22. KazCENT Conference Center Almaty Cost Breakdown.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- W5J9JE-22-R-0004
About this file
This document contains a federal contract solicitation and independent government cost estimate for construction of a conference center in Almaty, Kazakhstan. The U.S. Army Corps of Engineers, Transatlantic Expeditionary District is seeking a fixed-price design-bid-build construction contract to build a prefabricated metal training facility for Kazakhstan to be used as a regional platform for training with other Central Asian States. The facility will include a large conference room that can be divided into three smaller rooms with movable wall panels. The magnitude of construction is estimated between $1-5 million. The North American Industry Classification System code is 236220 for industrial building construction. The period of performance is approximately 270 calendar days after notice to proceed. Proposals are due in the System for Award Management, and the successful bidder must provide performance and payment bonds.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
| Independent Government Estimate (IGE) |
| KazCENT Conference Center Almaty |
| Description: KazCENT Conference Center Almaty |
| Location: Bostandyk District, Almaty, Kazakhstan |
| CLIN No. | Description | Unit | Quantity | DIRECT LABOR COST | CONSTRUCTION EQUIPMENT COST | CONSTRUCTION MATERIAL COST | TOTAL DIRECT | FIELD OVERHEAD COST (xx%) | HOME OFFICE OVERHEAD (xx%) | PROFIT COST (xx%) | Total Amount | |
| UNIT PRICE | COST | |||||||||||
| 0001 | Mobilization/Demobilization | |||||||||||
| 1-1 | Mobilization/Demobilization | LS | 1 | |||||||||
| 1-2 | Submittal Preparation | LS | 1 | |||||||||
| Mobilization/Demobilization | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | |||
| 0002 | Civil Work | |||||||||||
| 2-1 | Substructure | LS | 1 | |||||||||
| 2-2 | Superstructure | LS | 1 | |||||||||
| 2-3 | Roofing | LS | 1 | |||||||||
| 2-4 | Interior Construction / Finishes | LS | 1 | |||||||||
| 2-5 | Plumbing / Mechanical / Fire Protection | LS | 1 | |||||||||
| 2-6 | Electric Power & Lighting, Communications | LS | 1 | |||||||||
| KAZCENT Conference Center | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | ||||
| 0003 | Demolition | |||||||||||
| 3-1 | Demolition | LS | 100 | |||||||||
| Demolition | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | ||||
| 0004 | Tree Removal | |||||||||||
| 4-1 | Tree Removal | LS | 140 | |||||||||
| Tree Removal | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | ||||
| 0005 | Utilities | |||||||||||
| 5-1 | HVAC | LS | 1 | |||||||||
| 5-2 | Water | LS | 1 | |||||||||
| 5-3 | Electrical Distribution | LS | 1 | |||||||||
| 5-4 | Sewer | LS | 1 | |||||||||
| Utilities | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | ||||
| 0006 | As-Builts | |||||||||||
| 6-1 | As-Builts | LS | 1 | |||||||||
| As-Builts | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | ||||
| TOTAL BASE BID | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | ||||
| 0007 | Optional Furniture and Equipment | |||||||||||
| 7-1 | Optional Furniture and Equipment | LS | 1 | |||||||||
| Optional Furniture and Equipment | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | ||||
| 0008 | Optional Landscaping | |||||||||||
| 8-1 | Substructure | LS | 1 | |||||||||
| 8-2 | Superstructure | LS | 1 | |||||||||
| 8-3 | Roofing | LS | 1 | |||||||||
| 8-4 | Interior Construction / Finishes | LS | 1 | |||||||||
| 8-5 | Plumbing / Mechanical / Fire Protection | LS | 1 | |||||||||
| Optional Landscaping | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | ||||
| TOTAL OPTIONAL BID ITEMS | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
TOTAL OPTIONAL AND BASE BID ITEMS $ - $ - $ - $ - $ - $ - $ - $ -