19. 100% Design KAZCENT - HSRC.pdf
PDF 10 MB Posted
- Solicitation number
- W5J9JE-22-R-0004
About this file
This solicitation notice is for a firm-fixed price design-bid-build construction contract to build a prefabricated metal training facility in Almaty, Kazakhstan. The U.S. Army Corps of Engineers, Transatlantic Expeditionary District will award a single contract for a conference center with a large room divisible into three smaller rooms using movable wall panels. The magnitude of construction is estimated between $1 million to $5 million. The project service code is Y1JZ for construction of miscellaneous buildings. The construction period of performance is approximately 270 calendar days from notice to proceed. The solicitation does not include a scheduled site visit. Offerors must have an active System for Award Management registration to be considered for award. Performance and payment bonds will be required.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORKING DRAWINGS
Contract No. H92277-19-C-0004 KazCent Conference Center Bostandyk (Kalinin) Region, Zharokov Street, 210/1, Almaty City, Kazakhstan
"Integra Engineering Group" LLP
State License No. 15018832
Almaty, 2020
_февраль
A g re e d
C h a p te r H S
A g re e d
C h a p te r W
SA
u b a k ir o v
A ki m be rg en ov E s e n k u lo v
C h a p te r G P
C h a p te r E
SZ
h u s u p o v
C h a p te r O R C
SN
a b ie v Z
.1
.1
.1
.1
.1
Format A3
S ig n a n d D a te
O ri g.
I nv
N o.
R ep l.
In v.
N o.
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
List of working drawings of the main set
List of reference and attached documents
HSRC-1.1
General Infomation
List of reference documents
Reference documents
SNiP RK 2.03-30-2006 "Construction in seismic areas"
SNiP 2.01.07-85* "Loads and impacts"
SNiP RK 2.04-01-2010 "Construction climatology"
SNiP RK 5.01-01-2002 "Foundations of buildings and structures"
SNiP RK 5.04-18-2002 "Metal structures"
SNiP RK 5.04-23-2002 "Steel structure. Design standards"
SNiP 2.09-03-85 "Facilities of industrial enterprises"
SNiP 3.02.01-87 "Earthworks, bases and foundations"
SNiP 3.04.03-85
SNiP 3.04.01-87 "Insulation and finishing coatings"
Serial 3.006.1-8 al. 0-1 «Каналы и тоннели сборные железобетонные из лотковых элементов»
Serial 3.900.1-14 al. 1
Serial 1.450.3-7.94 al. 2
Serial 1.400-15 al. 1
"Precast concrete channels and tunnels from tray elements» "Stairs, platforms, ladders and fences steel for industrial buildings of industrial enterprises"
"Unified mortgage products of reinforced concrete structures for fastening of technological communications and equipment"
General Information
Layout of reinforced concrete elements
Fixed support H1, H2
Compensators K1
Details of pipelines UT1. Formwork drawing
Details of pipelines UT1 (Reinforcements)
Monolithic part MU1 (sec. 1-1). Turn points UP1-UP5.
1.1
Reference documents
Fixed support of pipelines4.903-10, a.5
Fixed support of pipelines
7.903-9 Compositions of heating insulation of pipelines.
Attached documents
4.903-10, a.4
ТС/RC.I-МС2
Water collector МN-1
ТС/RC.I-МС3
ТС/RC.I-МС1
Connection details МС2
Connection details МС1
General Information1.2
8 Fixed supports H3-H6
NoteDescriptionList
NoteDescriptionDocument
NoteDescriptionDocument
"Protection of building structures and structures from corrosion. Rules of production and acceptance of works"
This design has been developed in accordance with the codes applicable in the Republic of Kazakhstan, and ensures the safety of human life and health in the period of the facility operation subject to the implemenation of measures provided in drawings
Chief Project Engineer Orazalin K.K. 8
S ig n a n d D a te
O ri g In v N o
R e p l.
I n v N o
Format A3
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
HSRC-1.2
1.General Information The working project "KazCent Conference Center Almaty city, Bostandyksky district (Kalininsky), Zharokova str., 210/1" was developed on the basis of drawing set TC.
Conditions of construction site:
- climatic area-III, subdistrict B (SP RK 2.04-01-2017);
- the average temperature of the coldest five days-minus 23.3 C° (SP RK 2.04-01-2017).
The project is designed for the following climatic conditions:
- normative weight of snow cover-70 kgs / m2 (I) SNiP 2.01.07-85*);
- normative high-speed wind head-38 kgf / mg (III) SNiP 2.01.07-85*);
- The area is located in the zone with seismic hazard (according to the SP RK 2.03-30-2017) - 9 (nine) points on maps of seismic zoning of OCZ-2475 and OCZ-22475. Peak accelerations (in fractions of g) for rocky soils: OCZ-1475 - (agR(475)) - 0.38; and OCZ-12475 -(agR(2475)) - 0.73;
- Type of ground conditions of the construction site-II (second) (according to vol. 6. 1 SP RK 2.03-30-2017).
- Design acceleration-0,535 (according to Annex E SP RK 2.03-30-2017).
- Design seismicity of the construction site - 9 (nine) points (according to vol. 6. 2 SP RK 2.03-30-2017).
- Normative depth of soil freezing for loam-0.79 m; for sandy loam-0.96 m; for coarse soil - 1.17 m.
