This solicitation package includes drawings and specifications for the construction of a conference center in Almaty, Kazakhstan. The U.S. Army Corps of Engineers seeks a fixed-price design-bid-build contract valued between $1-5 million to build a prefabricated metal training facility comprising a large conference room divisible into three smaller rooms. The 270-day period of performance commences with notice to proceed. Offerors must register in the System for Award Management and furnish performance and payment bonds.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORKING DRAWINGS
Contract No. H92277-19-C-0004 KazCent Conference Center Bostandyk (Kalinin) Region, Zharokov Street, 210/1, Almaty City, Kazakhstan
"Integra Engineering Group" LLP
State License No. 15018832
Almaty, 2020
_февраль
List of working drawings of the main set
List Description Note
General Information
Scheme of the ORC System. Legend
List of References and Attachments
Document Description Note
References Documents
Equipment Specification
Attachments
H92277-19-C-0004-ORCS.SO on 1-list
LLP "Termoline"
"Operational and remote control system
"Termoline". Application manual
General Information
The ORC system is designed for continuous monitoring of the polyurethane foam (PUF) thermal insulation layer of pre-insulated pipelines during their entire service period.
The complex of devices and equipment of ORCS allows to find the exact location of the damages in due time and with accuracy. Application of ORCS promotes safe operation of pipelines, allows to reduce expenses and time for repair works considerably.
In the working project, the scheme of system of operational remote control is developed with application of 2 pass-through terminals.
Metal insulation plugs will be used in the end of control unit.
Metal insulation plugs with lead cables will be used in the pass-through unit.
The cables from the pipelines extend to wall board, which is located in heating manhole TK 2B and will be connected to the terminal KT 12Sh (sealed), as well as ground board which is located in heating manhole UT-1 and will be connected in prescribed terminal KT-16.
For connecting to the terminal, KT-16 three-core connecting cable NYM 3x1,5 will be used, and to the intermediate terminal KT-12 /Sh five-core connecting cable NYM 5x1,5 will be used.
At the stage of installation of ORC system, for preliminary measurements of pipelines in the foam insulation during acceptance and commissioning, "AM-2002 the control and installation digital tester megaohmmeter" will be used .
For determination of damage location, "Reis-105-R pulse reflectometer" will be used .
Two copper wires will be used in work of ORCS: the first (conditionally tinned)
-the main signal which is located always on the right side of the direction of water supply to the consumer, and the second (copper) - transit. All side branches have to be included in the break of the main signal wire.
Installation of the ORC system will be performed after the completion of pipe welding and hydraulic testing.
ATTENTION! Installation of the control system can not be carried out in wet weather, unless the pipes are protected by a shelter.
Heating System
Akimbergenov Nabiev Z.
Stage Sheet Sheets
WDDrawn by
Checked by
N.Control
GIP
H92277-19-C-0004-ORCS
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
"Integra Engineering
Group KZ" LLP Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
ORCS-1
General Information
This design has been developed in accordance with the codes applicable in the
Republic of Kazakhstan, and ensures the safety of human life and health in the period of the facility operation subject to the implemenation of measures provided in drawings
Chief Project Engineer Orozalin K.K.
Format A3
S ig n a n d D a te
O ri g.
I nv
N o.
R ep l.
In v.
N
o. C h a p t e r
H
S R
C A m i r k u l o v
D
C h a p t e r
H
S N a b i e v
Z
A g r e e d
Д
Wall Board №1
Passing Control Unit
KT-12Sh ORC systems
Ground Board №2
Passing Control Unit
KT-16 ORC systems
Н2
Н6
Н3
Н4
Н5
К1
Н1
ТК-2В
exist.
UT-1
7 6
UP1
UP2
UP5
UP3
UP4
D
KazCent
Existing
Building
O r i g
I n v
S i g n a n
D a t e
R e p l
I n v
N o
Item Elements of ORCS Unit
Qua-ty
Note
Terminal КТ-12Sh pcs.
Terminal КТ-16 pcs.
Wall Board pcs.
Ground Board pcs.
Connecting Cable 5х1.5 NYM m/pcs.
20/4
Connecting Cable 3х1.5 NYM m/pcs.
20/4
Metal Corrugated Hose Du25 m 30.0
8 Galvanized Steel Pipe Du50 m 10.0
Metal Insulation Plug with Access Cable
108-1-PPU-PE-650К
pcs.
Metal Insulation Plug with Access Cable
89-1-PPU-PE-650К
pcs.
Metal Insulation Plug with Access Cable
57-1-PPU-PE-650К
pcs.
Specification
Note:
1. See riser of ORC system together with the riser of Heating
System Line on the sheet TC-4.
2. See plan of Heating System Line on the sheet TC-2.
Legend
Transit Wire
Main Wire
End element with access cable
Ground Board
End terminal with the access to the detector
Д
Passing terminal with access to the detector
Д
Scheme of ORC System
Wall Board
10 9 8 7 6 5 4 3 2 1
Zh-Z
Zh-Z
С
С
К
К
Zh-Z
С
К
12 11
Zh-Z
С
К
Riser of terminal connection KT16 in the passing point
(3x1. 5 NYM-20m)
Zh-Z
С
К
Zh-Z
С
К
Connection scheme of the terminal KT12/Sh at the intermediate point
(5x1.5 NYM-10m)
10 9 8 7 6 5 4 3 2 1
Ch-B
Zh-Z
Ch
К
Zh-Z
C
Wire color designation for terminal " KT-16":
С -blue (signal)
К -brown or black (transit)
Zh-Z -yellow-green or white (ground conductor)
С -Blue (signal)
К -brown (transit)
Zh-Z -yellow-green (ground conductor)
Ch -black (signal)
Ch-B -black-white (transit)
Wire color designation for terminal " KT-12 / Sh":
Heating System
Akimbergenov Nabiev Z.
Stage Sheet Sheets
WDDrawn by
Checked by
N.Control
GIP
H92277-19-C-0004-ORCS
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
"Integra Engineering
Group KZ" LLP Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
ORCS-2
Scheme of ORC System.
Legend
Ch-B
Zh-Z
Ch
К
Zh-Z
C
Format A2
Item
Description and technical characteristics
Type, Class, Designation of Document, Questionnaire
Equipment, Detail, Material
Code, Manufacturer Unit
Quantity Weight
Note
1 2 3 4 5 6 7 8 9
ORC System
1 Terminal КТ-16 psc.
Terminal КТ-12Sh psc.
Ground Board psc.
4 Wall Board psc.
Connecting Cable 3х1.5 NYM m/psc.
20/4
Connecting Cable 5х1.5 NYM m/psc.
20/4
Steel Corrugated Hose Du25 m 30.0
Galvanized Steel Pipe Du50 m 10.0
Metal Insulation Plug with Access Cable 108-1-PPU-PE-650К psc.
Metal Insulation Plug with Access Cable 89-1-PPU-PE-650К psc.
Metal Insulation Plug with Access Cable 57-1-PPU-PE-650К psc.
O r i g
I n v
N o
S i g n a n
D a t e
R e p l
I n v
N o
Heating System
Akimbergenov Nabiev Z.
Stage Sheet Sheets
WDDrawn by
Checked by
N.Control
GIP
H92277-19-C-0004-ORCS
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
"Integra Engineering
Group KZ" LLP Celebi B.
Orazalin K.K.
Qty. Doc.NoRev. Sheet Sign. Date
11.19
11.19
11.19
11.19
ORCS.SO-1
Specification of Equipments, Materials
.SO
Format A3
| Листы и виды |
| Cover |
| OLE1 |
File details come from the government source that posted it. Updated .