About this file

Attachment 9 Exhibit C

View the file

Other files

File Type Posted
Attachment_6_DO_0001_IMILES_VTESS_Performance_Specification.pdf PDF
W900KK-16-R-0003_Amendment_0003.pdf PDF
W900KK-16-R-0003_Amendment_0003__Conformed_Copy.pdf PDF
W900KK-16-R-0003_Amendment_0002.pdf PDF
1-Attachment_13_Cost_Price_Workbook_8.xlsx XLSX spreadsheet
W900KK-16-R-0003_Amendment_0002_Conformed_Copy.pdf PDF
Final_RFP_QandA_14JAN2016.pdf PDF
Final_RFP_QandA_14JAN2016.pdf PDF
Attachment_7_DO_0001_CDRLs.pdf PDF
Attachment_15_Laser_Paring_Analysis.pdf PDF
Attachment_13_Cost_Price_Workbook_8.xlsx XLSX spreadsheet
W900KK-16-R-0003_Amendment_0001.pdf PDF
W900KK-16-R-0003__Amendment_0001_Conformed_Copy.pdf PDF
Attachment_4_IMILES_VTESS_Delivery_Order_0001.pdf PDF
Attachment_6_DO_0001_IMILES_VTESS_Performance_Specification.docx DOCX document
List_of_potential_Small_Business_Offerors.docx DOCX document
W900KK16R0003.pdf PDF
Attachment_12_TDP_Drawings.pdf PDF
Attachment_5_IMILES_VTESS_DO_0001_SOW.pdf PDF
Attachment_11_Exhibit_Z.pdf PDF
Update_to_QnA_posted_on_24_DEC_2015.pdf PDF
Attachment_10_Exhibit_E.pdf PDF
Attachment_1_IMILES_VTESS_Basic_SOW.pdf PDF
Attachment_4_IMILES_VTESS_Delivery_Order_0001.pdf PDF
Attachment_6_DO_0001_IMILES_VTESS_Performance_Specification.pdf PDF
Attachment_8_Exhibit_A.pdf PDF
Attachment_18_Solicitation_Clarification_Form.doc DOC document
Attachment_3_SB_Participation_Form.pdf PDF
Attachment_15_Laser_Paring_Analysis.pdf PDF
Attachment_2_DD254.pdf PDF
Attachment_17_Production_Capability_Assessment.pdf PDF
Attachment_14_PastPerfQuestionnaire.pdf PDF
Draft_RFP_22_DEC_QnA.xlsx XLSX spreadsheet
Attachment_13_Cost_Price_Workbook_8.xlsx XLSX spreadsheet
Attachment_16_Laser_Paring_Laboratory__Analysis.pdf PDF
Attachment_7_DO_0001_CDRLs.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9

04/24/15

ANNEX TO EXHIBIT - C

DATA ITEM NUMBERS:

C002 PAGE-BASED TECHNICAL MANUALS - OPERATOR USER’S MANUAL

C003 PAGE-BASED TECHNICAL MANUALS - SYSTEM MAINTENANCE MANUAL

PAGE-BASED TECHNICAL MANUALS

MIL-STD 40051-2B

DEPARTMENT OF DEFENSE STANDARD PARCTICE PREPARATION OF DIGITAL TECHNICAL

INFORMAITON FOR PAGE-BASED TECHNICAL MANUALS

FOR

INSTRUMENTABLE MULTIPLE INTEGRATED LASER

ENGAGEMENT SYSTEM VEHICLE TACTICAL

ENGAGEMENT SIMULATION SYSTEM (I-MILES VTESS)

Prepared by

U.S. ARMY Program Executive Office of Simulation, Training, & Instrumentation (PEO STRI)

12350 Research Parkway Orlando, Florida 32826-3276

MIL-STD-40051-2B

TABLE A-II. TM Requirements Matrix for Operator User’s Manual. .

TM Content -10

-13

-13&P

-14

-14&P

MIL-STD-40051-2

Reference Element Name

FRONT MATTER R R R 5.2.1 <paper.frnt>

Front cover R R R 5.2.1.1 <frntcover>

(MC) Promulgation letter 5.2.1.2 <promulgation>

Warning summary 5.2.1.4 <warnsum>

Change transmittal page 5.2.1.5 <chgsheet>

List of effective pages / work packages

(Excluding pocket TMs and publications with less than eight pages)

R R R 5.2.1.6 <loepwp>

Title block page R R R 5.2.1.7 <titleblk>

Table of contents R R R 5.2.1.9 <contents>

How to use this manual R R R 5.2.1.10 <howtouse>

CHAPTER 1.

GENERAL INFORMATION,

EQUIPMENT DESCRIPTION

AND THEORY OF

OPERATION

R R R Appendix B <gim>

GENERAL INFORMATION WORK

PACKAGE

R R R B.5.2 <ginfowp>

Scope R R R B.5.2.3 <scope>

Maintenance forms, records, and reports R R R B.5.2.4 <mfrr>

Reporting equipment improvement recommendations (EIR)

R R R B.5.2.5 <eir>

Hand receipt (HR) manuals B.5.2.6 <handreceipt>

Corrosion prevention and control (CPC) R R R B.5.2.7 <cpcdata>

Ozone depleting substances (ODS) B.5.2.8 <odsdata>

Destruction of Army materiel to prevent enemy use

R R R B.5.2.9 <destructmat>

Preparation for storage or shipment R R R B.5.2.10 <pssref>

Warranty information B.5.2.11 <wrntyref>

Nomenclature cross-reference list B.5.2.12 <nomenreflist>

List of abbreviations/acronyms R R R B.5.2.13 <loa>

Quality of material P B.5.2.15 <qual.mat.info>

Safety, care, and handling B.5.2.16 <sftyinfo>

Nuclear hardness B.5.2.17 <hcp>

Calibration B.5.2.18 <calref>

Supporting information for repair parts, special tools, TMDE, and support equipment

P B.5.2.25 <supdata>

Copyright credit line B.5.2.26 <copyrt>

TM Content -10

-13

-13&P

-14

-14&P

MIL-STD-40051-2

Reference Element Name

EQUIPMENT DESCRIPTION AND

DATA WORK PACKAGE

R R R B.5.3 <descwp>

Equipment characteristics, capabilities, and features

R R R B.5.3.3 <eqpinfo>

Location and description of major components

R R R B.5.3.4 <locdesc>

Differences between models B.5.3.5 <eqpdiff>

Equipment data R R R B.5.3.6 <eqpdata>

THEORY OF OPERATION WORK

PACKAGE

R R R B.5.4 <thrywp>

CHAPTER X.

OPERATOR INSTRUCTIONS

R R R Appendix C <opim>

DESCRIPTION AND USE OF

OPERATOR CONTROLS AND

INDICATORS WORK PACKAGE

R R R C.5.2.2.1 <ctrlindwp>

OPERATION UNDER USUAL

CONDITIONS WORK PACKAGE

R R R C.5.2.2.2 <opusualwp>

Operation Under Unusual Conditions

Task

R R R C.5.2.2.2.3 <opertsk>

Security measures for electronic data C.5.2.2.2.2 <secref>

Siting requirements C.5.2.2.2.5 <site>

Shelter requirements C.5.2.2.2.6 <shelter>

Assembly and preparation for use C.5.2.2.2.7 <prepforuse>

Initial adjustments, before use and self-test

C.5.2.2.2.8 <initial>

Operating procedures R R R C.5.2.2.2.9 <oper>

Operating auxiliary equipment C.5.2.2.2.11 <operaux>

Preparation for movement C.5.2.2.2.12 <prepmove>

Decals and instruction plates C.5.2.2.2.13 <instructplt>

OPERATION UNDER UNUSUAL

CONDITIONS WORK PACKAGE

R R R C.5.2.2.2.3 <opunutsk>

Operation Under Unusual Conditions

Task

R R R C.5.2.2.3.5 <unusualenv>

Security measures for electronic data C.5.2.2.3.4 <secref>

Unusual environment / weather R R R C.5.2.2.3.5 <unusualenv>

Fording and swimming C.5.2.2.3.6 <fording>

Interim nuclear, biological, and chemical

(NBC) decontamination procedures

C.5.2.2.3.7 <decon>

Jamming and electronic countermeasures

(ECM) procedures

C.5.2.2.3.8 <ecm>

-13

-13&P

-14

-14&P

MIL-STD-40051-2

Reference Element Name

Degraded operation procedures C.5.2.2.3.9 <degraded>

Decals and instruction plates C.5.2.2.3.10 <instructplt>

EMERGENCY WORK PACKAGE C.5.2.2.3.10 <emergencywp>

STOWAGE AND DECAL / DATA

PLATE GUIDE WORK PACKAGE

C.5.2.2.5 <stowagewp>

ON-VEHICLE EQUIPMENT

LOADING PLAN WORK PACKAGE

C.5.2.2.6 <eqploadwp>

CHAPTER X.

TROUBLESHOOTING

MASTER INDEX

Appendix D

D.5.4.4

<tim>

<masterindexcategor y>

TROUBLESHOOTING INDEX

WORK PACKAGE

D.5.5.5 <tsindxwp>

CHAPTER X.

TROUBLESHOOTING

PROCEDURES

NOTE

The notation (*) indicates that, if required, at least one of the these content items shall be included

R R Appendix D

D.5.4.2

<tim>

<troublecategory>

INTRODUCTION WORK PACKAGE D.5.5.3 <tsintrowp>

TROUBLESHOOTING INDEX

WORK PACKAGE

D.5.5.5 <tsindxwp>

*OPERATIONAL CHECKOUT

WORK PACKAGES

D.5.5.8.3 <opcheckwp>

*TROUBLESHOOTING

PROCEDURES WORK PACKAGES

D.5.5.8.4 <tswp>

*COMBINED OPERATIONAL

CHECKOUT AND

TROUBLESHOOTING

PROCEDURES WORK PACKAGES

D.5.5.8.5 <opcheck-tswp>

CHAPTER X.

PMCS MAINTENANCE

INSTRUCTIONS

NOTE

PMCS is required as a minimum in one maintenance chapter

R R R Appendix E

E.5.2.1

<mim>

<pmcscategory>

PMCS INTRODUCTION WORK

PACKAGE

R R R E.5.3.4.1 <pmcsintrowp>

-13

-13&P

-14

-14&P

MIL-STD-40051-2

Reference Element Name

PMCS, INCLUDING LUBRICATION

INSTRUCTIONS, WORK PACKAGE

R R R E.5.3.4.2 <pmcswp>

CHAPTER X.

MAINTENANCE

INSTRUCTIONS

NOTE

PMCS is required as a minimum in one maintenance chapter

R R R Appendix E

E.5.2.2 E.5.2.3

<mim>

<maintenancepmcscat egory><maintenancec ategory>

SERVICE UPON RECEIPT

WORK PACKAGE(FIELD LEVEL

ONLY)

R R R E.5.3.2 <surwp>

Service upon receipt tasks R R R R E.5.3.2.3 <surtsk>

Siting E.5.3.2.3.1 <siting>

Shelter requirements E.5.3.2.3.2 <shltr>

Service upon receipt of materiel R R R E.5.3.2.3.3 <surmat>

Installation instructions R R R E.5.3.2.3.4 <install>

Preliminary servicing of equipment E.5.3.2.3.4.45 <preserv>

Preliminary checks and adjustment of equipment

E.5.3.2.3.6 <prechkadj>

Preliminary calibration of equipment E.5.3.2.3.7 <precal>

Circuit alignment E.5.3.2.3.8 <calign>

Ammunition markings E.5.3.2.3.9.1 <mark>

Classification of defects E.5.3.2.3.9.2 <ammo.defect>

Ammunition handling E.5.3.2.3.9.3 <ammo.handling>

Procedures to activate ammunition E.5.3.2.3.9.4 <arm>

Other service upon receipt task E.5.3.2.3.10 <other.surtsk>

Follow-on maintenance E.5.3.2.3.11 <followon.maintsk>

EQUIPMENT / USER FITTING

INSTRUCTIONS WORK PACKAGE

E.5.3.3 <perseqpwp>

PMCS INTRODUCTION WORK

PACKAGE

R R R E.5.3.4.1 <pmcsintrowp>

PMCS, WORK PACKAGE R R R E.5.3.4.2 <pmcswp>

MAINTENANCE WORK PACKAGES R R R E.5.3.5 <maintwp>

Maintenance Tasks R R R E.5.3.5.3 <maintsk>

Inspect E.5.3.5.3.2 <inspect>

Test E.5.3.5.3.3 <test>

Service E.5.3.5.3.4 <service>

Adjust E.5.3.5.3.4 <adjust>

Align E.5.3.5.3.6 <align>

-13

-13&P

-14

-14&P

MIL-STD-40051-2

Reference Element Name

Calibrate E.5.3.5.3.7 <calibration>

Remove E.5.3.5.3.8 <remove>

Install E.5.3.5.3.9 <install>

Replace E.5.3.5.3.10 <replace>

Repair E.5.3.5.3.11 <repair>

Paint E.5.3.5.3.12 <paint>

Overhaul E.5.3.5.3.13 <overhaul>

Rebuild E.5.3.5.3.14 <rebuild>

Lubricate E.5.3.5.3.15 <lube>

Mark E.5.3.5.3.16 <mark>

Pack E.5.3.5.3.17 <pack>

Unpack E.5.3.5.3.18 <unpack>

Preserve E.5.3.5.3.19 <preserv>

Prepare for use E.5.3.5.3.20 <prepforuse>

Assemble E.5.3.5.3.21 <assem>

Disassemble E.5.3.5.3.22 <disassem>

Clean E.5.3.5.3.23 <clean>

Nondestructive inspection E.5.3.5.3.24 <ndi>

Radio interference suppression E.5.3.5.3.25 <ris>

Place in service E.5.3.5.3.26 <pis>

Towing E.5.3.5.3.27 <tow>

Jacking E.5.3.5.3.28 <jack>

GENERAL MAINTENANCE WORK

PACKAGE

E.5.3.7 <gen.maintwp>

LUBRICATION INSTRUCTIONS

WORK PACKAGE

E.5.3.8 <lubewp>

ILLUSTRATED LIST OF

MANUFACTURED ITEMS WORK

PACKAGE (FIELD LEVEL AND

ABOVE)

E.5.3.10

Illustrated list of manufactured items introduction work package

E.5.3.10.1 <manu_items_introwp

Manufacturing procedures work package E.5.3.10.2 <manuwp>

TORQUE LIMITS WORK PACKAGE E.5.3.11 <torquewp>

WIRING DIAGRAMS WORK

PACKAGE(FIELD LEVEL AND

ABOVE)

E.5.3.12 <wiringwp>

-13

-13&P

-14

-14&P

MIL-STD-40051-2

Reference Element Name

CHAPTER X.

AUXILIARY EQUIPMENT

MAINTENANCE

INSTRUCTIONS

Appendix E

E.5.2.6

<mim>

<auxiliarycategory>

AUXILIARY EQUIPMENT

MAINTENANCE WORK PACKAGE

E.5.3.14 <auxeqpwp>

ILLUSTRATED LIST OF

MANUFACTURED ITEMS WORK

PACKAGE(FIELD LEVEL AND

ABOVE)

E.5.3.10

Illustrated list of manufactured items introduction work package

E.5.3.10.1 <manu_items_introwp

Manufacturing procedures work package E.5.3.10.2 <manuwp>

TORQUE LIMITS WORK PACKAGE

(FIELD LEVEL AND ABOVE)

E.5.3.11 <torquewp>

WIRING DIAGRAMS WORK

PACKAGE(FIELD LEVEL AND

ABOVE)

E.5.3.12 <wiringwp>

CHAPTER X.

AMMUNITION

MAINTENANCE

INSTRUCTIONS

E.5.2 E.5.2.7 <mim>

<ammunitioncategory

AMMUNITION MAINTENANCE

WORK PACKAGE

E.5.3.15.1 <ammowp>

AMMUNITION MARKING

INFORMATION WORK

PACKAGE

E.5.3.15.2 <ammo.markingwp>

FOREIGN AMMUNITION

(NATO) WORK PACKAGE

E.5.3.15.3 <natowp>

CHAPTER X.

PARTS INFORMATION

(-10, -13, -14)

(-13&P, -14&P)

P

R

Appendix F <pim>

INTRODUCTION WORK PACKAGE P R R F.5.3.5 <introwp>

REPAIR PARTS LIST WORK

PACKAGE

P R R F.5.3.6 <plwp>

REPAIR PARTS FOR SPECIAL

TOOLS WORK PACKAGE

P F.5.3.7 <stl_partswp>

-13

-13&P

-14

-14&P

MIL-STD-40051-2

Reference Element Name

KIT PARTS LIST WORK PACKAGE P F.5.3.8 <kitswp>

BULK ITEM WORK PACKAGE P F.5.3.9 <bulk_itemswp>

SPECIAL TOOLS LIST WORK

PACKAGE

P F.5.3.10 <stlwp>

NSN INDEX WORK PACKAGE P R R F.5.3.11.1 <nsnindxwp>

P/N INDEX WORK PACKAGE P R R F.5.3.11.2 <pnindxwp>

REFERENCE DESIGNATOR INDEX

WORK PACKAGE

P F.5.3.11.3 <refdesindxwp>

CHAPTER X.

DESTRUCTION OF

EQUIPMENT TO PREVENT

ENEMY USE NOTE IF A SEPARATE

DESTRUCTION OF MATERIAL MANUAL

IS NOT DEVELOPED FOR THIS

EQUIPMENT, THEN THE DESTRUCTION

CHAPTER MUST BE INCLUDED.

Appendix H <dim>

DESTRUCTION OF EQUIPMENT

TO PREVENT ENEMY USE

INTRODUCTION WORK PACKAGE

H.5.2 <destruct-introwp>

Authority to destroy H.5.3.3 <authorize_to_destr oy>

Reporting destruction H.5.3.4 <report_destruct>

General destruction information H.5.3.5 <general_destruct_i nfo>

Degree of destruction H.5.3.6

Essential components and spare parts H.5.3.7 <component_spares>

DESTRUCTION OF EQUIPMENT

TO PREVENT ENEMY USE

PROCEDURES WORK PACKAGE

H.5.4 <destruct-materialwp>

Parts list H.5.4.3 <essential_spares>

Specific destruction procedures H.5.4.4 <proc>

CHAPTER X.

SUPPORTING

INFORMATION

NOTE

Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly.

R R R Appendix G <sim>

REFERENCES WORK PACKAGE R R R G.5.2 <refwp>

-13

-13&P

-14

-14&P

MIL-STD-40051-2

Reference Element Name

INTRODUCTION FOR STANDARD

TWO-LEVEL OR AVIATION TWO-

LEVEL MAINTENANCE MAC

WORK PACKAGE

R R G.5.3.3 <macintrowp>

MAC WORK PACKAGE (NON-

AVIATION TWO-LEVEL)

R R G.5.3.3 <macwp>

COMPONENTS OF END ITEM

(COEI) AND BASIC ISSUE ITEMS

(BII) LISTS WORK PACKAGE

R R R G.5.4 <coeibiiwp>

ADDITIONAL AUTHORIZATION

LIST (AAL) WORK PACKAGE

G.5.5 <aalwp>

EXPENDABLE AND DURABLE

ITEMS LIST WORK PACKAGE

R R R G.5.6 <explistwp>

TOOL IDENTIFICATION LIST

WORK PACKAGE

G.5.7 <toolidwp>

MANDATORY REPLACEMENT

PARTS WORK PACKAGE

G.5.8 <mrplwp>

CRITICAL SAFETY ITEMS AND

FLIGHT SAFETY CRITICAL

AIRCRAFT PARTS WORK

PACKAGE

G.5.9 <csi.wp>

SUPPORT ITEMS WORK

PACKAGE

G.5.10 <supitemwp>

ADDITIONAL SUPPORTING

WORK PACKAGES

G.5.11 <genwp>

REAR MATTER R R R 5.2.2 <rear>

Glossary 5.2.2.1 <glossary>

Alphabetical index 5.2.2.2 <aindx>

DA Form 2028 R R R 5.2.2.3 <da2028>

Authentication page R R R 5.2.2.4 <authent>

Foldout Pages 5.2.2.5 <foldsect>

Back cover R R R 5.2.2.6 <back>

Legend

R Required

P Prohibited

Shaded As Required

TABLE A-IV. TM Requirements Matrix for System Maintenance Manual .

TM Content

-23

-23&P

-24

-24&P

MIL-STD-40051-2

Reference Element Name

FRONT MATTER R R 5.2.1 <paper.frnt>

Front cover R R 5.2.1.1 <frntcover>

(MC) Promulgation letter 5.2.1.2 <promulgation>

Warning summary 5.2.1.4 <warnsum>

Change transmittal page 5.2.1.5 <chgsheet>

List of effective pages / work packages

R R 5.2.1.6 <loepwp>

Title block page R R 5.2.1.7 <titleblk>

Table of contents R R 5.2.1.9 <contents>

How to use this manual R R 5.2.1.10 <howtouse>

CHAPTER 1.

GENERAL INFORMATION,

EQUIPMENT DESCRIPTION

AND THEORY OF OPERATION

R R Appendix B <gim>

GENERAL INFORMATION WORK

PACKAGE

R R B.5.2 <ginfowp>

Scope R R B.5.2.3 <scope>

Maintenance forms, records, and reports R R B.5.2.4 <mfrr>

Reporting equipment improvement recommendations (EIR)

R R B.5.2.5 <eir>

Hand receipt (HR) information B.5.2.6 <handreceipt>

Corrosion prevention and control (CPC) R R B.5.2.7 <cpcdata>

Ozone depleting substances (ODS) B.5.2.8 <odsdata>

Destruction of Army materiel to prevent enemy use

R R B.5.2.9 <destructmat>

Preparation for storage or shipment R R B.5.2.10 <pssref>

Warranty information B.5.2.11 <wrntyref>

Nomenclature cross-reference list B.5.2.12 <nomenreflist>

List of abbreviations R R B.5.2.13 <loa>

Quality of material R R B.5.2.15 <qual.mat.info>

Safety, care, and handling B.5.2.16 <sftyinfo>

Nuclear hardness B.5.2.17 <hcp>

Calibration B.5.2.18 <calref>

Supporting information for repair parts, special tools, TMDE, and support equipment

B.5.2.25 <supdata>

Copyright credit line B.5.2.26 <copyrt>

-23

-23&P

-24

-24&P

MIL-STD-40051-2

Reference Element Name

EQUIPMENT DESCRIPTION AND

DATA WORK PACKAGE

R R B.5.3 <descwp>

Equipment characteristics, capabilities, and features

R R B.5.3.3 <eqpinfo>

Location and description of major components R R B.5.3.4 <locdesc>

Differences between models B.5.3.5 <eqpdiff>

Equipment data R R B.5.3.6 <eqpdata>

THEORY OF OPERATION WORK

PACKAGE

R R B.5.4 <thrywp>

CHAPTER X.

TROUBLESHOOTING MASTER

INDEX

Appendix D

D.5.4.4 <tim>

<masterindexcategory>

TROUBLESHOOTING INDEX WORK

PACKAGE

R R D.5.5.5 <tsindxwp>

CHAPTER X.

TROUBLESHOOTING

PROCEDURES

NOTE

The notation (*) indicates that, if required, at least one of the these content items shall be included

R R Appendix D

D.5.4.2

<tim>

<troublecategory>

INTRODUCTION WORK PACKAGE D.5.5.3 <tsintrowp>

TROUBLESHOOTING INDEX WORK

PACKAGE

D.5.5.5 <tsindxwp>

*OPERATIONAL CHECKOUT WORK

PACKAGES

D.5.5.8.3 <opcheckwp>

*TROUBLESHOOTING PROCEDURES

WORK PACKAGES

D.5.5.8.4 <tswp>

*COMBINED OPERATIONAL

CHECKOUT AND

TROUBLESHOOTING PROCEDURES

WORK PACKAGES

D.5.5.8.5 <opcheck-tswp>

CHAPTER X.

PMCS

MAINTENANCE INSTRUCTIONS

NOTE

PMCS is required as a minimum in one maintenance chapter

R R Appendix E

E.5.2.1 <mim>

<pmcscategory>

PMCS INTRODUCTION WORK

PACKAGE

R R E.5.3.4.1 <pmcsintrowp>

-23

-23&P

-24

-24&P

MIL-STD-40051-2

Reference Element Name

PMCS, INCLUDING LUBRICATION

INSTRUCTIONS, WORK PACKAGE

R R E.5.3.4.2 <pmcswp>

CHAPTER X.

MAINTENANCE INSTRUCTIONS

NOTE

PMCS is required as a minimum in one maintenance chapter

R R Appendix E

E.5.2.2 E.5.2.3 <mim>

<maintenancepmcscategory>

<maintenancecategory>

SERVICE UPON RECEIPT WORK

PACKAGE

R R E.5.3.2 <surwp>

Service upon receipt tasks R R E.5.3.2.3 <surtsk>

Siting E.5.3.2.3.1 <siting>

Shelter requirements E.5.3.2.3.2 <shltr>

Service upon receipt of materiel R R E.5.3.2.3.3 <surmat>

Installation instructions R R E.5.3.2.3.4 <install>

Preliminary servicing of equipment E.5.3.2.3.4.4 <preserv>

Preliminary checks and adjustment of equipment

E.5.3.2.3.6 <prechkadj>

Preliminary calibration of equipment E.5.3.2.3.7 <precal>

Circuit alignment E.5.3.2.3.8 <calign>

Ammunition markings E.5.3.2.3.9.1 <ammo.markings>

Classification of defects E.5.3.2.3.9.2 <ammo.defect>

Ammunition handling E.5.3.2.3.9.3 <ammo.handling>

Procedures to activate ammunition E.5.3.2.3.9.4 <arm>

Additional service upon receipt task E.5.3.2.3.10 <other.surtsk>

Follow-on maintenance E.5.3.2.3.11 <followon.maintsk>

EQUIPMENT / USER FITTING

INSTRUCTIONS WORK PACKAGE

(PERSONAL USE EQUIPMENT)

E.5.3.3 <perseqpwp>

PMCS INTRODUCTION WORK

PACKAGE

R R E.5.3.4.1 <pmcsintrowp>

PMCS WORK PACKAGE R R E.5.3.4.2 <pmcswp>

MAINTENANCE WORK PACKAGES

NOTE

As applicable, the following maintenance tasks shall be presented in the general order listed below:

R R E.5.3.5 <maintwp>

Maintenance tasks R R E.5.3.5.3 <maintsk>

Inspect E.5.3.5.3.2 <inspect>

Test E.5.3.5.3.3 <test>

Service E.5.3.5.3.4 <service>

-23

-23&P

-24

-24&P

MIL-STD-40051-2

Reference Element Name

Adjust E.5.3.5.3.4 <adjust>

Align E.5.3.5.3.6 <align>

Calibrate E.5.3.5.3.7 <calibration>

Remove E.5.3.5.3.8 <remove>

Install E.5.3.5.3.9 <install>

Replace E.5.3.5.3.10 <replace>

Repair E.5.3.5.3.11 <repair>

Paint E.5.3.5.3.12 <paint>

Overhaul E.5.3.5.3.13 <overhaul>

Rebuild E.5.3.5.3.14 <rebuild>

Lubricate E.5.3.5.3.15 <lube>

Mark E.5.3.5.3.16 <mark>

Pack E.5.3.5.3.17 <pack>

Unpack E.5.3.5.3.18 <unpack>

Preserve E.5.3.5.3.19 <preserv>

Prepare for use E.5.3.5.3.20 <prepforuse>

Assemble E.5.3.5.3.21 <assem>

Disassemble E.5.3.5.3.22 <disassem>

Clean E.5.3.5.3.23 <clean>

Nondestructive inspection E.5.3.5.3.24 <ndi>

Radio interference suppression E.5.3.5.3.25 <ris>

Place in service E.5.3.5.3.26 <pis>

Towing E.5.3.5.3.27 <tow>

Jacking E.5.3.5.3.27 <jack>

Parking E.5.3.5.3.28 <park>

Mooring E.5.3.5.3.29 <moor>

Covering E.5.3.5.3.30 <cover>

Hoisting E.5.3.5.3.31 <hoist>

Sling loading E.5.3.5.3.32 <sling>

External power E.5.3.5.3.33 <extpwr>

Preparation for shipment and storage E.5.3.5.3.36 <pss>

Arm E.5.3.5.3.37 <arm>

Load E.5.3.5.3.38 <load>

Unload E.5.3.5.3.39 <unload>

Software maintenance E.5.3.5.3.40 <softwaremaint>

Additional maintenance task E.5.3.5.3.41 <other.maintsk>

Follow-on maintenance E.5.3.5.3.42 <followon.maintsk>

-23

-23&P

-24

-24&P

MIL-STD-40051-2

Reference Element Name

GENERAL MAINTENANCE WORK

PACKAGE

E.5.3.6 <gen.maintwp>

LUBRICATION INSTRUCTIONS WORK

PACKAGE

E.5.3.7 <lubewp>

ILLUSTRATED LIST OF

MANUFACTURED ITEMS WORK

PACKAGE

E.5.3.8 <manuwp>

Illustrated list of manufactured work package E.5.3.10 <manu_items_introwp>

Manufacturing procedures work package E.5.3.10.1 <manuwp>

TORQUE LIMITS WORK PACKAGE E.5.3.10.2 <torquewp>

WIRING DIAGRAMS WORK PACKAGE E.5.3.11 <wiringwp>

CHAPTER X.

AUXILIARY EQUIPMENT

MAINTENANCE INSTRUCTIONS

E.5.2 E.5.2.6 <mim>

<auxiliarycategory>

AUXILIARY EQUIPMENT

MAINTENANCE WORK PACKAGE

E.5.3.14 <auxeqpwp>

ILLUSTRATED LIST OF

MANUFACTURED ITEMS WORK

PACKAGE

E.5.3.10 <manuwp>

Illustrated list of manufactured work package E.5.3.10.1 <manu_items_introwp>

Manufacturing procedures work package E.5.3.10.2 <manuwp>

TORQUE LIMITS WORK PACKAGE E.5.3.11 <torquewp>

WIRING DIAGRAMS WORK PACKAGE E.5.3.12 <wiringwp>

CHAPTER X.

AMMUNITION MAINTENANCE

INSTRUCTIONS

Appendix E

E.5.2.7

<mim>

<ammunitioncategory>

AMMUNITION MAINTENANCE WORK

PACKAGE

E.5.3.15.1 <ammowp>

AMMUNITION MARKING

INFORMATION WORK PACKAGE

E.5.3.15.2 <ammo.markingwp>

FOREIGN AMMUNITION (NATO)

WORK PACKAGE

E.5.3.15.3 <natowp>

CHAPTER X.

PARTS INFORMATION

(–23, –24)

(–23&P, –24&P)

Appendix F <pim>

INTRODUCTION WORK PACKAGE R R F.5.3.5 <introwp>

-23

-23&P

-24

-24&P

MIL-STD-40051-2

Reference Element Name

REPAIR PARTS LIST WORK PACKAGE R R F.5.3.6 <plwp>

REPAIR PARTS FOR SPECIAL TOOLS

WORK PACKAGE

F.5.3.7 <stl_partswp>

KIT PARTS LIST WORK PACKAGE F.5.3.8 <kitswp>

BULK ITEM WORK PACKAGE F.5.3.9 <bulk_itemswp>

SPECIAL TOOLS LIST WORK

PACKAGE

F.5.3.10 <stlwp>

NSN INDEX WORK PACKAGE R R F.5.3.11.1 <nsnindxwp>

P/N INDEX WORK PACKAGE R R F.5.3.11.2 <pnindxwp>

REFERENCE DESIGNATOR INDEX

WORK PACKAGE

F.5.3.11.3 <refdesindxwp>

CHAPTER X.

DESTRUCTION OF EQUIPMENT

TO PREVENT ENEMY USE NOTE

IF A SEPARATE DESTRUCTION OF

MATERIAL MANUAL IS NOT DEVELOPED

FOR THIS EQUIPMENT, THEN THE

DESTRUCTION CHAPTER MUST BE

INCLUDED

Appendix H <dim>

DESTRUCTION OF EQUIPMENT TO

PREVENT ENEMY USE

INTRODUCTION WORK PACKAGE

H.5.2 <destruct-introwp>

Authority to destroy H.5.3.3 <authorize_to_destroy>

Reporting destruction H.5.3.4 <report_destruct>

General destruction information H.5.3.5 <general_destruct_info>

Degree of destruction H.5.3.6

Essential components and spare parts H.5.3.7 <component_spares>

DESTRUCTION OF EQUIPMENT TO

PREVENT ENEMY USE PROCEDURES

WORK PACKAGE

H.5.4 <destruct-materialwp>

Parts list H.5.4.3 <essential_spares>

Specific destruction procedures H.5.4.4 <proc>

CHAPTER X.

SUPPORTING INFORMATION

NOTE

Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly.

R R Appendix G <sim>

REFERENCES WORK PACKAGE R R G.5.2 <refwp>

-23

-23&P

-24

-24&P

MIL-STD-40051-2

Reference Element Name

INTRODUCTION FOR STANDARD

TWO-LEVEL MAC WORK PACKAGE

R R G.5.3.1 <macintrowp>

STANDARD TWO-LEVEL MAC WORK

PACKAGE

R R G.5.3.3 <macwp>

EXPENDABLE AND DURABLE ITEMS

WORK PACKAGE

R R G.5.6 <explistwp>

TOOL IDENTIFICATION LIST WORK

PACKAGE

G.5.7 <toolidwp>

MANDATORY REPLACEMENT PARTS

WORK PACKAGE

G.5.8 <mrplwp>

CRITICAL SAFETY ITEMS AND

FLIGHT SAFETY CRITICAL AIRCRAFT

PARTS WORK PACKAGE

G.5.9 <csi.wp>

SUPPORT ITEMS WORK PACKAGE G.5.10 <supitemwp>

ADDITIONAL SUPPORTING WORK

PACKAGES

G.5.11 <genwp>

REAR MATTER R R 5.2.2 <rear>

Glossary 5.2.2.1 <glossary>

Alphabetical index 5.2.2.2 <aindx>

DA Form 2028 R R 5.2.2.3 <da2028>

Authentication page R R 5.2.2.4 <authent>

Foldout pages 5.2.2.5 <foldsect>

Back cover R R 5.2.2.6 <back>

Legend

R Required

P Prohibited

Shaded As Required

File details come from the government source that posted it. Updated .