Attachment 4.2 - RTOP W900KK-23-R-TS01 Unrestricted Lot QASP ITAM Fort Bragg.docx

DOCX document 402 KB Posted

Attached to
U. S. Army Training Support Center (ATSC), Training Support Systems Enterprise (TSS-E) Contract
Solicitation number
W900KK22F0016
Issued by

About this file

This solicitation is seeking proposals to support the U.S. Army Training Support Center's Training Support Systems Enterprise requirement. The Army Contracting Command-Orlando will issue firm-fixed-price contracts with cost provisions on a multiple award indefinite delivery/indefinite quantity basis for a five year ordering period. Services will include program support for implementation and operations to Army commands, installations, and agencies to provide realistic integrated training. Support will be performed at government and contractor facilities throughout the continental United States and its territories as well as outside the continental United States. This procurement is classified under the NAICS code for other professional, scientific, and technical services with an associated size standard of $16.5 million average annual revenue.

View the file

Other files

File Type Posted
Attachment 4.3 - RTOP W900KK-23-R-TS01 Unrestricted Lot Pricing Worksheet Rev 1.xlsx XLSX spreadsheet
Attachment 1.1 -MAIDIQ - Questions and Answers Rev 1.pdf PDF
Attachment 5.2 - RTOP W900KK-23-R-TS02 Small Business Lot QASP Inst Oper Spt JBLM Rev 1.docx.pdf PDF
W900KK22R0016-002 - TSSE QA and Extension Conformed Copy.pdf PDF
Attachment 5.3 - RTOP W900KK-23-R-TS02 Small Business Lot Pricing Worksheet Rev 1a.xlsx XLSX spreadsheet
Attachment 4 - RTOP W900KK-23-R-TS01 Unrestricted Lot Amendment 0001 signed.pdf PDF
Attachment 4.2 - RTOP W900KK-23-R-TS01 Unrestricted Lot QASP ITAM Fort Bragg Rev 1.docx.pdf PDF
Attachment 4.6 - RTOP W900KK-23-R-TS01 Unrestricted Lot Questions and Answers Rev 1.pdf PDF
Attachment 3 - RTOP QASP TSS MAIDIQ Rev 1.pdf PDF
W900KK22R0016-002 - TSSE QA and Extension.pdf PDF
Attachment 5.5 - RTOP W900KK-23-R-TS02 Small Business Lot Questions and Answers.pdf PDF
Attachment 1 - MAIDIQ Performance Work Statement Rev 1.pdf PDF
Attachment 7 - Cost Pricing Workbook Rev 1.xlsx XLSX spreadsheet
Attachment 5 - RTOP W900KK-23-R-TS02 Small Business Lot Amendment 0001 signed.pdf PDF
W900KK-22-R-0016_Amendment 0001.pdf PDF
Attachment 1 - MAIDIQ Performance Work Statement.pdf PDF
Attachment 5 - RTOP W900KK-23-R-TS02 Small Business Lot.pdf PDF
Attachment 3 - RTOP QASP TSS MAIDIQ.docx DOCX document
Attachment 2 - DD Form 254.pdf PDF
Attachment 7 - Cost Pricing Workbook.xlsx XLSX spreadsheet
Attachment 6 - Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Attachment 5.2 - RTOP W900KK-23-R-TS02 Small Business Lot QASP Inst Oper Spt JBLM.docx DOCX document
Attachment 5.1 - RTOP W900KK-23-R-TS02 Small Business Lot PWS Instructor Operator Support JBLM.docx.pdf PDF
Attachment 4 - RTOP W900KK-23-R-TS01 Unrestricted Lot.pdf PDF
Attachment 5.4 - RTOP W900KK-23-R-TS02 Small Business Lot WD 15-5539 Rev 21.pdf PDF
Attachment 5.5 - RTOP W900KK-23-R-TS02 Small Business Lot Questions and Answers.xlsx XLSX spreadsheet
Attachment 5.3 - RTOP W900KK-23-R-TS02 Small Business Lot Pricing Worksheet Rev 1.xlsx XLSX spreadsheet
Attachment 4.5 - RTOP W900KK-23-R-TS01 Unrestricted Lot GFP form.xlsx XLSX spreadsheet
Attachment 4.6 - RTOP W900KK-23-R-TS01 Unrestricted Lot Questions and Answers.xlsx XLSX spreadsheet
Attachment 4.1 - RTOP W900KK-23-R-TS01 Unrestricted Lot PWS ITAM Fort Bragg.docx.pdf PDF
Attachment 4.3 - RTOP W900KK-23-R-TS01 Unrestricted Lot Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 1.1 -MAIDIQ - Questions and Answers.xlsx XLSX spreadsheet
Attachment 4.4 - RTOP W900KK-23-R-TS01 Unrestricted Lot WD 15-4377 Rev 19.pdf PDF
W900KK-22-R-0016.pdf PDF
Attachment 8 - DFAR 252-215-7009-Proposal-Adequacy-Checklist.pdf PDF
Attachment 12 - GFP Master Report CDRL A002.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