In accordance with the report of engineering and geological survey, the following engineering and geological elements are identified in site:
1a. Road layers- small crushed stone, low moisture, from 0,0 to 0,2m with layers of sandy firm loam-41A; density of soil-1,75 g/cm3 (table);
1b. Bulk soil-crushed stone soil with a dusty-clay filler, low moisture-14; soil density-1.80 g / cm3 (table);
1c. Bulk soil-semi-solid loam, with the inclusion of grus to 10-15%, from 1.0 m to 1.2 m with layers of loose pebbles-35g; soil density-1.95 g/cm3 (table);
2. Hard sandy loam with inclusion of gravel up to 25-30% - 36V; the number of plasticity-3.6; natural humidity-10.8%; yield strength-<0; soil density-1.80 g / cm3 (table); angle of natural slope in the dry state-270; angle of natural slope in the wet state-24*0; modulus of deformation in the natural state-16.0 MPa;
3. Gravel soil, with sandy aggregate, with layers of hard sandy loam - 6A; natural humidity-8.4%; soil density-1.75 g/cm3 (table);
angle of natural slope in the dry state-40°; angle of natural slope in the wet state-38°; modulus of deformation in the natural state-40.0 MPa;
4a. Pebble soil, with sand filler, low moisture - 6b; natural humidity-5.6%; soil density-1.95 g/cm3 (table); angle of natural slope in the dry state-41°; angle of natural slope in the wet state-39°; modulus of deformation in the natural state -40.0 MPa;
5. Pebble soil with inclusions of boulders 25% - 6g; soil density-2.00 g/cm3 (table); angle of natural slope in the dry state-43°;
angle of natural slope in the wet state-40°; modulus of deformation in the natural state-50.0 MPa;
The construction site surface is composed of bulk soils-crushed stone soil with a dusty-clay filler, low-moisture, with a capacity of 0.6-0.9 m (1st and 3rd wells), semi-solid loam, with the inclusion of grus up to 10-15%, with 1.0 m to 1.2 m with layers of loose pebbles, with a capacity of 0.4 m (1st well). Bulk soils are underlain by gravel soil (1, 2 wells), sandy loam solid, with the inclusion of grus to 25-30%, pebble soil, with a sandy filler, low moisture (3rd well). In all wells between the depth of 1,3-2,9 m, pebble soils with the inclusion of boulders up to 25%, low moisture were detected within opened depth of 8,7-12,9 m.
Groundwater during the survey period (February 2019) within a depth of 10.0-15.0 m were not detected.
According to chemical analyses, soils are not salty (ST RK 2.01-101-2013, Appendix B.,t.B-1). According to the degree of sulfate aggressiveness of the soil, for concrete to take class W/4H1.1x; for portland cement to take from non-aggressive to mildly aggressive, for calculations to take a weak degree of aggressiveness. To R/C structures (on the content of chlorides) -non-aggressive.
Corrosivity of soils to carbon steel (specific resistance of the soil) is low.
Soils on the degree of frost hazard is almost non-porous.
2. Structure solution. Underground laying of pipelines.
Underground laying of pipes is designed in the channels of precast concrete trays according to the series 3.006.1-8 "Precast concrete canals and tunnels of tray elements". The lower trays of the underground channels shall be laid on the sand subbase of sand with medium size fraction 0.25-0.5 mm and thickness of 100mm.
Between R/C walls of drainage manhole and manholes, connecting elements of MC1-MC5 shall be intalled. The connecting elements of MC1-MS5 shall be installed in horizontal joints between reinforced concrete walls according to seismic conditions and with technical solutions for water manholes (TPR 901-09-11.84 AVI.88 "Domestic water manholes" additional measures for construction in seismic areas 7-9 points).
Joints between precast concrete elements of underground structures shall be carefully filled with cement mortar M100.
In joints under R/C trays R/C pads shall be installed.
In underground channels not more than 50 m, and also in places of conjunction of channels to manholes and fixed supports, it is necessary to install expansion joint. For the details of expansion joint, see series 3.006.1-8. The joints between the trays shall be filled with cement mortar M100. In places of expansion joints of underground channels elements, bitumen mastic shall be filled .
Underground manhole for sectioning valves, branch units, air service units and pipeline drainage service units was designed for heating system line.
Manhole structures - monolithic reinforced concrete cl.B20 bottom reinforced monolithic thickness of 300mm, lean concrete cl. B7,5. Walls is reinforced monolithic with thickness 300mm. Manhole slabs-precast concrete slabs by series 3.006.1-8 based on the walls of the manhole and precast beams.
The structures of the drainage manhole was provided from precast concrete walls with a diameter of 1500 mm.
Precast concrete walls and slabs were adopted according to the series 3.900.1-14 "Reinforced concrete Products for round manholes".
The top of the manholes shall be covered with cast iron hatches type "T" according to GOST 3634-99.
Channel structures were designed to be laid with the depth of 0.5 m or more from the top of the pavement to the top of the slab. The minimum depth of the slab of the heating manholes from the top of the road surface is 0.3 m.
Fixed supports shall be made of reinforced monolithic reinforced concrete cl.B25 On the heating lines, guide supports of metal inserts with sealing in reinforced concrete trays are provided.
3. Instructions for the preparation of earthworks.
Backfill of underground structures shall be made by local non-sedimentary pebble soil with uniform layers with the thickness of 20-30 cm, simultaneously from opposite sides, with compacting in accordance with the requirements of SNiP 3.02.01-87 "Earthworks, bases and foundations".
During the preparation of earthworks, the soils of the base have to be protected from moisture by surface waters and from freezing.
Earthworks shall be performed in accordance with the requirements of SNiP 3.02.01-87 " Earthworks, bases and foundations."
4. Preparation of concrete, reinforcement and installation works.
Preparation and installation of precast concrete elements of channels, slabs of manholes shall be strictly made in accordance with instructions of a series 3.006.1-8 "Channels and tunnels precast concrete from tray elements".
The location of the reinforcement of monolithic reinforced concrete structures shall be performed with fixators which provide the required values of the protective layers of concrete and the required distances between the rebars. It is not allowed to use trimming of reinforcement bars, plates, wooden bars, etc. as fixators.
Individual reinforcement rebars shall be connected to each other, linking them with tire wire at all intersections.
Hooks of cross reinforcement shall be located strictly perpendicularly to the working rebars and densely adjoin to than.
All welded joints of working rebars shall be performed in accordance with the requirements of GOST 14098-91.
Cast of monolithic concrete structures shall be performed only after installation and verification of the correct position of all embedded and reinforcement features .
Monolithic structures shall be made on lean concrete cl. B7,5 with the thickness of 100 mm. Precast concrete structures in the manholes shall be mounted on cement mortar M100. Prefabricated trays shall be installed on a layer of sand subbase with a thickness of 100 mm.
