and visualization tools, and operation of government provided instrumentation. The period of performance is a 60 month base period starting March 4, 2019 through March 3, 2024 with an option to extend an additional six months. The contract type will be cost plus fixed fee. The anticipated award amount is $78 million. The solicitation is open to all responsible sources and proposals are due by December 26, 2018 at 10:00 AM local time.
Draft Solicitation
View the file
Other files
Show 40 more
Latest 50 of 122 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 26 Dec 2018
X
A X B X C
D
EX
X G F 109 - 120
121 - 131 X H 132 - 138 natasha.l.elder.civ@mail.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 138
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W91151 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
AMRDEC
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
NATASHA L. ELDER 254-287-5115
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 14
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
15 - 79 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
81 - 83
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 84 - 85 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 86 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
87 - 106
PART II - CONTRACT CLAUSES
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5095 254-287-0038
254-288-3617FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
107 - 108
6. REQUISITION/PURCHASE NO.
0011033501
5. DATE ISSUED
20 Nov 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W91151-19-R-0003
Section A - Solicitation/Contract Form
SPECIAL INSTRUCTIONS
1. This solicitation will be awarded as a Cost Plus Fixed Fee, Indefinite Delivery Indefinite Quantity (IDIQ) contract. The Government will award a single contract from this solicitation.
2. The period of performance will be a 60 month ordering period. The contract will not include option periods, but does include FAR 52.217-8, Option to Extend Services.
3. Task orders will only be issued by the Mission and Installation Contracting Command (MICC) Fort Hood, Texas,– ATEC Support Division (ASD).
CLAUSES INCORPORATED BY REFERENCE
52.203-18 Prohibition on Contracting With Entities That Require Certain
Internal Confidentiality Agreements or Statements-- Representation
JAN 2017
CLAUSES INCORPORATED BY FULL TEXT
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of provision)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Job BASE and Test Support Services
CPFF
Provide all labor, management, supervision, supplies, materials, equipment, training, and tools, not otherwise provided as GFP, required to support operational test missions for OTC. The Contractor shall be required to perform data management, data collection, and logistics in support of Operational Tests, Joint and Multi-Service Tests, training activities, and other DoD organizations, IAW Performance Work Statement (PWS) Part 5 Specific Tasks; Year 1, Period of Performance 4 March 2019 through 3 March 2020.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011033501
PSC CD: H210
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Lot
ODC
COST
Other Direct Costs--This is a Not-To-Exceed, Cost Reimbursable, No Fee CLIN.
The ODC estimated amount for this line item is, $1,956,691.00, a plug figure provided by the Government for proposal purposes. ODCs are incidental material and services associated with the PWS and the Test TARs for which there is not a labor category (e.g. travel, supplies, training, etc.).
FOB: Destination
ESTIMATED COST
0003 1 Each Contract Manpower Reporting (CMR)
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
NET AMT
Contractor Acquired Property (CAP)
COST
Contractor Acquired Property classified as Equipment, Materials, Special Tooling, and Special Test Equipment. Upon delivery and acceptance by the Government, and when retained by the Contractor for use under this contract, the delivered CAP items become GFP and shall be added to the contract as GFP.
0005 1 Months Transition Phase In
FFP
Phase-In IAW PWS Section 1.6.58.1, Period of Performance 4 March 2019 through 3 April 2019 FOB: Destination
PURCHASE REQUEST NUMBER: 0011033501
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED Job BASE and Test Support Services
CPFF
Provide all labor, management, supervision, supplies, materials, equipment, training, and tools, not otherwise provided as GFP, required to support operational test missions for OTC. The Contractor shall be required to perform data management, data collection, and logistics in support of Operational Tests, Joint and Multi-Service Tests, training activities, and other DoD organizations, IAW Performance Work Statement (PWS) Part 5 Specific Tasks; Year 2, Period of Performance 4 March 2020 through 3 March 2021.
1002 Lot
ODC
COST
Other Direct Costs--This is a Not-To-Exceed, Cost Reimbursable, No Fee CLIN.
The ODC estimated amount for this line item is, $2,015,392.00, a plug figure provided by the Government for proposal purposes. ODCs are incidental material and services associated with the PWS and the Test TARs for which there is not a labor category (e.g. travel, supplies, training, etc.).
1003 1 Each Contract Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Contractor Acquired Property (CAP)
COST
Contractor Acquired Property classified as Equipment, Materials, Special Tooling, and Special Test Equipment. Upon delivery and acceptance by the Government, and when retained by the Contractor for use under this contract, the delivered CAP items become GFP and shall be added to the contract as GFP.