For

Training Support Systems (TSS) Enterprise Mission Support Services Contract Integrated Training Area Management (ITAM) Support Fort Bragg, NC

Contract #TBD

16 September 2022

Michael SonTBD
Contracting OfficerContracting Officer’s Representative

CUI//SP-SSEL//FEDCON

W900KK-22-R-0016

Unrestricted Lot 1

W900KK-23-R-TS01

CUI//SP-SSEL//FEDCON

W900KK-22-R-0016

Unrestricted Lot 1

W900KK-23-R-TS01

ACC-ORLANDO

Controlled by: U.S. Army Controlled by: ACC-ORL CUI Category: Source Selection Distribution/Limited Dissemination Control: FED Only POC: PAQA Branch QAS

CUI//SP-SSEL//FEDCON

CUI//SP-SSEL//FEDCON

TABLE OF CONTENTS

Subject Page Number

1. Overview

2. Description of Services

3. Roles and Responsibilities

4. Contract Quality Requirements

5. Government Surveillance

6. Non-Conforming Performance

7. Deduct Plan

8. Data Analysis

9. Acceptance of Services

10. COR Status Report

11. Service Contract Reporting (SCR) in the System for Award Management (SAM)

12. Contractor Performance Assessment Reporting System (CPARS)

13. Combating Trafficking In Persons

14. COR/Quality Assurance Surveillance Files

15. QASP Changes

1. Overview.

1.0 Purpose. This Quality Assurance Surveillance Plan (QASP) is a Government developed document used to ensure that the Government receives quality services, and pays only for conforming services actually provided. The objective of this Task Order is to provide technical support and recommendations necessary for operations support of the SRP, including operations and maintenance, code development, and testing; provide review and analysis of program requirements and technical reports; and provide recommendations for Army-wide policies and procedures to ensure sustainment of quality ranges and training lands necessary to provide realistic conditions for training soldiers to standard at Fort Eustis, VA as defined in this Performance Work Statement (PWS), Section 5. Government-furnished property and services for those items specified in the PWS are exempt from this QASP. The Contractor shall perform to the standards specified in the Training Support Systems Operations (TSSO) Multiple Award Indefinite Delivery, Indefinite Quantity (MAIDIQ) PWS. This Quality Assurance Surveillance Plan (QASP) identifies the methods and procedures the Government will use to ensure it receives the services to the desired standard, as identified in the PWS.

1.1. Intent. The intent of this QASP is to:

1) Ensure Contractor performance meets or exceeds contract terms, conditions and specifications 2) Hold the Contractor accountable for quality control

3) Encourage the Contractor to take appropriate steps to control and improve quality

4) Ensure all sections of FAR 46 are applied as required and applicable

Accordingly, the Government will perform surveillance on the contract in accordance with this QASP, but reserves the right to monitor the contract in any manner necessary, at any time necessary, and at all places necessary to ensure that the services rendered conform to contract requirements. The Government also reserves the right to perform quality assurance at the Subcontractor level, and at the contractor's place of business. Sub-contract service providers shall be accountable to the Contractor who, in turn is responsible to the Government. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor. The Government will not exercise any supervisory controls over the contract service providers performing the services herein.

2. Description of Services.

2.1. Scope of Work. The Contractor shall provide technical support and recommendations necessary for operations support of the SRP, including operations and maintenance, code development, and testing; provide review and analysis of program requirements and technical reports; and provide recommendations for Army-wide policies and procedures to ensure sustainment of quality ranges and training lands necessary to provide realistic conditions for training soldiers to standard.

2.2. Type of Contract. This will be a Firm Fixed Price Task Order.

3. Roles and Responsibilities. The following provides a synopsis for the roles and their respective authority during the performance of the contract:

3.1. Government.

3.1.1. Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority, and solely at the risk of the Contractor. No changes in, or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes.

3.1.2. Contracting Officer’s Representative (COR). The COR will monitor all technical and performance aspects of the contract, and assist the (KO) in contract administration. The COR is authorized to perform the following functions:

· Assure that the Contractor performs the technical requirements of the contract

· Perform inspections necessary in connection with contract performance

· Maintain written and oral communications with the Contractor concerning technical and performance aspects of the contract

· Issue written interpretations of technical requirements, including Government drawings, designs, and specifications

· Monitor Contractor's performance and documents and notifies both the Contracting Officer and Contractor of all deficiencies

· Coordinate availability of Government furnished property

· Provide site entry of Contractor

ACC doesn’t use other acronyms to refer to and describe a COR. Terms such as the “COTR, “Onsite COR”, “TM”, etc. will not be used. Some personnel may be assigned as Alternate CORs, but other than a statement to that effect and what actions the KO expects that ACOR to take in the absence of the primary COR, there is no difference between a COR an Alternate COR, or other government surveillance personnel assigned to conduct contract oversight. Throughout the remainder of this QASP, The term “COR’ will be used to refer to all government surveillance personnel assigned to monitor the contractor’s performance on this contract.