All work have to be performed in accordance with the requirements of SNiP RK 5.03-37-2005 "Bearing and enclosing structures".
All welded joints of working rebars shall be performed in accordance with GOST 14098-91 by electrodes type E42-a according to GOST 9467-75*.
5. Measures to protection of building structures from corrosion.
For monolithic reinforced concrete structures, concrete with strength cl. B20 and B25 on Portland cement (GOST 10178), frost resistance grade F100, hot-rolled rebars with periodic profile class A-III and without profile class A-I according to GOST 5781-82 shall be used. For manual arc welding, electrodes of type E42A according to GOST 9467-75 shall be used.
All steel, connecting, embedded and overhead metal elements, welds shall be painted by 2 layers of enamel PF-115 (GOST 6465) on the primer GF-021 (GOST 25129) with the total layer of 150 microns thickness.
The side surfaces of reinforced concrete structures in contact with the ground shall be covered with 2 layers of hot bitumen.
Work of corrosion protection of structures shall be performed in accordance with the requirements of SNiP 3.04.03-85 "Protection of building and structures from corrosion. Rules of production and acceptance of works", SNiP 3.04.01-87 "Insulation and finishing coatings".
The project does not allow to prepare the works at negative outdoor temperatures.
General Infomation
A g re e d
O ri g In v N o .S ig n a n d D a te
R ep l.
In v.
N o.
Layout of R/C Elements
HSRC-2
1. For general Information, see sheet RC1
2. Read this sheet together with the sheets RC3-RC6
3. The connection of proposed heating system to existing heating line shall be executed during installation.
Absolute level of the ground, existing underground systems shall be specified during earthworks.
4. For the layout and profiles of heating lines, refer to the set of TC.
5. Joints between precast R/C elements of channels shall be caulked with cement mortar M100.
6. In channels through more than 50m, and also in connection points of the channel to the R/C manhole or fixed support, expantion joints "E.J." shall be provided according to series 3.006.1-2.87.
Support cushion shall be placed on a cement mortar M100 of thickness 10mm. For the location of the support cushion OP, refer to sheets TC.
7. At the base of the trays, a sand subbase with a thickness of 100 mm shall be performed.
8. All surfaces of R/C elements in contact with the ground shall be coated with hot bitumen for two time.
9. Prefabricated elements of the channel with the sign "*" shall be removed during installation.
10.Trays (slabs) with the sign "*" are additional elements. The quantity of trays in the specification is taken into account that the excessive parts to be used in other locations.
11. The concrete strength of precast reinforced concrete structures shall be taken by the series.
Item Qua.DescriptionDocument Weight, kg Note
Assembly unit:
Support element Н-1Н-1
Sheet RC-3 1
Support element Н-2Н-2 Sheet RC-7 1
Material:
Brick in joints and e.j.
KR-r-by 250×120×65/1NF/200/2,0/50
Waterproofing (strip of ruberoid) width400х5000
0,8 m 3GOST 530-2012
2 m 2GOST 10923-93
(Pad 65х250х1200) Concrete cl. В7,51 m ³
Heating manhole UT1UT-1
Sheet RC-7 1
Details:
Sand Subbase 31.6 m 3
Expantion Joint "e.j." 18 шт
2.0
0,025
Support element Н-3Н-3 1
Support element Н-4Н-4 1
4.0
0,025
Expansion Joint in wall
R/C structure (manhole, support and ect.)
(plan)
Two layers of rubberoid Tray class "L"
Brick (65х250х300h) in joint and "e.j."
Expansion Joint (on slab and bottom of tray)
-Concrete pad class В7,5 -Two layers of rubberoid -R/C tray class "LK" Concrete В7,5
Tray class"LK"
-R/C tray class "L" -R/C pad in joints -Sand subbase -Compacted soil
Expansion Joint (Detail of connection to R/C structure)
-Concrete pad class В7,5 -Two layers of rubberoid -R/C slab class "P"
Bitumen mastic
Concrete В7,5
R/C structure
Tray class "L"
Slab class "P"
Prefabricated R/C Pad
Brick (65х250х300h) in joint and "e.j."
А - А
PT1(PT1*)
PP..
Brick (65х250х300h) in joint and e.j.
i=0,003
Cement Mortar M100
0 10
Bottom of tray
SandLK1(LK1*) Tray LK.300.90.60
C
PT1
LK1
B
C
PT1
LK1
PT1
LK1
layout of reinforced concrete elements
170 280 170
3.006.1-2/87.0-17
ОP1
sp.3.0m
Section 3-3
Heating Pipes 2 p. ∅57x3,0
P5-8 P5d-8
Slab
85,9 m
900.0R/C Tray L4-8*(var.)L4-8* 3.006.1-2.87 в.0, 1
230.0R/C Tray L4d-8L4d-8
R/C Pad of Tray PP3 100.0
P5-8* 410.0R/C Slab P5-8
PP3
OP1 Support Pad OP1 10.0
P5d-8 100.0R/C Slab P5d-8
3.006.1-2.87 в.0, 2
MU1 Monolitic Slab MU1 2,5 r.m.RC-5
Support element Н-5Н-5 1
Support element Н-6Н-6 1
Sheet RC-8
Sheet RC-8
Sheet RC-8
Sheet RC-8
3.006.1-2.87 в.0, 1
3.006.1-2.87 в.0, 2
3.006.1-2.87 в.0, 2
3.006.1-2.87 в.0, 2
4500 2300
8500 11500 9000
8600 10005 e.j.
e.j.
P7 -5
L6 -1
P7 -5
L6 -1
P7-5 L6-11
P7-5 L6-11
P7d-5 L6d-11 P7d-5
L6d-11
P d
L d
P7 -5
L6
-1 1*
P7-5* L6-11*
P7d-5 L6d-11
P7d-5 L6d-11
P
L 11*
P7-5* L6-11*
2560 2570
250 250
OP1
1500 1500
3х3000=9000
3000 1000
780 2300 700
OP1 OP1
250 250 e.j.
