Attachment_1_IMILES_VTESS_Basic_SOW.pdf
PDF 583 KB Posted
- Solicitation number
- W900KK-16-R-0003
About this file
Attachment 1 IMILES VTESS IDIQ BASE SOW
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PEO-STRI-15-W47
04 January 2016
DISTRIBUTION LIST STATEMENT A:
Approved for public release; distribution is unlimited.
Statement of Work
For
INSTRUMENTABLE MULTIPLE INTEGRATED LASER ENGAGEMENT SYSTEM
VEHICLE TACTICAL ENGAGEMENT SIMULATION SYSTEM
(IMILES VTESS)
U.S. Army Program Executive Office for Simulation, Training, and Instrumentation (PEO STRI)
12350 Research Pkwy.
Orlando, FL 32826-3276
Patrick Sincebaugh Systems Engineer, PM LTS
Jesse Campos Chief Engineer, PM LTS
Shanitha Coats Logistician, PM LTS
Roberto Capote Chief Logistics Manager
PM TRADE
Kyle Platt Project Director, PM LTS
LTC Corey Hemmingway Product Manager Live Training Systems http://www.peostri.army.mil/apps/
20160104 – VTESS Base Statement of Work ii
Revision History
REV DATE BY CHANGE
- 20160104 KP Published.
iii
Table of Contents
1.0 SCOPE
1.1 BACKGROUND
2.0 APPLICABLE DOCUMENTS
2.1 DEPARTMENT OF DEFENSE SPECIFICATIONS
2.2 AVAILABILITY OF DEPARTMENT OF DEFENSE SPECIFICATIONS
2.3 DEPARTMENT OF DEFENSE STANDARDS
2.4 AVAILABILITY OF DEPARTMENT OF DEFENSE STANDARDS
2.5 DEPARTMENT OF DEFENSE DIRECTIVES
2.6 AVAILABILITY OF DEPARTMENT OF DEFENSE DIRECTIVES
2.7 DEPARTMENT OF DEFENSE INSTRUCTIONS
2.8 AVAILABILITY OF DEPARTMENT OF INSTRUCTIONS
2.9 OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
2.10 AVAILABILITY OF OTHER GOVERNMENT DOCUMENTS AND PUBLICATIONS
2.11 NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS
2.12 AVAILABILITY OF NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS
3.0 REQUIREMENTS
3.1 MANAGEMENT, ORGANIZATION AND PROCESSES
3.1.1 LT2 Core Asset Evolution
3.1.2 Product Integration, Fielding and Sustainment
3.2 PROGRAM MANAGEMENT
3.2.1 Integrated Product and Process Development (IPPD)
3.2.2 Integrated Master Plan (IMP) and Integrated Master Schedule (IMS)
3.2.3 Earned Value Management (EVM) System
3.2.4 Configuration Management
3.2.5 Risk Management
3.2.6 Associate Contractor Agreements (ACAs)
3.2.7 Meetings and Program Reviews
3.2.8 Subcontractor Management
3.2.9 Cost as an Independent Variable (CAIV)
3.2.10 Computer Hardware, Enterprise Software Solutions (CHESS) Program
3.2.11 Contracting Invoicing and Payment
3.3 SYSTEMS ENGINEERING
3.3.2 Hardware Engineering
3.3.3 Test Engineering
3.3.4 Hardware and Software Integration
3.3.5 Technology Insertion
3.3.6 System Safety Program
3.4 SPECIALTY ENGINEERING
3.4.1 Reliability Engineering
3.4.2 Maintainability Engineering
3.4.3 Safety Engineering
3.4.4 Producibility Engineering
3.4.5 Quality Engineering
3.4.6 Supportability Engineering
3.4.7 Human-Systems Integration (HSI)
3.4.8 Value Engineering
3.5 CYBERSECURITY
3.5.1 Anti-Terrorism Level 1 Training
3.5.2 iWATCH Training iv
3.5.3 Protection Policy & Procedures
3.5.4 Access to Government Information Systems
3.5.5 OPSEC Plan
3.5.6 OPSEC Training
3.5.7 Information Assurance / Information Technology Training
3.5.8 Spectrum Management
3.6 LOGISTICS
3.6.1 Contractor Support
3.6.2 Disclosure of Information
3.7 WEAPON AND AMMUNITION STORAGE AND TRANSPORTATION
4.0 APPENDIX A - ACRONYM LIST
Statement of Work For
Instrumentable Multiple Integrated Laser Engagement System Vehicle Tactical Engagement Simulation System
(IMILES VTESS)
1.0 Scope
This Statement of Work (SOW) defines the efforts for the production of the Instrumentable Multiple Integrated Laser Engagement System (IMILES) Vehicle Tactical Engagement Simulation System (VTESS) Indefinite Delivery/ Indefinite Quantity (ID/IQ) contract. The requirements for this document are derived from MILES 2000 Operational Requirements Document (ORD) for Replacement of Ground Direct Fire Tactical Engagement Systems (TES) Devices, Cards Number 0291, and revised July 1996. The IMILES VTESS IDIQ contract will be utilized by Department of Defense organizations that desire to procure IMILES VTESS devices.
This SOW defines the general tasks that Project Manager Training Devices (PM TRADE) desires to have performed under the IMILES VTESS IDIQ contract in support of a componentized training system. Individual delivery orders will delineate the detailed requirements in each respective Delivery Order (DO) SOW. PM TRADE envisions the evolution of IMILES VTESS in the following ways:
Architecture Evolution.
Software Integration.
Hardware Integration.
Instrumentation System Integration.
Live Training Engagement Composition (LTEC) Evolution.
Production.
Testing / Automated Testing.
Fielding.
New Equipment Training.
Interim Contractor Support (ICS).
1.1 Background
The U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), PM TRADE, Product Manager Live Training Systems (PM LTS) has an immediate need to evolve and procure the I-MILES product line. IMILES VTESS is a product within the I-MILES product-line and is also one system within in a larger Live Training System of Systems (SoS). The IMILES VTESS acquisition will complete the Basis of Issue (BOI) and potentially replace older legacy systems. The IMILES VTESS will provide a more realistic training capability, reduce life cycle costs, and integrate emerging commercial-off-the-shelf (COTS) or modified COTS technologies.
2.0 Applicable Documents
The following documents form a part of this SOW to the extent specified herein:
2.1 Department of Defense Specifications
2.2 Availability of Department of Defense Specifications
Copies are available on the WWW at URL: http://www.assistdocs.com/search/
2.3 Department of Defense Standards
The following specifications, standards, and handbooks form a part of this document to the extent specified herein.
MIL-STD-882E System Safety
2.4 Availability of Department of Defense Standards
Copies are available on the WWW at URL: http://www.assistdocs.com/search/
2.5 Department of Defense Directives
DoDM 5200.1 Information Security Program
DoDD 8570.01 Information Assurance (IA) Training, Certification, and Workforce Management
DoD 8570.01-M Information Assurance Workforce Improvement program
DoD 5100.76-M Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives (AA&E)
2.6 Availability of Department of Defense Directives
Copies are available on the WWW at URL: http://www.dtic.mil/whs/directives/
2.7 Department of Defense Instructions
2.8 Availability of Department of Instructions
Copies are available on the WWW at URL: http://www.dtic.mil/whs/directives/
2.9 Other Government Documents, Drawings, and Publications
AR 5-12 Army Use of the Electromagnetic Spectrum, 15 February
AR 25-2 Information Assurance http://www.assistdocs.com/search/ http://www.assistdocs.com/search/ http://www.dtic.mil/whs/directives/ http://www.dtic.mil/whs/directives/
AR 525-13 Antiterrorism
AR 530-1 Operations Security
Copies are available on the WWW at URL: http://www.apd.army.mil
2.10 Availability of Other Government Documents and Publications
Copies of the above documents are available at PEO STRI, ATTN: SFAE-STRI- TRADE-LT, 12350 Research Parkway, Orlando, FL 32826-3276
2.11 Non-Government Standards and Other Publications
ANSI/EIA-748 Earned Value Management
2.12 Availability of Non-Government Standards and Other Publications
Copies are available on the WWW at URL: http://www.eia.org
3.0 Requirements
The requirements defined herein shall form the basis for all work that shall be performed as part of DOs the Government will issue under the IMILES VTESS IDIQ contract for the integration, prototype production ,testing, fielding, sustainment and product line management of the IMILES VTESS system and it’s Live Training Transformation (LT2) Core Assets and Products.
3.1 Management, Organization and Processes
In support of the IMILES VTESS, the contractor shall perform the programmatic activities, which provide for an optimized Product Line (P/L) organizational structure.
The contractor’s approach shall ensure efficient processes for the management and oversight of the IMILES VTESS technical activities including resources utilized across all IMILES VTESS delivery orders. The following table provides a representative list of tasks and activities that could be required by specific delivery orders.
Associate Contractor Agreements Interface Management
Business Strategy Life Cycle Support
Concept of Operations Meetings & Program Reviews
Conferences Metrics, Measurement and Tracking
Configuration Change Management Organizational Planning
Configuration Identification Post Award Conference
Configuration Management Program Management
Configuration Management Planning and Management
Program Management Review
Configuration Status Accounting Requirements Management
Configuration Verification and Audit Resource Planning and Management
Customer Interface Management Reuse Analysis http://www.apd.army.mil/ http://www.eia.org/
Data Repository Risk Management
Decision Analysis Technical Assessment
Design Review Technical Data Management
Earned Value Management Technical Interchange Meetings
Engineering Change Proposal Technical Planning
Facilities Management Technical Reviews
Financial Management Technology Forecasting
Hardware Audit Test Readiness Review
Integrated Baseline Review Training
Integrated Master Schedules / Plans Variance / Variance Management
Integrated Product Team Management Visitor Support
3.1.1 LT2 Core Asset Evolution
The contractor shall perform the necessary tasks and activities to continue the development, evolution, and sustainment of the IMILES VTESS LT2 Core Assets. The Government will address the specific requirements in each delivery order. The following table provides a representative list of tasks and activities that could be required by specific delivery orders with respect to IMILES VTESS Core Asset Development & Evolution:
Architecture development P/L Developer Training
Architecture evaluation Performance Verification & Validation
Architecture validation Quality Assurance
Configuration Management Requirement Engineering
Decision Analysis Re-Use Analysis
Domain Analysis Service/Component Development
LT2 Configuration Management Standards Development and Sustainment
LT2 Configuration Change Control Technology Insertion
LT2 Configuration Identification Test & Verification
LT2 Configuration Management Planning Variation Management
LT2 Configuration Status Accounting Version Control
Obsolescence Management and Planning
3.1.2 Product Integration, Fielding and Sustainment
The contractor shall perform the necessary tasks and activities for product development integration, prototype production, testing, fielding and sustainment. The Government will address the specific requirements in each delivery order. The following table provides a representative list of tasks and activities that could be required by specific delivery orders with respect to Integration, Fielding and Sustainment:
Assembly Production
Code and Unit Test Production Planning
Cold Start Test Production Readiness Review
Component Testing Prototyping
Concept Development Quality Assurance
Configuration Management Quality Engineering
Cyber Security Reliability Engineering
Electromagnetic Environmental Effects Test & Analysis
Requirements Analysis, Management & Traceability
Fabrication Risk Management Framework Testing and Certification
Factory Inspection Safety Assessment
Fielding Safety Engineering
First Article Test Security Engineering
Full Rate Production Software Engineering
Functional Analysis Software Integration
Government Acceptance Test Spectrum Management
Hardware / Software Integration System Demonstration
Hardware Engineering System Design
Hardware Integration System Engineering
Hazards Tracking & Risk Resolution System Integration
Health Hazard Assessments System Modification
Information Assurance Vulnerability Management
Systems Verification Test
Integrated Testing & Test Planning Test and Inspection Report
Low Rate Initial Production (LRIP) Test Discrepancy Management
Maintainability Engineering Test Support
Manpower and Personnel Integration
(MANPRINT)
Testing & Test Engineering
Operations Security Trade Studies
Post-Deployment Software Support
(PDSS)
Training
Post-Production Software Support
(PPSS)
Training Product Verification & Validation
Producibility Engineering Validation Testing
Product Definition Data (PDD) Verification Testing
3.2 Program Management
The contractor shall establish and maintain an integrated program management system, which shall plan, direct, integrate and control the administrative, management, technical, logistical, financial, production and support functions of each specific order.
The contractor shall maintain procedures to respond to requirements of Request for Proposals (RFPs) and delivery order modifications. The contractor shall manage work efforts to optimize total product performance, ensure interoperability and common solutions, and minimize total ownership cost.
3.2.1 Integrated Product and Process Development (IPPD)
As specified by individual delivery orders, the contractor shall establish and maintain a process for IPPD and participate in joint Government/contractor Integrated Product Teams (IPT) in a Performance-Based Business Environment to manage and integrate all tasks, activities and data. The contractor shall facilitate Government insight into contract activities and establish working relationships with Government personnel that will enable continuing insight into all contract activities. The contractor shall provide real-time, reliable and user-friendly electronic remote access to all data produced under the contract to enable review of contract status and demonstrate readiness to complete significant events. The contractor shall make available to the Government all technical, cost and schedule data for each specific order of the order IPT. The contractor shall maintain processes that facilitate completion of delivery order.
3.2.2 Integrated Master Plan (IMP) and Integrated Master Schedule (IMS)
As specified by individual delivery orders, the contractor shall develop an IMP and an IMS. The contractor shall manage to and maintain the IMP and IMS it has developed for each specific order, including appropriate program milestones with corresponding entrance and exit criteria. The IMP and IMS shall include a detailed account of all tasks necessary to accomplish the goals and objectives of each specific delivery order.
The contractor shall develop and maintain an Integrated Master Schedule (IMS) by logically networking detailed program activities including synchronization of all active delivery orders. The schedule shall contain the planned events and milestones, accomplishments, exit criteria, and activities from contract award to the completion of the contract. The contractor shall quantify risk in hours, days, or weeks of delay and provide the most likely duration for each IMS activity and event.
3.2.3 Earned Value Management (EVM) System
The contractor shall use EVM System as each specific delivery order defines.
3.2.3.1 Contractor Integrated Performance Management
As specified by individual delivery orders, the contractor shall establish, maintain, and use in the performance of each delivery order, an integrated performance management system. Central to this integrated system shall be a validated Earned Value Management System (EVMS) in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 252.234-7001, DFARS 252.234-7002, and the EVMS guidelines contained in ANSI/EIA-748. To establish the integrated performance management system, the EVMS shall be linked to and supported by the contractor’s management processes and systems to include the IMS, contract work breakdown structure, change management, material management, procurement, cost estimating, and accounting. The correlation and integration of these systems and processes shall provide for early indication of cost and schedule problems, and their relation to technical achievement.
3.2.3.2 Integrated Baseline Review
The Contractor shall participate with the Government in the assessment of program risk and the degree to which the following have been established:
a. Technical scope of work is fully included and is consistent with authorizing documents.
b. Project schedule key milestones are identified and supporting schedules reflect a logical flow to accomplish the work.
c. Resources (budget, facilities, personnel, skills, etc.) are available and are adequate for the assigned tasks.
d. Tasks are planned and can be measured objectively relative to the technical progress.
e. Rationales underlying the review are reasonable.
f. Management processes support successful execution of the project.
3.2.4 Configuration Management
As specified by individual delivery orders, the Contractor shall use an automated internal configuration management process to monitor, update, and control all configuration documentation, physical media, and physical parts representing or comprising the system configuration items (CIs). The Contractor shall plan and implement an automated configuration management function to perform configuration control, configuration identification, audits, and status accounting in a system engineering environment. The Contractor shall develop, maintain, and update configuration management procedures and processes for control of all hardware and software baselines. The process shall allow Government simultaneous access to the common product data model coupled with the ability to coordinate and update immediate changes to the product definition data. The configuration management process must handle all levels of product and process integration to build and support the product as well as manage the sequence of significant events. The Government will maintain control of the functional baseline (FBL) defined by the system performance specification, interface control documents, and software requirement specifications.
3.2.4.1 Engineering Change Proposals (ECP)
As specified by individual delivery orders, the Contractor shall document and the IPT shall review all changes to established baselines and all changes to the requirements (other than the functional baseline), including changes to the statement of work, contract data requirements list (CDRL), the contract schedule, and the general provisions of the contract.
3.2.4.2 Variances
As specified by individual delivery orders, the Contractor shall document the rationale and the potential impact of any variance. The Contractor shall obtain approval before varying from any Government-controlled baseline.
3.2.5 Risk Management
As specified by individual delivery orders, the contractor shall implement an integrated risk management system with risk planning, identification, assessment, mitigation and monitoring functions to improve technical, cost and schedule performance for each specific delivery order.
3.2.6 Associate Contractor Agreements (ACAs)
As specified by individual delivery orders, the contractor shall implement Associate Contractor Agreements (ACAs) for exchanging data, accessing and using third party software and equipment, receiving technical support, working interface issues, transitioning to sustainment and agreeing on equipment use and time. ACAs shall be maintained to achieve interoperability and common component goals, as applicable.
3.2.7 Meetings and Program Reviews
As specified by individual delivery orders, the Contractor shall attend and conduct meetings, reviews and working groups. The Contractor shall document action items, coordinate resolutions and track action items until closure.
3.2.8 Subcontractor Management
As specified by individual delivery orders, the contractor shall maintain the capability to manage subcontractors in accordance with the delivery orders’ Subcontractor Management Plan. The contractor shall integrate subcontractors into program IPTs.
Additionally, subcontractors shall be included in program management and tracking systems such as management information systems, EVM system, etc. The contractor shall ensure the requirements of this contract and subsequent delivery orders are applied to all subcontracts and associate contracts.
3.2.9 Cost as an Independent Variable (CAIV)
As specified by individual delivery orders, the contractor shall participate on joint Government-contractor Cost Performance IPTs to discuss tradeoff options for implementing CAIV concepts and guidance.
3.2.10 Computer Hardware, Enterprise Software Solutions (CHESS) Program
The Army's Computer Hardware, Enterprise Software Solutions (CHESS) program, under Program Executive Office Enterprise Information Systems (PEO EIS), is the mandatory source for commercial Information Technology (IT) purchases for IMILES VTESS. CHESS contracts provide IT products and services that comply with Network Enterprise Technology Command (NETCOM), Army and DoD policy and standards.
Purchasers of commercial hardware and software must satisfy their IT requirements by utilizing CHESS contracts and DoD Enterprise Software Initiative agreements first, regardless of dollar value. Any IT purchase made outside of CHESS contracts requires a waiver. A complete list of CHESS contracts and the on-line waiver process can be found at https://chess.army.mil.
3.2.11 Contracting Invoicing and Payment
The contractor shall document and track the status of all funds associated with the contract to include obligations, payments, cancellations, invoices and disbursements against each contract line item and sub-line item.
“The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor shall report all contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor shall be required to completely fill in all the information in the format using the following web address https://cmra.army.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours paid this reporting period (including sub-contracts); (6) Estimated direct dollars paid this reporting period (including sub-contractors); (7) Total payments (including sub-contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).
As part of its submission, the contractor shall also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. The contractor shall use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The Specific formats for the XML direct transfer may be downloaded from the web site as specified.
3.3 Systems Engineering
The contractor shall provide the requisite technical and programmatic support to https://chess.army.mil/ https://cmra.army.mil/ complete the required tasks of the individual delivery orders associated with the IMILES VTESS engineering and management. These tasks shall encompass the efforts associated with the development, dissemination, engineering, management, and maintenance of the IMILES VTESS architecture, components, and documentation.
These tasks shall also include the works efforts associated with the engineering, management, and tracking of IMILES VTESS fielded Products and core assets.
3.3.1.1 Software Engineering
As specified by each delivery order, the contractor shall provide the requisite technical and programmatic support to complete the required tasks of the individual delivery orders associated with the IMILES VTESS engineering and management. These tasks shall encompass the efforts associated with the development, dissemination, engineering, management, and maintenance of the IMILES VTESS architecture, components, and documentation. These tasks shall also include the works efforts associated with the engineering, management, and tracking of IMILES VTESS fielded Products and core assets.
3.3.2 Hardware Engineering
As specified by each delivery order, the contractor shall integrate and assemble the system hardware that satisfies the performance and Risk Management Framework requirements stated in the delivery order. The contractor shall conduct market surveillance and market investigations in order to maximize the use of commercial and non-developmental items. The contractor shall apply the systems engineering process during each level of system development (system, subsystem, and component) to add value (additional detail) to the products defined in the prior application of the process.
Through each of the following design stages, information generated shall be documented in an integrated database.
3.3.3 Test Engineering
As specified by each delivery order, the contractor shall develop, implement, and maintain a system testability process satisfying all testability requirements, which is traceable throughout the design process, is integrated with other system engineering requirements, and is disseminated to design personnel and subcontractors. The contractor shall establish controls for ensuring that each subcontractor’s testability practices are consistent with overall system requirements. The contractor shall define the means for verifying and validating that the diagnostic capability meets specified requirements, using maintainability demonstrations, test program verification, and other demonstration methods. The contractor shall ensure that as test and evaluation of the system progresses, problems presented by new failure modes, test voids, ambiguities, and test tolerance difficulties are recognized and defined, solutions are traceable to diagnostic hardware and software, and technical publication procedures are updated.
The contractor shall define an approach for the analysis of acceptance test and evaluation results to determine how built in test hardware and software, automatic test equipment hardware and software, and maintenance documentation performed as a means for satisfying production testing, and meeting testability requirements. The contractor shall establish a testability program that accomplishes the following:
a. Establishment of sufficient, achievable and affordable diagnostic concept and state-of-the-art testability built-in and off-line test performance requirements.
b. Integration of testability into equipment and systems during the design process in coordination with the maintainability design process.
c. Evaluation of the extent to which the design meets testability requirements.
d. Inclusion of testability in the program review process.
3.3.4 Hardware and Software Integration.
As specified by each delivery order, the Contractor shall perform all activities to integrate and assemble the hardware and software to achieve a fully functional and accreditable system, with all support systems, that performs and operates in accordance with the system specification and Contractor generated specifications. The Contractor shall verify the complete integration of the hardware and software of each hardware and software subsystem and the overall system through the utilization of formalized test procedures.
3.3.5 Technology Insertion
As specified by each delivery order, IMILES VTESS shall provide a path-ahead for migration to and incorporation of future FOF/FOT technological advancements. This includes the establishment of a IMILES VTESS baseline configuration that is adaptable and can be extended to incorporate future technologies. The result is better, more realistic FOF/FOT training capability; reduced life-cycle (LC) support costs; and more realistic simulation for Army tactical vehicles that do not have an embedded fire control system. The contractor shall work with the Government to investigate new technology insertion plans through system analysis and trade studies. The cost of production implementation is over and above the firm fixed price of the contract. Possible candidate new technologies to be considered in the future include the following:
a. Improving laser transmission through environments obscurants.
b. Improving supportability, increase mean time between essential function failures.
c. Reducing the size and weight of the devices.
d. Lighter weight sensor and detector with improved detection fidelity.
e. Reducing number and complexity of physical connections (cables and connectors).
f. Improving the ability to quickly and easily introduce system upgrades.
g. Minimizing test measurement and diagnostics equipment.
h. System component modularity.
i. Pan Position System.
j. MANET System.
k. GPS Position Logger.
l. Direction and Position encoding on Laser Link.
m. Incorporation of Fast Code.
n. 1.55 µm Laser/Detector.
o. Optical Communications Link.
p. Passive helmet.
q. Geometric pairing link.
r. Seamless video/I-MILES play.
s. New laser diode.
t. Future Army fire control systems, vehicle types, weapon systems.
u. Weapon effect’s on vehicle crew within and outside the vehicle.
v. Incorporation of total rounds fired data field, updated with every shot.
w. Other technologies agreed upon via the I-MILES Integrated Project Team
(IPT).
x. VICTORY bus integration.
y. Encoding Azimuth, Deflection and Shooter Position into the MCC while maintaining backwards compatibility.
z. LT2 PAN Crew Kill Modules
aa. Future and Modernization of Current Army and Marine Vehicles (e.g., AMPV, JLTV, LAV25, AAV, ACV).
bb. Multifunction Vehicle Port (MFVP).
cc. LT2 Data Driven Technical Data Package Management.
dd. Common Operating Environment (COE).
3.3.6 System Safety Program
As specified by individual delivery orders, the contractor shall maintain a safety process to identify, evaluate, and eliminate or control hazards throughout the IMILES VTESS IDIQ contract. The contractor shall ensure all CPM software services and products are designed to minimize safety risks to operators and maintainers in accordance with MIL-
STD-882.
3.4 Specialty Engineering
3.4.1 Reliability Engineering
As specified by individual delivery orders, the contractor shall perform reliability engineering to meet the availability and specific Reliability requirements of each specific delivery order.
3.4.2 Maintainability Engineering
As specified by individual delivery orders, the contractor shall perform a maintainability engineering to meet the availability and specific Maintainability requirements of each specific delivery order.
3.4.3 Safety Engineering
As specified by individual delivery orders, the contractor shall perform Safety Engineering to meet the availability and specific safety requirements of each specific delivery order.
3.4.4 Producibility Engineering
As specified by individual delivery orders, the contractor shall perform Producibility engineering to meet the requirements of each specific delivery order.
3.4.5 Quality Engineering
As specified by individual delivery orders, the contractor shall perform quality engineering to meet the requirements of each specific delivery order.
3.4.6 Supportability Engineering
As specified by individual delivery orders, the contractor shall perform supportability tradeoffs during the systems engineering process by considering the effect design decisions have on life-cycle cost, reliability, maintainability, and availability rates as specified by each specific delivery order.
3.4.7 Human-Systems Integration (HSI)
The contractor shall establish and maintain a formal Human-Systems Integration (HSI) engineering program as each specific delivery order requires.
3.4.8 Value Engineering
The contractor shall implement and use a value engineering program employing the value methodology. The contractor shall conduct multi-disciplined Joint Government value engineering methodology workshops in order to identify and implement areas for program/process improvement. Each delivery order will address specific requirements.
3.5 Cybersecurity
The Contractor shall develop and maintain a Cybersecurity process to guide management and modification actions, document decisions, specify and track Cybersecurity requirements, document certification efforts, identify possible solutions, and maintain operational systems security. The Contractor shall establish or adopt standards for managing Cybersecurity requirements and capabilities and a Cybersecurity engineering approach that emphasizes purposeful modification or configuration of security solutions. Contractor shall configure, integrate, and implement all architectures, plans, policies and security controls IAW the Department of Defense Risk Management Framework process.
3.5.1 Anti-Terrorism Level 1 Training
All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://atlevel1.dtic.mil/at.”
All US based contractor employees and associated sub-contractor employees shall receive Government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13.
3.5.2 iWATCH Training
The contractor and all associated sub-contractors shall brief all employees of the types of behavior to watch (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. Training shall be completed within 60 calendar days of contract award and with 60 calendar days for new employees commencing performance with the results reported to the COR NLT 120 calendar days after contract award.
3.5.3 Protection Policy & Procedures
The contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA https://atlevel1.dtic.mil/at and/or local policy. In addition to the changes otherwise authorized by the changed clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in the contractor security matters or processes.
3.5.4 Access to Government Information Systems
All contractor employees with access to a government information system shall be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness training prior to assess to the Information System and then annually thereafter.
3.5.5 OPSEC Plan
3.5.6 OPSEC Training
Per AR 530-1, Operations Security, All contractor employees must complete annual Level I OPSEC awareness training. New contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty.
3.5.7 Information Assurance / Information Technology Training
All contractor employees and associated sub-contractor employees must complete the DOD Information Assurance Awareness Training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DOD and Army training requirements in DODD 8570.01, DOD 8570.01-M and AR 25-2 within 6 months of employment.
3.5.8 Spectrum Management
As specified by each delivery order, the Contractor shall ensure compliance with the policies and procedures for the Army Frequency Allocation to Equipment (Army J/F-12) Program as described in AR 5-12, Chapter 4 for any system that operates in an electromagnetic spectrum.
3.6 Logistics
The Contractor shall conduct engineering analyses to establish quantitative and qualitative supportability design guidelines. The Contractor shall conduct trade studies, evaluate design and support alternatives, and establish system supportability preliminary design configurations consistent with system readiness and availability and life cycle cost goals. The contractor shall perform the necessary tasks and activities for logistics, fielding and sustainment. The Government will address the specific requirements in each delivery order. The following table provides a representative list of tasks and activities that could be required by specific delivery orders with respect to Logistics, Support Resources, Publications, Training, Fielding and Sustainment:
Requirements Analysis Publication In Process Reviews
Accounting Requirements Codes Reliability Analyses
Authentication Repair Level Analyses
Baseline Drawing Revisions Repair Procedures
Commercial Off The Shelf Publications SCORM Compliance
Common and Bulk Items Serial Numbers
Course Conduct Information Site Support
Diagnostic Procedures Software Support Environment
Engineering Services Source, Maintenance, and Recovery Codes
Facility Analyses and Summary Spares and Support and Test Equipment
Fielding plans Supply Support
Initial Spares and Repair Parts Lists Support Analyses
Instructional Media Design Support Concepts
Instructional Media Package Supportability Analysis
Instructional Media Requirements Sustainment Transition
Instructional Performance Requirements Technical Publications
Interim Contractor Support Test and Evaluation
Inventory Support Tools and Test Equipment
IUID Marking and Reporting Training and Support
Life Cycle Software Engineering Environment
Training Assessments
Logistics Database Management Training Conducts Support
Logistics Demonstration Training Facility and Equipment
Maintenance Actions Training Products
Maintenance Planning Training Reviews
Manpower, Personnel and Training Training Situation Document
Materiel Component List Training System Support
Parts Management Transition Planning
Pocket Guides Validation
Post Production Support Verification
Provisioning Parts List Warranty Data
3.6.1 Contractor Support
The contractor shall perform the tasks necessary to operate, maintain and support the core assets, products, and fielded systems as each specific order defines. The contractor shall provide all supplies, services and system/configuration management necessary to perform Interim contractor Support (ICS).
3.6.2 Disclosure of Information
The contractor shall comply with the protection standards and guidance described in DoDM 5200.1 to prevent foreign intelligence collection and/or the unauthorized disclosure of information.
3.7 Weapon and Ammunition Storage and Transportation
The contractor shall comply with the requirements of DoD 5100.76-M when handling conventional arms, ammunition and explosives.
4.0 Appendix A - Acronym List
AAR After Action Review
ACA Associate Contractor Agreement
AIS Automated Information System
ATP Acceptance Test Procedure
BAE British Aerospace Engineering
BER Beyond Economical Repair
BPR Beyond Physical Repair
C&A Certification and Accreditation
CAB Corrective Action Board
CAGE Commercial and Government Entity
CAIV Cost as an Independent Variable
CBT Computer Based Training
CDE Controlled Development
CDRL Contract Data Requirement List
CI Configuration Item
CL Confidentiality Level
CLS Contractor Logistics Support
CM Configuration Management
CMMI Capability Maturity Model Integration
CMMI – DEV Capability Maturity Model Integration - Development
CMP Configuration Management Plan
CONUS Continental United States
COTS Commercial-off-the-Shelf
CSCI Computer Software Configuration Item
CVS Combat Vehicle System
DCMA Defense Contracts Management Agency
DOD Department of Defense
DODD Department of Defense Directive
DODI Department of Defense Implementation
DS Depot Support
E3 Electromagnetic Environmental Effects
ECP Engineering Change Proposal
FAI First Article Inspection
FAT First Article Test
FBL Functional Baseline
FOF Force on Force
GAT Government Acceptance Test
GFE Government-Furnished Equipment
IA Information Assurance
IAVA IA Vulnerability Alert
IAW In Accordance With
ICD Interface Control Document
ICS Interim Contractor Support
ICWG Interface Control Working Group
IDD Interface Design Description
IMP Integrated Master Plan
IMS Integrated Master Schedule
IPR In Process Review
IPT Integrated Product Team
IS Instrumentation Systems
LCC Life Cycle Cost
LCCS Life Cycle Contractor Support
LPAN Live Player Area Network
LTEC Live Training Engagement Composition
LMI Logistic Management Information
LRIP Low Rate Initial Production
LRU Lowest Replaceable Unit
LT2 Live Training Transformation
MAC Mission Assurance Category
MANPRINT Manpower and Personnel Integration Program
MCC MILES Communication Code
MCTC Maneuver Combat Training Center
MILES Multiple Integrated Laser Engagement System
MOS Military Occupational Specialty
MRB Material Review Boards
NSN National Stock Number
OCONUS Outside Continental United States
OEM Original Equipment Manufacturer
OUM Operators User Manual
O&M Operation & Maintenance
PDD Product Definition Data
PEO STRI
Program Executive Office for Simulation, Training and Instrumentation
PMR Program Management Review
QA Quality Assurance
QE Quality Engineer
RCS Range Communication System
RDMS Range Data Measurement Subsystem
RMF Risk Management Framework
RTM Requirements Traceability Matrix
SAIV schedule as an independent variable
SAR Safety Assessment Report
SAP Security Authorization Package
SAWE Simulated Area Weapons Effects
SCORM Sharable Content Object Reference Model
SIP System Identification Profile
SIT Systems Integration Test
SOW Statement of Work
SPS Software Product Specification
STE Special Test Equipment
ST&TE Special Tools & Test Equipment
STIG Security Technical Implementation Guide
SVD Software Version Descriptions
SVT Systems Verification Test
TASC Training Area Support Center
T&E Test and Evaluation
TD Test Discrepancies
TESS Tactical Engagement Simulation Systems
TIM Technical Interchange Meetings
TIR Test Incident Reports
TRL Technology Readiness Level
TRR Test Readiness Review
TSV Thru Sight Video
UID Unique Identification
VTESS Vehicle Tactical Engagement Simulation System
WAWF Wide Area Workflow
WFF War Fighter Focus
| 2016-01-04T13:22:51-0500 | |
| SINCEBAUGH.PATRICK.J.1228691301 |
| 2016-01-04T13:46:49-0500 | |
| CAMPOS.JESSE.J.1398399605 |
| 2016-01-04T12:47:56-0500 | |
| COATS.SHANITHA.DIONNE.1266899463 |
| 2016-01-04T14:08:23-0500 | |
| CAPOTE.ROBERTO.1031558618 |
| 2016-01-04T12:45:07-0500 | |
| PLATT.KYLE.I.1286591279 |
| 2016-01-04T14:00:21-0500 | |
| SIMS.MICHAEL.T.1211260307 |
File details come from the government source that posted it. Updated .