A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost, price, or delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

The Contracting Officer shall use the DoD Joint Appointment Module (JAM) to electronically track COR nominations, appointments, terminations, and training certifications for each COR appointed to conduct oversight on this contract. The COR will upload their surveillance documents, such as COR Status Reports (CSR) COR trip reports, correspondence with the contractor, and other miscellaneous documents into the Surveillance and Performance Monitoring (SPM) module within the online contract file. JAM and SPM are available within the Procurement Integrated Enterprise Environment (PIEE) suite of tools at: https://piee.eb.mil/.

3.1.2.1 Alternate Contracting Officer’s Representative (ACOR). The Alternate COR is an employee of the U.S. Government provided by the Requiring Activities (RA) and appointed by the Contracting Officer to provide additional surveillance personnel in monitoring and documenting the contractor’s performance. These alternate surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training and experience requirements and are appointed by the contracting officer as Alternate CORs (ACOR) in the Joint Appointment Module (JAM). This term will apply to other government surveillance personnel as defined in Army Regulation 70-13, paragraph 2-2 g.

3.1.3. Property Administrator. An authorized representative of the Contracting Officer appointed in accordance with agency procedures responsible for administering the contract requirements and obligations relating to Government property in possession of a Contractor.

3.2. Contractor.

3.2.1. Task Order Manager. The Contractor shall provide a TO manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the KO. The TO manager or alternate shall have full authority to act for the Contractor on all TO matters relating to daily operation of this TO. The TO manager or alternate shall be available between 8:00 a.m. and 5:30 p.m. Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The contractor shall provide Key personnel as list in PWS tasks items 5.1 through 5.2.4 meeting the personal qualification described for each key position of the task order.

3.2.2. Program Manager. The Contractor responsible for running the program. May supervise the program team and manages conflicts within different departments. Plans and sets program goals and milestones and develops risk management strategies. Defines resources and schedules for the implementation of the program. Clearly defines requirements and sets targets accordingly. Recognizes areas for internal improvement and develops plans for implementing the improvements.

3.2.3. Quality Manager. The Contractor responsible for promoting quality achievement and performance improvement throughout the organization. Develops, implements, communicates and maintains a quality plan to bring the Contractor’s Quality Systems and Policies into compliance with quality system requirements. Directs the activities of contractor quality personnel to measure key quality characteristics of services delivered and processes from inception to completion. Establishes the standards of service for customers expected by the Requiring Activity.

For quick access, the contact information for the performance of this QASP is provided:

Government Personnel:

Table 1; Key Positions for Contract Administration

Title
Name
Phone
e-mail
Contracting Officer
Michael Son
407-208-5658
Michael.a.son2.civ@army.mil
COR/ACOR
TBD
Property Administrator
Sandra Coombs
407-384-3581
Sandra.n.coombs-walters.civ@army.mil

Contractor Personnel:

Title
Name
Phone
e-mail
Contract Manager
TBD
Project Manager
TBD
Quality Manager
TBD

4. Contract Quality Requirements.

4.1. Contractor’s Quality Control Plan/Program (QCP). The Government will evaluate the adequacy of the Contractor’s Quality Control Plan (QCP) performance under this contract in accordance with this QASP.

The Contractor’s quality control program is the means by which he assures himself that all work complies with the requirement of the contract PWS. It is essential that Government Surveillance Personnel understand that Quality Control (QC) is the responsibility of the contractor, and not the government.

As such, the government will focus their efforts on validating if the contractor is maintaining an adequate quality control inspection systems that ensures the contractor maintains evidence that services provided conform to contract quality requirements. The Contractor shall provide inspection data to the Government on request for validation.

The Contractor’s QCP shall include a process that can identify, prevent, and ensure non-recurrence of defective services.

4.2. Government Quality Assurance. This QASP describes what the Government will do to ensure that the Contractor has performed in accordance with the performance standards within the PWS.

This QASP describes:

· How the performance standards will be applied:

· The Performance Standard for each requirement in the PWS will be applied as prescribed in the PWS. Ensure that each Performance requirement within the PWS includes a Measurable performance standard in terms of quality, timeliness, or quantity.

· Ensure the method of assessing contractor performance against performance standards is included in this QASP

· Ensure each Performance Requirement includes an acceptable quality limit (AQL). AQL is the worst tolerable performance that is still considered acceptable.

See attachment 6, QASP Surveillance Item Requirements

· Which performance elements will be surveilled (Surveillance Checklist, attachment 4)

· All performance activities will be surveilled through-out the Period of Performance, using a risk based approach. The selected items will be populated on the Monthly Checklist and placed on the Surveillance Schedule for each period surveilled.

· When the surveillance will be scheduled (Surveillance Schedule, attachment 3)

· Selected items for each month will be placed on the Surveillance Checklist and scheduled surveillance on the Monthly Schedule. Surveillance may be scheduled on a daily, weekly or monthly frequency. However, each contractor requirement must be audited for compliance prior to invoice payment being made.

