20. 100% Design KAZCENT - ORCS.pdf

PDF 1 MB Posted

Attached to
Solicitation: Project KAZCENT CONFERENCE CENTER Almaty, Kazakhstan
Solicitation number
W5J9JE-22-R-0004
Issued by

About this file

This solicitation package includes drawings and specifications for the construction of a conference center in Almaty, Kazakhstan. The U.S. Army Corps of Engineers seeks a fixed-price design-bid-build contract valued between $1-5 million to build a prefabricated metal training facility comprising a large conference room divisible into three smaller rooms. The 270-day period of performance commences with notice to proceed. Offerors must register in the System for Award Management and furnish performance and payment bonds.

View the file

Other files

File Type Posted
W5J9JE22R0004-0005 Amendment 0005 28 Apr 22.pdf PDF
31. Projnet Kazcent Final Q&A 24 April 2022.pdf.pdf PDF
W5J9JE22R004-0004 Amendment 0004 24 April 2022.pdf PDF
31.1 Projnet Bidder Inquiry Attachment to ID#9701431.pdf PDF
23. Sol_Permits & Background Info.pdf PDF
30. Projnet Questions and Answers 16 April 2022.pdf PDF
23. Permits and Background Info.pdf PDF
22. KazCENT Conference Center Almaty Cost Breakdown.xlsx XLSX spreadsheet
29. Attachment 5_BLG Template.docx DOCX document
26. Site Pictures 21-31.pdf PDF
W5J9JE22R0004-0003 16 APRIL 22 (Amendment 0003).pdf PDF
2. PPQ Attachment.pdf PDF
28. Attachment 4_BLA Template.docx DOCX document
24. Site Pictures 1-10.pdf PDF
27. SOW-KACENT 14APR2022.pdf PDF
1. Project Summary Form.pdf PDF
25. Site Pictures 11-20.pdf PDF
W5J9JE22R00040002 (amendment 0002).pdf PDF
W5J9JE-22-R-0004-0001 (Amendment).pdf PDF
14. 100% Design KAZCENT - MS.pdf PDF
13. 100% Design KAZCENT - WS.pdf PDF
8. 100% Design KAZCENT - GP.pdf PDF
12. 100% Design KAZCENT - HVAC.pdf PDF
16. 100% Design KAZCENT -EWS.pdf PDF
7. 100% Design KAZCENT - AR.pdf PDF
17. 100% Design KAZCENT - ES.pdf PDF
15. 100% Design KAZCENT - RC.pdf PDF
10. 100% Design KAZCENT - LC.pdf PDF
21. 100% Design KAZCENT - CPD.pdf PDF
18. 100% Design KAZCENT - HS.pdf PDF
9. 100% Design KAZCENT - EOM.pdf PDF
11. 100% Design KAZCENT - TE.pdf PDF
19. 100% Design KAZCENT - HSRC.pdf PDF
6. Site map location.pdf PDF
4. Site pictures 12 Jul 2021.pdf PDF
W5J9JE-22-R-0004_Kazcent Conference Center Solicitation.pdf PDF
5. Pictures of demolish works.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORKING DRAWINGS

Contract No. H92277-19-C-0004 KazCent Conference Center Bostandyk (Kalinin) Region, Zharokov Street, 210/1, Almaty City, Kazakhstan

"Integra Engineering Group" LLP

State License No. 15018832

Almaty, 2020

_февраль

List of working drawings of the main set

List Description Note

General Information

Scheme of the ORC System. Legend

List of References and Attachments

Document Description Note

References Documents

Equipment Specification

Attachments

H92277-19-C-0004-ORCS.SO on 1-list

LLP "Termoline"

"Operational and remote control system

"Termoline". Application manual

General Information

The ORC system is designed for continuous monitoring of the polyurethane foam (PUF) thermal insulation layer of pre-insulated pipelines during their entire service period.

The complex of devices and equipment of ORCS allows to find the exact location of the damages in due time and with accuracy. Application of ORCS promotes safe operation of pipelines, allows to reduce expenses and time for repair works considerably.

In the working project, the scheme of system of operational remote control is developed with application of 2 pass-through terminals.

Metal insulation plugs will be used in the end of control unit.

Metal insulation plugs with lead cables will be used in the pass-through unit.

The cables from the pipelines extend to wall board, which is located in heating manhole TK 2B and will be connected to the terminal KT 12Sh (sealed), as well as ground board which is located in heating manhole UT-1 and will be connected in prescribed terminal KT-16.

For connecting to the terminal, KT-16 three-core connecting cable NYM 3x1,5 will be used, and to the intermediate terminal KT-12 /Sh five-core connecting cable NYM 5x1,5 will be used.

At the stage of installation of ORC system, for preliminary measurements of pipelines in the foam insulation during acceptance and commissioning, "AM-2002 the control and installation digital tester megaohmmeter" will be used .

For determination of damage location, "Reis-105-R pulse reflectometer" will be used .

Two copper wires will be used in work of ORCS: the first (conditionally tinned)

-the main signal which is located always on the right side of the direction of water supply to the consumer, and the second (copper) - transit. All side branches have to be included in the break of the main signal wire.

Installation of the ORC system will be performed after the completion of pipe welding and hydraulic testing.

ATTENTION! Installation of the control system can not be carried out in wet weather, unless the pipes are protected by a shelter.