750 750 750 2х3000=6000
250250 75030003000 750 750460 х
0 L4-8
P5-8 L4-8 P5-8
L4-8 P5-8
L4-8 P5-8
L4-8 P5-8
L4д-8 P5д-8
L4d-8 P5d-8
L4d-8 P5d-8
L4-8 P5-8
L4d-8 P5d-8
L4-8 P5-8
Л4д-8 П5д-8
L4d-8 P5d-8
L4 -8
P 5-
L4
-8
P 5-
8*
OP1 OP1
3000 2500 3000
OP1OP1
OP1
25002500
OP1
OP1
OP2
OP2
OP2
1500 1890
170015501250
3000 1000
OP2
OP2
OP1 OP1 OP1
220027002500
1 1
2 2
Н3
RC-6
Н4
RC-6
A
A
OP2 Support Pad OP2 13.0123.006.1-2.87 в.0, 2
1125.0R/C Tray L6-11*(var.)L6-11* 3.006.1-2.87 в.0, 1
280.0R/C Tray L6d-11L6d-11
P7-5* 610.0R/C Slab P7-5*
P7d-5 150.0R/C Slab P7d-5
3.006.1-2.87 в.0, 2
3.006.1-2.87 в.0, 1
3.006.1-2.87 в.0, 2
Compensator К1K1 Sheet R/C-6 1
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
Format А1
L4-8 P5-8
R/C Pad of Tray PP5 190.0PP5 103.006.1-2.87 в.0, 2
R/C elements
Limit of design e.j.
Н6
RC-6
L4-8 P5-8
L4 -8
P 5-
L4 d-
P 5d
-8 L4
-8 P 5-
L4 d-
P 5d
-8 L4 d-
P 5d
-8 L4 d-
P 5d
-8
OP1
OP1
OP1
OP1
e.j.
OP2 OP2
Level of Channel Bottom see profile TC
Level of Channel Top see profile TC
Ground Level
Н D e p th o f
B a ck fi ll in g
Н D e p th o f
L a y in g
∅1 х4
A x e o f ca n a l
165 165 335 9013533590135
SandSupport Cushion PP5
Prefabricated R/C lining type "PP.." only in joints and in E.J.
Only in joint and E.J.
Brick(65х250х300h)
L6-11 (L6d-11*) R/C Tray
P7-5 (P7d-5*) R/C Slab
Heating Pipes
C
-Cement screed with slope М100 -15÷20mm -2 layers of bitumen mastic waterproofing
- Leveling cement screed M100-20mm
- Reinforced concrete slab type "PT"
- Reinforced concrete tray type "LC"
- R/C lining type "PP" in the joints
- Sand subbase
- Compacted soil
∅108х4
Section 1-1
155 310 155
3.006.1-2/87.0-17
ОP1
sp.2.5m
Section 2-2
Sand Subbase b=100mm
PP3
Brick Wall
Heating Pipes ∅89x4/160
Л4-8* Л4д-8
П5-8(П5д-8)
Н 1 D e p th o f
B a ck fi ll in g
V a ri o u s
Prefabricated R/C lining type "PP.." only in joints and in E.J.
R/C Tray
R/C Slab
-Cement screed with slope М100 -15÷20mm -2 layers of bitumen mastic waterproofing
- Leveling cement screed M100-20mm
- Reinforced concrete slab type "PT"
Ground Level
Level of Channel Bottom see profile TC
Level of Channel Top see profile TC
Н1
RC-6
e.j.
Limit of Design e.j.
e.j. Limit of Design
-Cement screed with slope М100 -15÷20mm -2 layers of bitumen mastic waterproofing
- Leveling cement screed M100-20mm
- Reinforced concrete slab type "PT" Level of
Channel Top see profile TC
Level of Channel Bottom see profile TC
Prefabricated R/C lining type "PP.." only in joints and in E.J.
Cement Mortar M100
- Reinforced concrete tray type "LC"
- R/C lining type "PP" in the joints
- Sand subbase
- Compacted soil
Bitumen mastic -R/C tray class "L" -R/C pad in joints -Sand subbase -Compacted soil
Brick (65х250х300h) in joint and "e.j."
Tray class"LK"
Bitumen mastic
Prefabricated R/C Pad
Prefabricated R/C Pad Bitumen mastic
-Cement screed with slope М100 -15÷20mm -2 layers of bitumen mastic waterproofing
- Leveling cement screed M100-20mm
- Reinforced concrete slab type "PT"Ground Level
Н 1 D e p th o f
B a ck fi ll in g
V a ri o u s
Level of Channel Bottom see profile TC
Level of Channel Top see profile TC
Brick Wall
Sand Subbase b=100mm
- Reinforced concrete tray type "LC"
- R/C lining type "PP" in the joints
- Sand subbase
- Compacted soil
PP3
Л4-8* Л4д-8
Prefabricated R/C lining type "PP.." only in joints and in E.J.
R/C Tray
Cement Mortar M100
Cement Mortar M100
SPECIFICATION OF ELEMENTS FOR THE SCHEME LOCATED ON THE SHEET
n a n d D a te
O ri g In v N o
R e p l.
I n v N o
Format A3
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
HSRC-3
300300 2500 manhole UT1.
Formwork Drawings
Ground Level
0.000
-0.500
CG-22
КО6Л1МС1
Ур.земли
0.000 867.57
-0.500 867.07
750 1000 750 300300
300 780 300
100100
ПО4
1 - 1
2 - 2
250 1000 250
А
А1
U1 Зд1
Зд1 У1
А1А1 а а
To drill ∅12
-2.000 865.07
-2.300 864.77
7501000750
-1.460 866.11
-1.000 866.57
MN-1
МН-1
620 600
А
1. General information, ground conditions and backfilling, refer to sheet RC-1.
2. Scheme location of manhole UT1 and drainage manhole DK1 refer to drawing TC-2,3.
3. manhole shall be placed on lean concrete cl.B7,5 of thickness 100mm with the horizontal surface in plumb with the dimensions exceeding the dimensions of a manhole slab as 100mm in each side on the compacted of soil.
4. The joints between slabs of manhole shall be filled by mortar M100.
5. After installation of hatch "L", around the hatch shall be filled by concrete cl.B15. Consumption of concrete-0.03m3.
6. Manhole wall shall be installed on freshly laid cement mortar M100.
7. The connecting element MC-1 shall be installed in each horizontal joint at 90° (4 pieces per joint in the neck).
The connecting element MC-2 shall be installed in each horizontal joint at 45° (8 pieces per joint in the manhole walls).
8. All side surfaces of R/C structures in contact with the soil shall be coated with hot bitumen for 2 times on the primer based on bitumen BN 90/10.
9. Prior to open required sleeves on wall, drill along the contour of sleeve.
10. Along the perimeter of the manhole necks UT1, as well as the manhole DK1, blind area with the width of
1000mm with concrete cl.B12,5 shall be installed (consumption of concrete per manhole-0.6 m3).
11. The concrete strength of precast R/C structures shall be taken by the series.
12. Refer to the sheet RC-4 with this sheet together.
DK1
∅1000
МС-2
С1
Dranaige manhole DK1
МС-2
∅ 50мм Centre El. 859,14 see note п.9 3
Scheme of Slab DK
"L"
"L"
КО-6
МС-1
867.57
864.76
∅50mm see note 9
863.17
С1
КС10.9
КС10.6
КС10.9
МС-2
PP10-2
manhole UT1 (Formwork)
-1.460 866.11
-1.000
866.57 5
1000х460h Invert el. 866.11
620х460h Invert el. 866.11
620х460h Invert el. 866.11
∅700
∅700
For Bm1
Bm1
1250 1250
Бм1
Bm1
400х300h 1350400
КО6L1МС1
PO4
manhole UT1.
Layout of the slab
Axe of Canal
-2.000 865.07
-2.300 864.77
867.57
867.07
300 2500 300
3 - 3 а - а
СГ-22
CG-22
OP3
Crash stone М400, fractions 5-10mm
Axe of Canal
Axe of Canal
-Cement screed with slope М100 -15÷20mm -2 layers of bitumen mastic waterproofing
- Leveling cement screed M100-20mm
- Reinforced concrete slab
-Cement screed with slope М100 -15÷20mm -2 layers of bitumen mastic waterproofing
-Leveling cement screed M100-20mm
-Reinforced concrete slab type
Specification
Materials:
Assembly unit:
UT1 manhole UT1sheet RC 18
U1 8 1,4GOST 8509-93* L75х6 L=200mm 11.20
12GOST 19903-74 plate -6х130х150 0,95Zd1 11.40 kg kg
КО6 6Support Slab КО6Serial 3.900.1-14 a.1 50.0 300.00kg
МС1 Connection Detail МС1 16 1.8 28.80 kgRC.I-МС1
Blind Area (Concrete В10) m³2.1
А1 28"HILTI" HSL-3-GM8/20
CG-22 Stair CG-22, L=2200Serial 1.450.3-7.94.2-КМ4 2 39.2 78.40 kg
L1 2Hatch Т(С250) a2.60 GOST 3634-99 120.0 240.00kg
6.9
Concrete cl. В20, W4, F100 m³8.4
Materials:
1 GOST 5781-82* 32∅16AIII, L=2570 4.06 129.92
1 1812.47 kg
3* GOST 5781-82* 56∅16AIII, L=1800 2.85 159.60 kg
4* GOST 5781-82* 56∅16AIII, L=1300 2.06 115.36 kg
5 GOST 5781-82*
40∅16AIII, L=2580 4.08 163.20 kg6 GOST 5781-82*
196.6 310.63 kg
8 GOST 5781-82* 108.8∅20AIII, L=п.м 2.47 268.74kg
F1* GOST 5781-82* 50∅8AI, L=790 0.32 16.00 kg
Sh1* GOST 5781-82* 140∅8AI, L=480 0.19 26.60 kg
Х1* GOST 5781-82* 240∅8AI, L=980 0.39 93.60 kg
G1* GOST 5781-82* 58∅12AIII, L=1700 1.51 87.58 kg
Ск1* GOST 5781-82* 56∅12AIII, L=1220 1.09 61.04 kg
G2* GOST 5781-82* 40∅12AIII, L=1400 1.25 50.00 kg
Lean Concrete (concrete cl. В7,5) m³0.93
∅16AIII, L=пм 1.58 manhole UT1.
Scheme of reinforcement х
200х15=300050
F1 sp.400х400
3;4 sp.200
3;4 sp.200
The scheme of reinforcement anchor of the manhole slab х
200х12=2400 sp.200 sp.200 х
200х12=2400 manhole UT1.
Scheme of wall reinforcement
Г2 ш.200
Gr.Level
3,4 sp.200 х
0 Ск1 sp.200 sp.200
3,4 sp.200
Ск1
Sh1 sp.400х400
200х15=3000
F1 sp.400х400
А - А B-B
Pos. Scheme
List of details
(4) (1
Ф1
3 16
Sh1
120 120
Х1
260 140
G1
0 17
Ск1
510 510
G2
50200 sp.200 sp.200
G1 sp.200
F1 Ск1
-2.000
-2.300
∅ 8 Total ∅ 12 ∅ 20 Total
Total Total steel,kg
List of steel consumption per element, kg.
136.20 136.20 198.62 268.741676.271812.47 1812.47
A I A III
GOST 5781-82*GOST 5781-82*
Class of reinforcement
Reinforcement Details
∅ 16
1208.91
Pos.
UT1
Detail of overlapping
Lн=42d d н d н
Twist the knitting wire not less than in 3 places а800 800
200 200
Scheme of framing openings
Х1
Х1
Х1 v v
Х1 sp.100 v - v
Х1 sp.100
100 100
50 50
1. For general Information, refer to sheet RC-1.
2. Manhole shall be placed on lean concrete cl.B7,5 with the thickness of 100mm on plumb surface. The dimensions of lean concrete shall exceed the dimensions of manhole slab with 100mm in each side of the compacted soil.
3. The connecting element MC-1 shall be installed in each horizontal joint at 90° (4 pieces per joint in the neck).
4. After installing the hatch L1, a blind area with the width of 1.5 m and with the thickness of 100mm concrete (class B10) shall be provided. Hatches shall be installed in flush with the ground.
5. All side surfaces of R/C structures in contact with the soil shall be coated with hot bitumen for 2 times on the primer based on bitumen BN 90/10.
6. All metal products, surfaces of details shall be painted in 2 layers with enamel PF-115 on 1 layer of a primer GF-021 on the surface free of rust.
7. Welding shall be performed by electrodes type E42A (GOST 9467-75*) in accordance with the requirements of GOST 14098-91 and SNiP RK 5.03-37-2005.
8. All reinforcement shall be fixed with tire wire in all intersections.
9. In the reinforcement scheme, the holes are not conventionally shown. The rebars shall be cut during installation of blockouts and sleeves.
10.The rebars of pos.3,4 and pos. 5,6 shall be altered in a row, as long one will be replaced with short.
0.000
-0.500
-2.000
-2.300
А А
Б
Б
B
B
МN-1 Water collector МN-1 1 99.024-17-0-RC.I-МN-1 manhole UT1
HSRC-4
(reinforcement)Ин в.
п од л.
По дп ис ь и да та Вз ам . и нв
Формат А2
UT1 manhole UT1.
Dranaige Manhole DK 1 1
К0-6 К0-6 4 50.0Support SlabSerial 3.900.1-14 a.1
Serial 1.450.3-7.94 a.0 Stair 1С1 63.6СХ-40
PP10-2 PP10-2 1SlabSerial 3.900.1-14 a.1 250.0
3 600.0КС10.9КС10.9 Serial 3.900.1-14 a.1
400.0КС10.6КС10.6 Serial 3.900.1-14 a.1 2
"L" GOST 3634-99 120.0Hacth Т(С250-ТС.2,7-60) with hinge and lock
МС-2 Connection Detail МС-2 32
1.8МС-1 Connection Detail МС-1 12
2.2
24-17-0-RC.I-МС-1
24-17-0-RC.I-МС-2
ш.200(ш.100) sp.200(sp.100) sp.200 sp.200 sp.200 ш.200
Specification of DK1 elements
*Underground R/C structures shall be made of concrete on sulphate-resistant cement according to GOST 22266-2013.
* Specification for single element
Gr.Level
3,4 sp.200 х
0 Ск1 sp.200 sp.200
3,4 sp.200
Ск1
Sh1 sp.400х400
200х12=2400
F1 sp.400х400
-2.000
0.000
-0.500
-2.300 sp.200(sp.100) sp.400х400
3;4 sp.200
3;4 sp.200 sp.200
Bm1 Beam B5 1 600.0 600.0Serial 3.006.1-2.87. a.6
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
PO4 Serial 3.006.1-2.87 a.6-24 2Slab PO4 1530 3060,0kg ш.200(ш.100)
2 GOST 5781-82* 28∅16AIII, L=3070 4.85 135.80 kg sp.200 sp.200 sp.200
40∅16AIII, L=3080 4.86 194.40kg7 GOST 5781-82*
865.07
864.77
867.57
867.07
865.07
864.77
867.57
867.07
OPZ 6 40.0Support Cushion OP-3Serial 3.006.1-2.87 a.2
NoteItem Document Description pcs
Qua.
kg
Weight
Support Wall
Support Wall
NoteItem Document Description pcs
Qua.
kg
Weight n a n d D a te
O ri g In v N o
R e p l.
I n v N o
Format A3
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
HSRC-5
Underground R/C structures shall be made by the concrete on sulphate-resistant cement according to GOST 22266-2013.
1. General information, ground conditions and backfilling, refer to sheet RC-1.
2. Refer this sheet together with the sheet RC-2.
3. Scheme of location of heating system elements, profiles, section 1-1, turn points UP1, UP2, refer to drawing TC-2,3.
4. Joints between precast reinforced concrete elements shall be filled with M100 cement mortar.
5. All side surfaces of reinforced concrete structures in contact with the ground shall be coated with hot bitumen for 2 times on a primer based on bitumen BN 90/10.
6. Walls of reinforced concrete trays shall be removed during mounting.
7. The concrete strength of precast reinforced concrete structures shall be taken by the series.
8. Monolithic part MU1 (for sec. 1-1) shall be provided in parts of the layout, where the use of trays is not available.
9. The instalation of monolithic part shall be produced on a layer of lean concrete cl. B7,5 with thickness 100mm.
Note
SPECIFICATION OF ELEMENTS FOR THE SCHEME LOCATED ON THE SHEET
Item Document Description pcs
Qua.
kg
Weight
Turn Point UP1, UP2, UP3, UP4, UP55
Turn Point UP3, UP4, UP5
Concrete Slab P8-11
С-4
100 200 Sand Subbase
1 - 1
С-1 1GOST 23279-85
С-2 GOST 23279-85
С-3 GOST 23279-85
Mesh 4С 100х2002550
10АIII-150
10АIII-150 17.26
1Mesh 4С 85х100 50
10АIII-150
10АIII-150 7.37
2Mesh 4С 70х100 50
10АIII-150
10АIII-150 6.10
0.39 m3
0.11 m3
Concrete cl. В15*, W4, F50
Concrete cl. В7,5Lean Concrete
P5d-8 3.006.1-2.87.2-5 100.0Slab P5d-82
Monolitic Part MU1 (for sec. 1-1) for 1 r.m.2,5 r.m.
0.20 m3Concrete cl. В15*, W4, F50
С-4 1GOST 23279-85 Mesh 4С 55х150 75
10АIII-150
10АIII-150 7.09
Monolitic Part MU (for sec. 1-1) (formwork) see note 8
120120
120120
5 С-1
С-3
С-2
(reinforcement)
170 280 170 Lean Concrete cl.В7.5 h=100mm
Monolitic Part MU P5d-8
Heating Pipe 2p. ∅89x4
(2 p. ∅57x3,5) cl.В15 b=100mm
Monolitic Part MU1 (sec. 1-1) Turn Point UP1-UP5
Turn Point UP1
Concrete В15
С-4
Tray L4-8*
280 170
Tray L4-8*
Pad PP3see RC-2 see RC-2 see RC-2
100 325 330 325 100
Tray L6-11* see RC-2
Removed Part of Wall
Pad PP3 see RC-2
Tray L6-11* see RC-2
Concrete В15
С-4
Tray L6-11*
330 325
Tray L6-11*1000
Pad PP3 see RC-2 See RC-2 see RC-2
Turn Point UP2
Removed Part of Wall
Removed Part of Wall n a n d D a te
O ri g In v N o
R e p l.
I n v N o
Format A3
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
HSRC-6
SPECIFICATION OF ELEMENTS FOR THE SCHEME LOCATED ON THE SHEET
Compensator К1
900.0Tray L4-8*3.006.1-2.87.1-7
Tray Pad 100.0PP3
410.0Slab P5-8
PP3
Support cushion OP1OP1 10.03.006.1-2.87.2-58
100.0Slab P5d-8
230.0Tray L4d-8*3.006.1-2.87.1-8 3
L4-8*
P5-8
P5d-8
L4d-8
3.006.1-2.87.2-30
3.006.1-2.87.2-6
3.006.1-2.87.2-55
0.60 m3Concrete cl. В15*, W4, F50
С-1 4GOST 23279-85 Mesh 4С 55х150 75
10АIII-150
10АIII-150 7.09
1. For general Information, refer to sheet RC-1.
2. For the layout of the fixed support, refer to drawing RC-2.
3. On the base of channel, sand cushion with a thickness of 100 mm shall be placed, exceeding the dimensions of the bottom channel by 100 mm in each side.
4. Walls of reinforced concrete trays, slab shall be removed during mounting.
5. All side surfaces of R/C structures in contact with the ground shall be coated with hot bitumen for 2 times on the primer based on bitumen BN 90/10.
6. Support cushion OP1 shall be installed on a cement mortar cl. M100 with thickness of 10 mm.
200200
С-1
PP3
281550
OP1
PP3
P5-8
P5-8
P5d-8*
Compensator К1 Scheme of Slab
170 280 170
3.006.1-2/87.0-17
OP1
1 - 1
Sand Subbase b=100mm
PP3
in joints
Brick Wall
Heating Line 2 p. ∅76х3/140
L4-8* L4d-8
P5-8 P5d-8
К
867.77 (К1)
866.51 (К1)
Axe of Canal
С-1
Compensator К1.
L4-8*
L4-8*
OP1
PP3
С-1
0 6
С-1
PP3
280550
OP1
1 1
1 1
*Underground R/C structures shall be made of concrete on sulphate-resistant cement according to GOST 22266-2013.
* Specification for one element
L4d-8*
L4d-8*
866.97 (К1)
L4d-8*
Removed Part of Wall
Removed Part of Wall
Removed Part of Wall
Removed Part of Wall
Concrete В15
Concrete В15
Concrete В15
Concrete В15
Compensator К1
-Cement screed with slope М100 -15÷20mm -2 layers of bitumen mastic waterproofing
- Leveling cement screed M100-20mm
- Reinforced concrete slab
NoteItem Document Description pcs
Qua.
kg
Weight n a n d D a te
O ri g In v N o
R e p l.
I n v N o
Format A3
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
HSRC-7
Welding shall be performed by electrodes E42A GOST 9467-75*.
SPECIFICATION OF ELEMENTS FOR THE SCHEME LOCATED ON THE SHEET
Underground R/C structures shall be made by the concrete on sulphate-resistant cement according to GOST 22266-2013.
1. For general information, ground conditions and backfilling, refer to sheet RC-1.
2. For the layout of the fixed support, refer to drawing RC-2.
3. The fixed supports shall be installed on a layer of lean concrete cl. B7,5 with thickness of 100mm.
4. Before commissioning of pipeline, the supports have to achieve 100% comprehensive strength.
5. All side surfaces of R/C structures in contact with the ground shall be coated with hot bitumen 2 times on the primer based on bitumen BN 90/10.
6. Holes for pipelines shall be cut during mounting.
Fixed supports H1, H2 (layout)
Axe of Pipelines
1 - 1
С-1
С-2
2 - 2
С-3
С-1
Lean Concrete
cl. В7.5 h=100mm100
Sleeve ∅159х4 L=500mm
1 1
Supports
Channel KL
Heating Pipe 2 p. ∅108x4
330635 635
330335 335
0 2
С-1 Mesh 2СGOST 23279-85 45х155 2 7.33
С-2 45х95 75
25 2 4.53GOST 23279-85
С-3 2 13.63
Mesh 2С
0.80 m3
0.13 m3
Concrete cl. В25*
Concrete cl. В7,5*
95х155 75 75GOST 23279-85 Mesh 2С
Lean Concrete
12АIII-200
12АIII-200
12АIII-200
12АIII-200
12АIII-200
12АIII-200
Fixed Support Н1, Н2 2
GOST 10704-91 Sleeve ∅159х4 L=500mm 1 7.65
866.68 (Н1)
867.94 (Н1)
866.16 (Н2)
867.59 (Н2)
Н
866.68 (Н1)
867.94 (Н1)
866.16 (Н2)
867.59 (Н2)
Supports
Sand Subbase b=100mm
Supports
NoteItem Document Description pcs
Qua.
kg
Weight
Fixed Support Н1, Н2 n a n d D a te
O ri g In v N o
R e p l.
I n v N o
Format A3
Stage Sheet Sheets
WD
H92277-19-C-0004-HSRC
Construction Solutions of the Heating System
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
Fixed Support Н3-:-Н6
1 - 1
С-1
С-2
2 - 2
С-3
С-1
Sleeve ∅159х4 L=500mm
1 1
Channel KL
Heating Pipe 2 p. ∅89x4
(2 p. ∅57x3,5)
310 Н3,Н4,Н5445 445
310 Н3,Н4,Н5155 155
0 2
С-1 Mesh 2СGOST 23279-85 45х115 2 5.46
С-2 45х95 75
25 2 4.53GOST 23279-85
С-3 2 10.17
Mesh 2С
0.60
0.10
95х115 75 75GOST 23279-85 Mesh 2С
12АIII-200
12АIII-200
12АIII-200
12АIII-200
12АIII-200
12АIII-200
GOST 10704-91 Sleeve ∅159х4 L=500mm 1 7.65
HSRC-8
Fixed Support Н3-Н6
866.19 (Н3)
867.59 (Н3)
866.95 (Н4)
868.00 (Н4)
868.00 (Н5)
868.96 (Н5)
868.78 (Н6)
869.18 (Н6)
866.19 (Н3)
867.59 (Н3)
866.95 (Н4)
868.00 (Н4)
868.00 (Н5)
868.96 (Н5)
868.78 (Н6)
869.18 (Н6)
280 Н6
280 Н6460 460
,Н ,Н
,Н ,Н
170 170
(layout)
Supports
Supports
Axe of Pipelines
Axe of Pipelines
Supports
Lean Concrete
cl. В7.5 h=100mm
Sand Subbase b=100mm
SPECIFICATION OF ELEMENTS FOR THE SCHEME LOCATED ON THE SHEET
Fixed Support Н3-Н6
NoteItem Document Description pcs
Qua.
kg
Weight m3 m3
Concrete cl. В25*
Concrete cl. В7,5*Lean Concrete
Underground R/C structures shall be made by the concrete on sulphate-resistant cement according to GOST 22266-2013.
1. For general information, ground conditions and backfilling, refer to sheet RC-1.
2. For the layout of the fixed support, refer to drawing RC-2.
3. The fixed supports shall be installed on a layer of lean concrete cl. B7,5 with thickness of 100mm.
4. Before commissioning of pipeline, the supports have to achieve 100% comprehensive strength.
5. All side surfaces of R/C structures in contact with the ground shall be coated with hot bitumen 2 times on the primer based on bitumen BN 90/10.
6. Holes for pipelines shall be cut during mounting.
∅650
∅630
∅530
S ig n a n d D a te
O ri g In v N o
R e p l.
I n v N o
Document DescriptionP o z
Z o n e
F o rm a t
Qua. Note
MN-1
1. The welding shall be performed by electrodes type E42A GOST 9467-75* in accordance with the requirements of GOST 14098-91.
MN-1
1 GOST 10704-91 p.∅530х8; L=700mm 1 72,1 kg
GOST 19903-74* -t=4; ∅630mm 1 9,8 kg
GOST 8706-78* PV 510; ∅650mm 1 8,2 kg
1 - 1
1 1
4 GOST 10704-91 p.∅168х4; L=550mm 1 8,9 kg
Water Collector
MN-1
99,0
H92277-19-C-0004-HSRC.I 1
kg
Sheet 1
Format А4
Sheets 3
WD
Stage Weight Scale
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
Connection Detail
МС-1
2 0,5kg
1 0,8kg
МС-1
1,8kg pos.1 pos.2 pos.2
МС-1
1 1
1 - 1 pos.1
GOST 19903-74*
GOST 19903-74*
-t=8х100х80
-t=8х150х80
H92277-19-C-0004-HSRC.I 2
Sheet 2
Format А4
Sheets 3
WD
Stage Weight Scale
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
Document DescriptionP o z
Z o n e
F o rm a t
Qua. Note
1. The welding shall be performed by electrodes type E42A GOST 9467-75* in accordance with the requirements of GOST 14098-91.
S ig n a n d D a te
O ri g In v N o
R e p l.
I n v N o
11.19
11.19
МС-2
-160х80х8 ГОСТ19903-74* 2 0,8kg
-120х80х8 ГОСТ19903-74* 1 0,6kgС235 GOST 27772-88*
С235 GOST 27772-88*
pos.1 pos.2 pos.1 pos.2
МС-2 1 - 1
1 1
1. Detail shall be fabricated in accordance with GOST 10922-90.
2.The welding shall be performed by electrodes type E42A GOST 9467-75* in accordance with the requirements of GOST 14098-91.
Connection Detail
МС-2
2,2kg
Sheet 3
Format А4
Sheets 3
WD
Stage Weight Scale
Amirkulov D.Drawn by
Checked by
N.Control
GIP
"Integra Engineering Group KZ" LLP
Aubakirov
Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
H92277-19-C-0004-HSRC.I 3
Document DescriptionP o z
Z o n e
F o rm a t
Qua. Note
S ig n a n d D a te
O ri g In v N o
R e p l.
I n v N o
11.19
11.19
| H92277-19-C-0004-ТСКЖ(Eng).dwg.pdf |
| Обл.pdf |
| Листы и виды |
| Cover |
| HSRSeng |
| H92277-19-C-0004-ТСКЖ(Eng).dwg |
| 1.1.pdf |
| Листы и виды |
| 1 |
| 1.2.pdf |
| Листы и виды |
| 1.2 |
| 2.pdf |
| Листы и виды |
| 2 |
| 3.pdf |
| Листы и виды |
| 3 |
| 4.pdf |
| Листы и виды |
| 4 |
| 5.pdf |
| Листы и виды |
| 5 |
| 6.pdf |
| Листы и виды |
| 6 |
| 7.pdf |
| Листы и виды |
| 7 |
| 8.pdf |
| Листы и виды |
| 8 |
| к1.pdf |
| Листы и виды |
| HSRC.I-1 |
| к2.pdf |
| Листы и виды |
| HSRC.I-2 |
| к3.pdf |
| Листы и виды |
| HSRC.I-3 |
File details come from the government source that posted it. Updated .