· The Acceptable Quality Limit (AQL)

· The AQL will be determined by the Requiring Activity, i.e., the COR.

· The nature of Government contract quality assurance actions that include the number of observations made and the number and type of defects (defect rate)

· Personnel conducting contractor performance surveillance will use attachment 4, Surveillance Checklist, or equivalent to answer the Performance question asked, and provide comments in the area provided on the checklist. These comments and metrics from the Checklist will be included on each CSR submitted during the Period of Performance.

5. Government Surveillance.

5.1. Methods of Surveillance. The following Methods of Surveillance may be utilized in monitoring the Contractors’ performance:

NOTE: The performance items selected for surveillance in this QASP as a minimum should contain those listed in the Performance Requirements Summary (PRS). The PRS is a stand-alone document that illustrates to the contractor the few, most salient items the government wishes the contractor to be aware of. The PRS is contained in the contract Performance Work Statement (PWS). See Attachment 1 for PRS items.

1. 100% Inspection will be reserved for the highest risk areas where consequence of failure may affect life or limb, or there is likelihood of mission failure

1. Random Sampling Will be used when a service is performed on a frequent basis and a statistically valid sample can be selected for audit. This is most appropriate method for frequently recurring tasks

1. Periodic Inspection Will be used when planned sampling of a service is at a specific predetermined date and time. This is most appropriate for tasks that occur infrequently, yet on a scheduled basis

1. Customer Feedback. Not a valid method of surveillance, but a good indicator of areas where surveillance should be conducted or intensified.

The Customer Complaint Record, Attachment 2, will be placed at convenient locations for the end user of these services, and made available to document/record all complaints. The COR will collect the Customer Complaints each surveillance cycle and investigate for validity ASAP.

The following procedures will be followed when a complaint is received.

1. The COR/ACOR will investigate to determine the validity of the complaint

2. If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical

3. For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be applied

4. A Customer Complaint Log will be used to document each validated customer complaint and attached to the COR Monthly Surveillance Report in the SPM module

5.1.1 Surveillance Procedure:

a. The COR will perform evaluations/validation of contractor supplied performance data.

Monthly Status Report: A report will be provided by each ACOR NLT 1 week following each month of the calendar year to the COR. The period of the report is from the first to the last day of that month and should address the contractor’s performance.

5.2. Surveillance Schedule. (Required) A Surveillance Schedule (Attachment 3) will be created each month. Locally generated equivalent is acceptable. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. Each Month’s Surveillance Schedule will be completed at the beginning of each month during the Period of Performance (PoP) to schedule the upcoming month surveillance activity. Completed Surveillance Schedules will be filed in the online Surveillance and Performance Monitoring (SPM) module located within (https://piee.eb.mil) file for this contract, either as an attachment to COR Status Report (CSR) or uploaded separately in the Miscellaneous Documents Section.

5.3. Surveillance Checklists. (Required) A Surveillance Checklist (Attachment 4) will be created each month. Locally generated equivalent is acceptable. The Checklist is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. Each Month’s Surveillance Checklist will be completed with the Surveillance Schedule. Completed Surveillance Checklist will be filed in the online Surveillance and Performance Monitoring (SPM) module located within (https://piee.eb.mil) file for this contract, either as an attachment to COR Status Report (CSR) or uploaded separately in the Miscellaneous Documents Section.

Note: Surveillance Schedules and Checklists are considered COR documentation and must be uploaded in the SPM module. Smartforms are available for use at the individual record level under “Add Smart Form”

5.4. Surveillance Documentation. Each months’ Completed Surveillance Documentation, to include the COR Status Report must be filed in the online Surveillance and Performance Monitoring (SPM) module located within (https://piee.eb.mil) file for this contract. The COR Status Report (Smart Form) must be utilized, supporting documentation can be uploaded as an attachment.

6. Non-Conforming Performance. A Non-conformance occurs when the Contractor fails to meet the terms, conditions and/or specifications of the Contract/Task Order. All instances of non-conformance must be documented by the COR. The COR will provide the details of the non-conformance using the Nonconformance Report (NCR), Attachment 5 to the KO, who will notify the Contractor of each nonconformance occurrence, unless the KO has authorized the COR to submit directly to the contractor, and copy the KO. Resolution of any non-conformance discovered at the Subcontractor level will be addressed with the prime Contractor.

Non-conformances are classified as either: Level I (Minor); Level II (Major); or Level III (Critical).

6.1. Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written Contractor Nonconformance Report (NCR). However, the Government is required to document verbal Level I NCRs. The COR may issue verbal Level I NCRs directly to the appropriate level of Contractor management. The COR will notify the KO as soon as practical when a verbal Level I NCR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency. The KO will issue and sign written Level I NCRs, Attachment 5.

6.2. Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, a large number of documented Level I NCRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II NCRs. The KO issues all Level II NCRs in writing, Attachment 5. The COR will notify the KO as soon as practical when a major non-conformance is identified.

6.3. Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the manner in which the services are performed; prevent or impact a vital agency mission as a result of performance; or are for repeated or uncorrected Level II NCRs. The Contracting Office Director or Deputy Director issues written Level III NCRs. The COR is responsible for notifying the KO immediately upon discovery of a critical non-conformance.

6.4. Documenting NCRs. The COR will provide the details of the non-conformance using the NCR, Attachment 5. If the Requiring activity prefers to issue a locally developed NCR, documentation must include as a minimum: the Contract or Task Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; Contractor representative who was notified; and the suspense date for Contractor response/corrective action.

6.5. Tracking and Resolving NCRs. All NCRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The COR and KO shall track NCRs to ensure the Contractor identifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work.

7. Deduct Plan. This acquisition does not include a Deduct Plan.

8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Status Report and may be used to make adjustments to surveillance schedules and/or checklist items to increase or decrease surveillance, based on performance trends. Negative trends noted using Government data/observations could result in issuing the Contractor Nonconformance Report. Trends noted using Contractor data will not result in a NCR unless the Contractor has not addressed the negative trend. QASP changes based on Data Analysis will be coordinated with the Contracting Officer for approval.

9. Acceptance of Services. When all services have been deemed acceptable and there is documented, objective, quality evidence to support acceptable performance, the COR will accept the services provided and authorize payment to the Contractor. Acceptance and payment will be made by approving the Contractor’s Receiving Reports in Wide Area Workflow at https://piee.eb.mil/ as a WAWF Inspector, and/or Acceptor.

10. COR Status Report. COR Status Reports (CSR) will be submitted on a monthly basis to the Contracting Officer via the Surveillance and Performance Monitoring (SPM) module. CSRs must be uploaded into the Surveillance and Performance Monitoring (SPM) module using the “Smart Form”. CSRs will be due NLT the 10th day of the month following the month of surveillance. CSRs will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis must contain a summary of surveillances performed, Customer Feedback if any, NCRs if any, an analysis of the Contractors performance, recommended adjustments to surveillance schedules, and any other pertinent contract information IAW FAR 46.104, and the COR Appointment Letter. Completed Surveillance Checklists and NCRs, if any, will be included as attachments to COR Status Reports. See para 5.4.

11. Service Contract Reporting (SCR) in the System for Award Management (SAM). https://www.sam.gov. Reporting Labor Hours. Service contractor reporting of information is required in the System for Award Management (SAM) when a contract or order- 1) Has a total estimated value, including options, that exceeds $3 million; and 2) Is for services in the following service acquisition portfolio groups (see PGI 204.1703 for a list of applicable product and service codes):

(1) Logistics management services.

(2) Equipment-related services.

(3) Knowledge-based services.

(4) Electronics and communications

The system allows industry to report all manpower data into a single Federal-wide portal. For Contractors who meet the SCR reporting thresholds (in excess of $3 million), your entity must be registered in SAM.

SCR requires contractors to enter the following information for their contract or order:

(1) The total dollar amount invoiced for services performed during the preceding Government fiscal year under the contract or order.

(2) The number of Contractor direct labor hours, to include first-tier subcontractor direct labor hours, as applicable, expended on the services performed under the contract or order during the previous Government fiscal year.

Contractor reporting is required annually, by October 31, on the services performed under the contract or order, including any first-tier subcontracts, during the preceding Government fiscal year (October 1-September 30). For indefinite delivery contracts, basic ordering agreements, and blanket purchase agreements, 1) Reporting is required for each order issued under the contract or agreement that meets the requirements of PGI 204.1703 and, 2) Service contract reporting is not required for the basic contract or agreement. Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications.

12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback and CDRs, if any) will be used to support CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information.

13. Combating Trafficking In Persons (CTIP). In accordance with PGI 222.17 and FAR 52.222-50, the KO will be notified immediately of any information from any source that alleges a Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.

14. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance Files will be maintained in the on-line Joint Appointment Module (JAM) and Surveillance and Performance Monitoring (SPM) module IAW DoDI 5000.72, and DFARS PGI 201.602-2.

15. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications by the KO, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes.

COR’S Signature Block Date

Contracting Officer’s Signature Block Date

DOCUMENT REVISION HISTORY

This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes.

Version #
Effective Date
Originator
Summary of Changes

1.0

Attachments:

1. Performance Requirements Summary (PRS)

2. Customer Complaint Record

3. Surveillance Schedule

4. Surveillance Checklist

5. Nonconformance Report (NCR)

Attachment 1

Contract/Task Order Performance Requirements Summary

(PRS)

Performance Objective
Performance Standard
Performance Threshold
Incentive/ Disincentive

5.1.1 The Contractor shall manage work priorities coordinate for scheduling, develop MSRs, and execution reports to include coordination of all ITAM equipment requirements, field supplies, and vehicle requirements.

The PMP first draft shall be due to the ACOR within thirty (15) calendar days after the TO is awarded. Teams and Zoom are acceptable platforms.
No timeline deviation; 90% error free.
Incentive Positive CPARS Rating, no discrepancy reports filed.
5.2.5.2 LRAM Work Plan. In coordination with the ACOR, the Contractor shall use the government provided LRAM Work Plan as the framework for preparing work plans to execute current projects.
Project completed to the standard indicated in the LRAM Work Plan
All projects completed to 100 percent standard by end of PoP

Incentive Positive CPARS Rating, no discrepancy reports filed.

3.2.1 Accountability of Government Furnished Property or Equipment (GFP/GFE). The Contractor is responsible for the accountability of all GFP/GFE in their possession IAW the Performance Work Statement (PWS).
All require inventories submitted on time and no losses of property.
Reports submitted by due dates. No property loss.
Incentive Positive CPARS Rating, no discrepancy reports filed. Negligent loss or damage deductions.
3.5. Maintenance. The Contractor shall maintain all GFE used to complete assigned ITAM contract tasks in safe working order and shall follow regular service recommendations as determined in Equipment Maintenance Manuals or as directed by the Government maintenance activities.
Operator checks, Form 2404 completed daily and submitted weekly to the government, report NMC and maintenance faults.
Daily operator prior to equipment use. Form 2404 weekly. Maintenance faults reported by end of workday unless corrected. All 100%. Deadline faults reported by end of day.
Incentive Positive CPARS Rating, no discrepancy reports filed.
5.3 Supplies and Materials. The Contractor shall procure materials and supplies through ODCs as approved by the ACOR.
Submit purchase authorization through the ACOR. Obtain and provide quotes when required, Maintain funds balance for both obligated and committed ODCs. Provide receipts for all purchases
100% funds status. 100% receipts on file.
Incentive Positive CPARS Rating, no discrepancy reports filed.

Attachment 2 Customer Complaint Record

Attachment 3 Surveillance Schedule

The COR will develop a Surveillance Schedule for conducting surveillance. The COR may use the SPM Smart Form or any KO approved schedule.

Attachment 4 Surveillance Checklist(s)

COR SURVEILLANCE CHECKLIST Template

COR Inspection Checklist & Data Report (Fixed Firm Price Contract)
Period Of Performance:
Contractor:
From:
Contract Number:
To:
Service Provided:
Meeting Contract Requirements?

COR Name:

Date:
YES
No

Comments:

Comments:

Comments:

Comments:

Comments:

Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:

To populate the checklist, find in the PWS: "The Contractor Shall...”, Then, make that requirement a checklist item by converting the requirement to a question: “Did the contractor…" Each "Yes" can be graded as a 1, and each NO graded as a 0. Once the checklist is complete, the COR may generate a quantifiable performance rating using these numbers as metrics.

The COR will develop a Surveillance Checklist for conducting surveillance. The COR may use the SPM Smart Form or any KO approved checklist.

Attachment 5 Nonconformance Report (NCR) image1.emf

ACC_ORL_Customer Compliant Record.pdf

Army Contracting Command Orlando (ACC-ORL)

CUSTOMER COMPLAINT RECORD

DATE OF COMPLAINT TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION (Include name of person and contact information of person reporting the complaint for the organization

INDIVIDUAL (Include name and contact information)

NATURE OF COMPLAINT

CONTRACT NUMBER & REQUIREMENT REFERENCE

VALIDATION (document findings of validation of complaint), Complaint IS Valid (notify contractor)

Complaint IS NOT Valid

DATE / TIME CONTRACTOR INFORMED OF COMPLAINT CONTRACTOR NAME RECEIVING COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED AND VALIDATED BY

Copy provided for filing (COR) DATE:

Customer Follow-up DATE:

TIME OF COMPLAINT:

NATURE OF COMPLAINT:

CONTRACT NUMBER REQUIREMENT REFERENCE:

VALIDATION document findings of validation of complaint Complaint IS Valid notify contractor Complaint IS NOT Valid:

Complaint IS Valid notify contractor: Off

Complaint IS NOT Valid: Off

DATE TIME CONTRACTOR INFORMED OF COMPLAINT:

CONTRACTOR NAME RECEIVING COMPLAINT:

ACTION TAKEN BY CONTRACTOR:

RECEIVED AND VALIDATED BY:

Copy provided for filing COR DATE Customer Followup DATE:

undefined: Off undefined_2: Off

Date1_af_date:

Organization:

Individual:

Date4_af_date:

Date5_af_date:

image2.emf

COR Surveillance Schedule1.docx

“FOR OFFICIAL USE ONLY”

Contract #:

Contractor:

Functional Area:

Surveillance Period:

COR:

Date Submitted:

Date for

Surveillance

(Req Ref)

(Req Ref)

(Req Ref)

(Req Ref)

(Req Ref)

(Req Ref)

(Req Ref)

(Req Ref)

(Req Ref)

(Req Ref)

(Req Ref)

Instructions for Completing the

The surveillance schedule form shall be completed prior to the beginning of each month to identify when and where surveillance will be conducted throughout the month. If changes to the schedule occur during the month, the Contracting Officer Representative (COR) will line through the activity, annotate the reason for the change, indicate the revised date and annotate at the new date when the activity is to be conducted. Completed schedules shall be maintained as part of surveillance documentation in the COR contract files.

BLOCK 1: Enter contract number.

BLOCK 2: Enter contract title.

BLOCK 3: Identify the functional area or contract section to be surveilled.

BLOCK 4: Indicate performance period - month and year surveillance is to be accomplished.

BLOCK 5: Enter name of COR responsible for surveillance.

BLOCK 6: Indicate the date the schedule was prepared and submitted (Must be prior to start of surveillance period).

BLOCK 7: Indicate days of the month when surveillance will be performed (i.e. 1 thru 30).

BLOCKs 8(a) through 8(k) indicate the contract PWS paragraph and the PRS number. If all characteristics for a PWS Paragraph are to be surveilled on the same date, you do not need to enter the individual PRS numbers in the schedule.

image3.emf

Surveillance Checklist.xlsx Surv ChkList

ACC-ORL COR SURVEILLANCE CHECKLIST Template

COR Inspection Checklist & Data Report (Fixed Firm Price Contract) Period Of Performance:

Contractor: From:

Contract Number: To:

Service Provided: Meeting Contract Requirements ?

COR Name:

Date:

Select answer in cloumn C or D YES No

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:

To populate the checklist, find in the PWS: "The Contractor Shall..." , Then, make that requirement a checklist item by converting the requirement to a question: " Did the contractor…" Each "Yes" can be graded as a 1, and each NO graded as a 0, for example.

From this, the COR may generate a quantifiable performance rating using numbers.

List of Perf Parameters

Surveillance Checklist Questions for QASP

1. Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform grounds maintenance

2. Contractor shall perform to the standards of this PWS.

3. Contractor shall ensure all work accomplished maintains and presents a healthy, clean, neat, and professional appearance to all grounds included and covered by this contract in support of mission requirements for users, residents, and visitors to the installation (in accordance with DA PAM 420-1-1, Housing Management, Table 2-14, 4.Contractor shall maintain Improved, Semi-Improved, and Unimproved Grounds as identified under Technical Exhibit (TE) {X, X, X Insert Installation TEs}, in this PWS, utilizing accepted industry standards and practices, where practical.

5. Contractor shall include mowing grass, edging and trimming grass, removing grass trimmings from paved areas, irrigating, aerating lawn areas, applying fertilizer and/or lime, applying herbicide to lawn and landscape areas, maintaining plants, shrubs, and flowers, performing seasonal planting of plants and flowers, removing leaves, applying mulch, pruning trees, removing grass from cracks in sidewalks and pavements, and litter control.

6. Semi-Improved Areas. These areas are used for operational and maintenance purposes. Erosion control shall be the predominant grounds maintenance work performed in this area by the Contractor. This will include grassed areas, vegetated areas, trees, and pavements. The work performed in these areas by the Contractor shall include mowing grass

7. Contractor shall provide personnel support outside the normal hours of operation as required, including holidays, to support the Directorate of Public Works (DPW) Maintenance Division mission.

8. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the Contracting Officer.

9. The Program/Project Manager or the alternate Project Manager shall be available after normal duty hours to serve as the central point of contact for contractor operations.

10. Contractor personnel shall not be scheduled for overtime work.

11. Contractor shall make available competent personnel trained and capable of dealing with minor personnel injuries.

12. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the Contracting Officer (KO) or Contracting Officer’s Representative (COR) within two (2) hours of the incident.

13. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5.

14. The KO and Contracting Officer’s Representative (COR) shall meet periodically with the Contractor to review the Contractor's performance. Written minutes of such meetings will be recorded by the Government and signed by the Program/Project Manager and the Contracting Officer or COR and distributed within five (5) workdays after the meeting.

15. The Contractor may request a meeting with the Contracting Officer or COR when the Contractor believes such a meeting is necessary.

16. Written minutes of such meetings shall be recorded by the Contractor and signed all participants involved and distributed within five (5) workdays after the meeting. In either case, if the Contractor does not concur with any portion of the minutes, recorded by the Government or the Contractor, such non-concurrence shall be provided in writing to the Contracting Officer within two (2) calendar days following receipt of the minutes.

17. Communications pertaining to contractual administrative matters shall be addressed to the KO.

18. No changes in or deviation from the terms and conditions shall be affected without a written modification to the contract executed by the KO authorizing such changes.

19. The Contractor shall not in any way represent that it is a part of the U. S. Government, or that it has the authority to contract or procure supplies for the account of the United States of America.

20. The Contractor shall develop and maintain a Quality Control Plan acceptable to the Government

21. The Contractor shall develop and implement procedures to identify, prevent, and ensure against recurrence of defective services

22. Contractor shall submit resumes and an organization chart (to include contact info) for initial key personnel and replacements, to the KO.

23. The Contractor shall provide a Program/Project Manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer.

24. The Program/Project Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

25. The Program/Project Manager or alternate shall be available between {Insert the hours, i.e., 8:00 a.m. to 4:30p.m.}, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons.

26. All contract personnel shall be identified as a Contractor, i.e., badge, company logo, or uniform.

27. Contractor personnel’s conduct shall not reflect discredit upon the Government.

28. The Contractor shall ensure that personnel present a professional appearance.

29. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.

30. The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner.

31. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. In accordance with Department of Defense (DOD) Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/ gratuities, and on non-disclosure of sensitive or classified information.

32. The Contractor shall ensure employee conduct complies with 41 U.S.C. 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions.

33. The Contractor shall ensure no Contractor employees conduct political related activities or events on the installation.

34. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement.

35. The Contractor shall manage the timeliness, completeness and quality of problem identification to a degree acceptable to the Government.

36. The Contractor shall provide corrective action plans, timely identification of issues and effective management of subcontractors.

37. The Contractor shall assure customer satisfaction and professional and ethical behavior of all Contractor personnel

38. Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by Government representative).

39. The Contractor shall also provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office, and COR.

40. The Contractor shall safeguard all Government equipment, information and property provided for Contractor use.

41. The Contractor shall maintain a physical security checklist/log (e.g., Army Standard Form (SF) 701 Activity Security Checklist), which will be forwarded to the COR, not later than (NLT) the 10th of each month, following the month of surveillance.

42. At the close of each work period, Government facilities, equipment, and materials shall be secured by the Contractor.)

43. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated.

44. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.

45. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the COR.

46. Lost keys shall immediately be reported to the COR, by personal contact via phone and be followed up by written correspondence.

47. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.

48. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor.

49. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

50. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees.

51. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer (KO).

52. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons.

53. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

54. The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer (ATO)). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.

55. This training shall be completed within {XX} calendar days (recommend 30) of contract award and within {YY} calendar days (recommend five (5)) of new employees commencing performance with the results reported to the COR not later than {XX} calendar days (recommend 30) after contract award.

56. The Contractor shall safeguard and maintain all Government property and Contractor property, as well as provide for the safety and well-being of personnel employed in the administration of this contract.

57. The Contractor shall comply with the provision of AR 385-10, Army Safety Program.

58. The Contractor shall develop and implement a safety program for employees performing work under this contract.

59. The Contractor shall submit the Safety Plan to the Contracting Officer, or designated representative, for review and acceptance within 10 days of commencement of work.

60. Revisions shall be submitted five (5) calendar days prior to the effective date of change.

61. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards.

62. The Contractor shall be responsible for ensuring adherence to all applicable {insert Installation}, State of {insert State}, and federal rules and regulations.

63. Contractor must be certified/licensed in appropriate Environmental Protection Agency (EPA) and {XX} (fill in the state of performance) Department of Agriculture categories for the application of herbicides.

64. Required documentation of certification or licensure for new Contractor personnel shall be filed with the Contracting Officer or COR within 24 hours prior to performance of service by any Contractor personnel

65. The Contractor shall comply with tenants of the EO and when practicable, shall use:

a. (a) products with post-consumer recycled content

b. (b) products that are recyclable

c. (c) low toxicity or non-toxic products

d. (d) low-maintenance products

66. The Contractor is required to use these recycled or recovered products unless they cannot be procured within a reasonable period of time; at reasonable prices; or the product(s) do not meet technical or performance standards. EPA Guidelines are the minimum requirement.

67. The Contractor shall maintain records and submit an annual report to the COR, along with the annual certification required by FAR 52.223-9 Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items, upon completion of the basic year and each option year.

68. The Contractor shall comply with all federal, state, local and installation environmental laws, rules and plans.

69. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation in accordance with industry standards, local, federal and state laws, and according to manufactures' recommendations.

70. The Contractor will submit Material Safety Data Sheets (MSDS) for approval on all materials, five (5) days before delivery of the material, to the COR.

71. The Contractor shall make all environmental and hazardous material records available at the beginning of the next duty day after the Government’s request to view the records.

72. Discretionary landscaping decisions by the Contractor shall be made in a manner to maintain current grounds appearance, and to maintain an appearance consistent with the surrounding installation.

73. The Contractor shall repair Government property damaged by vehicles, erosion, drought or insect/diseases.

74. The Contractor shall furnish all labor, materials, and equipment to perform the repair work including cultivating and applying seed, sprigging, or placing sod.

75. All turf repair work shall be maintained to ensure successful growth.

76. Contractor shall notify the COR of the extent of the damage and proposed corrective action in the event that the Contractor discovers damages caused by another party.

77. The Contractor shall make no repairs until authorized by the KO or their designated representative.

78. Contractor reimbursement shall be based on itemized proposals negotiated by the Contracting Officer, and shall be executed under the Damage Repair Contract Line Item Number (CLIN).

79. Damages caused by Contractor employees during the execution of Contractor provided services shall be repaired at no cost to the Government.

80. The Contractor shall notify the COR and shall return the damaged area to its previous condition.

81. The Contractor shall submit a monthly damage report to the COR that annotates…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .