TE_Q_ABNSOTD_Tech_Services_Revised_Recompete_8_Mar_19_.doc
DOC document 80 KB Posted
- Attached to
- Base and Test Support Services Federal contract opportunity
- Solicitation number
- W91151-19-R-0003
About this file
This document outlines requirements for technical services support for the Airborne Special Operations Test Directorate at Fort Bragg, North Carolina. The contractor shall provide test support services, data management, instrumentation support, logistics services, and limited non-personal technical services. Requirements include maintaining on-site test support and data management staff, collecting and entering test data, operating government-furnished instrumentation and GPS systems, providing vehicle maintenance and property management, and photographic support for up to two aircraft tests per month. The period of performance is five years with a 30-day transition period prior to the start date. Costs shall be provided for the base year through each option year and included in the contractor's response to volume II of the solicitation.
This related federal contract opportunity posting provides additional context for solicitation number W91151-19-R-0003 seeking base and test support services for the Airborne and Special Operations Test Directorate. Services required include administrative support, field test support, data collection and management, technical input to test planning, maintenance of test sites and government property, and supply and logistics functions. The contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. The anticipated award date is not specified.
Technical Exhibit Q
View the file
Other files for this federal contract opportunity
Show all 50
Base and Test Support Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Volume II, Factor I, Mission Capability (Technical) Task Authorization Request (TAR XXXX)-Airborne Special Operations Test Directorate (ABNSOTD) Base Services/Transitional Phase-In-Technical Exhibit Q
1. GENERAL TEST INFORMATION.
1.1. Full name of effort: Airborne Special Operations Test Directorate Technical Support Services (ABNSOTD Base Services). This TAR is not in support of a specific test.
1.2. Location/Dates: Fort Bragg/Pope Field, North Carolina (NC), Section B (5 years) Transition Location/Dates: Fort Bragg/Pope Field, NC, 30 days prior to contract start date.
1.3. The main contractor facility is located on Pope Army Airfield, NC and houses administration, offices, conference room, data management/collection, and instrumentation services. Other Operating Locations consists of:
· Testing normally occurs on the drop zones and
· ranges located on Fort Bragg and surrounding airfields (Camp McCall, Laurinburg airport, Raeford airport).
· Occasional offsite testing occurs at Yuma Proving Grounds, Aberdeen Test Center, Fort Carson, CO, Fires Test Directorate (Fort Sill, OK)
1.4. Classification: Unclassified.
1.5. Support Services Narrative: The Contractor shall provide Airborne Operations with the support to multiple test types including low velocity airdrop, personnel airdrop (both static line and freefall), internal and external air transport and technical support requirements for ABNSOTD.
2. CONTRACTING TECHNICAL POINT OF CONTACT and CONTRACT INFORMATION:
2.1. Contracting Officer’s Representative (COR), USAOTC ABNSOTD:
2.2. Alternate Contracting Officer’s Representative (ACOR), USAOTC G4:
2.3. Personnel identified herein are constrained by the Performance Work Statement (PWS). All technical coordination shall be within the general scope of the contract and the Task Authorization Request. Technical coordination shall not result in any action that:
a. Constitutes an assignment of additional work outside of the contracts Performance Work Statement (PWS) or the Government requirement.
b. Constitutes a change as defined in the contract clause entitled "Changes ‑ Cost-Reimbursement" (FAR 52.243‑2 Alt I).
c. Causes an increase in the total cost, the resource limits approved by the Contracting Officer (KO) in the approved performance estimate, or the time required for contract performance.
d. Changes in any of the expressed terms, conditions, or specifications of the contract.
e. Interferes with the Contractor's right to perform the terms and conditions of the contract.
2.4. Safety/ Human Research and Protection Plan (HRPP):
a. HRPP constraints and requirements: None identified at this time. Late or subsequent publishing of HUC constraints and requirements shall be included in a follow-on point change or Task Instruction Letter (TIL).
b. Safety issues and concerns: The risk at all levels in the performance of responsibilities pertaining to human subject participation in research and development activities must be considered IAW the PWS (Safety Section) of the contract.
c. Other safety issues and concerns In Accordance With (IAW) PWS (Hazardous Duty Section) of the contract. The following are elements of the test program, which are anticipated to pose potential hazards in the course of test implementation activities. Actions should be considered to mitigate the risks associated with these hazards and should be considered in the development of the cost.
Lasers
Power Interfaces
Brackets
Radio Frequencies
Radars
3. DESCRIPTION OF SERVICES:
3.1. Provide test support services and non-personal services at Airborne and Special Operations Test Directorate (ABNSOTD), Fort Bragg, NC. A specific scope determination will be made prior to tasking the contractor to provide non-personal services to support the technical support services portion of this TAR.
3.2. Scope: The Contractor shall maintain a staffing level and skill mix that shall provide continuity of airborne operations. This TAR supports multiple test types including low velocity airdrop, personnel airdrop (both static line and freefall), internal and external air transport and technical support requirements at ABNSOTD.
4. Specific Technical Requirement: The contractor's cost shall describe the technical methodology with associated labor and reimbursable The Contractors technical methodology TIP response shall be included with Volume II. The TAR costs shall be included in Attachment 5, base year through year 5, and shall be included with the cumulative totals under the Summary tab.
4.1. Data Management Requirements:
a. Contractor Points of Contact: XXXXXXXXX.
b. Period of Support: XXXXXX
c. Provide a data manager on-site at Fort Bragg.
d. Planning:
[1] In conjunction with the Government Operational Research and Systems Analysis (ORSA) and Government Data Manager, develop data collections forms and the database dictionaries and queries using Microsoft Access.
[2] Perform data collection efforts during testing.
[3] Perform data reduction, formulate, and provide databases to the government for its use in test reports.
[4] Survey forms must be created using information from Chapter 2 of the Operational Test Agency Test Plan (OTATP) to collect the required data to reduce to a numerical response.
(a) Surveys must be created for each the following phases of testing: New equipment training, equipment loading, equipment rigging, pre-jump, post-jump, post-airdrop inspection.
(b) Technical data collection includes numerical data such as from inspections, function checks, rigging, collimation, drop zone, aircraft, hit/miss data, etc.
[5] Provide training for data collection and reduction personnel.
[6] Carry out the data collection functions to include collection and initial Quality Control (QC) of field test data in conjunction with other test team personnel.
[7] Execute the data collection plan. Ensure all data is collected and QC checks are performed during test events. Collect all data during test events (if data collectors are not required or available).
[8] Observe Rigging procedures and annotate any rigging issues noted.
[9] Attend Simulated Airdrop Impact Testing (SAIT) and all airdrops to collect data in preparation for the writing of Test Incident Reports.
[10] Input all manual data into the Microsoft Access database collected from surveys, technical function checks, testing, and data from other departments, such as photos and instrumented data (APLS, accelerometers).
[11] Maintain constant quality control checks on all data input.
[12] Prepare final reports in Microsoft Access for test officer to use in test report.
[13] Verify all numbers and run reports to ensure quality of data.
[14] Turn databases over to ORSA to do a final authentication.
e. Data Reduction:
[1] Execute the data reduction plan.
[2] Provide DAG and scoring conference support, as required.
[3] Provide an authenticated database on CD-Rom.
[4] Provide a scored RAM database and resulting reports.
f. Meetings:
[1] Attend Test and Integration Integrated Process Team (T&I IPT) meetings, ATEC Systems Team (AST) meetings, Threat Working Groups (TWGs), Instrumentation IPT meetings, Test Event Planning meetings, and specific contractor meetings at various locations conducted /coordinated by Government agencies to provide operational test technical clarification during the meetings.
[2] The Test Officer or Test Support Officer will provide date, time, and location of remote installation meetings. Provide personnel for travel to IPT working groups (test planning, instrumentation, R&M, and threat) and coordination conferences, scenario development and validation activities, technical interchange meetings, in-progress reviews, and other events held in support of test scenario development.
g. Additional Travel Requirements: Contractor personnel shall be required to make several round trips to the locations listed below. The Test Officer or Test Support Officer may provide additional travel dates and duration.
Yuma Proving Grounds, AZ Date: TBD
Estimated duration – 1 Week
h. Milestones/Deliverables: As required and if identified in paragraph 4.1 above.
4.2. Instrumentation Requirements:
a. Period of Support:
b. Requirements:
[1] Operate and maintain the Government provided Mobile Bore Sight Collimator.
[2] Provide Global Positioning System (GPS) based surveying services using Government provided surveying systems. GPS based services to be provided may include, but are not limited to, surveying select points in the test area and gathering load dispersion data after a test mission.
(a) Maintain a catalog of networked GPS points suitable for gathering load dispersion data.
[3] Provide meteorological services using Government provided meteorological systems. Meteorological services include gathering surface and upper air meteorological conditions including temperature, humidity, barometric pressure, winds, and cloud height.
[4] Provide assistance to obtain and maintain ATEC instrumentation accreditation and Risk Management Framework (RMF) certification for TSC assigned instrumentation. Adhere to ABNSOTD RMF controls when operating TSC assigned instrumentation.
[5] Provide rigging/de-rigging/recovery support for the Airborne Position Location System.
[6] Provide rigging/de-rigging/recovery support for the On-Board Data Storage System (accelerometers, data recorders).
4.3 Logistics Requirement:
a. Obtain repair parts, spares, and raw materials to meet the requirements of this TAR.
b. Property Control:
[1] Be responsible and accountable for GFP in accordance with applicable FAR 45.5 provisions and the requirements of the contractor's approved property control plan.
[2] Initiate actions through the Government Property Administrator, with a copy to the ABNSOTD COR, to replace all lost, damaged, or destroyed GFP in accordance with the Contractor's approved property control plan.
c. Purchasing: Purchasing of items shall be in accordance with the terms of the contract.
d. Maintenance:
[1] General Maintenance Requirements.
[2] Automotive Maintenance. Provide motor maintenance service support in accordance with the PWS for vehicles.
[3] Milestones/Deliverables. Provide the following Government Furnished Property (GFP).
Item Description
Date/Quantity
4.4 Non-Personal Technical Support Services: The purpose of this section of the requirements is to define the non-personal technical support services required to support the ABNSOTD test mission. The contractor shall structure its response to this section of the TAR to fill requirements outlined below. Additional requirements by the Government will require a specific scope determination by the contracting officer.
a. Period of Support:
b. Requirements:
Note: There are three (3) forecasted test events scheduled for FY 19 that consists of Rapid Rigging (l8-months long), Parachute Flotation Device (2 weeks long), and Enhanced Electronic Automatic Activation Device (2-months long). These test events are located at Fort Bragg, NC. A separate TAR will be issued for each of these tests events.
[1] Provide photographic support on a variety of Directorate tests as needed. Support encompasses capturing test data on digital still cameras and digital video cameras. The Government estimates that the contractor shall support up to two active aircraft test days per month. On those test days, the contractor shall provide video and stills of up to eight individual low velocity airdrop test missions and the subsequent derigging and operational use of the pieces of test equipment.
[2] The contractor shall also provide video and stills for up to four individual personnel airdrop test missions (both static line and freefall) including the operational use of the pieces of test equipment. Each aircraft test shall require pretest setup time and post-test processing time for videos and stills. Requirements for photographic support shall be provided weekly to the TSC designated contractor.
5. Transitional Phase-in. There are two parts to this 30-day transition period.
Part 1- The successor Contractor shall provide the necessary personnel to begin transition immediately upon contract award. Costs associated with the immediate transition of necessary personnel upon contract award shall be included in section B, CLIN 0005 and in Attachment 5.
Part 2- , The Contractor shall meet with the incumbent Contractor and coordinate an effective orderly transition of all work in progress. Upon completion of this joint meeting, the Contractor shall provide the KO and COR a transition plan with associated costs. The Contractor shall transition personnel to obtain base passes, plan for training, obtain Common Access Cards (CAC) as required, conduct 100% joint inspection and inventory and sign for facilities if required, and any other ancillary requirements.
File details come from the government source that posted it. Updated .