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED Job BASE and Test Support Services
CPFF
Provide all labor, management, supervision, supplies, materials, equipment, training, and tools, not otherwise provided as GFP, required to support operational test missions for OTC. The Contractor shall be required to perform data management, data collection, and logistics in support of Operational Tests, Joint and Multi-Service Tests, training activities, and other DoD organizations, IAW Performance Work Statement (PWS) Part 5 Specific Tasks; Year 3, Period of Performance 4 March 2021 through 3 March 2022.
2002 Lot
ODC
COST
Other Direct Costs--This is a Not-To-Exceed, Cost Reimbursable, No Fee CLIN.
The ODC estimated amount for this line item is, $2,075,853.00, a plug figure provided by the Government for proposal purposes. ODCs are incidental material and services associated with the PWS and the Test TARs for which there is not a labor category (e.g. travel, supplies, training, etc.).
2003 1 Each Contract Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Contractor Acquired Property (CAP)
COST
Contractor Acquired Property classified as Equipment, Materials, Special Tooling, and Special Test Equipment. Upon delivery and acceptance by the Government, and when retained by the Contractor for use under this contract, the delivered CAP items become GFP and shall be added to the contract as GFP.
UNIT UNIT PRICE MAX AMOUNT
3001 UNDEFINED Job BASE and Test Support Services
CPFF
Provide all labor, management, supervision, supplies, materials, equipment, training, and tools, not otherwise provided as GFP, required to support operational test missions for OTC. The Contractor shall be required to perform data management, data collection, and logistics in support of Operational Tests, Joint and Multi-Service Tests, training activities, and other DoD organizations, IAW Performance Work Statement (PWS) Part 5 Specific Tasks. Year 4, Period of Performance 4 March 2022 through 3 March 2023.
3002 Lot
ODC
COST
Other Direct Costs--This is a Not-To-Exceed, Cost Reimbursable, No Fee CLIN.
The ODC estimated amount for this line item is, $ $2,138,129.00, a plug figure provided by the Government for proposal purposes. ODCs are incidental material and services associated with the PWS and the Test TARs for which there is not a labor category (e.g. travel, supplies, training, etc.).
3003 1 Each Contract Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Contractor Acquired Property (CAP)
COST
Contractor Acquired Property classified as Equipment, Materials, Special Tooling, and Special Test Equipment. Upon delivery and acceptance by the Government, and when retained by the Contractor for use under this contract, the delivered CAP items become GFP and shall be added to the contract as GFP.
UNIT UNIT PRICE MAX AMOUNT
4001 UNDEFINED Job BASE and Test Support Services
CPFF
Provide all labor, management, supervision, supplies, materials, equipment, training, and tools, not otherwise provided as GFP, required to support operational test missions for OTC. The Contractor shall be required to perform data management, data collection, and logistics in support of Operational Tests, Joint and Multi-Service Tests, training activities, and other DoD organizations, IAW Performance Work Statement (PWS) Part 5 Specific Tasks; Year 5, Period of Performance 4 March 2023 through 3 March 2024.
4002 Lot
ODC
COST
Other Direct Costs--This is a Not-To-Exceed, Cost Reimbursable, No Fee CLIN.
The ODC estimated amount for this line item is, $ $2,202,273.00, a plug figure provided by the Government for proposal purposes. ODCs are incidental material and services associated with the PWS and the Test TARs for which there is not a labor category (e.g. travel, supplies, training, etc.).
4003 1 Each Contract Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Contractor Acquired Property (CAP)
COST
Contractor Acquired Property classified as Equipment, Materials, Special Tooling, and Special Test Equipment.Upon delivery and acceptance by the Government, and when retained by the Contractor for use under this contract, the delivered CAP items become GFP and shall be added to the contract as GFP.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$1,000,000.00 $78,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Performance Work Statement United States Army Operational Test Command
Base and Test Support Services
TABLE OF CONTENTS
Description
1.0. General
1.1. Description of Services
1.2. Background
1.3. Objectives
1.4. Scope
1.5. Period of Performance
1.6. General Information
1.6.1. Quality Control Plan (QCP)
1.6.2. Non-Conforming Performance
1.6.3. Quality Assurance (QA)
1.6.4. Recognized Holidays
1.6.5. Hours of Operation
1.6.6. Training Holiday
1.6.7. Command Closure
1.6.8. Overtime
1.6.9. Place of Performance
1.6.10. Type of Contract
1.6.11. Contractor Reporting
1.6.12. Security Requirements
1.6.13. Search and Seizure
1.6.14. Personnel
1.6.15. Personnel Security Facility Clearance Requirements
1.6.16. Common Access Cards (CAC)
1.6.17. Installation Access
1.6.18. Access to Government Information Systems (IS)
1.6.19. Identification and Badges/Access Roster
1.6.20. Vehicle Registration
1.6.21. Physical Security
1.6.22. Reports of Adverse Information
1.6.23. Conduct of Personnel
1.6.24. Keys
1.6.25. Lock Combinations
1.6.26. Post-Award Conference
1.6.27. Periodic Progress Meeting
1.6.28. Contracting Officer’s Representative (COR)
1.6.29. Key Personnel
1.6.30. Identification of Contractor Employees
1.6.31. Appearance of Personnel
1.6.32. Head Protection
1.6.33. Contractor Travel
1.6.34. Other Direct Costs
1.6.35. For Official Use Only (FOUO)
1.6.36. Non-Disclosure of Information
1.6.37. Organizational Conflict of Interest
1.6.38. Files
1.6.39. Privacy Act Information
1.6.40. Hazardous Materials Management
1.6.41. Sensitive Item Storage
1.6.42. Government Observations
1.6.43. Interface with Government Operation
1.6.44. General Training Requirements
1.6.45. Operations Security (OPSEC) Training
1.6.46. In-Service Training
1.6.47. Fraud, Waste, and Abuse
1.6.48. Conservation of Utilities
1.6.49. Fire Protection
1.6.50. Accident Reporting
1.6.51. Safety
1.6.52. Occupational Safety and Health Act (OSHA)
1.6.53. Compliance with Laws and Regulations
1.6.54. Contractor Use of Government Dining Facility
1.6.55. Responsibility for Loss, Damage, and Personal Injury of Contractor
Personnel
1.6.56. Hazardous Duty
1.6.57. Environmental Support
1.6.58. Phase-In/Phase-Out Period
2.0. Definitions and Acronyms
2.1. Definitions
2.2. Acronyms
3.0. Government-Furnished Items
3.1. Facilities and Forward Test Center (FTC)
3.2. Property
3.2.1. Government Furnished Property (GFP)
3.2.2. Equipment Maintenance and Repair
3.3. General
3.3.1. Parking
3.3.2. Utilities
3.3.3. Communications
3.3.4. Local Area Network
3.4. Materials
3.4.1. Keys
3.4.2. Forms
3.4.3. Petroleum, Oils, and Lubricants (POL)
3.4.4. Government Furnished Information
3.5. Services
3.5.1. Emergency Medical Care
3.5.2. Fire Protection
3.5.3. Police Protection
3.5.4. Refuse Collection
4.0. Contractor-Furnished Items and Responsibilities
4.1. General
4.2. Facility Clearance
4.3. Materials
4.4. Equipment
4.5. Employee Identification
4.6. Refuse/Recycling
4.7. Deliverables
4.8. Transportation
4.9. Contractor Acquired Property (CAP)
4.10. Services
4.10.1. GFP
4.10.2. Tools
4.10.3. User Responsibilities
4.10.4. GCSS-Army
4.10.5. Telecommunication Systems
4.10.6. Software Application
4.10.7. Grounds Maintenance
4.10.8. Utilities
4.10.9. Government Furnished Facilities (GFF)
4.10.10. Paperless Environment
4.10.11. Reduced Rates for Air Shipments
4.10.12. TAR and TIP Process
5.0. Description of Services
5.1. Base Operations
5.2. Test Support Services
5.3. Planning Phase
5.3.1. Data Management Plan
5.3.2. Communications
5.3.3. TAR Concerns
5.3.4. Resource and Time Management
5.3.5. Weekly TAR Progress Report
5.3.6. Quarterly Cost Revision
5.3.7. Monthly Progress and Financial Report
5.4. Test Execution Phase
5.4.1. Initial Setup
5.4.2. Data Management Support
5.4.3. Data Dictionary Design and Development
5.4.4. Information Technology Support
5.4.5. Supply
5.5. Recovery Phase
5.5.1. Recovery Maintenance
5.5.2. Post-Test Data Management Functions
5.5.3. Documentation
5.5.4. Prepare After-Action Reports
5.6. Technical Support
5.7. Documentation Requirements
5.7.1. Document Repository
5.7.2. Technical Information