Heating System

Akimbergenov Nabiev Z.

Stage Sheet Sheets

WDDrawn by

Checked by

N.Control

GIP

H92277-19-C-0004-ORCS

Facility: KazCent Conference Center

Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1

"Integra Engineering

Group KZ" LLP Celebi B.

Orazalin K.K.

Qty. Doc.NoRev. Sheet Sign. Date

11.19

11.19

11.19

11.19

ORCS-1

General Information

This design has been developed in accordance with the codes applicable in the

Republic of Kazakhstan, and ensures the safety of human life and health in the period of the facility operation subject to the implemenation of measures provided in drawings

Chief Project Engineer Orozalin K.K.

Format A3

S ig n a n d D a te

O ri g.

I nv

N o.

R ep l.

In v.

N

o. C h a p t e r

H

S R

C A m i r k u l o v

D

C h a p t e r

H

S N a b i e v

Z

A g r e e d

Д

Wall Board №1

Passing Control Unit

KT-12Sh ORC systems

Ground Board №2

Passing Control Unit

KT-16 ORC systems

Н2

Н6

Н3

Н4

Н5

К1

Н1

ТК-2В

exist.

UT-1

7 6

UP1

UP2

UP5

UP3

UP4

D

KazCent

Existing

Building

O r i g

I n v

S i g n a n

D a t e

R e p l

I n v

N o

Item Elements of ORCS Unit

Qua-ty

Note

Terminal КТ-12Sh pcs.

Terminal КТ-16 pcs.

Wall Board pcs.

Ground Board pcs.

Connecting Cable 5х1.5 NYM m/pcs.

20/4

Connecting Cable 3х1.5 NYM m/pcs.

20/4

Metal Corrugated Hose Du25 m 30.0

8 Galvanized Steel Pipe Du50 m 10.0

Metal Insulation Plug with Access Cable

108-1-PPU-PE-650К

pcs.

Metal Insulation Plug with Access Cable

89-1-PPU-PE-650К

pcs.

Metal Insulation Plug with Access Cable

57-1-PPU-PE-650К

pcs.

Specification

Note:

1. See riser of ORC system together with the riser of Heating

System Line on the sheet TC-4.

2. See plan of Heating System Line on the sheet TC-2.

Legend

Transit Wire

Main Wire

End element with access cable

Ground Board

End terminal with the access to the detector

Д

Passing terminal with access to the detector

Д

Scheme of ORC System

Wall Board

10 9 8 7 6 5 4 3 2 1

Zh-Z

Zh-Z

С

С

К

К

Zh-Z

С

К

12 11

Zh-Z

С

К

Riser of terminal connection KT16 in the passing point

(3x1. 5 NYM-20m)

Zh-Z

С

К

Zh-Z

С

К

Connection scheme of the terminal KT12/Sh at the intermediate point

(5x1.5 NYM-10m)

10 9 8 7 6 5 4 3 2 1

Ch-B

Zh-Z

Ch

К

Zh-Z

C

Wire color designation for terminal " KT-16":

С -blue (signal)

К -brown or black (transit)

Zh-Z -yellow-green or white (ground conductor)

С -Blue (signal)

К -brown (transit)

Zh-Z -yellow-green (ground conductor)

Ch -black (signal)

Ch-B -black-white (transit)

Wire color designation for terminal " KT-12 / Sh":

Heating System

Akimbergenov Nabiev Z.

Stage Sheet Sheets

WDDrawn by

Checked by

N.Control

GIP

H92277-19-C-0004-ORCS

Facility: KazCent Conference Center

Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1

"Integra Engineering

Group KZ" LLP Celebi B.

Orazalin K.K.

Qty. Doc.NoRev. Sheet Sign. Date

11.19

11.19

11.19

11.19

ORCS-2

Scheme of ORC System.

Legend

Ch-B

Zh-Z

Ch

К

Zh-Z

C

Format A2

Item

Description and technical characteristics

Type, Class, Designation of Document, Questionnaire

Equipment, Detail, Material

Code, Manufacturer Unit

Quantity Weight

Note

1 2 3 4 5 6 7 8 9

ORC System

1 Terminal КТ-16 psc.

Terminal КТ-12Sh psc.

Ground Board psc.

4 Wall Board psc.

Connecting Cable 3х1.5 NYM m/psc.

20/4

Connecting Cable 5х1.5 NYM m/psc.

20/4

Steel Corrugated Hose Du25 m 30.0

Galvanized Steel Pipe Du50 m 10.0

Metal Insulation Plug with Access Cable 108-1-PPU-PE-650К psc.

Metal Insulation Plug with Access Cable 89-1-PPU-PE-650К psc.

Metal Insulation Plug with Access Cable 57-1-PPU-PE-650К psc.

O r i g

I n v

N o

S i g n a n

D a t e

R e p l

I n v

N o

Heating System

Akimbergenov Nabiev Z.

Stage Sheet Sheets

WDDrawn by

Checked by

N.Control

GIP

H92277-19-C-0004-ORCS

Facility: KazCent Conference Center

Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1

"Integra Engineering

Group KZ" LLP Celebi B.

Orazalin K.K.

Qty. Doc.NoRev. Sheet Sign. Date

11.19

11.19

11.19

11.19

ORCS.SO-1

Specification of Equipments, Materials

.SO

Format A3

Листы и виды
Cover
OLE1

File details come from the government source that posted it. Updated .