4. Site pictures 12 Jul 2021.pdf

PDF 3 MB Posted

Attached to
Solicitation: Project KAZCENT CONFERENCE CENTER Almaty, Kazakhstan
Solicitation number
W5J9JE-22-R-0004
Issued by

About this file

This solicitation is for the construction of a prefabricated metal training facility in Almaty, Kazakhstan to be used as a regional conference center. The U.S. Army Corps of Engineers (USACE) Transatlantic Expeditionary District (TAE) will award a firm-fixed price design-bid-build construction contract between $1M and $5M. The construction project is to build a large conference room that can divide into three smaller rooms with movable wall panels. The period of performance for the approximately 270-day construction duration begins with the notice to proceed. The North American Industry Classification System code is 236220 for Industrial Building Construction. Site pictures and demolition work pictures are provided in attachments, along with the site location map. The response deadline is not specified in this document.

View the file

Other files

File Type Posted
W5J9JE22R0004-0005 Amendment 0005 28 Apr 22.pdf PDF
31. Projnet Kazcent Final Q&A 24 April 2022.pdf.pdf PDF
W5J9JE22R004-0004 Amendment 0004 24 April 2022.pdf PDF
31.1 Projnet Bidder Inquiry Attachment to ID#9701431.pdf PDF
23. Sol_Permits & Background Info.pdf PDF
30. Projnet Questions and Answers 16 April 2022.pdf PDF
23. Permits and Background Info.pdf PDF
22. KazCENT Conference Center Almaty Cost Breakdown.xlsx XLSX spreadsheet
29. Attachment 5_BLG Template.docx DOCX document
26. Site Pictures 21-31.pdf PDF
W5J9JE22R0004-0003 16 APRIL 22 (Amendment 0003).pdf PDF
2. PPQ Attachment.pdf PDF
28. Attachment 4_BLA Template.docx DOCX document
24. Site Pictures 1-10.pdf PDF
27. SOW-KACENT 14APR2022.pdf PDF
1. Project Summary Form.pdf PDF
25. Site Pictures 11-20.pdf PDF
W5J9JE22R00040002 (amendment 0002).pdf PDF
W5J9JE-22-R-0004-0001 (Amendment).pdf PDF
14. 100% Design KAZCENT - MS.pdf PDF
13. 100% Design KAZCENT - WS.pdf PDF
8. 100% Design KAZCENT - GP.pdf PDF
12. 100% Design KAZCENT - HVAC.pdf PDF
20. 100% Design KAZCENT - ORCS.pdf PDF
16. 100% Design KAZCENT -EWS.pdf PDF
7. 100% Design KAZCENT - AR.pdf PDF
17. 100% Design KAZCENT - ES.pdf PDF
15. 100% Design KAZCENT - RC.pdf PDF
10. 100% Design KAZCENT - LC.pdf PDF
21. 100% Design KAZCENT - CPD.pdf PDF
18. 100% Design KAZCENT - HS.pdf PDF
9. 100% Design KAZCENT - EOM.pdf PDF
11. 100% Design KAZCENT - TE.pdf PDF
19. 100% Design KAZCENT - HSRC.pdf PDF
6. Site map location.pdf PDF
W5J9JE-22-R-0004_Kazcent Conference Center Solicitation.pdf PDF
5. Pictures of demolish works.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Current KAZCENT -HQ

Left side of KAZCENT, not finished like the little bit of entrance

KAZCENT Conference Center proposed site right after the existing warehouse building was demolished in 2018.

The same area picture currently in 2021.

This picture is from 2018.

The spot where people are was leveled and could be used as a parking lot with concrete in front of the new facility. The concrete added there should tie in with the existing concrete of the HQ building to complete the campus.

The drop off edge near where the group is about where the leading edge of the facility could start and go back to the back of the property from there.

This is current 2021 picture.

MOD put some concrete and made like a road.

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
The same area picture currently in 2021.
Slide Number 6
Slide Number 7
This is current 2021 picture. MOD put some concrete and made like a road.
Slide Number 9
Slide Number 10
Slide Number 11

File details come from the government source that posted it. Updated .