22. KazCENT Conference Center Almaty Cost Breakdown.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Solicitation: Project KAZCENT CONFERENCE CENTER Almaty, Kazakhstan
Solicitation number
W5J9JE-22-R-0004
Issued by

About this file

This document contains a federal contract solicitation and independent government cost estimate for construction of a conference center in Almaty, Kazakhstan. The U.S. Army Corps of Engineers, Transatlantic Expeditionary District is seeking a fixed-price design-bid-build construction contract to build a prefabricated metal training facility for Kazakhstan to be used as a regional platform for training with other Central Asian States. The facility will include a large conference room that can be divided into three smaller rooms with movable wall panels. The magnitude of construction is estimated between $1-5 million. The North American Industry Classification System code is 236220 for industrial building construction. The period of performance is approximately 270 calendar days after notice to proceed. Proposals are due in the System for Award Management, and the successful bidder must provide performance and payment bonds.

View the file

Other files

File Type Posted
W5J9JE22R0004-0005 Amendment 0005 28 Apr 22.pdf PDF
31. Projnet Kazcent Final Q&A 24 April 2022.pdf.pdf PDF
W5J9JE22R004-0004 Amendment 0004 24 April 2022.pdf PDF
31.1 Projnet Bidder Inquiry Attachment to ID#9701431.pdf PDF
23. Sol_Permits & Background Info.pdf PDF
30. Projnet Questions and Answers 16 April 2022.pdf PDF
23. Permits and Background Info.pdf PDF
29. Attachment 5_BLG Template.docx DOCX document
26. Site Pictures 21-31.pdf PDF
W5J9JE22R0004-0003 16 APRIL 22 (Amendment 0003).pdf PDF
2. PPQ Attachment.pdf PDF
28. Attachment 4_BLA Template.docx DOCX document
24. Site Pictures 1-10.pdf PDF
27. SOW-KACENT 14APR2022.pdf PDF
1. Project Summary Form.pdf PDF
25. Site Pictures 11-20.pdf PDF
W5J9JE22R00040002 (amendment 0002).pdf PDF
W5J9JE-22-R-0004-0001 (Amendment).pdf PDF
14. 100% Design KAZCENT - MS.pdf PDF
13. 100% Design KAZCENT - WS.pdf PDF
8. 100% Design KAZCENT - GP.pdf PDF
12. 100% Design KAZCENT - HVAC.pdf PDF
20. 100% Design KAZCENT - ORCS.pdf PDF
16. 100% Design KAZCENT -EWS.pdf PDF
7. 100% Design KAZCENT - AR.pdf PDF
17. 100% Design KAZCENT - ES.pdf PDF
15. 100% Design KAZCENT - RC.pdf PDF
10. 100% Design KAZCENT - LC.pdf PDF
21. 100% Design KAZCENT - CPD.pdf PDF
18. 100% Design KAZCENT - HS.pdf PDF
9. 100% Design KAZCENT - EOM.pdf PDF
11. 100% Design KAZCENT - TE.pdf PDF
19. 100% Design KAZCENT - HSRC.pdf PDF
6. Site map location.pdf PDF
4. Site pictures 12 Jul 2021.pdf PDF
W5J9JE-22-R-0004_Kazcent Conference Center Solicitation.pdf PDF
5. Pictures of demolish works.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

Independent Government Estimate (IGE)
KazCENT Conference Center Almaty
Description: KazCENT Conference Center Almaty
Location: Bostandyk District, Almaty, Kazakhstan
CLIN No.DescriptionUnitQuantityDIRECT LABOR COSTCONSTRUCTION EQUIPMENT COSTCONSTRUCTION MATERIAL COSTTOTAL DIRECTFIELD OVERHEAD COST (xx%)HOME OFFICE OVERHEAD (xx%)PROFIT COST (xx%)Total Amount
UNIT PRICECOST
0001Mobilization/Demobilization
1-1Mobilization/DemobilizationLS1
1-2Submittal PreparationLS1
Mobilization/Demobilization$ -$ -$ -$ -$ -$ -$ -$ -$ -
0002Civil Work
2-1SubstructureLS1
2-2SuperstructureLS1
2-3RoofingLS1
2-4Interior Construction / FinishesLS1
2-5Plumbing / Mechanical / Fire ProtectionLS1
2-6Electric Power & Lighting, CommunicationsLS1
KAZCENT Conference Center$ -$ -$ -$ -$ -$ -$ -$ -
0003Demolition
3-1DemolitionLS100
Demolition$ -$ -$ -$ -$ -$ -$ -$ -
0004Tree Removal
4-1Tree RemovalLS140
Tree Removal$ -$ -$ -$ -$ -$ -$ -$ -
0005Utilities
5-1HVACLS1
5-2WaterLS1
5-3Electrical DistributionLS1
5-4SewerLS1
Utilities$ -$ -$ -$ -$ -$ -$ -$ -
0006As-Builts
6-1As-BuiltsLS1
As-Builts$ -$ -$ -$ -$ -$ -$ -$ -
TOTAL BASE BID$ -$ -$ -$ -$ -$ -$ -$ -
0007Optional Furniture and Equipment
7-1Optional Furniture and EquipmentLS1
Optional Furniture and Equipment$ -$ -$ -$ -$ -$ -$ -$ -
0008Optional Landscaping
8-1SubstructureLS1
8-2SuperstructureLS1
8-3RoofingLS1
8-4Interior Construction / FinishesLS1
8-5Plumbing / Mechanical / Fire ProtectionLS1
Optional Landscaping$ -$ -$ -$ -$ -$ -$ -$ -
TOTAL OPTIONAL BID ITEMS$ -$ -$ -$ -$ -$ -$ -$ -

TOTAL OPTIONAL AND BASE BID ITEMS $ - $ - $ - $ - $ - $ - $ - $ -