This document provides details for a federal construction solicitation. The U.S. Army Corps of Engineers seeks to award a firm-fixed price design-bid-build construction contract to build a prefabricated metal training facility in Almaty, Kazakhstan to be used as a regional platform for training with Central Asian states. The facility will include a large conference room that can divide into three smaller rooms. The construction project magnitude is estimated between $1 million to $5 million. The selected offeror must be registered in the System for Award Management and have an active registration at the time of proposal submission. Performance and payment bonds will be required. The construction period of performance is approximately 270 calendar days from notice to proceed.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORKING DRAWINGS
Contract No. H92277-19-C-0004 KazCent Conference Center Bostandyk (Kalinin) Region, Zharokov Street, 210/1, Almaty City, Kazakhstan
"Integra Engineering Group" LLP
State License No. 15018832
Almaty, 2020
_февраль
1 General Information. on 2 sheets
2 Single Line Diagram. ШР on 6 sheets
3 Single Line Diagram. ЩНО on 5 sheets
4 Single Line Diagram. ЩО on 10 sheets
5 Single Line Diagram. ЩС on 7 sheets
6 Single Line Diagram. ЩВ on 10 sheets
7 Single Line Diagram. ЩТП on 4 sheets
8 Single Line Diagram. ЩДУ on 4 sheets
9 Single Line Diagram. ЩИБП on 3 sheets
1st Floor Plan. Grounding.
Roof Plan. Lightning Protection
1st Floor Cable Tray Plan
Mezzanine Floor Cable Tray Plan
1st Floor Lighting Plan
Mezzanine Floor Lighting Plan
Site Lighting Plan
1st Floor Power Plan
Mezzanine Floor Power Plan
Roof Power Plan
1st Floor Mechanical Equipment Power Supply Plan
Mezzanine Floor Mechanical Equipment Power Supply Plan
Roof Mechanical Equipment Power Supply Plan
List of Main Set of Conceptual Design
Sheet Description Note
List of References and Attachments
Code Description Note
References
GOST 21.614-2014 Electric equipment and wiring graphical symbols
SP RK 2.04-104-2012*
Natural and artifical lighting
SP RK 4.04-106-2013*
Residential and public building electric equipment. Design standards
SP RK 2.04-103-2013
Guidelines for Installation of Lighting Protection Systems for
Buildings, Structures and Industrial Communications
Attachments
EOM.SO Equipment Specification on 9 sheets
Scheme of equalization of potentials
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
General Information (Beginning)
EOM-1.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832
This design has been developed in accordance with the codes applicable in the Republic of Kazakhstan, and ensures the safety of human life and health in the period of the facility operation subject to the implemenation of measures provided in drawings
Chief Project Engineer ______________ Orazalin K.K.
A p p ro v e d
Norm.Control Celebi B.
09.19
09.19
09.19
C h a p te r G P
E s e n k u lo v
Ch ap te r H V A C
Is a e v a
C h a p te r E S
Z h u s u p o v
Ch ap te r W S
Is a e v a
C h a p te r A R
S a la m a to v
.1
.1
.1
.1
.1
GENERAL INFORMATION
Project is developed on the basis of:
· Tasks for design development approved by the customer,
· Existing rules and standards,
· Tasks of Architectural, Structural, Plumbing, and HVAC Part of the Project and Design Project.
The current project is subject to II. category of power supply with the exception of evacuation lighting, electric receivers of fire-fighting devices, fire alarm and notification systems and evacuation management, which belong to the I. category of power supply reliability.
Since the contract for power supply of this compound is issued under one agreement, the existing ТП 10/0.4кВ already includes electricity metering in accordance with Almaty RES. This building is considered as a part of this compound, therefore additional electricity metering is not required.
Power supply of this compound is provided from different sections of existing TP, which is related to different independent sets. Feeding cables 1-N1 и 1-N2(Refer to Section ES) is connected to mechanism of automatic switching to back up power Compact NSX from Schneider Electric, which is installed in ЩР Board located inside of the building.
Power supply of lighting system and power receptacles are provided by separate switchboards.
Basically, all distribution panels are made as stationary and installed on the basis of having a protection class of IP 31. Distribution boards are determined as set boards, which are made of standardized elements and futures. All built-in elements are located inside of the protected panels. All diverted tires are made on terminals.
Installation of power supply cables to distribution boards of receptacles, lighting and other equipment is carried out on galvanized cable trays without a cover, and for the rest of the equipments – i n PVC pipes.
Power Distribution System In the building, following power distribution system is accepted:
From substation to power distribution board 0,4 кВ – four-wire TN-C-with a zero protective and working PEN conductors;
From power distribution board 0,4 кВ to main, group and distribution points of current collectors – five-wire TN-C-S with dedicated zero protective and working PEN conductors.
In all power distribution points, isolation from the N-Bus in case is provided.
On the power line of receptacles, feeder devices are provided with the protective disconnection devices (PDD).
Interior Lighting Project is provided with the sets of regularly working and emergency lightings.
Emergency lighting is provided for all zones and areas, which is occupied by 50 or more people, areas without natural lighting with occupancy and mean of egress.
Exit signs with light and direction signs of egress are installed in height not more than 2 meters, and equipped with power batteries working not less than 1 hour.
Control of the lighting of conference hall and lobby area is provided by lighting buttons for switching on/off and dimming the lighting. Control of the lighting of the other rooms are provided by local switch on/off buttons from different outputs.
Portable battery lamps are provided for repair lighting.
Exterior Lighting Exterior lighting of the territory is provided by the pedestrian poles. (1 lighting pole by 40 W in every single 4 meters), parking poles (103 W in every single 6 meters) Lighting of the building facade is provided by the linear LED lighting (10 m/W), installed hidden in the building parapet niche at the height of 9,7 meters and facade flood lighting installed on blind area (28 W).
№ item Name of the indicator Unit Quantity of indicator
1 Mains voltage B 380/220
2 Power supply category II
3 Total installation capacity kW 137,17
4 Total design capacity kW 89,16
5 Total design current A 142,59
Control of the exterior and facade lighting is provided by the automatic timer, which is installed in ЩНО and ЩО boards. If needed, it is possible to provide control manually via the 3-position Cam switches that are installed in ЩНО and ЩО boards.
Grounding of metal supports and outdoor lighting fixtures is provided with a protective conductor PE of the power cable.
Fire Protection Measures In the project, automatic disconnection of ventilation system is provided in case of fire. For this purpose, automatic switch of the ЩВ Board (from which the ventilation system is fed) is provided with a drive. Signal for the disconnection of ventilation system is received from the fire automation system.
Lightning Protection and Grounding In accordance with the current code «Instructions for the lightning protection of buildings and structures» SNiP RK 2.04-103-2013, community buildings are subject to III. category of lightning protection and protection from direct strikes.
Lightning protection of an building is provided for the purpose of ensuring life safety of the people, protecting building and property from any explosion, fire and destruction that may caused by the lightning strikes.
Lightning protection of the building will be provided by the grids installed on roof and made of round galvanized steel with a diameter of 8 mm on the roof from above or under the fire resistant insulation.
Metal elements protruding above the roof (pipes, ventilation equipment, antennas, etc.) must be connected to metal lightning grid installed on the roof .
For the buildings related to III. category for lighting protection, it is recommended to provide grid layout less than 6x6 meters.
The grounding loop of the building is made of 40x4 mm galvanized steel strip.
The distance from doors and windows to current collectors shall be at least 3.0 m.
The grounding cables shall be laid minimum 0.5 meters from the ground surface and minimum 1 meters away from the building foundation.
The building has a potential equalization system. All metal parts of engineering systems in buildings (pipes, channels, trays, etc.) must be grounded by the main grounding bus in the electrical panel.
The equipment and materials specified in the project can be replaced with similar ones, provided that they meet the minimum standards and are approved by the Customer.
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
General Information (End)
EOM-1.2 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832
A p p ro v e d
Norm.Control Celebi B.
09.19
09.19
09.19
C h a p te r G P
E s e n k u lo v
Ch ap te r H V A C
Is a e v a
C h a p te r E S
Z h u s u p o v
Ch ap te r W S
Is a e v a
C h a p te r A R
S a la m a to v
.1
.1
.1
.1
.1
Contractor shall label all equipment, switches, and circuit breakers when installed.
OFF OFF
Wire number and section, voltage
Cables and wires required, length, m
Brand
ВВГнгLS
45м
Corrugated pipe
Description
Pipes required
Diameter by standard, mm d=25мм
Length, м
15м
3х4мм² - 660 Corrugated pipe d=32мм 15м
ВВГнгFRLS
5х4мм² - 660
5х6мм² - 660
5х10мм² - 660
4х70/35мм² - 660
30м
15м
30м 15м
15м
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Single Line Diagram. ЩР
EOM-2.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832Norm.Control Celebi B.
09.19
09.19
09.19
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Pe
X01
L1 L2 L3 N
1Q1
In=250A
380VAC
X02
L1 L2 L3 N
E/M
T1S
T1T
T1R
T2S
T2T
T2R
Input-1(1-N1) Input-2(1-N2)
1Q2
To Autom.&Manual
Control lock
Ir=200A
Electromechanical
X1
X2
1H2
RED
SIGNAL
LAMP
X1
X2
1H3
RED
SIGNAL
LAMP
X1
X2
1H1
RED
SIGNAL
LAMP
1F1
1x6A
1F2
1x6A
1F3
1x6A
L1, L2, L3
N
Data L1 L2 L3
Total installed capacity
[kW]
Coefficient at one time
Total calculated capacity [kW]
Design current
[A]
Lighting
142,59
Outlet network
Other device 47 056,00 45 056,00 45 056,00 137,17 0,65 89,16
Total 47 056,00 45 056,00 45 056,00 137,17 89,16
M
M
36kA
In=250A
Ir=200A
36kA
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-2.2
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
To Autom.&Manual
Control
380VAC
7S1
AUTO-0-MAN
A1
A2
7R1
RELAY
7F1
3(1x6A)
7FK1
Phase
L1
12 14
7FR1
7FK2
L1
12 14
9 10 11
15 16 186
A2
A1
7ZR1
TIME RELAY
7FR1
A2
A1
7ZR2
TIME RELAY
A1 A2
7FR1
4 4
7F2
A2
A1
7ZR2
TIME RELAY
A1 A2
A1
A2
7FR1
RELAY
A1
A2
7FR1.1
RELAY
7FR1
N
L220
MAN
OTO
T1R
T1S
T1T
T2R
T2S
T2T
N
3(1x6A)
380VAC
control relay
Phase control relay
Automatic & Manual Control ЩР
Fuse Fuse
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-2.3
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N
1 0MCH
TR1
ON
TR1
OFF
TR1
TRIP
1 0MCH
GEN
ON
GEN
OFF
GEN
TRIP
1Q1
250A
B4
A1
A211
OFF1
OFF2
A4
7ZR1
7FR1
A1
A2
8R1
X1
X2
8H2
X1
X2
8H3
X1
X2
8H1
7FR1.1
29 323130
8R1
8R1
B281
SDE
4 4
21194
1Q2
250A
B4
A1
A211
OFF1
OFF2
A412
A1
A2
8R2
RELAY
X1
X2
8H5
RED
SIGNAL
LAMP
X1
X2
8H6
YELLOW
SIGNAL
LAMP
X1
X2
8H4
GREEN
SIGNAL
LAMP
33 363534
8R2
8R2
B281
SDE
4 4
8S2
Push button(red)
STOP
8S1
Push button(green)
START
7R1
8R2
7ZR2
7FR2
7FR1.1
8S4
8S3
7R1
8R1
N
L220
MAN
OTO
Push button(red)
STOP
Push button(green)
START
RELAY
RED
SIGNAL
LAMP
YELLOW
SIGNAL
LAMP
GREEN
SIGNAL
LAMP
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-2.4
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Automatic & Manual Control ЩР
L1,L2,L3
N
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Inom
Type of power
Power area
X1
2Q5
3x32A
MCB
6kA C
X1
2Q2
3x32A
MCB
6kA C
X1
2Q1
3x63A
MCB
6kA C
X1
2Q4
3x32A
MCB
6kA C
380V 380V 380V 380V 380V L1 380V
1 2 3 4 5 6 7 8 9 10
F1 F2 F3 F4 F5 F6 F7 F8
5x10мм2 ВВГнг-LS 5x4мм2 ВВГнг-LS
4x70/35мм2
ВВГнг-LS
5x6мм2 ВВГнг-LS 5x4мм2 ВВГнг-LS 3x4мм2 ВВГнг-LS 5x10мм2 ВВГнг-LS
5x10мм2
ВВГнг-FRLS
14292,00 7302,00 82110,00 7902,00 3561,00 2000,00 20001,00
25,55 13,05 146,77 14,12 6,37 10,70 35,75
Power Supply
ЩС ЩО ЩВ ЩТП ЩНО ЩИБП Boyler ЩДУ
X1
2Q3
In=3x200A
Ir=3x200A
MCCB
25kA C
I>>
M
X1
2Q6
1x25A
MCB
6kA C
X1
2Q8
3x63A
MCB
6kA C
X1
2Q7
3x50A
MCB
6kA C
X1
2Q9
3x32A
MCB
6kA C
X1
2Q10
1x25A
MCB
6kA C
UPS 2,7кВт, 220В
Length, m with number and cross-section of cores
15 15
- 15
Pipe
Diameter, mm
Length, m
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-2.5
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply
N
3F1
1x6A
MCB
6kA D
L220V
Turn on
2Q3
2S1
Manual.-0-Auto.
2K1
T o f i r e a l a r m s y s t e m
X2
X2
X1
X2
2H1
Green
M
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-2.6
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N
K1 K1 K1 K1
C. Pipe
Таймер
ВВГнгLS
610м
HDPE pipe d=32мм 610м
3х4мм² - 660
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Single Line Diagram. ЩНО
EOM-3.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832Norm.Control Celebi B.
09.19
09.19
09.19
Wire number and section, voltage
Cables and wires required, length, m
Brand Description
Pipes required
Diameter by standard, mm Length, м
AutoCAD SHX Text
PE
L1-L2-L3
X0
L1 L2 L3 N
1Q1
3x32A
N
MCB
6kA C
L1 L2 L3
618,00 1 240,00 1 700,00 3,56 1,00 3,56
5,88
618,00 1 240,00 1 700,00 3,56 3,56
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-3.2
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Data
Total installed capacity
[kW]
Coefficient at one time
Total calculated capacity [kW]
Design current
[A]
Lighting
Outlet network
Other device
Total
N
Inom
L1 L2 L3
1 2 3 4 5 6 7 8 9 10
L1 L2 L3
3x4мм2 ВВГнгLS 3x4мм2 ВВГнгLS 3x4мм2 ВВГнгLS
618,00 1240,00 1700,00
3,30 6,63 9,09
Lighting Lighting Lighting
The lighting of the Parking lot Site lighting Flood lighting of the facade
130 230 250
130 230 250
32 32
X1
2Q1
1x16A
MCB
6kA C
X1
2Q2
1x16A
MCB
6kA C
X1 X1
2Q4
X1
2Q5
X1
2Q6
2K4
2K3
2K2
2K1
1x20A
1x16A
MCB
6kA C
1x16A
MCB
6kA C
1x16A
MCB
6kA C
1x20A 1x20A 1x20A
N
N
2Q3
2x25A
30mA
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-3.3
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
3F1
1x6A
MCB
6kA C
L220V
Turn on
A1
A2
2K1
2S1
2K1
X2
X2
X1
X2
2H1
Green
Turn on
A1
A2
2K2
2S2
2K2
X2
X2
X1
X2
2H2
Green
Turn on
A1
A2
2K3
2S3
2K3
X2
X2
X1
X2
2H3
Green
Turn on
A1
A2
2K4
2S4
2K4
X2
X2
X1
X2
2H4
Green
C o n n e c t i n t t h e t i m e r
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-3.4
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
C o n n e c t i t h e t i m e r
C o n n e c t i t h e t i m e r
C o n n e c t i t h e t i m e r
AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
Note: Contractor shall label timers when installed and shall include on As-Builts
Timer
NL
Power
N
Load
A1
A2
2K1
A1
A2
2K2
L220V
3F2
1x6A
MCB
6kA C
A1
A2
2K3
A1
A2
2K4
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-3.5
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note: Contractor shall label timers when installed and include on As-Built Drawings.
C. Pipe
K1
Таймер
K1 K1 K1 K1 K1 K1 K1
K1 K1 K1 K1 K1 K1 K1 K1
3х1,5мм² - 660
ВВГнгLS
1481м d=25мм 830м
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Single Line Diagram. ЩО
EOM-4.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832Norm.Control Celebi B.
09.19
09.19
09.19
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Wire number and section, voltage
Cables and wires required, length, m
Brand
Corrugated pipe
Description
Pipes required
Diameter by standard, mm Length, м
X0
L1 L2 L3 N
1Q1
3x32A
N
MCB
6kA C
L1 L2 L3
2 430,00 2 610,00 2 520,00 7,56 1,00 7,56
12,49
2 430,00 2 610,00 2 520,00 7,56 7,56
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.2
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Data
Total installed capacity
[kW]
Coefficient at one time
Total calculated capacity [kW]
Design current
[A]
Lighting
Outlet network
N
Inom
L1 L2 L3 L1 L2 L3 L1 L2 L3 L1
1 2 3 4 5 6 7 8 9 10
L1 L2 L3 L4 L5 L6 L7 L8 L9 L10
3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS
110,00 100,00 200,00 60,00 80,00 170,00 250,00 180,00 170,00 450,00
0,56 0,51 1,01 0,30 0,40 0,86 1,26 0,91 0,86 2,27
Lighting
Electric lighting Facade Lighting
X1
2Q1
1x10A
MCB
6kA C
X1
2Q2
1x10A
MCB
6kA C
X1
2Q3
1x10A
MCB
6kA C
X1
2Q4
1x10A
MCB
6kA C
X1
2Q5
1x10A
MCB
6kA C
X1
2Q6
1x10A
MCB
6kA C
X1
2Q7
1x10A
MCB
6kA C
X1
2Q8
1x10A
MCB
6kA C
X1
2Q9
1x10A
MCB
6kA C
X1
2K4
1x16A
2K5
1x16A
2K10
1x16A
24 28 60 32 48 61 91 57 63 15
10 15 30 20 25 15 50 20
25 25 25 25 25 25 2525 25
N
N
2Q10
2x25A
30mA
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.3
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting
Lighting Lighting Lighting Lighting Lighting Lighting Lighting Lighting Lighting
Inom
L1,L2,L3
L2 L3 L1 L2 L3 L1 L2 L3 L1 L2
11 12 13 14 15 16 17 18 19 20
L11 L12 L13 L14 L15 L16 L17 L18 L19 L20
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS
450,00 450,00 400,00 530,00 330,00 310,00 410,00 310,00 360,00 380,00
2,27 2,27 2,02 2,68 1,67 1,57 2,07 1,57 1,82 1,92
Lighting
Facade Lighting
Facade Lighting Electric lighting
X1 X1 X1
2Q13
1x10A
MCB
6kA C
X1
2Q14
1x10A
MCB
6kA C
X1
2Q15
1x10A
MCB
6kA C
X1
2Q16
1x10A
MCB
6kA C
X1
2Q17
1x10A
MCB
6kA C
X1
2Q18
1x10A
MCB
6kA C
X1
2Q19
1x10A
MCB
6kA C
X1
2Q20
1x10A
MCB
6kA C
2K11
1x16A
2K12
1x16A
2K13
1x16A
2K14
1x16A
2K15
1x16A
2K16
1x16A
2K17
1x16A
2K18
1x16A
2K20
1x16A
45 40 13 83 19 61 25 67 137 61
20 10 5 65 5 45 5 45
25 25 25 25 25 25 2525 25
N
N
2Q11
2x25A
30mA
N
N
2Q12
2x25A
30mA
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.4
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting
Lighting Lighting Lighting Lighting Lighting Lighting Lighting Lighting Lighting
Inom
L1,L2,L3
L3 L1 L2 L3 L1 L2 L3 L2
21 22 23 24 25 26 27 28 29 30
L21 L22 L23 EL1 EL2 EL3 EL4 EL5
3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS 3x1,5мм2 ВВГнгLS
440,00 380,00 60,00 170,00 110,00 170,00 280,00 250,00
2,22 1,92 0,30 0,86 0,56 0,86 1,41 1,26
Lighting
Electric lighting Repair lighting
X1
2Q21
1x10A
MCB
6kA C
X1
2Q22
1x10A
MCB
6kA C
X1
2Q23
1x10A
MCB
6kA C
X1
2Q24
1x10A
MCB
6kA C
X1
2Q25
1x10A
MCB
6kA C
X1
2Q26
1x10A
MCB
6kA C
X1
2Q27
1x10A
MCB
6kA C
X1
2Q28
1x10A
MCB
6kA C
X1
2Q29
1x10A
MCB
6kA C
X1
2Q30
1x10A
MCB
6kA C
2K21
1x16A
2K22
1x16A
2K26
1x16A
2K27
1x16A
34 44 40 98 110 67 43 15
15 15 15 65 70 45 25 15
25 25 25 25 2525 25
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.5
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting Electric lighting
Lighting Lighting Lighting Lighting Lighting Lighting Lighting
3F1
1x6A
MCB
6kA C
L220V
Turn on
A1
A2
2K4
2S4
2K4
C o n t r o l
B u t t o n
X2
X2
X1
X2
2H4
Green o f
L i g h t i n g
A1
A2
2K5
2S5
2K5
X2
X2
X1
X2
2H5
A1
A2
2K10
2S10
2K10
X2
X2
X1
X2
2H10
A1
A2
2K11
2S11
2K11
X2
X2
X1
X2
2H11
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.6
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
C o n t r o l
B u t t o n o f
L i g h t i n g
C o n n e c t i t h e t i m e r
AUTO-0-MAN
C o n n e c t i t h e t i m e r
AUTO-0-MANAUTO-0-MANAUTO-0-MAN
Turn on Turn on Turn on
Green Green Green
Note: Contractor shall label timers and shall include on As-Built Drawings.
3F2
1x6A
MCB
6kA C
L220V
A1
A2
2K12
2S12
2K12
X2
X2
X1
X2
2H12
Green
A1
A2
2K13
2S13
2K13
X2
X2
X1
X2
2H13
A1
A2
2K14
2S14
2K14
X2
X2
X1
X2
2H14
A1
A2
2K15
2S15
2K15
X2
X2
X1
X2
2H15
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.7
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
C o n n e c t i t h e t i m e r
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
Green Green Green
Turn on Turn on Turn on Turn on
Note: Contractor shall label timers when installed and shall include on As-Built Drawings.
3F3
1x6A
MCB
6kA C
L220V
A1
A2
2K16
2S16
2K16
X2
X2
X1
X2
2H16
A1
A2
2K17
2S17
2K17
X2
X2
X1
X2
2H17
A1
A2
2K18
2S18
2K18
X2
X2
X1
X2
2H18
A1
A2
2K20
2S20
2K20
X2
X2
X1
X2
2H20
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.8
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
Turn on Turn on Turn on Turn on
Green Green Green Green
3F4
1x6A
MCB
6kA C
L220V
A1
A2
2K21
2S21
2K21
X2
X2
X1
X2
2H21
A1
A2
2K22
2S22
2K22
X2
X2
X1
X2
2H22
A1
A2
2K26
2S26
2K26
X2
X2
X1
X2
2H26
A1
A2
2K27
2S27
2K27
X2
X2
X1
X2
2H27
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.9
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
C o n t r o l
B u t t o n o f
L i g h t i n g
AUTO-0-MAN
Green Green Green Green
Timer
NL
Power
N
Load
A1
A2
2K10
A1
A2
2K11
L220V
3F5
1x6A
MCB
6kA C
A1
A2
2K12
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-4.10
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note: Contractor shall label timers when installed and shall include on As-Built Drawings.
C.Pipe
Ecotherm
3х2,5мм² - 660
ВВГнгLS
1359м d=25мм 634м
3х4мм² - 660 132м
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Single Line Diagram. ЩC
EOM-5.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832Norm.Control Celebi B.
09.19
09.19
09.19
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Wire number and section, voltage
Cables and wires required, length, m
Brand
Corrugated pipe
Description
Pipes required
Diameter by standard, mm Length, м
L1 L2 L3
22,84
2 400,00 2 555,00 2 700,00 7,66 0,6 4,66
6 150,00 5 050,00 4 600,00 15,80 0,6 9,62
8 550,00 7 605,00 7 300,00 23,46 14,28
Pe
L1-L2-L3
X0
L1 L2 L3 N
1Q1
3x50A
N
MCB
6kA C
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-5.2
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Data
Total installed capacity
[kW]
Coefficient at one time
Total calculated capacity [kW]
Design current
[A]
Lighting
Outlet network
N
L1 L2 L3 L1 L2 L3 L1 L2 L3 L1
1 2 3 4 5 6 7 8 9 10
S1.1 S1.2 S1.3 S1.4 S1.5 S1.6 S1.7 S1.8 S1.9 S1.10
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS
225,00 300,00 300,00 450,00 375,00 150,00 375,00 375,00 225,00 300,00
1,14 1,52 1,52 2,27 1,89 0,76 1,89 1,89 1,14 1,52
Power line
Receptacle
N
N
2Q1
4x25A
30mA
X1 X1 X1
2F3
1x16A
MCB
6kA C
X1
2F4
1x16A
MCB
6kA C
2F2
1x16A
MCB
6kA C
2F1
1x16A
MCB
6kA C
X1
2F5
1x16A
MCB
6kA C
N
N
2Q6
4x25A
30mA
X1 X1 X1
2F8
1x16A
MCB
6kA C
X1
2F9
1x16A
MCB
6kA C
2F7
1x16A
MCB
6kA C
2F6
1x16A
MCB
6kA C
X1
2F10
1x16A
MCB
6kA C
26 41 14 55 93 37 69 78 64 63
10 15 14 25 45 15 25 35
25 25 25 25 25 25 2525 25
3pcs 4pcs 4pcs 6pcs 5pcs 2pcs 5pcs 5pcs 3pcs 4pcs
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-5.3
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o . Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Power line Power line Power line Power line Power line Power line Power line Power line Power line
Receptacle Receptacle Receptacle Receptacle Receptacle Receptacle Receptacle Receptacle Receptacle
L1,L2,L3
L2 L3 L1 L2 L3 L1 L2 L3 L1 L3
11 12 13 14 15 16 17 18 19 20
S1.11 S1.12 S1.13 S2.1 S2.2 S2.3 S2.4 S2.5 S2.6 S2.7
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS
980,00 225,00 600,00 300,00 225,00 150,00 150,00 75,00 300,00 1500,00
4,95 1,14 3,03 1,52 1,14 0,76 0,76 0,38 1,52 7,58
Receptacle, electrical heating Receptacle Receptacle of projector
Receptacle, refrigerator Dishwasher
N
N
2Q11
4x25A
30mA
X1 X1 X1
2F13
1x16A
MCB
6kA C
X1
2F14
1x16A
MCB
6kA C
2F12
1x16A
MCB
6kA C
2F11
1x16A
MCB
6kA C
X1
2F15
1x16A
MCB
6kA C
N
N
2Q16
4x25A
30mA
X1 X1 X1
2F18
1x16A
MCB
6kA C
X1
2F19
1x16A
MCB
6kA C
2F17
1x16A
MCB
6kA C
2F16
1x16A
MCB
6kA C
X1
2F20
1x16A
MCB
6kA C
67 67 52 48 55 45 51 46 64 48
15 25 30 10 25 25 20 20
25 25 25 25 25 25 2525 25
5pcs
3pcs 8pcs 4pcs 3pcs 2pcs 2pcs 1pcs
4pcs 1pcs
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-5.4
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o . Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Power line Power line Power line Power line Power line Power line Power line Power line Power line Power line
Receptacle Receptacle Receptacle Receptacle Receptacle
L1,L2,L3
L2 L1 L2 L3 L1 L2 L3 L1 L2 L3
21 22 23 24 25 26 27 28 29 30
S2.8 E1 E2 E3.1 E3.2 E4 E5 E6 E7 E8
3x2,5мм2 ВВГнгLS 3x4мм2 ВВГнгLS 3x4мм2 ВВГнгLS
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x4мм2 ВВГнгLS 3x4мм2 ВВГнгLS
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS
75,00 2850,00 2850,00 1600,00 1600,00 900,00 1700,00 1700,00 1300,00 1300,00
0,38 14,39 14,39 8,08 8,08 4,55 8,59 8,59 6,57 6,57
Power line Power Supply
Receptacle Heating cable (input) Hand dryer Screen drive for projector
Self-regulating heating cable of drains and gutters
X1
2F21
1x16A
MCB
6kA C
N
N
2Q22
2x25A
30mA
X1
N
N
2Q23
X1
N
N
2Q24
X1
N
N
2Q25
X1
N
N
2Q26
X1
N
N
2Q27
X1
N
N
2Q28
X1
N
N
2Q29
X1
N
N
2Q30
X1
2x25A
30mA
2x25A
30mA
2x25A
30mA
2x25A
30mA
2x25A
30mA
2x25A
30mA
2x25A
30mA
2x25A
30mA
2K22
3x25A
47 30 47 47 47 46 31 24 45 44
25 20 25 15 15 15 15 15
25 25 25 25 25 25 2525 25
1шт
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-5.5
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o . Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply
Heating cable (input) Hand dryer
Self-regulating heating cable of drains and gutters Hand dryer Hand dryer
X1
2Q32
1x20A
MCB
6kA C
X1
2Q33
1x20A
MCB
6kA C
L1,L2,L3
X1
2Q34
1x20A
MCB
6kA C
X1
2Q35
1x20A
MCB
6kA C
31 32 33 34 35 36 37 38 39 40
Reserve
N
N
2Q31
X1
2x25A
30mA
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-5.6
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o . Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Reserve Reserve Reserve
Thermal relay
Sensor
Т1
NL
3F1
1x6A
MCB
6kA C
Load
A1
A2
2K22
Power
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-5.7
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N
3х2,5мм² - 660
ВВГнгLS
641м
3х4мм² - 660 14м d=25мм 321м
5х2,5мм² - 660 296м
5х4мм² - 660 144м
5х6мм² - 660 89м
5х10мм² - 660 40м d=32мм 55м
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Single Line Diagram. ЩВ
EOM-6.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832Norm.Control Celebi B.
09.19
09.19
09.19
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Wire number and section, voltage
Cables and wires required, length, m
Brand
Corrugated pipe
Description
Pipes required
Diameter by standard, mm Length, м
Corrugated pipe
N
X01
L1 L2 L3 N
1Q1
In=160A
Ir=160A
L1 L2 L3
138,62
37 394,00 37 194,00 42 714,00 117,30 0,70 82,11
37 394,00 37 194,00 42 714,00 117,30 82,11
36kA C
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.2
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Data
Total installed capacity
[kW]
Coefficient at one time
Total calculated capacity [kW]
Design current
[A]
Lighting
Outlet network
N
X1
2Q2
1x40A
MCB
6kA C
X1
2Q3
1x20A
MCB
6kA C
X1
2K4
3x9A
2Q4
1-1,6A
L1 L3 L3 380V 380V L1 L2 L3 L1
1 2 3 4 5 6 7 8 9 10
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10
3x2,5мм2 ВВГнгLS 3x4мм2 ВВГнгLS
3x2,5мм2 ВВГнгLS 5x6мм2 ВВГнгLS 5x6мм2 ВВГнгLS
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS
150,00 6000,00 100,00 18000,00 18000,00 500,00 800,00 500,00 400,00
0,80 32,09 0,53 32,17 32,17 2,67 4,28 2,67 2,14
Power Supply
Exhaust fan
Split unit Reserve Supply fan Air curtain Air curtain VRF-1 Indoor unit VRF-1 Indoor unit VRF-1 Indoor unit VRF-1 Indoor unit
X1
2K1
3x9A
2Q1
X1
2Q5
3x40A
MCB
6kA C
X1
2Q6
3x40A
MCB
6kA C
X1
2Q7
1x20A
MCB
6kA C
X1
2Q8
1x20A
MCB
6kA C
X1
2Q9
1x20A
MCB
6kA C
X1
2Q10
1x20A
MCB
6kA C
1-1,6A
GV2 ME10 GV2 ME10
TeSys D TeSys D
13 14 128 - 31 49 42 58 57 55
13 14 75 - 15 20 15 15
25 25 - 32 32 25 25 25 25
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.3
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply
X1
2Q13
3x32A
MCB
6kA C
L2 L3 380V L1 L2 380V L1 L2 380V L3
11 12 13 14 15 16 17 18 19 20
M11 M12 M13 M14 M15 M16 M17 M18 M19 M20
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 5x4мм2 ВВГнгLS
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 5x4мм2 ВВГнгLS
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 5x4мм2 ВВГнгLS
3x2,5мм2 ВВГнгLS
230,00 230,00 12000,00 230,00 230,00 10002,00 230,00 230,00 10002,00 180,00
1,23 1,23 21,45 1,23 1,23 17,88 1,23 1,23 17,88 0,96
HRV-01 Vent. HRV-01 Vent.
Electric preheater
HRV-02 Vent. HRV-02 Vent.
Electric preheater
L1,L2,L3
X1
2K11
2Q11
1,6-2,5A
X1
2K12
2Q12
1,6-2,5A
2K13
3x40A
X1
2Q16
3x32A
MCB
6kA C
X1
2K14
3x9A
2Q14
1,6-2,5A
X1
2K15
3x9A
2Q15
1,6-2,5A
2K16
3x40A
X1
2Q19
3x32A
MCB
6kA C
X1
2K17
2Q17
1,6-2,5A
X1
2K18
2Q18
1,6-2,5A
2K19
3x40A
X1
2K20
2Q20
1,6-2,5A
GV2 ME10 GV2 ME10 GV2 ME10 GV2 ME10 GV2 ME10 GV2 ME10 GV2 ME10
3x9A
TeSys D
3x9A
TeSys D TeSys D TeSys D TeSys D TeSys D
3x9A
TeSys D
3x9A
TeSys D
3x9A
TeSys DTeSys D
6666666
26 32 32 32 38 38 38 48
5 5 5 5
25 25 25 25 25 25 25 25 25
26 26
5 5 5 5 5
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.4
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power SupplyPower Supply
HRV-03 Vent. HRV-03 Vent.
Electric preheater
HRV-04 Vent.
X1
2Q23
3x32A
MCB
6kA C
X1
2K26
3x9A
2Q26
1-1,6A
X1
2K27
3x9A
2Q27
L1 380V 380V 380V 380V 380V 380V 380V 380V 380V
21 22 23 24 25 26 27 28 29 30
M21 M22 M23 M24 M25 M26 M27 M28 M29 M30
3x2,5мм2 ВВГнгLS 5x4мм2 ВВГнгLS 5x6мм2 ВВГнгLS 5x10мм2 ВВГнгLS
5x2,5мм2 ВВГнгLS 5x2,5мм2 ВВГнгLS 5x2,5мм2 ВВГнгLS 5x2,5мм2 ВВГнгLS 5x2,5мм2 ВВГнгLS 5x2,5мм2 ВВГнгLS
180,00 8001,00 10002,00 11301,00 4752,00 252,00 150,00 150,00 750,00 3000,00
0,96 14,30 17,88 20,20 8,49 0,45 0,27 0,27 1,34 5,36
Outdoor unit
VRF-01
Heat pump TH-01 Roof fan Roof fan Roof fan Supply Vent.
AHU-01
Electric preheater
AHU-01
L1,L2,L3
X1
2Q22
3x32A
MCB
6kA C
X1
2K21
3x9A
2Q21
1,6-2,5A
2K22
3x40A
X1
2Q24
3x32A
MCB
6kA C
X1
2Q25
3x25A
MCB
6kA C
1-1,6A
X1
2K28
3x9A
2Q28
1-1,6A
X1
2K29
3x9A
2Q29
1,6-2,5A
X1
2Q30
3x20A
MCB
6kA C
2K30
3x25A
GV2 ME10 GV2 ME10 GV2 ME10 GV2 ME10 GV2 ME10
TeSys D TeSys D TeSys D TeSys D TeSys D TeSys D TeSys D
40 40 38 44 42
10 12
25 32 32 25 25 25 25 25 25
5 10 10
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.5
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power Supply Power SupplyPower Supply
HRV-04 Vent.
Electric preheater
Outdoor unit
VRF-02
X1
2Q32
1x20A
MCB
6kA C
X1
2Q33
1x20A
MCB
6kA C
380V
31 32 33 34 35 36 37 38 39 40
M31
5x2,5мм2 ВВГнгLS
750,00
1,34
Exhaust Vent.
AHU-01 Reserve
L1,L2,L3
X1
2K31
3x9A
2Q31
1,6-2,5A
X1
2Q34
1x20A
MCB
6kA C
X1
2Q35
1x20A
MCB
6kA C
GV2 ME10
TeSys D
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.6
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Power Supply
Reserve Reserve Reserve
A1
A2
2K4
2S4
2K4
X1
X2
2H4
N
Turn on
A1
A2
2K1
2S1
2K1
X1
X2
2H1
Green
3F1
1x6A
MCB
6kA C
L220V
A1
A2
2K11
2S11
2K11
X1
X2
2H11
A1
A2
2K12
2S12
2K12
X1
X2
2H12
A1
A2
2K13
2S13
2K13
X1
X2
2H13
A1
A2
2K14
2S14
2K14
X1
X2
2H14
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.7
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Turn on Turn on Turn on Turn on Turn on
Green Green Green Green Green
Man.-0Man.-0Man.-0Man.-0Man.-0Man.-0
2K16
2S16
2K16
X1
X2
2H16
N
A1
A2
2K15
2S15
2K15
X1
X2
2H15
3F2
1x6A
MCB
6kA C
L220V
A1
A2
2K17
2S17
2K17
X1
X2
2H17
A1
A2
2K18
2S18
2K18
X1
X2
2H18
A1
A2
2K19
2S19
2K19
X1
X2
2H19
A1
A2
2K20
2S20
2K20
X1
X2
2H20
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.8
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Green Green Green Green Green Green
Turn on Turn on Turn on Turn on Turn on Turn on
2K22
2S22
2K22
X1
X2
2H22
N
A1
A2
2K21
2S21
2K21
X1
X2
2H21
3F3
1x6A
MCB
6kA C
L220V
A1
A2
2K26
2S26
2K26
X1
X2
2H26
A1
A2
2K27
2S27
2K27
X1
X2
2H27
A1
A2
2K28
2S28
2K28
X1
X2
2H28
A1
A2
2K29
2S29
2K29
X1
X2
2H29
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.9
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Turn on Turn on Turn on Turn on Turn on Turn on
Green Green Green Green Green Green
2K31
2S31
Man.-0
2K31
X1
X2
2H31
N
A1
A2
2K30
2S30
Man.-0
2K30
X1
X2
2H30
3F4
1x6A
MCB
6kA C
L220V
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-6.10
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Turn on Turn on
Green Green
C. Cable
3х2,5мм² - 660
ВВГнгLS
110м
5х4мм² - 660 55м d=25мм 85м
Wire number and section, voltage
Cables and wires required, length, m
Brand
Corrugated pipe
Description
Pipes required
Diameter by standard, mm Length, м
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Single Line Diagram. ЩТП
EOM-7.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832Norm.Control Celebi B.
09.19
09.19
09.19
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
L1 L2 L3
13,34
2 634,00 2 834,00 2 434,00 7,90 1,00 7,90
2 634,00 2 834,00 2 434,00 7,90 7,90
L1-L2-L3
X0
L1 L2 L3 N
1Q1
3x32A
N
MCB
6kA C
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-7.2
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Data
Total installed capacity
[kW]
Coefficient at one time
Total calculated capacity [kW]
Design current
[A]
Lighting
Outlet network
N
X1
2Q3
1x20A
MCB
6kA C
X1
2K4
3x9A
2Q4
1-1,6A
X1
2K1
3x9A
2Q1
X1
2Q6
3x20A
MCB
6kA C
X1
2Q7
1x20A
MCB
6kA C
X1
2Q8
1x20A
MCB
6kA C
X1
2Q9
1x20A
MCB
6kA C
2,5-4A
L1 L2 L3 380V
1 2 3 4 5 6 7 8 9 10
P1 P2 P3 P4 P5 P6
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 5x4мм2 ВВГнгLS
300,00 500,00 100,00 7002,00
1,60 2,67 0,53 12,52
Power Supply
Heat pump Heat pump (reserve) Water meter Hot water pump Hot water pump
(reserve) Hot water tank Reserve
X1
2K2
3x9A
2Q2
2,5-4A
X1
2K5
3x9A
2Q5
1-1,6A
10 10 10 55 55 55
GV2 ME10
TeSys D
GV2 ME10
TeSys D
GV2 ME10
TeSys D
GV2 ME10
TeSys D
10 10 10 15 15 15
25 25 25 25 25 25
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-7.3
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Power Supply Power Supply Power Supply Power Supply Power Supply
Reserve Reserve
2K2
2S2
2K2
X1
X2
2H2
N
Turn on
A1
A2
2K1
2S1
Man.-0
2K1
X1
X2
2H1
Green
2F1
1x6A
MCB
6kA C
L220V
A1
A2
2K4
2S4
2K4
X1
X2
2H4
A1
A2
2K5
2S5
2K5
X1
X2
2H5
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-7.4
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Turn on Turn on Turn on
Green Green Green
Man.-0 Man.-0 Man.-0
K1 K1
C.Cable
3х2,5мм² - 660
ВВГнгFRLS
56м d=25мм 56м
5х4мм² - 660 55м d=32мм 55м
Wire number and section, voltage
Cables and wires required, length, m
Brand
Corrugated pipe
Description
Pipes required
Diameter by standard, mm Length, м
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Single Line Diagram. ЩДУ
EOM-8.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832Norm.Control Celebi B.
09.19
09.19
09.19
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Corrugated pipe
X0
L1 L2 L3 N
1Q1
3x50A
N
MCB
6kA C
L1 L2 L3
22,15
4 394,00 4 394,00 4 334,00 13,12 1,00 13,12
4 394,00 4 394,00 4 334,00 13,12 13,12
Data
Total installed capacity
[kW]
Coefficient at one time
Total calculated capacity [kW]
Design current
[A]
Lighting
Outlet network
Other device
Total
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-8.2
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N
N
X1
2Q3
3x25A
MCB
6kA C
X1
2Q7
1x16A
MCB
6kA C
L1 L2 380V 380V
1 2 3 4 5 6 7 8 9 10
E1 E2 E3 E4
3x2,5мм2
ВВГнг-FRLS
3x2,5мм2
ВВГнг-FRLS
5x4мм2
ВВГнг-FRLS
5x4мм2
ВВГнг-FRLS
60,00 60,00 6501,00 6501,00
0,32 0,32 11,62 11,62
Power Supply
Smoke purge damper
Smoke purge damper
VDU-01 Smoke purge
VDU-02 Smoke purge
Reserve
2K3
3x25A
X1
2Q2
1x16A
MCB
6kA C
2K2
1x20A
X1
2Q1
1x16A
MCB
6kA C
2K1
1x20A
X1
2Q4
3x25A
MCB
6kA C
2K4
3x25A
26 30 20 35
26 30 20 35
25 32 32
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-8.3
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o . Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Power Supply Power Supply Power Supply
3F1
1x6A
MCB
6kA D
L220V
Turn on
A1
A2
2K1
2S1
Man.-0-Auto.
2K1
T o f i r e a l a r m
X2
X2
X1
X2
2H1
Green s y s t e m
A1
A2
2K2
2S2
2K2
X2
X2
X1
X2
2H2
A1
A2
2K3
2S3
2K3
X2
X2
X1
X2
2H3
A1
A2
2K4
2S4
2K4
X2
X2
X1
X2
2H4
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-8.4
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Man.-0-Auto. Man.-0-Auto. Man.-0-Auto.
T o f i r e a l a r m s y s t e m
T o f i r e a l a r m s y s t e m
T o f i r e a l a r m s y s t e m
Turn on
Green
Turn on
Green
Turn on
Green
ВВГнгLS
130м d=25мм 50м
3х2,5мм² - 660
Wire number and section, voltage
Cables and wires required, length, m
Brand
Corrugated pipe
Description
Pipes required
Diameter by standard, mm Length, м
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
Format А3
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Single Line Diagram. ЩИБП
EOM-9.1 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832Norm.Control Celebi B.
09.19
09.19
09.19
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N
220V
X0
L1 N
1Q1
1x25A
N
MCB
6kA C
L1 L2 L3
9,09
2 000,00 2,00 1,00 2,00
2 000,00 2,00 2,00
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-9.2
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Data
Total installed capacity
[kW]
Coefficient at one time
Total calculated capacity [kW]
Design current
[A]
Lighting
Outlet network
N
X1
2Q1
1x16A
MCB
6kA C
X1
2Q2
1x16A
MCB
6kA C
X1
2Q3
1x16A
MCB
6kA C
X1
2Q4
1x16A
MCB
6kA C
X1
2Q5
1x16A
MCB
6kA C
L1 L1 L1
1 2 3 4 5 6 7 8 9 10
E1 E2 E3
3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS 3x2,5мм2 ВВГнгLS
500,00 500,00 1000,00
2,67 2,67 5,35
Power Supply
Fire alarm system Notification and evacuation system
Power supply of SCS rack Reserve
45 45 40
15 15 20
25 25
Format А3
Sheet
Qty. Doc.NoRev. Sheet Sign. Date
EOM-9.3
H92277-19-C-0004 - EOM
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o . Inom
Phase
Number of the feeder
Plan number
Cable section
Рnom, W
In, A
Current, А
Type of power
Power area
Length, m with number and cross-section of cores
Pipe
Diameter, mm
Length, m
Power Supply Power Supply
Reserve
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Format А2
H92277-19-C-0004 - EOM
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Scheme of equalization of potentials
EOM-10 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832
KazCent Conference Center
Norm.Control Celebi B.
09.19
09.19
09.19
AutoCAD SHX Text ПВ3 6mm2
AutoCAD SHX Text ПВ3 6mm2
AutoCAD SHX Text ПВ3 6mm2
AutoCAD SHX Text ПВ3 6mm2
AutoCAD SHX Text ПВ3 6mm2
AutoCAD SHX Text
MAIN GROUND BUS(ГЗШ-10)
AutoCAD SHX Text
PE
AutoCAD SHX Text N
AutoCAD SHX Text 3L
AutoCAD SHX Text 3L
AutoCAD SHX Text N
AutoCAD SHX Text
PE
AutoCAD SHX Text
ALONG THE PERIMETER OF THE BUILDING
AutoCAD SHX Text
FROM THE GROUNDING LINE
AutoCAD SHX Text
CABLE TRAY
AutoCAD SHX Text
METAL COMMUNICATIONS
AutoCAD SHX Text
PE
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text
RECEPTACLE
AutoCAD SHX Text Technical boards
AutoCAD SHX Text
INPUT 1
AutoCAD SHX Text
PROTECTIVE CONDUCTOR PE
AutoCAD SHX Text
INPUT 2
AutoCAD SHX Text Automatic switch-on
AutoCAD SHX Text ПВ3 6mm2
AutoCAD SHX Text
GALVANIZED STRIP 40Х4ММ
AutoCAD SHX Text 300x40x4мм, Cupper
AutoCAD SHX Text of the reserve of the SR
AutoCAD SHX Text 3L
AutoCAD SHX Text N
AutoCAD SHX Text
PE
AutoCAD SHX Text
PE
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text Technical boards
AutoCAD SHX Text
LAMPS
AutoCAD SHX Text 3L
AutoCAD SHX Text N
AutoCAD SHX Text
PE
AutoCAD SHX Text Technical boards
AutoCAD SHX Text
PE
AutoCAD SHX Text 3L
AutoCAD SHX Text
METAL PIPES OF HEATING SYSTEM ENTERING THE BUILDING
AutoCAD SHX Text
METAL PIPES OF SEWAGE SYSTEM ENTERING THE BUILDING
AutoCAD SHX Text
METAL PIPES OF DOMESTIC WATER ENTERING THE BUILDING
METAL AIR DUCTS OF HVAC SYSTEM
5850 5850 5850 3635 2805
29250
1 2 3 4 5 6
А
Б
В
±0.000
105 106 107 111
118 108 116 117
88.16 51.08 50.10
5.71 3.90 6.46 6.24
9.46
9.62
2.89 4.04
15.37
8.65 9.80
8.40
7.89
84.50
115120 114
5.78
3.87
+0.920
6.16
5/14/1
2215 3045
А/1
Б/2
5%
5%
5%
5%
6 x 153 = 920
6 x 153 = 920
18 x 194 = 3 500
Б/1
HH
4 1
2 2
Legend
Galvanized steel strip 40х4mm 500-600mm below finish grade
Galvanized steel ground rod ∅20mm, L=3000mm
Connect ground loop to steel structure
Handhole
Cable to ground bus bar
Lightning protection down conductor connection to grounding counterpoise. Provide PVC conduit cast into the exterior wall for each down conductor
Ground bus bar
4 PVC sleeve ∅50mm
HH
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Format А2
H92277-19-C-0004 - EOM
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
1st Floor Grounding Plan
EOM-11 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832
1-st Floor Plan ±0.000
Sc: 1/100
KazCent Conference Center
Cloakroom
Lobby Area
Vestibule
Conference Room 1
Translator Booth 1
No. Space Description Net m2
Restroom Entrance Hall
Restroom (Men)
Conference Room 2
Conference Room 3
Translator Booth 2
Restroom (Woomen)
Staff Office
Janitor Closet
Restroom (Disabled)
Storage (CF 2)
Total NET Area
Service & Storage (Lobby)
Mechanical Room
Electrical Room
7.70
83.54
8.65
88.69
51.08
50.89
9.57
3.93
8.40
16.15
9.46
3.83
2.90
6.34
6.97
6.71
6.38
5.78
9.79
3.84
390.60
Storage (CF 3)
Storage (CF 1)
Norm.Control Celebi B.
09.19
09.19
09.19
Galvanized wire rod 8mm
(Vertical current collector) i= i=8%
5850 5850 5850 3635 2805
29250
1 2 3 4 5 6
А
Б
В
5/14/1
2215 3045
А/1
1% 1% 1%1% 1%1%1% 1%
1% 1% 1%1% 1%1%1% 1% i= i= i= i= i= i=8%
Б/2
-Б/1
Air terminal ∅16mm, L=1m
Galvanized steel 8mm
Mechanical equipment bonding
0,000
Ground loop
Vertical steel grounding wire d=16mm, L=3M
Galvanized wire rod 8mm
Galvanized strip 40x4
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Format А2
H92277-19-C-0004 - EOM
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Lightning Protection Plan
EOM-12 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832
Roof Plan
Sc: 1/100
KazCent Conference Center
Norm.Control Celebi B.
09.19
09.19
09.19
Legend
Galvanized wire rod 8mm
(Vertical current collector)
Lightning receiver ∅16mm, L=1m
29250
1 2 3 4 5 6
А
Б
В
±0.000
105 106 107 111
118 108 116 117
88.16 51.08 50.10
5.71 3.90 6.46 6.24
9.46
9.62
2.89 4.04
15.37
8.65 9.80
8.40
7.89
84.50
115120 114
5.78
3.87
+0.920
6.16
5/14/1
2215 3045
А/1
Б/2
5%
5%
5%
5%
6 x 153 = 920
6 x 153 = 920
18 x 194 = 3 500
Б/1
Detail B
Detail B
ЩО ЩСЩВ
ЩРЩНОЩДУ
ЩТП
ЩО ЩСЩВ ЩТПЩДУ
ЩР ЩНО
700500
500500450500 600
600400
Detail C
Detail C
ЩИБП
ЩИБП
IBP/2.7kW
IB
P
ИБП
Power cable tray 200mm
LC cable tray 200mm to +3.500 to +3.500
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
"Integra Engineering Group KZ"
LLP
GSL No. 15018832
Format А2
H92277-19-C-0004 - EOM
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
1st Floor Cable Tray Plan
Legend
Low voltage cable tray 100-200mm
Low current cable tray 100-200mm
EOM-13 23
1-st Floor Plan ±0.000
Sc: 1/100
KazCent Conference Center
Cloakroom
Lobby Area
Vestibule
Conference Room 1
Translator Booth 1
No. Space Description Net m2
Restroom Entrance Hall
Restroom (Men)
Conference Room 2
Conference Room 3
Translator Booth 2
Restroom (Woomen)
Staff Office
Janitor Closet
Restroom (Disabled)
Storage (CF 1)
Total NET Area
Storage (CF 2)
Storage (CF 3)
Service & Storage (Lobby)
Mechanical Room
Electrical Room
7.89
84.50
8.65
88.16
51.08
50.10
9.62
3.90
8.40
15.37
9.46
4.04
2.89
6.16
5.78
6.46
6.24
5.71
9.80
3.87
388.08
Norm.Control Celebi B.
09.19
09.19
+3.500
58.76
8.07
5.25
2.32
±0.000+0.920
5850 5850 5850 3635 2805
29250
1 2 3 4 5 6
А
Б
В
5/14/1
2215 3045
А/1
7.85
Б/2
±0.000
±0.000
±0.000
18 x 194 = 3 500
Б/1
LV cable tray 100mmLC cable tray 100mm
LV cable tray 200mm from ±0.000 from ±0.000
LC cable tray 200mm Anchor Rod
"U" Strut
Cabel Tray
Typical Detail of the Cabel Tray
A
Fire Wall
A Detail А-А
Fire-resistant material (mineral wool, non-flammable sealant)
Cable
Cable Tray
Fire Wall
Cable
Cable Tray
Detail of Cable Trays Penetrating through the Walls
Fire-resistant material (mineral wool, non-flammable sealant)
LV cable tray 200mm
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Format А2
H92277-19-C-0004- EOM
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
Mezzanine Floor Cable Tray Plan
Legend
Low voltage cable tray 100-200mm
Low current cable tray 100-200mm
EOM-14 23
"Integra Engineering Group KZ"
LLP
GSL No. 15018832
Mezzanine Floor Plan +3.500
Sc: 1/100
KazCent Conference Center
Restroom (Mezzanine)
Kitchenette
Mezzanine Lounge
Storage (Mezzanine)
No. Space Description Net m2
Lobby Mezzanine
Total NET Area
58.76
7.85
2.32
8.07
5.25
82.25
Norm.Control Celebi B.
09.19
29250
1 2 3 4 5 6
А
Б
В
±0.000
105 106 107 111
118 108 116 117
88.16 51.08 50.10
5.71 3.90 6.46 6.24
9.46
9.62
2.89 4.04
15.37
8.65 9.80
8.40
7.89
84.50
115120 114
5.78
3.87
+0.920
6.16
5/14/1
2215 3045
А/1
Б/2
5%
5%
5%
5%
6 x 153 = 920
6 x 153 = 920
18 x 194 = 3 500
Б/1 x
A
2x36
A
A
A
AA A
A
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
E X I T
В Ы Х О Д
A
ЩО
A
A
A
№1
№1
№1
№2
№3 №3 №3 №3 №3 №3
№4
№4 №4
№5
№5
№6
№6
№6
№6№6
№7
№7
№7
№7
№7
№7
№7
№7
№7
№7
№7
№7
№7
№8 №8
№8
№8№8№8
№8 №8
№8
№9 №9
№9
№9
№9
№9
№E1 №E1 №E1
№E1
№E1
№E1
№E1
№E1
№E1
№E2 №E2 №E2
№E2
№E2
№E2
№E2 №E2 №E2
A
№2 A
Lighting of the staircase
№23
2x36
A
1x32w
5,0
2-BLM032T
200lx 300lx
150lx
150lx
200lx
200lx 200lx
300lx
150lx
200lx
150lx 150lx
150lx
300lx
300lx
200lx
1x32w
2,7
2-BLM032T
1x32w
5,0
2-BLM032T
1x32w
5,0
2-BLM032T
1x32w
2,7
3-BLM032T
1x18w
2,55
2-DWL018A
1x18w
2,7 3-DWL018A 1x18w
2,7
8-DWL018A
1x18w
2,55
2-DWL018A
1x20w
2,9
6-DWL020A
1x20w
2,9
4-DWL020A
200lx
1x32w
2,7
2-BLM032T
1x32w
2,7
2-BLM032T
1x20w
3,0
4-DWL020A
1x48w
2,7
2-STL048S
1x37w
5,0
2-LNE040U
1x37w
5,0
1-LNE040U
ЯТП
220/36
250ВА
(for Repair lighting)
EL5
EL5
1x20w
3,5
1-DWL020A
1x20w
3,5
1-DWL020A
1x20w
3,5
1-DWL020A
1x20w
3,0
1-DWL020A
at el. +3,500
L10-L22, EL3-EL4
at el. +3,500
EL2
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Format А2
H92277-19-C-0004 - EOM
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Sadyrov M.
Kamchybekov A.
1st Floor Lighting Plan
Legend
Recessed linear LED light 16W/m (STL 016A)
A
A
2x36
A
A
Recessed LED downlight 20W ∅200mm (DWL020A)
Round pendant LED light: ∅647mm- 47W (NTA 047S)
2x36
A
Pendant LED light 36W IP65(LNE 040U)
Recessed LED square light 32W 600x600mm with emergency power supply unit (BLM 032T)
Recessed LED spotlight 4W ∅68мм(ESP004A)
Recessed LED downlight 24W ∅125мм(ORI024A)
Hidden LED striplight 15W/m
Motion detector
Recessed 1 gang light switch
Button 2 gang
Multitouch panel
Emergency recessed LED downlight 20W ∅200mm with emergency power supply unit (DWL020A)