5.8. Information Technology Management
5.8.1. GCSS-Army
5.8.2. Configuration Management
5.8.3. Server Access
5.8.4. Lifecycle Replacement
5.9. Logistics
5.9.1. Property Control
5.9.2. GFP Inventory
5.9.3. Annual Inventory
5.9.4. Final Inventory
5.10. General Maintenance Requirements
5.10.1. Estimated Cost of Damages Report
5.10.2. Use of GCSS-Army
5.10.3. Equipment Maintenance
5.10.4. TMDE Calibration Services
5.10.5. Automotive Maintenance and Motor Pool Operations
5.10.6. Monthly Fuel and Mileage Report
5.10.7. Federal Automotive Statistical Tool (FAST) Reporting
5.10.8. Parts
5.10.9. Maintain Records
5.10.10. Preventive Maintenance
5.10.11. Safety of Use Message (SOUM)
5.10.12. Transfer Army Equipment
5.10.13. Safety Compliance
5.10.14. Job Orders
5.10.15. Technical Manuals
5.10.16. Forms and Publications
5.10.17. Equipment Files
5.10.18. Fair Wear and Tear (FWT)
5.10.19. Army Warranty Program
5.10.20. Drivers Training
5.10.21. Night Vision Devise Training and Plan
5.10.22. Logistics Readiness Center (LRC) Maintenance
5.10.23. Equipment Operation Licenses
5.11. Transportation Services
5.12. Supply Services
5.12.1. Supply Discrepancy Report
5.12.2. Consumables and Durables
5.12.3. Support Equipment
5.12.4. Self Help Store
5.12.5. Logistics Supplies
5.13. Government Provided Uniforms
5.13.1. When to wear Government Provided Uniforms
5.13.2. Clothing Record Accountability
5.13.3. Maintain and Hand Receipt
5.13.4. Written Uniform Policy
5.14. Fabrication Services
5.15. Incidental Services
5.15.1. Portable Buildings and Trailers
5.15.2. Temporary Test Facilities
5.16. ABNSOTD Base Operations
5.16.1. Staffing
5.16.2. Data Management/Data Collection
5.16.3. Instrumentation
5.16.4. Surveys
5.16.5. Technical Data Collection
5.16.6. Data Collection Training
5.16.7. Data Collection Functions
5.16.8. Data Reduction Plan
5.16.9. Database Input
5.16.10. Reliability, Availability, and Maintainability (RAM) Database
5.16.11. Test Incident Report
5.16.12. Scoring Conference
5.16.13. Final Reports
5.16.14. Share Drive or Repository
5.16.15. Meetings
5.16.16. Videographer Requirements
5.16.17. Instrumentation Systems
5.16.18. Instrumentation Certification Accreditation
5.16.19. Rigging and De-rigging
5.17. Enterprise Contractor Manpower Reporting
5.17.1. Annual Inventory
5.17.2. Reporting Period
5.17.3. Assistance
6.0. Applicable Publications
PERFORMANCE WORK STATEMENT (PWS)
BASE AND TEST SUPPORT SERVICES
1.0. General. This is a non-personal services contract to provide data management, document preparation, data collection, database development, data entry, reports, off-the-shelf instrumentation, and logistics support to operational tests events conducted by the U. S. Army Operational Test Command (OTC). The Government shall not exercise any supervision or control over the contract service providers performing the services herein.
1.1. Description of Services. The Contractor shall be required to perform field test support, data collection, data base management, data entry, and technical input to some test planning documents in support of operational test mission that includes:
Preparation and maintenance of test sites, supplies, and use of Government Furnished Property (GFP).
Maintenance, dispatch services, recovery, and operators for test support vehicles and generators.
Providing data entry, data visualization, and test support tools.
Operating Government provided off-the-shelf instrumentation.
Perform supply actions in support of the contracted mission and testing.
Primary locations of performance are Fort Hood, Texas, Airborne and Special Operations Test Directorate (ABNSOTD) at Fort Bragg, North Carolina, with additional support for motor pool operations at Fort Bliss, TX. Additional locations will be identified in individual Task Authorization Requests (TARs), and may require the delivery of test support services at locations within both the Continental United States (CONUS) and Outside the Continental United States (OCONUS). Requirements will be issued in accordance with (IAW) the procedures set forth in the Government’s TAR/Task Implementation Plan (TIP) process (see section 4.10.12.).
1.2. Background. The OTC mission is to plan for, conduct, and report on independent operational tests, experiments, and assessments of Army materiel and information mission area systems to inform acquisition and fielding decisions for Army and select multi-service Warfighting systems.
1.2.1. OTC is headquartered at Fort Hood, Texas and is a subordinate command of the U.S.
Army Test and Evaluation Command (ATEC) located at Aberdeen Proving Ground, Maryland.
1.2.2. Testing of materiel and major acquisition systems is complex. Operational testing involves a major effort in the integration of data management, data collection, logistics and field services documentation support. Operational testing requires the flexibility and depth of professional and technical expertise, professional managers with a technical staff capable of modifying and operating complex databases.
1.3. Objectives. The Contractor shall provide specific technical requirements in support of data management, data collection, logistics, and field operations to support the test missions of OTC to include Joint and Multi-Service tests, combined Developmental and Operational Test, training activities, and other Department of Defense (DoD) Organizations.
1.4. Scope. The Contractor shall provide all labor, management, supervision, supplies, materials, equipment, training, and tools, not otherwise provided as Government Furnished Property (GFP), to perform non-personal services required to support the operational test, data collection, and experimentation mission of OTC.
1.5. Period of Performance. The period of performance shall be a 60 month base period. If FAR clause 52.217-8 is exercised the period of performance will be extended for six (6) months. The Period of Performance reads as follows:
Base Period- 4 March 2019–3 March 2024 FAR clause 52.217-8 4 March 2019- 3 September 2024
1.6. General Information.
1.6.1. Quality Control Plan (QCP). Quality control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government. The Contractor shall develop and maintain an effective QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which the Contractor assures its work complies with the requirement of the contract.
1.6.1.1. The Contractor’s QCP shall contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP shall be submitted to the Contracting Officer (KO) for review and approval within thirty (30) days of contract award. Changes to the QCP shall be submitted to the KO not later than five (5) calendar days prior to the effective date of the change. The Government will make final review and acceptance of any subsequent changes. The basis of the plan is that the Contractor is responsible for quality. All methods, procedures, and forms shall support this concept. Deviation from the approved QCP based upon Government requirements shall be approved in writing by the KO in advance.
1.6.1.2. The QCP, at a minimum, shall address the following:
1.6.1.2.1. Inspection Program. Included shall be a quality control inspection program covering all general and specific tasks included in the PWS. It shall specify tasks or areas to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work that will be inspected on a recurring basis. In developing this inspection program, the Contractor shall identify the key activities and associated characteristics in each process that have a significant influence on specific services and provide for methods for evaluation of the selected characteristics.
1.6.1.2.2. Deficiency Identification. The QCP shall include a method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the Performance Requirements Summary (PRS),(TE A). This shall contain processes for corrective action without dependence upon Government direction.
1.6.1.2.3. Deficiency Correction. The QCP shall contain process control and process performance measurement procedures that shall include how the Contractor shall implement preventive corrective actions. The Contractor shall demonstrate that it has designed quality into the delivery of services thereby mitigating the risk(s) associated with delivery of deficient or nonconforming services.
1.6.1.2.4. Documentation and Enforcement. The QCP shall include a method of documenting and enforcing quality control operations of both prime Contractor and subcontractor work, including inspection and testing.
1.6.1.2.5. Trend Analysis. The QCP shall include a method of performing trend analysis and assessments with metrics.
1.6.1.2.6. Surveillance Methods. The QCP shall contain specific surveillance techniques for all contract services. The surveillance methods shall be comprehensive and adaptable to the reporting system of the plan.
1.6.1.2.7. Complaints. The Contractor shall document all customer complaints and report the complaint to the COR within one (1) workday after receipt of complaint. The Contractor shall use electronic mail or other written memoranda as notification. Each customer complaint reported to the COR shall have a scheduled completion date subject to COR approval. The QCP shall be updated, at no additional cost to the Government, as required to preclude a recurrence of the complaint.
1.6.2. Non-Conforming Performance. All Government discovered non-conformances will be documented at the time of discovery by the COR using DA Form 5479. Documentation will include the contract and task order number, reference to the specific TAR requirement, the specific deficiency to the requirement, where it was discovered, the date and time it was discovered, focal point for the Contractor who was notified and suspense date for Contractor response. The COR will notify the Contractor, in writing, each time a non-compliance is observed. The Contractor will be given a timeline after notification to correct the deficiency IAW requirements of the TAR. Deficiencies that cannot be corrected within the identified time-line will be reported to the KO. Non-conformance will be tallied for Contractor Performance Assessment Rating (CPAR) reporting periods and the results of the data will be used to substantiate objective ratings of Contractor performance in coordination with the PRS. Non-conformances shall be classified in one of three categories: Level I (Minor), Level II (Major), or Level III (Critical):
1.6.2.1. Level I (Minor). Nonconformance is defined as a nonconformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services. The Contractor will receive a verbal notification from the Government describing the deficiency.
1.6.2.2. Level II (Major). Nonconformance is defined as a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. The Contractor will receive a written notification from the Government deficiency.
1.6.2.3. Level III (Critical). Nonconformance is defined as a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; is likely to prevent performance of a vital mission; is for a repeated or uncorrected level II Contract Deficiency Report (CDR); or is for a non-responsive Contractor to a level II CDR. The Government will document the CPARs, and the Contractor shall provide a corrective action plan to mitigate the recurrence of the deficiency.
1.6.3. Quality Assurance (QA). Quality assurance is the responsibility of the Government. The Government will evaluate the Contractor’s performance under this contract IAW the Performance Requirements Summary (PRS). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed IAW the performance standards and that contract quality requirements are met. “Contract quality requirements” means the technical requirements in the contract relating to the quality of the product or service and those contract clauses prescribing inspection, and other quality controls incumbent on the Contractor, to ensure the product or service conforms to the contractual requirements. It defines how the performance standards will be applied, the frequency of surveillance, the performance threshold, and deductions, if applicable.
1.6.4. Recognized Holidays. Work shall not be required on the following federal holidays unless specifically required by a TAR.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
Federal holidays also include any Presidential or Congressionally designated days off other than the ten listed above.
1.6.5. Hours of Operation. Services shall be provided during normal duty hours, which are Monday through Friday 0730 to 1630, excluding legal public holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor will not be reimbursed when the
Government facility is closed for the reasons above. Continuous Contractor service may be required for one or more test operations, running sequentially or concurrently, day or night, or in any combination. The Government may require the Contractor to provide services on weekends or holidays and may require an extended workday that could require two or more work shifts or adjusted workweeks. Overtime may be required for one or more of the shifts. The Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons in section 1.6.4.
1.6.5.1. Other than Normal Operating Hours. The following events may affect the normal workday:
1.6.5.1.1. Installation Commander closes the post during the normal business day or delays opening the post to a later time than normal due to unforeseen events, e.g., inclement weather. In accordance with FH Regulation 385-2, the Contractor shall follow KO's guidance for early release or delayed opening. However, the Contractor may use their own system of time off (e.g.
compensatory time, time off awards, vacation time, personal time, or leave without pay) IAW company policy.
1.6.5.1.2. Advanced Post Closure: Post is closed by the Commander prior to the start of the normal business day.
1.6.5.1.3. Condition Green: Normal conditions. No restrictions on driving or on installation operations.
1.6.5.1.4. Condition Amber: Caution. Roads may be icy in spots. Exercise caution while driving. Installation operations and training continue as scheduled.
1.6.5.1.5. Condition Red: Roads are icy. Driving is hazardous and is limited to mission essential traffic only. Installation activity is limited to mission essential training and operations (e.g., national defense, health, safety, law and order.)
1.6.5.1.6. Condition Black: Severe reduction of traffic flow; no vehicular movement except emergency vehicles. The post is closed to all motor vehicular traffic except emergency vehicles such as Military Police vehicles, ambulances, engineer vehicles, fire-fighting vehicles, utility vehicles, and subsistence trucks.
1.6.6. Training Holiday. Work day designated by the Command, normally preceding a federal holiday. Only applicable to active duty military members.
1.6.7. Command Closure. Time off given by the Commander to Federal and Military personnel, which does not apply to Contractor personnel. However, the Contractor, mission permitting and approved by the KO, may use their own system of time off (e.g., compensatory time, time off awards, vacation time, personal time, or leave without pay) IAW company policy as a result of the closure. This time shall not be charged as a direct charge to the contract.
1.6.7.1. In all cases, the Contractor shall perform requirements as directed by the KO. In the case of actual test execution, the Contractor shall coordinate with the cognizant COR or KO for guidance before dismissing employees involved in the test.
1.6.7.2. The Contractor shall comply with Fort Hood policies for late openings and early release due to inclement weather conditions identified in section 1.6.5.1. For reporting purposes due to inclement weather, the Contractor shall report in conjunction with the earliest report time guidance provided by the installations web link or otherwise directed by the KO. In the case of Contractor employees operating in remote locations or those other than Fort Hood, the Contractor shall follow the policy at that installation, using the general guidelines herein.
1.6.8. Overtime. IAW Federal Acquisition Regulation FAR 22.103-2, the Contractor shall perform all contracts so far as practicable without using overtime, particularly as a regular employment practice, except when lower overall costs to the Government will result or when it is necessary to meet urgent program needs. Any approved overtime, extra-pay shifts, and multi-shifts should be scheduled to achieve these objectives.
1.6.9. Place of Performance. Primary location of performance is Fort Hood, Texas, with test support operations for Fort Bragg, North Carolina. Other locations will be identified in individual TAR, and may require the delivery of test support services at locations CONUS and
OCONUS.
Information about Fort Hood and Fort Bragg, can be found on their internet websites respectively, http://www.hood.army.mil/, https://www.bragg.army.mil/.
1.6.10. Type of Contract. The Government anticipates the award of a Cost Plus Fixed-Fee Indefinite Delivery Indefinite Quantity type of contract.
1.6.11. Contractor Reporting. The Contractor shall provide data/reports IAW the Data Item Descriptions (DIDs) which are incorporated as Contract Data Requirements List (CDRL).
1.6.12. Security Requirements. Contractor personnel or any representative of the Contractor entering Fort Hood, Texas shall abide by all security regulations and shall be subject to security checks.
1.6.12.1. Operations Security (OPSEC). The Contractor shall comply with OTC OPSEC guidance of OTC Memorandum 530-1 and all applicable DoD security regulations and procedures during the performance of this contract (See Section 6.0 for location of memorandums and policies). The Contractor shall not disclose and must safeguard procurement sensitive information, computer systems and data, Privacy Act data, and Government personnel work products that are obtained or generated in the performance of this contract.
1.6.12.2. If the Contractor, or a sub-Contractor, or employees of either disclose any information that disrupts or harms the Government's operations or activities, then the Government retains the right to exclude any employee from performance of duties under this contract. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. By way of example, personnel shall not sketch or take photos of Government facilities or activities, unless related to service to be provided. All Government paper products and removable digital storage material that is received, generated, or stored during the contract will be destroyed completely when no longer needed to preclude recognition of information.
1.6.12.3. The Contractor shall implement and maintain an OPSEC program for preventing the disclosure of critical information or sensitive information that could jeopardize the Government’s ability to execute its mission or to adequately protect its personnel and/or equipment. The Contractor shall develop an OPSEC and Physical Security Standing Operating Procedure (SOP) within thirty (30) calendar days of contract award IAW CDRL A012 (TE U) and provide it to the Government for approval by the OPSEC officer IAW AR 530-1, 2-3a (3).
See Section 6.0 for location of memorandums and policies. The SOP must contain a training plan that includes an initial OPSEC brief, continuous awareness, and annual OPSEC training (see also paragraph 1.6.45.). Awareness/training includes, but is not limited to information disclosure via letters, conversations, photographs, resumes, electronic mail (e-mail), social media/networking sites, dissemination of information and documents disposal. Certificates shall be provided to the COR upon completion of courses. OPSEC Program shall fully comply with the provisions of AR 530-1, Operations Security. In addition, the Contractor shall identify an individual who will be an OPSEC Coordinator. The Contractor shall ensure this individual becomes OPSEC Level II certified per AR 530-1 and all reviews for the release of ATEC information shall be provided to the OTC OPSEC Manager for OPSEC and Public Affairs Office (PAO) review prior to release.
1.6.13. Search and Seizure. Contractor personnel or any representative of the Contractor entering Fort Hood, Texas, or other military installation designated as a performance location, shall abide by all security regulations and shall be subject to security checks. Contractor personnel and property shall be subject to search and seizure upon entering and leaving the confines of any DoD facility or installations.
1.6.14. Personnel. The Government’s minimum requirement is to contract for a workforce of sufficient experience and depth to handle current and projected workload and test surge requirements. The Contractor shall provide personnel with the necessary skills, knowledge, and training to perform the required support and services of this contract. The personnel performing work under this contract shall remain employees of the Contractor and shall not be considered employees of the Government.
1.6.15. Personnel Security Facility Clearance Requirements. When the services and support being performed require access to security controlled or classified information, the Contractor shall obtain and provide personnel with the appropriate security clearance. The classification of the work to be performed and the items to be delivered under this contract will be determined and handled IAW the DD Form 254 pertaining to this contract. Contractor personnel shall comply with AR 25-2 and AR 380-5 to include the security training requirements in AR 380-5, paragraph 9-7, and AR 380-49, Chapter 3, Section 3, as mandatory training for Contractor employees who handle classified materials. The Contractor shall also comply with the Industrial Security Program IAW DoD 5220.22-M. See Section 6.0 for location of memorandums and policies. The Contract Security Classification Specification, DD Form 254 (TE R) will be incorporated as part of this contract.
1.6.15.1. The Program Manager (PM) and Security Manager (SM) shall possess a Top-Secret clearance. The Information Technology Lead shall possess a Secret clearance. Other personnel may require clearances based upon classification of test events being supported and positions held in this contract. Contractor shall be prepared to provide personnel with clearances when required by a task order and shall be capable of conducting tests in Special Compartmental Information (SCI) facilities. Personnel working in the SCI facilities shall have SCI clearances and access. This contract level of access is Top Secret SCI. At a minimum, interim clearances shall be required at contract start date for key personnel and for those personnel required to support tests. A request for clearance shall be made within five (5) working days after hiring and shall contain a request for an interim clearance. It is the responsibility of the Contractor to ensure updates are provided to the KO and COR once appropriate security clearances have been obtained. Compliance by the Contractor’s personnel with AR 25-2 and AR 380-5 is required. The Contractor shall also comply with the Industrial Security Program IAW DoD 5220.22-M. See Section 6.0 for location of memorandums and policies. As stated, the approved DD Form 254 will be incorporated as part of this contract.
1.6.15.2. All personnel hired under this contract who do not require a security clearance must have a Tier 1 (T1), formerly known as National Agency Check with Inquiries (NACI). IAW AR 25-2, “Contractor personnel without a security clearance shall have a favorable investigation on file, a favorable review of local personnel, base and military, medical, other security records as appropriate, and have a T1 investigation initiated or on file (Contractor) for access to the Government computer network.”
1.6.15.3. Denial of Access. Contractor personnel who have not received required security clearance shall not be granted access to classified information nor allowed to perform classified work.
1.6.15.4. Tier III or Tier III-R LAN Access Requirement. All Contractor personnel requiring access to the OTC LAN and other Information Technology (IT) systems involving sensitive information with higher-level access shall be required to have a Tier III.
1.6.16. Contractor Common Access Cards (CAC). All Contractor employees requiring computer access will be required to also obtain a CAC through the Trusted Associate Sponsorship System (TASS). The CAC will be issued for a period not to exceed three (3) years from the date of issuance. If the contract is for a period of one year, then the CAC shall only be issued for one year. New CACs will be issued for the remaining performance periods that are longer than three years. All Contractor employees requiring a CAC must have at least a Tier 1 for minimum access (previously the National Agency Check with Inquiries or NACI) trustworthy investigation submitted through the Office of Personnel Management to receive a CAC through the TASS. National Agency Check investigations with current/valid dates are accepted investigations for Contractor employees requiring a CAC. Industry/Company background investigations are unacceptable to receive a CAC or to have access to the LAN. The
Contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) remote access, via logon, to a DoD network using DoD-approved remote access procedures; or
(3) physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD. All Contractor personnel requiring access to the OTC LAN and other IT systems shall have a favorable background investigation for trustworthiness determination initiated or on file as verified on the digitally signed DD Form 2875 by an appointed Security Manager IAW AR 25-2 and Cyber Security for USAOTC, OTC Memorandum 25-2.
1.6.17. Installation Access. The Contractor shall be responsible for assuring all Contractor personnel authorized to perform work under this contract obtain installation access through obtaining a CAC. The Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures IAW OTC Memorandum 190-2. See Section 6.0 for location of memorandums and policies. Employees performing services under this contract shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Directorate of Emergency Services, Security Office, or the host nation equivalent. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes. The CAC shall be returned to the Government when the employee no longer performs work for the Contractor under this contract.
1.6.18. Access to Government Information Systems (IS). All Contractor and sub-Contractor employees performing services under this contract, who have access to a Government information system, must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services and must have successfully completed the DoD Cyber Awareness Challenge training prior to access to the information system and then annually thereafter. Additional requirements are included in paragraph 1.6.44. and 1.6.45.
1.6.19. Identification Badges/Access Roster. The Contractor shall provide all employees working on this contract with identification badges. As a minimum, badges shall include Contractor name, contract number, employee photograph, employee's name, and appropriate code for security clearance access. The badge shall be worn at all times while the employee is on duty and shall be clearly visible.
1.6.19.1. The Contractor shall include company name in all e-mail addresses, on facsimiles, and in written correspondence. When presenting briefings, conducting or attending meetings/seminars, Contractor employees shall wear identification and introduce themselves as “Contractor employees.”
1.6.19.2. Access Rosters. Personnel whose contracts exceed 180 days in duration are required to be processed for a CAC if required. Personnel whose contract is less than 180 days in duration will receive a personnel pass valid until the expiration of the contract or business venture date.
The Access Roster at a minimum will contain the individual’s name, date of birth, contract number, duration of visit, and point of contact for access and submitted to the COR.
1.6.20. Vehicle Registration.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .