Attachment 1 - MAIDIQ Performance Work Statement Rev 1.pdf
PDF 539 KB Posted
- Attached to
- U. S. Army Training Support Center (ATSC), Training Support Systems Enterprise (TSS-E) Contract Federal contract opportunity
- Solicitation number
- W900KK22F0016
About this file
This is a solicitation issued by the Army Contracting Command-Orlando to procure support services for the U.S. Army Training Support Center's Training Support Systems Enterprise requirement. The government intends to award multiple firm-fixed-price contracts with cost reimbursement provisions and a five-year ordering period. Services will support the Training Support Systems Enterprise's mission to provide realistic live, virtual, constructive, and gaming integrated training and program support to Army headquarters, installations, commands, and other units located throughout the continental United States, its territories, and outside the continental United States. This procurement is classified under NAICS code 541990 with a size standard of $16.5 million average annual revenue.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W900KK-22-R-0016
Attachment 1 Revision 1
PERFORMANCE WORK STATEMENT (PWS)
FOR
UNITED STATES (U.S.)
ARMY TRAINING SUPPORT CENTER (ATSC)
TRAINING SUPPORT SYSTEMS ENTERPRISE (TSS-E)
MISSION SUPPORT SERVICES
11 January 2022
Revision 1 - 01 November 2022
PERFORMANCE WORK STATEMENT (PWS)
FOR
UNITED STATES (U.S.) ARMY TRAINING SUPPORT CENTER (ATSC)
TRAINING SUPPORT SYSTEMS ENTERPRISE (TSS-E)
MISSION SUPPORT SERVICES
PART 1. GENERAL INFORMATION
1. General. This is a non-personal services contract to provide Training Support Systems Enterprise (TSS-E) Mission Support Services for the ATSC, Ft Eustis, VA. The Government shall not exercise any supervision or control over the contract service provider(s) performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the Government.
1.1 Description of Services/Introduction: The TSS-E is a system of systems that provides networked, integrated, and interoperable training support capabilities through five (5) core tasking areas for active duty, reserve and national guard soldiers, units, commands and installations located throughout the Continental United States (CONUS) and Outside the Continental United States (OCONUS). The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the required TSS-E Mission Support Services except for those items specified as Government-Furnished Property (GFP) and any additional services as defined in this PWS. The contractor shall perform to the standards as required in accordance with the PWS and resulting contract(s).
1.2 Background. The HQDA, Office of the Deputy Chief of Staff, G-3/5/7, Training Directorate, Training Simulations Division (DAMO-TRS) and elements of the Training and Doctrine Command (TRADOC) formed the TSS-E Enterprise as directed by the Vice Chief of Staff of the Army on 18 July 2008. The TSS-E Enterprise has teamed to develop a contract that will provide the necessary support to manage Army ranges and land assets with the Army’s emerging Live, Virtual, Constructive and Gaming (LVC&G) domains enabling an operationally relevant training environment for Army Warfighters. Contractor support is required to assist the Army in successfully accomplishing the TSS-E mission. Services will be performed at Government facilities and/or contractor facilities throughout the Continental United Stated (CONUS) and its territories and outside the Continental United States (OCONUS). The contractor shall be required to travel to locations throughout CONUS and OCONUS. Specific place(s) of performance will be detailed in individual task orders.
1.3 Objectives. This PWS conveys the basic performance requirements, standards, and assessment measures that will apply to all issued Army TSS-E task orders. Any additional performance requirements, standards, and assessment measures will be detailed in each individual task order PWS.
1.4 Scope. This PWS identifies the mission support requirements for the U.S. Army Training Support System (TSS). This TSS-E Mission Support Contract will provide program support for
TSS-E implementation and operations to Headquarters, Department of the Army (HQDA), the U.S. Army installations, the U.S. Army Commands (ACOMs), the U.S. Army National Training Center (NTC), the U.S. Army Training Support Center (ATSC), the U.S. Army Environmental Command (AEC), the U.S. Army National Simulation Center (NSC), the U.S. Army Training and Doctrine Command (TRADOC) and U.S. Combined Arms Center (CAC), U.S. Army Reserve Command (USARC), and the U.S. Army National Guard (ARNG), Direct Reporting Units (DRU’s). The TSS contract will incorporate services and support in the following five (5) tasking areas (to include all subtasking areas):
(1) Sustainable Range Program (SRP) (Section 5.1)
(a) SRP Training (Section 5.2)
(b) Range Operations Support (Section 5.3)
(c) Integrated Training Area Management (ITAM) Support (Section 5.4)
(d) SRP Geographic Technical Support (Section 5.5)
(e) SRP Information Technology Enterprise Support (Section 5.6)
(f) Range Operations (Section 5.7)
(g) Range Modernization (Section 5.10)
(h) Target and Instrumentation Training (Section 5.12)
(i) Homestation Augmentation and Deployed Live Fire Training Activities (Section 5.13)
(j) Contractor Logistics Support Program (Section 5.14)
(k) Post Fielding Analysist (Section 5.15)
(l) Future Army System of Integrated Targets Capability Development Documents Capabilities
Development (Section 5.16)
(m) SRP Planning Charrettes (Section 5.17)
(n) DD Form 1391 (Section 5.18)
(o) MILCON Dashboard (Section 5.19)
(p) Integrated Training Areas Management (Section 5.20)
(q) Support Range and Training Land Decisions (Section 5.21)
(r) LRAM (Section 5.22)
(s) Range and Training Land Assessment (Section 5.23)
(t) Sustainable Range Awareness (Section 5.24)
(u) SRP Geographic Information Systems (Section 5.25)
(v) SRP Support (Section 5.26)
(w) Individual and Small Unit Virtual and Live Simulations Modernization (ACM-Live) (Section
5.27)
(2) Combat Training Center (CTC) Support (Section 5.28)
(a) Leader Training Program (LTP) (Section 5.29)
(b) Operational Environment (OE) Support (Section 5.30)
(c) Miscellaneous CTC Support (Section 5.30.9)
(3) Mission Complex and LVC-IA Support (Section 5.31)
(a) Technical Support (Section 5.31.2)
(b) Training Support (Section 5.32)
(c) Exercise Support (Section 5.33)
(d) Program Management (Section 5.34)
(e) LVC-IA Support (Section 5.35)
(f) MILES Install/De-Install (Section 5.36)
(4) Soldier Training Support (Section 5.37)
(a) Soldier Training Support Program Management (Section 5.38)
(b) Custom Fabrication (Section 5.39)
(c) Training Support Center (TSC) Operations (Section 5.37.1)
(d) TSC Modernization (Section 5.37.2)
(e) Program Management (Section 5.38 and 5.38.3)
(5) Training Development Support (Section 5.40)
(a) Combat Development Training Capability
(b) Mission Training Capability (Section 5.43)
(c) Virtual Capability (Section 5.47)
(d) Gaming Capability (Section 5.41)
(e) Constructive Simulation Capability (Capabilities are mentioned in numerous
Sections - (5.31.26, 5.38.7, 5.38.8, 5.38.9), Both Mission training capability and simulation capability is laid out in Section 5.40.1)
(f) JLCCTC Models/Interfaces (Section 5.42)
(g) CBCSE (Section 5.44)
(h) Common Tasks (Section 5.45)
(i) DoD RMF (Section 5.46)
(j) ALOTT Operation (Section 5.48)
1.5 Type of Contract. The Government will award a Multiple Award Indefinite Delivery/Indefinite Quantity (MAIDIQ) contract with FFP with Cost-Type CLINS for Other Direct Costs (ODC) for travel and materials.
1.6 Performance Period. The performance period for the TSS-E base contracts will be for a five
(5) Year Ordering Period. The five (5) year ordering Period may be extended six (6) months in accordance with FAR 52.217-8 Option to Extend Services.
1.7 Quality Control. Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government under the terms of the contract and in accordance with FAR 52.246-1-Contractor Inspection Requirements, to include those provided by subcontractors. The contractor shall develop, implement, and maintain an effective Quality Control (QP) System which includes a written Quality Control Plan (QCP) to ensure that the requirements of this contract are met. The QCP shall implement standardized procedures/methodologies for monitoring and documenting contract performance to ensure all contract requirements are met. The contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP, as a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction;
corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis and corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The contractor shall periodically update the QCP as changes in program processes are identified.
1.7.1 Acceptable Quality Level (AQL). The contractor shall maintain schedules, track actions, and draft documents to aid in the preparation of draft correspondence, hard copy and slideshow presentations and briefings, and other documents related to program management, data management of live-fire systems and facilities development, operation, test planning, sustainment management and program office policy. The contractor shall review documents for conformance to previous records of doctrine and concepts relative to training development and delivery.
1.7.2 Quality Control Plan (QCP). The Contractor shall maintain a QCP that describes the QC Program. The successful offeror shall submit a finalized QCP thirty (30) days after award of the contract to the Government for approval. The Government will have ten (10) working days to review/accept the QCP. Throughout contract performance, the contractor shall submit any changes in the QCP to the Contracting Officer or the COR for approval a minimum of five (5) working days prior to implementation. The QCP shall address, at a minimum, the following elements:
1.7.2.1 Inspector Qualifications. The QCP shall include the names of firms or individuals who are responsible for managing the QCP and tasked to perform inspections and the extent of their authority. Their functional roles shall be depicted in an organization chart.
1.7.2.2 Inspection Program. The QCP shall identify the tasks or areas to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work which will be inspected on a recurring basis. In developing this inspection program, the contractor shall identify the key activities and associated characteristics in each process that has a significant influence on specific services and provide for methods for evaluation of the selected characteristics.
1.7.2.3 Documentation and Enforcement. The QCP shall include a method of documenting and enforcing quality control operations of both prime contractor and subcontractor work including inspection and testing. The contractor shall maintain a file of all inspections/tests conducted by the contractor, to include any corrective actions taken. This file shall be subject to review by the Contracting Officer.
1.7.2.4 Deficiency Identification. The QC Program shall include a method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the Performance Requirements Summary (PRS).
1.7.2.5 Deficiency Correction. The QC Program shall contain process control and process performance measurement procedures that include how the contractor shall effect preventive corrective actions as opposed to reliance on Government or customer identification of deficiencies prior to resolving the problem.
1.7.2.6 Trend Analyses. The QCP shall include a method of performing trend analyses and assessments through the use of metrics.
1.7.2.7 Surveillance Methods. The QCP shall contain specific surveillance techniques for all contract services. The surveillance methods shall be comprehensive and adaptable to the reporting system of the Plan.
1.7.2.8 Customer Complaint Program. The QC Program shall include a Customer Comments and Complaint Program and the processing system. The Program shall identify and correct valid customer complaints and provide feedback to the Government and customers on corrective action(s) taken. The term customer includes customers internal and external to the organizations identified by the contract.
1.7.2.9 Revisions. The QC Program shall include an annual review of the QCP to revise or update to ensure efficient and effective use of best practices.
1.8 Safety. All work shall be conducted in a safe manner and in compliance with Occupational Safety and Health Agency (OSHA), Environmental Protection Agency (EPA), State, Army, and Safety and Environmental Management Office (SEMO) Regulations. If the contractor fails or refuses to promptly comply with safety requirements, the Contracting Officer will issue an order stopping all or part of the work until satisfactory corrective action has been taken.
1.9 Vehicles. Contractor personnel operating motor vehicles on Government installations shall have a valid State license and shall comply with AR 190-5 - Motor Vehicle Traffic Supervision and AR 385-55 - Prevention of Motor Vehicle Accidents regarding motor vehicle use and registration. All personal and Contractor-owned vehicles shall be properly registered, insured, and inspected in compliance with State and local laws.
1.10 Security Requirements. The security requirements are in accordance with a DD Form 254 - Department of Defense (DoD) Contract Security Classification Specification. (See Attachment J
– DD254)
1.10.1 DoD Antiterrorism (AT) Standards/Operational Security Review.
1.10.1.1 In accordance with DoD I 2000.16, DoD Anti-terrorism Standards, all contractor employees, including subcontractor employees, shall complete the Anti-terrorism Level 1 Awareness Training within thirty (30) days of task order award date.
1.10.2 AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within thirty (30) calendar days after contract and task order award start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit Certificates of Completion for each contractor and subcontractor employee to the Contracting Officer, Contracting Officers Representative (COR), and/or the Alternate COR (ACOR). AT Level I awareness training is available at the following website: https://jko.jten.mil.
1.10.3 Operational Security.
1.10.3.1 Access and General Protection/Security Policy and Procedures. The contractor and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the Installation Provost Marshal’s Office, the Director of Emergency Services, or the Security Office. Contractor workforce shall comply with all Personal Identity (PI) verifications as required by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the Changes clause of the contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.10.3.2 Physical Security: The contractor shall be responsible for safeguarding all Government property, information, and equipment provided for contractor use. At the close of each work period, Government facilities, equipment, information, and materials shall be secured. Specific security requirements shall be in accordance with each individual task order.
1.10.3.2.1 Key Control. The contractor shall establish and implement methods of making sure all keys/key cards issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. No keys issued to the contractor by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the COR and ACOR. This requirement will be specified in each individual task order level. The contractor shall prohibit the use of Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in the performance of assigned work in those areas or personnel authorized entrance by the Contracting Officer. All references to keys include key cards.
1.10.3.2.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall Re-key to replace the affected lock or locks; however, the Government may make the decision to replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.
1.10.4 IWATCH Training. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer (ATO). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR and ACOR. This training shall be completed within thirty (30) calendar days of contract award and within thirty (30) calendar days of new employees commencing performance with the results reported to the COR and ACOR no later than thirty (30) calendar days after contract award.
1.10.5 Contractor Employees Who Require Access to Government Information Systems. All contractor employees with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services and shall successfully complete DoD Information Assurance Awareness Training prior to access to the information systems and annually thereafter.
1.10.6 Operations Security (OPSEC) Training. Per AR 530-1 Operations Security, new contractor employees must complete Level I OPSEC training within thirty (30) calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training.
1.10.7 Information Assurance (IA)/Information Technology (IT) Training. All contractor employees and associated subcontractor employees must complete the DoD IA Awareness Training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8140.01, DoD 8570.01-M, AR 25-2 and DA PAM 25-2-6 within six (6) months of employment. Contractors working at training locations with TADSS will get access to the Training Support-Material Army-wide Tracking System (TS-MATS) and record TADSS utilization.
1.11 Handling or Access to Classified Information. The contractor shall comply with FAR 52.204-2 Security Requirements. This clause involves access to information classified Confidential, Secret, or Top Secret and requires contractors to comply with the Security Agreement (DD Form 441) including 32 CFR Part 117 National Industrial Security Program Operating Manual (NISPOM) and any revisions.
1.12 AFFARS 5352.204-9000 Notification of Government Security Activity and Visitor Group Security Agreements. The Contracting Officer shall insert AFFARS 5352.204-9000 - Notification of Government Security Activity and Visitor Group Security Agreements in solicitations and contracts which require a DD Form 254 for performance on U.S. Government installations (CONUS) and overseas (OCONUS). The Contracting Officer may change the number of days specified in 5352.204-9000(a). If less than thirty (30) days is used, coordinate with the Installation Security Police activity.
1.12.1 In accordance with 32 CFR Part 117 National Industrial Security (NISPOM) and FAR
SUBPART 5304.4 – SAFEGUARDING CLASSIFIED INFORMATION WITHIN INDUSTRY.
1.12.2 AR 380-49 establishes policy for the Department of the Army Industrial Security Program.
1.12.3 Whenever a SECRET or TOP SECRET clearance is required for the performance of any tasks, it will be clearly specified within the individual task order. Contractor personnel may not have access to classified information without acquiring appropriate clearances and without a need-to-know. At a minimum, an interim clearance must be granted by the DoD Consolidated Adjudication Facility (CAF) prior to access of Classified Military Information (CMI) or meetings. Information will be accessed and stored in Government spaces only. Personnel who knowingly violate security policies or directives are subject to immediate removal.
1.12.4 Contractors that support the Upper Enclave (UE) require TOP SECRET clearance in support of the Army Capability Manager (ACM-C) and National Simulation Center (NSC) in conducting Joint Land Component Constructive Training Capability (JLCCTC) Verifications, Validations and Accreditations (VV&As), Maintenance Releases, and User Assessments.
1.12.4.1. TOP SECRET clearance is required in the NSC Global Simulations Capability (GSC).
The Contractor shall be required access up to TOP SECRET in support of the JLCCTC Upper Enclave (UE) simulation components for Regional Simulation Center (RSC) and MCTP exercise support.
1.12.5 Performance of certain tasks may require access to Secret Internet Protocol Router Network (SIPRNET) equipment. Before accessing the SIPRNET, the contractor shall obtain a North Atlantic Treaty Organization (NATO) awareness brief.by the installation security manager. Access to NATO information is NOT REQUIRED. When SIPRNET access is required, the contractor shall not access, download or further disseminate any special access data (i.e., intelligence, NATO, (Communication Security (COMSEC), etc.) outside the execution of the defined contract requirements and without the guidance and written permission of the COR of the requiring activity. In the event that any special access is required, the Contracting Officer must modify the requirements for the DD Form 254.
1.12.6 Contractor Personnel.
1.12.6.1 The investigative basis for personnel security clearances shall be in accordance with existing DoD policy. Eligibility based on investigations that are out of date (i.e., TOP SECRET (5 years); SECRET (10 years), and CONFIDENTIAL (15 years)) must be processed for a Periodic Reinvestigation within ten (10) days of being assigned to the contract. Contractors will not be allowed access to CMI until required investigations are submitted.
1.12.6.2. CONUS. Contractor personnel performing on this contract in CONUS shall be citizens of the U.S.
1.12.6.3 OCONUS. Contractor personnel performing on this contract OCONUS shall be vetted by local security as required.
1.12.7 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), applies as well as Industrial Security Letters (ISL).
1.12.8 Controlled Unclassified Information (CUI) material. The contractor will comply with applicable Army/Air Force Regulations and local command policies and procedures governing the protection of classified and CUI. After indoctrination, contractor personnel shall ensure classified and CUI government information is properly handled, stored, transmitted, disseminated, and destroyed in accordance with 32 CFR Part 2002 and local policy. Local guidance pertaining to the protection of classified and CUI material will be provided to the contractor by the customer upon arrival at each performance site.
1.12.9 All contractor personnel shall be properly briefed by the organization at performance start date of each individual task order and debriefed at the end of the period of performance. *See Attachment J - DD Form 254
1.12.10 Information Technology (IT)/Security Requirements.
1.12.10.1 Contractor must be able to obtain and maintain a favorable suitability/fitness determination under 5 CFR or equivalent for Common Access Cards (CAC) issuance and/or network access. Investigations have to be opened/scheduled at OPM and favorably reviewed by the government. The Government will submit background investigations for positions that require Common Access Card (CAC) and/or IT access only. For contractors, the minimum requirement for access to federal information systems is as follows: Tier 5 (T5) Single Scope Background Investigation (SSBI/SF 86); Tier 3 (T3) a NACLC (SF 86) and TIER 1 (T1) (SF 85). Prior to CAC issuance, the NAC (FBI 10 point FBI fingerprint check) must be completed without adverse comment, and the TIER 1 (T1) or equivalent MUST BE SCHEDULED/OPENDED AT OPM. CACs will not be issued before the fingerprint check results have been completed and the investigation has been submitted to OPM and favorably reviewed by the government. FINGERPRINTS AND THE APPROPRIATED
INVESTIGATION WILL BE SUBMITTED BY THE GOVERNMENT
Installation Security Office will submit all background investigations on prospective contractors requiring CAC and/or network access only.
On JBLE, Fort Eustis, VA the 733rd Security Force Squadron will conduct background checks on all contractor personnel requiring access to the installation. All other locations, contact the installation for access to the installation.
IAW 18 USC 1382, the authority of the Installation Commander to control and deny a Contractor employee entry to all or part of the installation is absolute.
Security Requirements
Contractors shall ensure an owning relationship is established in the Defense Information System for Security (DISS)
For each individual requiring access to CMI in performing duty in support of this PWS. All others will submit a Visit Authorization letter to the Army Training Support Center (ATSC) Security Management Office (SMO) Code (W3E9AA6).
The investigative basis for personnel security clearances shall be IAW existing DOD policy. Eligibility based on investigations that are out of date, i.e., Top Secret (5 years), SECRET (10 years), and CONFIDENTIAL (15 years) must be processed for a Periodic Reinvestigation within 10 days of being assigned to the contract. Contractors will not be allowed access to CMI until required investigations are submitted.
1.12.10.2 Contractor personnel performing under this PWS must be US citizens and be eligible for Secret access. Eligibility access is required at the SECRET level in order to gain access to classified systems (SIPRNET). Contractor personnel must maintain the level of eligibility required for the life of the contract. The security requirements are in accordance with the attached DD 254, Department of Defense Contract Security Classification Specification. Contractors having secret access should become familiar with existing post security guidelines and local policies, as well as, all ATSC security policies and Army security regulations to include AR 25-2, 24 Oct 07, AR 380-67, 9 Sep 88 and AR 25-1,4 Dec 08.IAW Air Force FAR: SUBPART 5304.4 - SAFEGUARDING CLASSIFIED INFORMATION WITHIN INDUSTRY, 5304.402 General, AFI 31-60, Industrial Security Program Management, Implements the Air Force’s industrial security programs, the contractor’s employee’s conduct shall be in accordance with Department of Defense (DOD) 5500 &-R Joint Ethics Regulation.
1.12.10.3 DOD cleared contractors located on or visiting a DA installation, tenant, agency, or activity in support of a classified contract must comply with the DOD 5220.22-R, the DOD 5220.22-M, visit requirements, AR 380-49, and other DA policy on visit requirements of the installation to be visited. Advance notification of pending contractor visits will be provided to the Organization's Security Officer by the FSO.
1.13 Joint Personnel Adjudication System (JPAS). Contractors assigned to the contract PWS and/or task order who require access to Government installations in performance of their duties, shall have an owning relationship established in the JPAS to the Government installation they are executing the contract/task order for. The Security Office where the contractors is assigned shall perform the JPAS requirement. Visit Requests shall be cleared by the Security Office of the Government installation the contractor is assigned to. For contractors who do not require access, a Visit Authorization Letter (VAL) must be submitted to the Security Office of the Government installation the contractor is visiting.
1.13.1 In accordance with Army Regulation and Air Force Instructions, all prospective contractors shall undergo a verification process to determine the trustworthiness and suitability prior to being granted access to federal property. Compliance with applicable regulations and local policy is required wherever work is being performed. Limited access with escort may be granted (at the installation’s discretion) for an interim period while investigations are being conducted.
1.13.2 Installation Security Office will submit all background investigations on prospective contractors requiring CAC and/or network access. Compliance with applicable regulations and local policy is required wherever work is being performed.
1.14 Post Award Conference/Periodic Progress Meetings. The contractor shall attend any post award conference convened by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) 42.5 - Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, will meet quarterly with the contractor to review the contractor's performance. At these meetings the Contracting Officer shall apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.15 Contracting Officer Representative (COR). The COR and ACOR will be identified by separate letter for each base contract and each individual task order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions:
assure that the contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance;
maintain written and oral communications with the contractor concerning technical aspects of the contract;
issue written interpretations of technical requirements to include Government drawings, designs, and specifications;
monitor contractor performance and notify both the Contracting Officer and contractor of any deficiencies;
Coordinate availability of Government-furnished property; and provide site entry of contractor personnel.
1.15.1 COR/ACOR Delegation Letter. A Letter of Delegation shall be issued to the COR and ACOR; a copy of which will be sent to the contractor stating the responsibilities and limitations of the COR and ACOR. The COR is not authorized to make any contractual changes to the base contracts nor task orders to include the terms and conditions of the base contract/task orders, changes which effect cost, price, and estimates or changes in delivery dates.
1.16 Key Personnel. Key Personnel shall be identified by name within the contractor’s proposal and their resumes submitted for evaluation during the Source Selection Process. The name of the person who shall be responsible for the performance of all work and who shall act on behalf of the company shall be designated, in writing, to the Contracting Officer. The name of the person who shall act in their absence shall also be designated in writing to the Contracting Officer.
These Key Personnel shall have full authority to act for the contractor on all contract matters relating to the daily operations of the contract and shall be available daily between the hours of
8:00 AM to 5:00 PM Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.
1.17 Identification of Contractor Employees. The contractor and subcontractors shall provide each employee an Identification (ID) Badge, which shall contain, at a minimum the company name, the employee name, and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times while performing work under this contract. All contractor and subcontractor employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The contractor and subcontractors shall be responsible for collection of ID Badges upon completion of the contract or termination of employee(s). A listing of issued ID cards shall be furnished to the Contracting Officer or the COR prior to the contract performance date and updated as needed to reflect contractor and subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced are suitably marked as contractor products or that contractor participation is appropriately disclosed. When contractor personnel send e-mail messages to Government personnel while performing on this contract, the contractor's e-mail address shall include the company name together with the person's name. When it is necessary for contractor personnel to have a user address on a Government computer, the Government will ensure that person's e-mail address includes .ctr@army.mil at the end of the email address and that the contractor includes the name of their company in their signature block at the end of their emails.
1.18 Supervision of Contractor Employees. The Government will not exercise any supervision or control over contractor or subcontractor employees while performing work under the contract.
Such employees shall be accountable solely to the contractor, not the Government. The contractor, in turn, shall be accountable to the Government for contractor or subcontractor employees.
1.19 Other Direct Costs (ODCs).
1.19.1 ODCs-Travel. Contractor personnel shall be required to travel CONUS and OCONUS during the performance of this contract to attend meetings, conferences, and training. The contractor shall be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in the contract and resulting task orders. All travel requires Government approval/authorization and notification to the COR.
For proposal purposes, a Contract Line Item Number (CLIN) shall be established at a Not-to- Exceed (NTE) amount estimated for the overall contract. Each individual task order requiring contractor travel will have a CLIN established for the NTE amount.
1.19.2 ODCs-Materials. The contractor may be required to provide materials in support of this PWS. All contractor furnished materials requires Government approval. For proposal purposes, a Contract Line Item Number (CLIN) shall be established at a Not-to-Exceed (NTE) amount estimated for the overall contract. Each individual task order requiring materials will have a CLIN established for the NTE amount.
1.20 Data & Copyrights. The Government's and contractor's rights and obligations with respect to patents, date, and copyrights shall be governed by the applicable clauses in FAR Part 27 and DFARS Part 227 incorporated into this contract.
1.21 Organizational Conflict of Interest (OCI). Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, PWS specifications, etc. or perform evaluation services which may create a current or subsequent OCI as defined in FAR 9.5. A Mitigation Plan shall be submitted as a part of the offeror’s proposal and shall be evaluated/approved during the source selection process. After contract award, the contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a Plan to the Contracting Officer to avoid or mitigate any such OCI. The contractor’s Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he/she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.22 Phase-In /Phase-Out Period.
1.22.1 Phase-In Period. The contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this contract and resulting task orders.
The contractor shall take all actions necessary for a smooth transition of the contracted operations. The phase-in period shall be up to a maximum of thirty (30) calendar days in duration (periods will be established in individual task orders). The Government shall make all facilities and equipment accessible to the contractor within the designated period prior to performance start date. During the phase-in period, the contractor shall, at a minimum:
Establish the Project Management Office Recruit and hire necessary personnel Obtain all required certifications and clearances; to include personnel security clearances Participate in joint inventories and sign for GFP Develop and submit any required deliverables Attend post-award meetings as required Accomplish necessary training to support the functions listed in the PWS.
1.22.2 Phase-Out Period. The Phase-Out period shall apply to any task order follow-on requirements. Thirty (30) calendar days prior to the completion of the task order, the incoming contractor may be afforded an observation period by the Government. During that time, the incoming contractor personnel may observe operations and performance methods of the incumbent contractor. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of service. The Contractor shall fully cooperate with the succeeding contractor and the Government so as not to interfere with their work or duties.
During the phase-out period, the Contractor shall approach the following issues: employee notification; retention of key personnel; turn-over of work-in-progress, inventories, Government property; removal of contractor property; data and information transfer; and any other actions required to ensure continuity of operations as designated in individual task orders.
1.22.3 Phase-In/Phase-Out Contract Ordering Periods/Task Order Periods of Performance.
1.22.3.1 Phase-In/Phase-Out CLINs will be established in the base contracts referencing the five
(5) Year Ordering Period. Each individual task order will contain Phase-In/Phase-Out CLINS if required.
1.23 Federal Holidays. The following days have been established as legal public holidays in the federal service:
New Year’s Day 1st day of January Martin Luther King Day 3rd Monday in January Presidents’ Day 3rd Monday in February Memorial Day 4th Monday in May Juneteenth Independence Day 19th day of June Independence Day 4th day of July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day 11th day of November Thanksgiving Day 4th Thursday in November Christmas Day 25th day of December
1.24 Hours of Operation. The contractor's hours of operation shall be specified in individual task orders. Additionally, the contractor shall ensure that services to customers are not interrupted during break and lunch periods.
1.25 Privacy Act. All contractor personnel assigned to this contract will have access to information that may be subject to the Privacy Act of 1974. The contractor is responsible for ensuring all assigned contract employees are briefed on Privacy Act requirements.
1.26 Program Management. The contractor shall perform continual program management and shall provide a Program Manager who shall conduct overall management coordination and serve as the central point of contact with the Government for performance of all work under the contract. The contractor shall also provide Project Managers who shall be physically located on-site in accordance with the requirements of the individual task orders. A contractor employee shall be designated to act on behalf of the Program Manager and the Project Manager during their absences and shall provide written notice to the Contracting Officer, the COR, and ACOR forty-eight (48) hours in advance of the change(s). Such designation is subject to approval by the Contracting Officer or the COR. The Program Manager and any individual designated to act in that capacity shall have full authority to contractually bind the contractor for prompt action on matters pertaining to execution of the contract and/or individual task orders. The Program Manager is responsible for work performed under the contract. The contracts manager is a POC for execution of the contracts action.
1.27 Conduct of Personnel. If a contract employee is removed from the job site or dismissed from the premises, the contractor is not relieved of the requirement to provide sufficient personnel to perform the services as required by the contract PWS and task order PWSs. In accordance with18 USC 1382 Army Regulations and Air Force Instructions, the authority of the Installation Commander to control and deny a contractor employee entry to all or part of the installation is absolute. The individual concerned has no right to appeal.
1.28 Records Keeping Maintenance. The contractor shall maintain and support the maintenance of accurate files of documentation, records, and reports required under the terms of the resulting contract(s) in accordance with AR 25-1 Army Knowledge Management and Information Technology and AR 25-400-2 Army Records Information Management System.
1.28.1 The contractor shall not allow access to the files by any Government agency, non- Government agency, or individual(s) unless specifically authorized by the Contracting Officer or the COR.
1.28.2 The contractor shall make files available to the Contracting Officer, COR, or designated representative upon request. All files shall become the property of the Government and shall be turned over to the Contracting Officer at the completion or termination of the contract or task orders.
1.29 Meetings, Conferences, Briefings, and Reports. The contractor, Program Manager or designated representative shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the contracted functions and services as required by the Government to provide effective communication and impart necessary information. This will include both on-site and off-site meetings and the frequency may be weekly, monthly, or as otherwise required. Meeting attendees shall, at times, include contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
The contractor shall identify opportunities for improvement or change; provide status, concept, and procedural briefings for projects as related to services provided for in individual task orders.
Reports and documentation shall be provided on Government-furnished forms.
PART 2. DEFINITIONS & ACRONYMS
2.1. DEFINITIONS
2.1.1 Abbreviated Capabilities Development Document (A-CDD). The A-CDD is a capability requirement document used to establish the Army's position on development of an Army material capability. They are a more robust and refined capability requirement document that conveys the Army's position which establishes a need to accomplish probable military objectives prior to an acquisition material development decision (MOD). Approval of the A- CDD will not support an acquisition milestone decision (MS A, MS B, or MSC). A-CDDs can be used as the source requirement to execute rapid experimentation and prototyping efforts prior to program initiation. Approval of an A-COD equates to an approved requirement.
2.1.2 Army Master Range Plan (AMRP). The AMRP is the master repository for the DCS, G– 3/5/7 validated, prioritized, and funded range modernization and training land acquisition projects. It serves as the Army’s database of record for all Army-approved range projects in all resourcing categories.
2.1.3 Army Regulations. Publications issued by Department of the Army (DA) which are directive in nature and contain missions, responsibilities, policies, and administrative procedures necessary to insure uniform compliance with those policies.
2.1.4 Army Range Requirements Model (ARRM). ARRM is a mid-range and long-range planning web application used by installation and higher level managers. ARRM calculates baseline range and land unit throughput requirements and installation capacity. ARRM provides analytical capabilities tailored to the user’s organizational level from the development of installation Range Complex Master Plan (RCMP) and RDP to Army-level stationing scenarios by allowing all input parameters to be changed and requirements recalculated. The ARRM project supports SRP installation managers or proponents in performing essential evaluations of the installation training land and range requirements compared to the installation capacity. The ARRM system will assist the proponents in making timely decisions using current data. ARRM allows users at all levels – installation, ACOM and HQDA – to model operational RTLP throughput requirements as well as institutional range and land requirements arising from TRADOC-approved Program of Instruction (POI) and compare them to throughput RTLP capacity at SRP installations.
2.1.5 As Directed, as Required, Approved, Acceptance. Where these words or words of similar import are used, it shall be understood that the direction, requirements, permission, approval, or acceptance of the Contracting Officer is intended unless stated otherwise.
2.1.6 Capability Development Document (CDD). A document that captures the information necessary to develop a proposed program(s), normally using an evolutionary acquisition strategy.
The CDD outlines an affordable increment of militarily useful, logistically supportable, and technically mature capability. The CDD supports a Milestone B decision review.
2.1.7 Charrette. Intensive planning session where designers and others collaborate on a vision for development. It provides a forum for ideas and offers the unique advantage of giving immediate feedback to the designers. More importantly, it allows everyone who participates to be a mutual author of the plan. The charrette process is focused workshop(s), which take place during the early phase of the design process. All project team members meet together to exchange ideas, encouraging generation of integrated design solutions.
2.1.8 Classified Material. Documents, data, information, and items for which access is limited to those persons having a "need to know" and appropriate security clearance.
2.1.9 Clearance. Authority permitting individuals cooperating in Department of the Army work, and having a legitimate interest therein, access to classified technical information, materiel, or equipment or admission to restricted areas or installations where such information or materiel is located.
2.1.10 Combat Training Center (CTC) Program. The Army’s CTC Program remains the cornerstone of an integrated strategy that builds trained and proficient, combat-ready units and leaders to conduct operations as part of the joint force-ready to win in a complex world. CTCs provide a crucible experience for units and leaders training in a complex and highly realistic decisive action training environment (DATE) designed to replicate combat by stressing every warfighting function with operations against tough, freethinking, realistic, hybrid threats under the most difficult conditions possible.
2.1.11 Construction. Erection, installation, or assembly of a new facility; addition, expansion, extension, alteration, conversion, or replacement of an existing facility; or relocation of a facility from one location to another. Includes equipment installed and made a part of such facilities, and related site preparation, excavation, filling, and landscaping, or other land improvements.
2.1.12 Contract. All types of agreements and orders for the procurement of supplies or services.
2.1.13 Contract Administrator. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.
2.1.14 Contractor. A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.
2.1.15 Contracting Officer. A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.16 Contracting Officers Representative (COR). n Employee of the U.S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .