Sheet1
| Question: | Relates to: | Answer: |
| In Table 8, the terms “N/A” in the Point Target (Effective) Range column and “effective” in the Area Target Range column for the same weapons, and how these are applied to Table 4 through Table 7, are unclear. Can the Government explain, for example, how it will verify performance for the various M2 weapons shown in Table 8? |
Attachment 6 – VTESS Performance Specification, Tables 4 through 8
| DO 0001 specification has been amended to remove the effective and suppression range to only use the Point and Area Target verbiage in Tables 4 through 8. In the case of the M2 weapon, it will not be tested as a Point Target Weapon (i.e. hit/kill percentage) but will be tested as a Area Target Weapon (i.e. hit/kill/near miss percentage). | |
| The M2 beam profile test range in Attachment 15 has been reduced to 500 meters, but this does not equate to 50% of the stated M2 effective range (1,830 meters) per Table 8 of the VTESS Performance Specification. Please correct the beam profile test range to 915 meters, or change the effective range in the Performance Specification to 1000 meters, to ensure the LPA test reflects the actual performance that must be delivered under the contract. | Attachment 15 - Laser Pairing Analysis-Field |
Table 1 and Para. 2.1.1.6
| The M2 is a unique case due to not having an effective range (point target), as a result, the specification has been clarified to state the 500 meter requirement in 3.6.1. | |
| The addition of IWS 2 SATs (M2 and M240) to Table 10 appears to be an error. These SATs are required to meet a 1.5 meter MAXIMUM laser hit profile (width) against the IWS Vest. The table now requires the same laser to have a 2.0 meter MINIMUM laser hit profile (width) against a single VTESS detector. Since it is not possible for the minimum to be larger than the maximum, please remove the SATS from Table 10 to remove this conflict. | Attachment 6 – VTESS Performance Specification |
Table 10
| Table 10 has been amended. | |
| 52.209-3(a) states: "The Contractor shall test 30 unit(s) of Lot/Item CLIN 0001 as specified in this contract." Please clarify that the 30 units for first article testing are only the base units and not any of the delta kits that are a part of the CLIN 0001 Lot. | Attachment 4 – Delivery Order 0001 |
Section I, FAR 52.209-3
| 22 Base Kits, 2 Abrams, 2 Bradley, 2 MGS and 2 ATGM kits. DO 0001 has been amended. |
| Clause H.3 requires all incurred costs for the FPIF CLIN be submitted to the Government no later than 90 days after acceptance of the First Articles for the final cost negotiation and price revision required at the completion of the FPIF CLIN work. However, as CLIN 0001 is for the full DO 0001 production and not just the first articles, only the costs incurred while producing the first article units will have been incurred by the stipulated deadline. Since most of the costs for CLIN 0001 will not have been incurred by 90 days after first article acceptance, all of the necessary data for final cost negotiation and price revision would not be available. |
Did the Government intend to make the deadline 90 days after Government acceptance of the full CLIN 0001 Lot so all costs for that CLIN would be included in the incurred cost submittal?
RFP W900KK-16-R-0003
Section H, Clause H.3
| Language in section H has been updated to clarify the requirement |
| Page 51, Attachment 5, SOW, Section 3.7 – The Contractor shall take necessary actions to facilitate transition of the system from ICS to a combination of Life Cycle Contractor Support and organic support. ...The transition effort shall include an analysis of all failures and maintenance actions undertaken during the interim support and revising technical publications subject to Government approval to reflect actual fielded experience. ...The Contractor in conjunction with a Government representative and the appropriate third party representative (TSC / LCCS Contractor / organic) shall conduct a physical inventory of Spares, ST&TE, and consumables during the transition period. |
The ICS scope of work was removed from the SOW. This paragraph requires output from ICS in order to do the analysis of failures.
Question: What is the process for collection of this data for the analysis without ICS?
| W900KK-16-R-0003 draft RFP 12-24-2015 Page 51, Attachment 5 SOW, Section 3.7 | DO 0001 SOW paragraph 3.7 and associated CDRLs have been removed. |
| Page 149, Section L.9.0– Note 2 – The Range and Laboratory Analysis events will be held at the Towns Institute Science & Technology Experimentation Facility (TISTEF) site in the Kennedy Space Center (KSC). The Offeror shall require Kennedy Space Center (KSC) badges to enter the facility at TISTEF. It is recommended that the Offeror get their badge one day prior to their scheduled Laser Pairing Analysis date. The Offeror’s team information (see Note 5) shall be given to the Contracting Officer when scheduling the pairing analysis. |
Question: The Reference in Note 2 should be to Note 4 versus Note 5. Please confirm.
| W900KK-16-R-0003 draft RFP 12-24-2015 Page 149, Section 9.0 Note 2 | RFP L.9.0 has been updated. |
| Page 150, Section L.10.0 Note 1 – The Production Capability Assessment requires an initial self-assessment and briefing. The contractor shall include the results of the initial self-assessment and briefing with its proposal in Volume II. |
Question: Please confirm that the initial self-assessment and briefing are to be included in proposal Volume III and not Volume II.
| W900KK-16-R-0003 draft RFP 12-24-2015 Page 150, Section 10.0 Note 1 | RFP has been corrected. |
| Attachment 13 is password protected and therefore does not allow the offeror to adjust the print area on DO 0001 to display visibly on a printed page. The current print area does not print the last 10 columns of the spreadsheet. Also, the column width in some columns does not accommodate full answers. |
Question: Will the Government please address these problems and reissue Attachment 13?
| W900KK-16-R-0003 draft RFP 12-24-2015 Attachment 13 | Attachment 13 has been updated |
| Page 156, Section 12.0 - Offerors shall submit a list of all Government contracts (prime and major subcontractors, in performance or awarded, during the past 3 years), which are relevant to the efforts required by this solicitation. Relevant efforts include such things as Product Line Development, Product Line Management, Configuration Management, Architectural Development, Architecture Management, Live Training Engagement Composition (LTEC) development, IA System Certification, Army Live Collective/Individual Training and Training Systems (development, integration, fielding, sustainment, etc.), and Live, Virtual & Constructive Interoperability.. |
Question: In order to provide a more thorough review of the most relevant contracts, will the Government consider limiting the response to a maximum of 10 contracts?
| W900KK-16-R-0003 draft RFP 12-24-2015 Page 156, Section 12.0 | The Government has reviewed the recommendation. The RFP will stand as written. |
| Page 1, Question 2 from IMILES VTESS DRAFT RFP questions dated December 7 - Reference Production Capability Assessment. Response Answer: The Government intends to visit all of the production facilities that the offeror is describing to be used for the VTESS production. DCMA will support PEO STRI in accomplishing this mission. The only location where DCMA is unlikely to go is Mexico, in this situation, PEO STRI will supply the appropriate resources to accomplish the mission. |
Question: To ensure fair and consistent evaluation of the Production Capability Assessment (PCA) of offeror's facilities, would the Government consider using a single evaluation agency for all sites and not a combination of DCMA for some sites and PEO STRI for Mexico?
| Question 2 from IMILES VTESS DRAFT RFP questions dated December 7 | The Government intends at least one consistent person across all Production Capability Assessments. All Government representatives will be using the IMILES VTESS Section L to execute the PCA. |
| Page 31, Attachment 6, Section 3.6.1, Delivery Order 0001 Performance Specification |
Question: Should the IWS2 M2 SAT and IWS2 M240 SAT be removed from the Target Hit Table, Table 10, as these laser transmitters are not set up to be profiled for vehicles with a horizontal aspect?
| W900KK-16-R-0003 draft RFP 12-24-2015 Delivery Order 0001 Performance Specification | Table 10 has been amended. |
| Page 18, Attachment 6, Section 3.4.8, Delivery Order 0001 Performance Specification - IMILES VTESS shall interface with the DIFCUE, Device number 06-69 (Ref: 9721801C - Prime Item Function Specification for the Keyless Direct/Indirect Fire Cue). IMILES VTESS shall provide the capability via Controller Mode to enable or disable the DIFCUE functionality. IMILES VTESS operation, with the exception of the DIFCUE not firing, shall not be affected when the DIFCUE is not connected. |
When the IMILES VTESS DIFCUE functionality is disabled, IMILES VTESS shall not generate a message to fire the DIFCUE under any circumstances. When enabled, the DIFCUE interface shall:
1. Generate a firing command in response to a catastrophic kill assessment by the IMILES VTESS.
2. Generate a firing command in response to the appropriate message from the instrumentation system IAW the IS-TESS Interface Standard, PRF-PT-00552.
3. Not generate a firing command in response to a MCC Universal Kill.
4. Notify the operator through the IMILES VTESS BIT if the DIFCUE is not connected to the IMILES VTESS.
Question: Does the Government expect the DIFCUE to be powered by the VMC, and if so, does the offeror need to provide a power cable as part of the Base Kit?
| W900KK-16-R-0003 draft RFP 12-24-2015 Delivery Order 0001 Performance Specification | Yes, the IMILES VTESS will be required to power both the DIFCUE and MGSS. Yes, a cable will need to be provided. |
| D0001 SOW, para 3.3.7.1, page 34 states: “The Government will require IMILES VTESS to be independently tested by the Army Test and Evaluation Command.” “The contractor shall provide assistance as needed…” |
When is this test? How long is this test? What is the intent of this test? Under which CLIN is this test priced, deliverable and billable?
SOW DO 001 SOW Page_34______ Section #_3.3.7.1
| This test event is discussed in DO 0001 SOW para. 3.3.7.1. The test timing will be based on offerors proposed schedule and is expected to occur after SVT but before GAT. This test will be developmental in nature and will be conducted using VTESS with contractor provided test procedures. Offerors will be requested to support test event in the manner described in DO 0001 SOW para. 3.3.7.1 This work should be priced in the NRE CLIN based on a two week test event. |
| "Attachment 4, D0001 Section B, page 43, clause 52.209-3: “The Contractor shall test 30 unit(s) of Lot/Item CLIN 0001 as specified in this contract.” |
CLIN 0001 includes base kits, Abrams kits, Bradley kits, MGS kits and ATGM kits. Will the Government clarify how many of each type of kits are to be included in this test?
| ATTACHMENT 4 (DO 0001)____ Section B, pg 43_ | 22 Base Kits, 2 Abrams, 2 Bradley, 2 MGS and 2 ATGM kits. DO 0001 has been amended. | |
| D0001 SOW, para 3.3.1, page 32: references LRIP units but nowhere else in RFP are LRIP units described, delivered or quantified. Will the Government clarify the reference to LRIP units? | SOW DO 001 SOW___ Page_32___ Section #_3.3.1_ | LRIP units are first article units. |
| Submitting all of the first article test reports within 60 days of contract award is un-executable. Will the government please edit the paragraph (52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989) as shown below in bold? |
(b) The Contractor shall submit the first article test report (To be determined at contract award) ...
| ATTACHMENT _#4_(IMILES DO 0001)_Section_52.209-3_ FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989) | DO 0001, clause 52.209-3 has been updated to reflect 570 days. |
| Attachment 4 (IMILES VTESS Delivery Order 0001) and Attachment 13 (Cost Price Workbook), show an NRE (Non-recurring Engineering) line item in CLINs 1001, 2002, 3002, 4002. However, NRE is not defined in any other documents. |
Will the Government please provide the applicable SOW paragraphs for NRE?
ATTACHMENT _#4_(IMILES DO 0001)_Section_B, Pg 5 ATTACHMENT 13 (Cost Price Workbook)
| NRE is anything required in the DO 0001 SOW that is not specifically broken out and listed in another CLIN. DO 0001 CLIN descriptions have been updated. |
| W900KK-16-R-0003_IMILES_VTESS_IDIQ_17_DEC_2015 indicates in Section A that the contract will be for a period of five (5) years and with two (2) one-year options. Attachment 13 (Cost Price Workbook) DO 0001 tab provides pricing for only five (5) periods. |
Will the Government provide pricing instructions for the two (2) one-year options?
ATTACHMENT _W900KK-16-R-0003_IMILES_VTESS_IDIQ _Section_A, Pg 2 ATTACHMENT 13 (Cost Price Workbook) DO 001 tab
| The IDIQ contract is for a base period of 5 years and two one year options. No CLIN pricing is required for the IDIQ. Offerors will provide Fixed Fully Burdened T&M rates (for each year of the IDIQ) and range pricing for base kits that will be incorporated into the IDIQ. Future DOs will be priced using these two elements. The first order against the IDIQ, DO 0001, will have contract period totaling 5 years and requires CLIN pricing is required for each year as specified in Attachment 13. |
| W900KK-16-R-0003_IMILES_VTESS_IDIQ_17_DEC_2015, Section L.13.0 FACTOR 5 – COST/PRICE (VOLUME VI) indicates that offeror shall provide a Target Cost and a Target Profit which calculates Target Price, x 1.20 for a Ceiling Price. Attachment 4 (IMILES VTESS Delivery Order 0001) and Attachment 13 (Cost Price Workbook) Instructions tab indicates for CLIN 0001 that offeror shall fill in the “Total Target Price” value. |
Will the Government please clarify whether evaluation will be made on Target Price or Ceiling Price?
| ATTACHMENT _W900KK-16-R-0003_IMILES_VTESS_IDIQ Section L.13.0 FACTOR 5 – COST/PRICE (VOLUME VI) | The Ceiling price for CLIN 0001 will be used in evaluating the total evaluated price for this solicitation. The price workbook, Attachment 13 and section M.7.0 have been updated to reflect the method for pricing CLIN 0001 and for evaluating the Total Evaluated price for this solicitation. |
| For Attachment 4 (Delivery Order 0001) Section B and 13 (Cost Price Workbook) tab DO 001 cell D7 |
Will the government please provide the applicable DO-0001 SOW paragraphs that the phrases “System Verification Test” and “performance is in accordance with CDRLs A026 and A028” refers to? We have the same question for CLINs 0005, 0006, 0012.
| ATTACHMENT _ Attch 4 (Delivery Order 0001) Section B and 13 (Cost Price Workbook) tab DO 001 cell D7 | CDRLs A026 and A028 have been removed from the CLIN description. These CDRLs are included in the NSP CDRL CLIN. Appropriate DIDs are incorporated into DO 0001 SOW. DO 0001 CLIN descriptions have been updated. |
| Attachment 4 indicates offeror is to provide a price for “Government Acceptance Test” in CLIN 003 and references CDRLs A026 and A028. |
In order to ensure that the offeror includes pricing for all applicable work for this CLIN, will the Government please provide the applicable DO-0001 SOW paragraphs corresponding to “Government Acceptance Test”? Same question applies for CLINs 0004, 0007, 0008, 0009, 0013
| ATTACHMENT _ Attch 4 (Delivery Order 0001) Section B and 13 (Cost Price Workbook) tab DO 001 cell D8 | CDRLs A026 and A028 have been removed from the CLIN description. These CDRLs are included in the NSP CDRL CLIN. Appropriate DIDs are incorporated into DO 0001 SOW. DO 0001 CLIN descriptions have been updated. |
| DO 0001 SOW sections 3.1.1 through 3.1.6.2 and SOW sections 3.2 and sections 3.2.1 through 3.2.7.8 |
Where should the DO 0001 work scope that is not specifically called out in Attachments 4 (IMILES VTESS Delivery Order 0001) and 13 (Cost Price Workbook), be priced? Is this work to be priced as FFP or FPI? There are multiple elements of the DO 0001 work scope that are not specifically included in the Year 1 CLIN structure. Examples include DO 0001 SOW sections 3.1.1 through 3.1.6.2 and SOW sections 3.2 and sections 3.2.1 through 3.2.7.8.
| SOW _DO 001 SOW_________ Page___________ Section #_3.1.1 – 3.1.6.2_ | How much of this work is executed in a given year or attributed to FPIF or FFP CLIN based upon the offerors approach. However, the earned value management tasks in 3.1.2.1 should only be associated with CLIN 0001. DO 0001 CLIN Descriptions have been updated. | |
| Is the workbook Attachment 13 to be printed and included in the Cost/Price (Volume VI) submittal? If yes, will the Government update Attachment 13 to include all requirements included in Section B of Attachment 4? | ATTACHMENT: DRFP (W900KK-16-R-0003_IMILES_VTESS_IDIQ_17_DEC_2015), ATTACHMENT 4 (Delivery Order 0001), and ATTACHMENT 13 (Cost Price Workbook) | Attachment 13 lists all the CLINs to be priced for DO 0001, the Fixed Fully Burdened T&M rates which will be incorporated into the IDIQ and the base kit range pricing that will be incorporated into the IDIQ. |
| Is Section B of Attachment 4 to be filled out and included in the Cost/Price (Volume VI) submittal? If so, will the Government specify what unit price is to be included, and defined NET AMOUNT in CLINs 1001, 2001, 3001 and 4001? | ATTACHMENT: 4 (Delivery Order 0001), Section B | CLINs 1001, 2001, 3001 and 4001 will populate automatically based on pricing provided in range pricing worksheet. |
| In Attachment 13, will the Government specify where Offeror should provide Target Cost and Ceiling Price? | ATTACHMENT: 13 (Cost Price Workbook) | Attachment 13 has been modified to include the target cost and target profit. The ceiling price will calculate automatically. |
| Attachment 13 (tab DO 001) cell A5 lists multiple kit types, will the Government specify which kit unit price should be entered in cell D5? | ATTACHMENT: 13 (Cost Price Workbook) tab DO 0001, cell A5 | Attachment 13 has been modified to include the target cost and target profit. The ceiling price will calculate automatically. CLIN 0001 is now defined as a LOT. |
| • Will the Government specify where the Offeror should apply Non-recurring Engineering (NRE) for Year 1 in Attachment 13 (Cost Price Workbook), tab DO 0001? | ATTACHMENT: 13 (Cost Price Workbook) tab DO 0001 | NRE should be included in CLIN 0001. For subsequent years, NRE is anything required in the DO 0001 SOW that is not specifically broken out and listed in another CLIN. DO 0001 CLIN descriptions have been updated. |
| • Request the removal of the following FAR Clauses: |
o Section I page 88 -FAR 52.227-14 Rights in Data – General – DRFP o Section I page 88 - FAR 52.227-17 Rights in Data – Special Works - DRFP o Section I page 96 - FAR 52.227-23 Rights to Proposal Data - DRFP The FAR clauses conflict with the corresponding DFARS clauses which are included in the RFP.
| ATTACHMENT: DRFP (W900KK-16-R-0003_IMILES_VTESS_IDIQ_17_DEC_2015) Section I, pg 88 | The RFP has been amended to use DFARS 227.4 guidance. | |
| Is it the Government’s intent that Offeror must bid exactly four (4) quantity ranges (per “range Pricing” worksheet of Attachment 13)? | ATTACHMENT: 13 (Cost Price Workbook), Range Pricing tab | yes |
| Is it the Government’s implication that the highest of quantity ranges incorporate a max quantity of 25,000? | ATTACHMENT: DRFP (W900KK-16-R-0003_IMILES_VTESS_IDIQ_17_DEC_2015), Section B.2-Range Pricing, pg 3 | yes. |
| "The current draft RFP includes FAR 52.225-1 Buy American – Supplies, certification at FAR 52.225-2, Buy American Act Certificate, as well DFARS 252.225-7021 Trade Agreements. As noted below, based on the value of the procurement and the types of products being acquired, the procurement should only be subject to the Trade Agreements Act (TAA) and its implementing clauses and certifications, instead of the Buy American Act. |
-Pursuant to FAR 25.402, DFARS 225.103(a)(i)(B) and DFARS 225.403, the BAA does not apply if the procurement is covered by a trade agreement, including the World Trade Organization Government Procurement Agreement (WTO GPA). Please see FAR 25.402(a) (“In acquisitions covered by the WTO GPA, Free Trade Agreements, or the Israeli Trade Act, the USTR has waived the Buy American Act and other discriminatory provisions for eligible products.”) -As set forth in FAR 25.402(b), procurements of supplies and services are covered by the WTO GPA if the value of the procurement is in excess of $202,000. In this case, given the number of training devices to be acquired, the value of the procurement is estimated to be well in excess of $202,000.
-This procurement is for training aids and devices, and has been categorized by the Army under FSG 69, “Training aids and devices” – a category of end product that is specifically identified in DFARS 225.401-70 as a type of end products that is “covered by trade agreements if the value of the acquisition is at or above the applicable trade agreement threshold and no exception applies.”
Because this procurement is for a type of product that is covered by trade agreements as set forth in DFARS 225.401-70 and because the value of the procurement is in excess of the applicable dollar threshold established by the WTO GPA, we respectfully request that the final RFP be amended to delete the following clauses:
-52.225-1 Buy American Act – DRFP, Section I page 96 -52.225-2 Buy American Certificate – DRFP page 122
| ATTACHMENT: DRFP (W900KK-16-R-0003_IMILES_VTESS_IDIQ_17_DEC_2015), Section I page 96 and page 122 | The RFP has been amended. | |
| What are the procedures for booking the ARL IMILES Lab for end-to-end testing of our VTESS equipment? | ATTACHMENT__16__________ SECTION________ | For the purposes of source selection, the procedures are defined in section L of the RFP. The Government will provide a date and time upon an offerors intent to bid email following the release of final RFP. The offerors will not be provided access to the I-MILES Lab for their own end-to-end testing prior to completion of source selection. Thereafter, I-MILES Lab access is coordinated through PM LTS. |
VTESS Draft RFP Question Received in response to documents posted 17 DEC 2015