This document provides details for a federal construction contract solicitation issued by the U.S. Army Corps of Engineers Transatlantic Expeditionary District. The solicitation seeks a firm-fixed price design-bid-build contract to build a prefabricated metal training facility in Almaty, Kazakhstan to be used as a regional conference center for training with Central Asian states. The magnitude of construction is estimated between $1 million to $5 million. The facility will include a large conference room that can divide into three smaller rooms. The North American Industry Classification System code is 236220 for industrial building construction. The period of performance is approximately 270 calendar days from notice to proceed. There is no scheduled site visit. The submission deadline is not provided. Performance and payment bonds will be required.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"Integra Engineering Group" LLP
State License No. 15018832
Almaty, 2020
WORKING DRAWINGS
Contract No. H92277-19-C-0004 KazCent Conference Center Bostandyk (Kalinin) Region, Zharokov Street, 210/1, Almaty City, Kazakhstan
_февраль
Format А3
List of working drawings of the main set of AR
AR-1
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
A g re e d
1st Floor Floor Plan ±0.000
Mezzanine Floor Plan +3.500
Roof Plan
Building Sections 1-1;2-2
Elevations 1-6;В-А
Elevations 6-1 ;А-В
2.1
2.2
Floor Finish Schedule
Floor Finish Schedule
Floor Finish Schedule
Floor Finish Schedule
Floor Finish Schedule16
Finish Schedule
Finish Schedule
Finish Schedule
Wall Schedule
Description Note Item
No.
Finish Schedule
1st Floor Floor Finish Plan ±0.000
Mezzanine Floor Finish Plan +3.500
Facade and Roof Finish Schedule
Reflected Ceiling Plan 1st Floor
Reflected Ceiling Plan Mezzanine Floor
Wall Schedule
Interior System Sections & Details
Interior System Sections & Details
Interior System Sections & Details
Conference Rooms & Mezzanine (104, 105, 106, 201) Interior Elevations
Conference Rooms & Mezzanine (104, 105, 106, 201) Interior Elevations
Interior Elevations
Interior Elevations
List of working drawings of the main set of AR
List of working drawings of the main set of AR
General Information (Concluded)
Description Note Item
No.
General Information
Specification of Wall Openings
Facade Sections 3-3,4-4
Facade Section 5-5
Facade and Roof Sections
Canopy Sections
Main Canopy Elevations E1
Side Canopy Elevations E2, Sections of Disabled Ramp
Evacuation Stair Sections and Details
Round Stair Sections and Details
Round Stair Front View and Details
Steel Ladder for Access to the Roof
Specification of Wall Openings
Specification of Wall Openings
Specification of Wall Openings
Specification of Wall Openings
Specification of Wall Openings
Specification of Wall Openings
Floor Finish Schedule
Floor Finish Schedule
Wall Schedule
Furniture Layout Plan ±0.000
Furniture Layout Plan +3.500
Summary Plan of Opening on Walls & Partitions ±0.000
Summary Plan of Opening on Walls & Partitions +3.500
Roof Sections57
Lobby Area (102) Interior Elevations
S e t
M S
S e t
H V A C
S e t
W S
S e t
E O M L C
S e t
R C
A ra lb a e v
A ra lb a e v
Is a e v a J
S a d y ro v M
Is a e v a J
.1
.1
.1
.1
.1
General Information
AR-2.1
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
1. General
1.1. Basis of Design
This architectural set is developed on the basis of:
· Technical Assigment (TZ) given by the customer ,
· All associated data in topographical survey provided by Almaty Geocenter at the date of 05.02.2019,
· All associated data in engineering and geodethic survey by Almaty Geocenter at the date of 14.03.2019, Architectural Planning Tasks (APZ) provided by Municipal Public Institution "Management of the Architecture and the City Planning of the Almaty" at the date of September 06. 2019 with the number of 3548
· Approved conceptual design project by Municipal Public Institution "Management of the Architecture and the City
Planning of the Almaty" at the date of September 19. 2019 with the number of KZ74VUA00106514
· Nature and climatic cond itions of the construction region accord ing to the Republican build ing codes:
SN iP RK 2.04-01 -2001 "Build ing climatology"
· SN iP RK 3.02-07 -2014 ''Public build ings and structures''
· SN iP RK 2.02-05-2009 "F ire safety of build ings and structures",
· SN iP RK 5.04-23-2002 "Steel Structures and standard of planning"
1.2 Geotechnical Data
The combination of climate-forming factors causes the predominance of hot d ry weather with sharp seasonal and daily fluctuations in air temperature. Summer is hot, winter is moderately cold, mild. Spring and summer are heavy raining.
Climatic data on the meteorological station of Almaty : (Code specif ication of RK 2.04-01 -2017)
· Climate region: III -B;
· Snow d istrict - II; Snow load 0.7 (70) kPa (kgf / m2);
· The average rainfall for November to March is 249mm;
· The average rainfall for April-October is 429mm;
· Absolute minimum air temperature ( - 37,7 ° C);
· The absolute maximum air temperature is (+ 43.4 ° C);
The d irection of the wind in the southern part of the territory is largely due to the mountain-valley circulation as a result of this the winds of the south, southeast and southwest is predominant.
The normative f reezing depth of soil for sand clay is 0.79 m, for clayey sand it is 0.96 m, for macro f ragmental soil is 1.17 m.
Geomorphologically, the site is located within the sub montane sloping plain, extend ing to the north of the piedmont of the Zailiyskiy Alatau. The area is located in the zone with seismic hazard accord ing to the Code specif ication of RK
2.03-30-2017 - 9 (nine) points. The type of ground cond itions of the construction site is II (second) accord ing to t.6.1 of the code specif ication of RK 2.03-30-2017. The ground waters during the survey period by wells were 10.0-15.0m deep.
The f inished floor level of the 1 -st floor is adopted as the relative elevation 869.20. The build ing elevation is determined with the general layout plan and it is compatible with the elevation of surround ing structures and facilities.
All geodethic and climatic data is considered during the development of the design.
1.3 Classif ication and Values of the Build ing
Functional f ire hazard - Class Ф2.1.
Class of structural f ire hazard of the build ing - C3.
F ire resistance category: IVa.
The build ing Importance Class - technically simple facility of II (normal) Importance Class.
F ire hazard class of build ing structures - K0.
Category of the build ing by explosion and f ire hazard - Д.
2. Architectural, Structural and Interior Planning Proposals
2.1 Architectural and Structural Elements
Layout- KazCent Conference Center is a single story build ing with a mezzanine floor , which covers approximately 1/3 of the total foot area of the build ing. The build ing is rectangular in plan with the d imensions of 30.15x14.55 m, as column grids are 5.85 x 6.825 m.
The design includes a large conference room, which could be d ivided into 3 smaller conference rooms with movable wall panels. The large conference room has a stage at the north end and mezzanine floor at the south end. The conference rooms are technically and functionally designed as they can be used as merged or separately. The lobby area is longitud inal extend ing f rom cloak room to south
(side) entrance. This area will be used as foyer and lounge area, where visitors will be hosted prior to conferences or at inter ludes.
Access to the mezzanine floor will be provided by a decorative round stair , located at the south side of the lobby area. This longitud inal area also extends to the south entrance and the restroom area.
Conference rooms will be flexible in use with the help of movable (acoustical) wall panels. They could be either merged as a single large room ( includ ing mezzanine), or could be used as separate rooms, when the attendees are less. Tables and chairs will be movable so sitting arrangement could be mod if ied with d ifferent setups such as theatre sitting, classroom sitting, board room sitting, or hollow square sitting.
Build ing and all common areas (except the mezzanine) will be accessible by d isabled people. Two main entrance doors and three emergency exits will be led by ramps with proper slope. The ramps will be provided with the required d imensions, slopes and features
)such as hand rails and detectible warning tiles) as required in SN RK 3.06-01 -2011 . All flooring surface materials will be non-slippery, in order to provide safety precautions for d isabled people. F rom parking lot to the south entrance, continuous detectable warning tiles will be installed. Likewise, the beginning and end ing of all ramps will be ind icated by the warning tiles. Please refer to general plan for more information about the location of tiles. All emergency egresses is designed as complying the minimum required d imensions for d isabled people. There will be a ded icated restroom for d isabled people designed accord ing to turning rad ius and includ ing grab bars and emergency button.
Structure- Structural system of the build ing will be pre-fabricated metal facility. The entire steel structure will be located on reinforced concrete foundations consist of stem walls, pedestals, tie columns, footings, and mat foundation (concrete class B25, steel reinforcement A-III). The total depth of the foundation will be 2800 mm f rom the floor f inish level. The foundation walls will be insulated and wrapped with vapor barrier f rom the exterior side of the stem wall. Thus, there will not be any insulation under lying the slab on grade. Structural elements will not be exposed af ter the completion of architectural f inishing. Slab on grade will be cast-in-place reinforced B-25 concrete with the thickness of 125 mm, with the reinforcement of Class A-III. All steel structure will be painted by 2 layers of f ire rated primer and 2 layer of f ire rated paint, in order to increase the performance of f ire resistance of the structures. Please refer to metal structure part of the project for more information.
Facade- Prefabricated metal facility build ing will be enveloped by cassette prof iles f illed with 100 mm thick insulation. There are 3 d ifferent facade system installed to these cassette prof iles: Composite Aluminum Paneling System, Brick Cladd ing System, T rapezoidal Paneling System. All transition between windows, doors, and facade will be properly sealed and flashing will be provided if necessary. The entire facade will be illuminated by wall washers. In add ition, there will be a hidden exterior lighting at the parapet niche of the facade.
Partition Walls- Internal partitions will be made of gypsum wall boards with various thickness, which is classif ied in the wall schedule. Partition systems will be safe enough to carry the own load and any load transferred to them. Any installation on walls require wall blocking inside of the partition. Several partitions will be sound or f ire rated per schedule. Refer to wall schedule for detailed information.
Roof - I t will consist of insulated sandwich panels installed on pur lins. Roof slope will be %8 (1:12) and the minimum height of the parapet will be a meter , and varies with the roof slope. There will be 6 d rains and 4 overflow scuppers on the roof for the d ischarge of rain water . Roof will be accessed by roof hatch, which meets the life safety requirements. All roof equipments and devices will be installed on metal support f raming, which is d irectly tied to main structure.
General Information
(Concluded)
AR-2.2
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Description
General Technical & Economic Data
Unit Value
Number of Users
Building Construction Volume
Building Footprint Area
Building Total Floor Area
Building Net Floor Area
Building Area of Effective Use men m3 m2 m2 m2 m2
7 Number of Stories
3797.29
655.36
Item
No.
8 Number of Exits 7 each each
470,50
465,25
443.69
Description
The list of reference and attached documents
SNiP RK РК 2.04-01-2017
SN RK 3.02-07-2014
SN RK 2.02-01-2014
SN RK 3.06-01-2011
NoteDesignation
Building climatology
Public buildings and structures
Fire safety buildings and structures
AccessI ibility of buildings and structures for phisically and handicapped person
This design has been developed in accordance with the codes applicable in the Republic of Kazakhstan, and ensures the safety of human life and health in the period of the facility operation subject to the implemenation of measures provided in drawings
Chief Project Architect ______________
Flooring - In restrooms, floor tiles will be used with the d imension of 600 x 600 mm, installed on anti-f racture membrane. The joint of the tiles will be properly grouted and floor surface will have 1% slope toward floor d rains. In entire lobby and stairs, granite stone will be used. This stone will match the exterior stone paving for consistent look. (Imperial G ray) Conference halls, off ice, mezzanine, and coat closet will receive carpet tile flooring; which will stimulate more comfortable environment. In storage and kitchenette, vinyl composite tiles will be preferred in order to provide more durable and easy cleanable surface. Stage will receive hardwood flooring with acoustical underlay which meets the desired acoustical values. At entrances, mat flooring will be used in order to control the hygiene of the build ing. Technical room floor will be covered by non combustible epoxy flooring. All flooring materials has to be coord inated with the under floor heating system. All flooring materials will be anti-slippery .
W indows - Insulated aluminum f raming will be used with the color matching exterior doors. (Anthracite) The windows will be operable, as ind icated in the windows schedule. W indows will consist of two pieces of clear annealed glass seperated by an argon f illed air space. Total thickness of the glazing will be 24 mm. Structured glass facade will have a total thickness of 32 mm and 20 mm of vertical and horizontal silicone gaps. The structural f rame will be insulated. There will be 2 interior windows, which will be operable and soundproof. (In translation booths) Cloakroom will have an opening to lobby, but this opening will be without any glazing.
Doors - Main entrance doors will be insulated fully glazed aluminum doors. Total thickness of the f rame will be 70 mm. The f inish will match the other aluminum f inishes such as windows and structural glass f raming. Other exterior doors will be metal solid with thermal insulation without any visual panel, total thickness will be 56 mm. Exterior door and exterior window f raming will have the same color and f inish. (Anthracite) Interior doors will be solid wood, with same color and f inish. As ind icated in door schedule, some interior doors require acoustical features. All door d imensions will meet the requirements in SN iP RK 2.02-05-2009
"F ire safety of build ings and structures"
Stairs - There will be 2 stairs serving for mezzanine. The f irst one will be a decorative round stair located at the lobby, which will be made of steel structure covered with laminated wood f inish. This stair will not be considered as evacuation stair per codes.
The evacuation stair will be made of steel and located at the outside of the build ing, with the clear wid th of 1000 mm. The stairs d imensions and features will meet the requirements of RK GOST R 53254-2009.
2.2. Interior F inishes
H igh-quality materials like ceramic tiles, glazing, carpets, vinyl tiles, furniture, acoustical wall panels, stone, paint, acoustical ceiling tiles complying with SN iP RK 2.02-05-2009 "F ire safety of build ings and structures", shall be installed at rooms, depend ing on the purposed use of the area. Interior layout and interior design shall be decided accord ing to the client's requirements and as given technical assignment. The f inish schedule and project documents refer to several specif ications and materials regard ing the f inishes and furniture, however contractor may propose a substitute materials in lieu of these references. The proposed materials shall meet the same requirements at minimum and also be approved by the owner .
F inishing of interior partitions will be properly plastered and sandpapered smoothly. 1 layer of water based primer and 2 layers of water paint will be used with the specif ic color as ind icated in f inish schedule. The conference rooms will receive acoustical wall panels, and laminated wood panels at the bottom. All floor f inishes will receive a wall base as ind icated in f inishing and floor schedule. In lobby area, east wall will be covered by acoustical panels in order to increase the acoustical quality of the room.
All build ing services shall be concealed by partitions and suspended ceilings except the mechanical rooms and storages. Ceilings will be completed as the combination of 600x600 acoustical ceiling tiles, gypsum board ceilings, and suspended cloud panels(with acoustical feature) in lobby area. All d iffusers, lights, alarms, wi-f i routers, and other functional elements will be ceiling mounted.
All ceiling materials will have specif ic sound absorption and sound attenuation values as specif ied in f inishing schedule.
Restroom cubicles will be of custom-made compacted laminated panels with anod ized aluminum hardware. All toilet accessories shall be stainless steel. All restroom and kitchenette countertops shall be made of acrylic with off -white color .
3. Build ing Service Proposals
Following engineering systems will be coord inated with architectural project:
HVAC System, Under floor Heating System, Sewage System, Storm Water System, Domestic Water D istribution System, Telecommunication System, F ire Alarm System, Heating Water Service System, G round ing System, Lightning System, Power D istribution
System, Interior and Exterior Lighting System, Aud io-V isual System
Please refer to related d rawings sets for detailed information about each build ing service proposal.
4. F ire Protection
Accord ing to SN RK 2.02-11 -2002 Clause 2.3.5, the build ing does not require f ire extinguishing system since the number of occupancy is less than 300 people.
Technical rooms and storage are separated by f ire-rated partitions f rom the rest of the areas accord ing to Clause 5.3.1.20 of SN iP
RK 3.02-07 -2014. Please refer to door and wall schedule for more information about the f ire features.
In total, 7 f ire extinguishers are located in d ifferent locations of the build ing such as conference rooms, technical rooms, kitchen etc.
F ire alarm system of the build ing is determined accord ing to SN RK 2.02-11 -2002 Clause 2.3.5 and SN RK 2.02-104-2014.
-0.200 -0.340
-1.300
2 2
5850 5850 5850 3635 2805
29250
1 2 3 4 5 6
А
Б
В
±0.000
105 106 107 111
118 108 116 117
88.16 51.08 50.10
5.71 3.90 6.46 6.24
9.46
9.62
2.89 4.04
15.37
8.65 9.80
8.40
7.89
84.50
30150
115120 114
5.78
3.87
+0.920
6.16
3488 2745 1500 1450 1500 4210 1450 1500 3910
2425 2995
9708 5600 5302
4342 2650 5014 500 3974 500 8014 1970 1970
1693 2500
300 4374 300
50147650 7511 5000
7490 935 2377 935 6675 935 4780 1000 3088 1000 935
5/14/1
2215 3045
А/1
03Б/2
5%
5%
5%
5%
Evacuation Stair see
AR-53
6 x 153 = 920
6 x 153 = 920
150 150
105 260
935 1495
1500 3753
100100
935 1335 935 882
8 53
493 1640 4587 1640 3612 1640 577
1167 1640 1167
1612 935
A A
C
BB
C
20 x 175 = 3 500
18 x 194 = 3 500
Ø 1400mm Ø 850mm Ø 300mm
Horizontal wall section see AR - 49
Horizontal Wall section see AR - 49
Entrance Canopy E-1 see AR - 50,51
Entrance Canopy E-2
AR - 52
Horizontal wall section see AR - 49
Vertical Wall section see AR - 49
S-1 see
AR - 53,54
Б/1
105/1
106/2
4/3
105/2
104/1 106/1
104/2 106/3
8000 1687
230015001130
00 10
1130 1000
800010
-0.050
-0.050 -0.350
-0.050
-0.800
-0.050 -0.500
-1.250
-0.050 -0.580
-0.050
1st Floor Plan ±0.000
Sc: 1/100
Format А2
1st Floor Plan ±0.000 0 21
SCALE BAR (M)
3 4 5
Cloakroom
Lobby Area
Vestibule
Conference Room 1
Translator Booth 1
No. Space Description Net m2
Restroom Entrance Hall
Restroom (Men)
Conference Room 2
Conference Room 3
Translator Booth 2
Restroom (Woomen)
Staff Office
Janitor Closet
Restroom (Disabled)
Storage (CF 1)
Total NET Area
Storage (CF 2)
Storage (CF 3)
Service & Storage (Lobby)
Mechanical Room
Electrical Room
Note:
This sheet shall be read in conjunction with sheets AR-4-8,10,19,21-56.
AR-3
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
±0,000
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
105/1
Room No.
Finished floor level
Casette Profile System with Insulation
Facade Cladding System
Sintered Stone Cladding System
Metal Structure
Interior Elevations Marking
Interior GWB Partition with Metal Profiles
Legend:
Fire Rated Interior GWB Partition with Metal Profiles
7.89
84.50
8.65
88.16
51.08
50.10
9.62
3.90
8.40
15.37
9.46
4.04
2.89
6.16
5.78
6.46
6.24
5.71
9.80
3.87
388.08
+3.500
58.75
8.245.25
2.32
±0.000+0.920
1413 2170
27052563
175007650 5000
935 3270
30150
2 2
5850 5850 5850 3635 2805
29250
1 2 3 4 5 6
А
Б
В
5/14/1
2215 3045
А/1
Roof Hatch
Vertical Shaft
Vertical Shaft
6138 2022
7.86
1100 647
Б/2
±0.000
±0.000
±0.000
S-1 see
AR - 53,54
5 100
391935
0 12
150150
Detail 1 see AR-41
Detail 2 see
AR-41
18 x 194 = 3 500
20 x 175 = 3 500
Evacuation Stair see
AR-53
Roof Top Hatch see
AR - 56, 57
Entrance Canopy E-1 see AR - 50,51
Entrance Canopy E-2
AR - 52
Б/1
30035088
Cover the Exposed Beam with Aluminum Panel Matching with Structural Glazing System see
AR - 39
201/1 201/2
201/3
105/1
4/3
105/2
104/1 106/1
104/2 106/3
+3.500+0.000
Format А2
Mezzanine Floor Plan ±3.500 0 21
SCALE BAR (M)
3 4 5
Restroom (Mezzanine)
Kitchenette
Mezzanine Lounge
Storage (Mezzanine)
No. Space Description Net m2
Lobby Mezzanine
Total NET Area
Mezzanine Floor Plan +3.500
Sc: 1/100
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-4
Note:
This sheet shall be read in conjunction with sheets AR-3,5-8,11,19-43,45,53-56
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
±0,000
105/1
Room No.
Finished floor level
Casette Profile System with Insulation
Facade Cladding System
Sintered Stone Cladding System
Metal Structure
Interior Elevations Marking
Interior GWB Partition with Metal Profiles
Legend:
Fire Rated Interior GWB Partition with Metal Profiles
58.75
7.86
2.32
8.24
5.25
82.42 i=
+8.525 i=8%
2 2
5850 5850 5850 3635 2805
29250
1 2 3 4 5 6
А
Б
В
5/14/1
2215 3045
А/1
1% 1%
+7.665
+3.400
+3.400
1%1% 1%1%1% 1%
1% 1% 1%1% 1%1%1% 1%
Downspout
∅100 mm
Gutter Width 350 mm
Overflow
Scupper
+7.665
Downspout
∅100 mm
+7.665
Downspout
∅100 mm
Downspout
∅100 mm
Downspout
100mm
Downspout
∅100 mm
Downspout
∅100 mm Downspout
∅100 mm
Overflow
Scupper
Overflow Scupper
250x150 mm
Overflow Scupper
250x150 mm
Gutter Width: 350 mm
VS-1 VS-2
i= i= i= i= i= i=8%
Б/2
Roof Hatch see
AR - 56,57
Composite
Paraphet
Roof Sandwich
Paneling
VS-3
VS-4
VS-5
VS-6
VS-7
Exnaust Fan 1;2 see AR - 57
Roof Ridge see AR - 49
Parapet Section see AR - 49
Roof Vent 3;4;5;6 see AR - 57
Roof Shaft Closure -7 see AR - 57
Roof Equipment Pad see AR - 57
Entrance Canopy E-1 see AR - 50,51
Entrance Canopy E-2
AR - 52
+7.665+7.665
+7.665
Б/1
Format А2
Roof Plan 0 21
SCALE BAR (M)
3 4 5
Roof Plan
Sc: 1/100
Note:
This sheet shall be read in conjunction with sheets AR-6-9,24,47-49,57.
Roof slope is 4,6°, which coresponds to 8%.
Area of roofing and canopies - 406.70 m2.
For rooftop equipments, see HVAC drawings set.
VS refers to vertical shafts penetrating the roof.
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-5
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
5850 5850 5850 3635 2805
29250
1 2 3 4 5 65/14/1
2215 3045
13650
АБВ А/1
+3,500
+4,700
+0,900
+10,000
+3,500
±0,000
+9,100
+7,000
+2,100
+7,000
+3,500
+10,000
+9,100
+7,000
+2,100
+0,900
±0,000
+7,000
+0,920
+0,925
+2,425
+5,000
+3,000
+0,925
+2,425
+3,500 +3,500
+2,700
+4,400
Overflow
Scupper Overflow
Scupper
Б/2
Projector Screen
4800x3800 mm
Projector Screen
1500x2500 mm
Projector Screen
4800x3800 mm
Projector Screen
4500x8000 mm
+8,525
Parapet Section see
AR - 49
Roof Ridge Section see
AR - 49
Entrance Canopy E-1 see AR - 50,51
Entrance Canopy E-2
AR - 52
Roof sandwich panel, 150mm
Vapor barrier
Eave purlin
Rigid frame rafter
Suspended ceiling
Evacuation Stair see
AR-53
Roof sandwich panel, 150mm
Vapor barrier
Eave purlin
Rigid frame rafter
Suspended ceiling
Carpet
Carpet adhesive
Screed
Underfloor heating pipe
Extruded polystyrene board
Concrete slab,160mm
Vapor retarder
Compacted gravel,150mm
Compacted soil
Carpet
Carpet adhesive
Screed
Underfloor heating pipe
Extruded polystyrene board
Concrete slab,160mm
Vapor retarder
Compacted gravel,150mm
Compacted soil
Parapet Section see
AR - 49
Roof Ridge Section see
AR - 49
Horizontal wall section 11-11
(Entrance Canopy) see AR - 52
Horizontal wall section 10-10
(Entrance Canopy) see AR - 50
35351765
Б/1
Cover the Exposed Beam with
Aluminum Panel Matching with
Structural Glazing System see
AR - 39
-1,300
-0,800
Format А2
0 21
SCALE BAR (M)
3 4 5
Building Sections 1-1; 2-2
Building Sections 1-1 ; 2-2
Sc: 1/100
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-6
Note:
This sheet shall be read in conjunction with sheets AR-3-5,7-57
For floors structure and flooring material quantities refer to floor finishing schedule.
Refer to wall schedule for wall types.
Structural Concrete
Underfloor Heating Pipe
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Elevation Level
Casette Profile System with Insulation
Facade Cladding System
Interior GWB Partition with Metal Profiles
Legend:
Roof Sandwich Panel
Gravel and Compacted Soil
±0,000 http://www.Architecture4design.com http://www.Architecture4design.com http://www.Architecture4design.com http://www.Architecture4design.com http://www.Architecture4design.com http://www.Architecture4design.com
АВ
1 6
+10,000
+3,500
±0,000
+3,500
+4,700
+3,500
±0,000
+9,100
+7,000
+10,000
+9,100
+7,000
+2,100
РВ-4
133 3
1 10
3 3
45111
13 13
Entrance Canopy E-1
AR - 50,51
Entrance Canopy E-2
AR - 52
Entrance Canopy E-1
AR - 50,51
Retaining Wall with
Schist Stone Finish GP-11
Retaining Wall with Schist
Stone Finish GP-11
Evacuation Stair see
AR-53
Parapet Section see AR - 49 Parapet Section see AR - 49
Parapet Section see AR - 49
Parapet Section see AR - 49
Horizontal Wall Section 7-7
(Structural Glazing Facade)
AR - 49
Vertical Section 8-8
(Structural Glazing Facade)
AR - 49
Horizontal wall section 11-11
(Entrance Canopy) see AR - 52
Horizontal wall section 10-10
(Entrance Canopy) see AR - 50
Horizontal wall section 10-10
(Entrance Canopy) see AR - 50
ВТ-1ВТ-1
ВТ-1
2497249724971577 2497 2497 2497 2497 2497 2497 2497 2365 1577
1684 2304 2304 2304 2304 2304 168469
-0,320
-0,930
-1,500
-1,300
-1,250
РВ-4
Format А2
Elevations 1-6; В-А 0 21
SCALE BAR (M)
3 4 5
Elevations 1-6; В-А
Sc: 1/100
Aluminum Composite Paneling
Trapezoidal Panel
Brick Cladding System
Entrance Canopy
No. Type of Material
Aluminum Entrance Doors
Structural Semi-Unitized
Silicone Facade System
Exterior Metal Hollow Doors
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-7
Facade finishes and cladding schedule
Note:
This sheet shall be read in conjunction with sheets AR-3-6,8,9,21-27,37,38,47-53
Exhaust Fan
Louvers
Aluminum Windows
Wall Hose Bibbs
Evacuation Stair
Overflow Scupper
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
А В
+3,500
+4,700
+3,500
±0,000
+10,000
+9,100
+7,000
+5,700 +4,400
+2,200 +0,900
3 3
+3,500
±0,000
+4,700
+10,000
+9,100
+7,000
+5,600
+1,900
+2,500
6 28
13 13
РВ-1РВ-2РВ-3РВ-2
313 9
57 1411
Entrance Canopy E-2
AR - 52
Entrance Canopy E-1
AR - 50,51
Evacuation Stair see
AR-53
Entrance Canopy E-2
AR - 52
Retaining Wall with Schist
Stone Finish GP-11
Retaining Wall with Schist
Stone Finish GP-11
Evacuation Stair see
AR-53
Horizontal wall section 6-6 see AR - 49
Parapet Section see AR - 49 Parapet Section see AR - 49
Parapet Section see AR - 49 Parapet Section see AR - 49
Horizontal wall section 6-6 see AR - 49
Horizontal wall section
(Entrance Canopy) see AR - 49
Horizontal wall section 11-11
(Entrance Canopy) see AR - 52
Horizontal wall section 10-10
(Entrance Canopy) see AR - 50
ВТ-2
ОК-1
ОК-3
ОК-2
4.1 4.1 4.1
4.2
ОК-2
1792 2304 2088 2304 2304 2304 179269
1495 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1495
-0,780
-0,250
-0,810-0,790
-0,330-0,370
Format А2
0 21
SCALE BAR (M)
3 4 5
Elevations 6-1 ; А-В
Sc: 1/100
Elevations 6-1 ; А-В
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-8
Note:
This sheet shall be read in conjunction with sheets AR-3-7,9,21-27,37,38,47-53
Aluminum Composite Paneling
Trapezoidal Panel
Brick Cladding System
Entrance Canopy
No. Type of Material
Aluminum Entrance Doors
Structural Semi-Unitized
Silicone Facade System
Exterior Metal Hollow Doors
Facade finishes and cladding schedule
Exhaust Fan
Louvers
Aluminum Windows
Wall Hose Bibbs
Evacuation Stair
Overflow Scupper
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
AR-9
Facade and Roof Finish Schedule
Pos.
Name of Facade and
Roof Elements Area/Len.Dimensions
Brick Cladding System1 Ströher Bricks on Nordfox
Aluminum Cladding System 375 Platingrau
Bricks: 240x71x14 mm (Reg.), 240x115/71x14(Corner)
Joint: 10mm horizontal way aluminum profiles filled with deep grey grout
Trapezoidal Panel2 Bemo TP 40-100 Deep Grey (Match with brick grout color) Standard dimensions per manufacturer
Aluminum Composite Paneling
(various dimensions) 3 Bemo Invisio System
1.Natural Green Metalic (GE15)
2.Light Grey 15GE/30 GE RAL:7035
Panels: Various dimensions. Refer to elevation drawings
Joints: 20 mm horizontal and vertical way
Entrance Canopy4 Neolith Sintered Stone Iron Corten Panels: Various dimensions. Refer to system section drawings
Joints: 4 mm filled with silicone matching sintered stone color
Structural Semi-Unitized Silicone
Facade System 5 Schüco
Glazing: Reflected Coated Glass
Frame: Anthracite Grey Mat Ral:7016 Glazing: 1720x830 mm or 520x830 mm.
Joints: 20 mm filled with weather proof gaskets
6 DtecExterior Metal Hollow Doors Frame and door: anthracite grey mat
Ral:7016; Hardwares: Stainless Steel Doors: 1640x2100 mm or 935x2100 mm.
7 Aluminum Entrance Doors Schüco
Schüco
Frame: Anthracite Grey Mat Ral:7016
Glazing: Reflected Coated Glass matching No 5 Doors: 3045x3975 mm, 3200x1790 mm
8 Aluminum Windows Frame: Anthracite Grey Mat Ral:7016
Glazing: Reflected Coated Glass matching No 5 Windows: 900x1300 mm, 1500x1300 mm, 900x600 mm
Refer to Mechanical Drawings9 Louvers Matching with the color of No 3 Louvers: 500x400 mm, 500x300 mm, 500x250 mm
Refer to Mechanical Drawings10 Exhaust Fan Matching with the color of No 1 EF: 260 mm diameter
Refer to Pumbing Drawings11 Wall Hose Bibbs Stainless Steel Cover Cover: 200x200 mm
Custom Fabrication12 Evacuation Stair Per detail drawings.
RAL:7035, Semi-gloss exterior high-performance coating paint
Custom Fabrication13 Overflow Scupper Stainless Steel Scupper: 250x150x1.2 mm. See roof details
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
440.00 m2
22.00 m2
260.00 m2
52.00 m2
118.00 m2
Facade and Roof Finish Schedule
14 Roof sandwich panel Panels: 1000x142 mm(100+42 mm) 397.00 m2Kingspan KS 1000 PRW RAL 9010
4.30 m2
11.30 m2
17.70 m2
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note:
This sheet shall be read in conjunction with sheets AR-3-5,7,8,21,25-27,47-53
15 Roof gutter Min thickness: 1 mm, width: 350 mm. Provide bracings at each 1000 mm 59.1 mStainless Steel -
Color
Sch.
Name of Finishing
Material
Name and Number of
Color Standard
Note
±0.000+0.920
А
Б
В
А/1
5850 5850 5850 3635 2805
29250
1 2 3 4 5 65/14/1
2215 3045
Floor box for
18 modules
Trap
Trap
Trap
Trap
Trap
Б/2
Floor box for
18 modules
5 5 5
ВТ-2
105 106
111 110
118 108 116 117
115120 114
4.1 4.1 4.1
6.1
6.2
6.3
6.4
6.66.12
6.7 6.7
6.11
6.10
7.1
7.2
9 9
ОК-4
ОК-5
4.1
5.1
4.1
4.1 4.1 4.1 4.1
4.1 5.1
5.2
5.2
7.1
7.1
7.2
7.2
7.1 7.1
ОК-1
ВТ-1
ОК-2
ОК-2
6.5
ВТ-1
Б/1
Align Stone Joints with Glazing Mullions
Trap
Equipment Pad see AR-56
Format А2
0 21
SCALE BAR (M)
3 4 5
1st Floor Finish Plan ±0.000
Floor Finish Plan.
1st floor ±0.000. Sc: 1/100
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-10
Note:
1. This sheet shall be read in conjunction with sheets AR-3,12-18,45-50.
2. Provide %1 slope to all interior floor traps.
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Granite Stone
Floor Ceramic Tile
Carpet Tile
Hardwood flooring
Flooring Type Net m2
Resilient Tile (VCT)
Entrance mat flooring
Decorative river rock
Floor marking
ОК-1
Door marking
Window marking
Legend:
Epoxy Floor Coating
Floor box for 18 modules
Trap
181.41
31.75
34.59
24.60
7.89
13.64
88.86
3.30
AutoCAD SHX Text 18M
AutoCAD SHX Text 18M
AutoCAD SHX Text 18M
AutoCAD SHX Text 18M
+3.500
5850 5850 5850 3635 2805
29250
1 2 3 4 5 6
А
Б
В
5/14/1
2215 3045
А/1
±0.000
Б/2
4.2
6.7
6.8
6.9 6.8
6.13
4.2
5.2
7.1
7.3
ОК-3
Б/1
20 x 175 = 3 500
Trap
Format А2
0 21
SCALE BAR (M)
3 4 5 Mezzanine Floor Finish Plan
+3.500
Floor Finish Plan.
Mezzanine floor +3.500. Sc: 1/100
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-11
Note:
1. This sheet shall be read in conjunction with sheets AR-4,12,14-18,54
2. Provide %1 slope to all interior floor traps.
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Natural Granite Stone
Floor Ceramic Tile
Carpet Tile
Flooring Type Net m2
Resilient Tile (VCT)
Floor marking
ОК-1
Door marking
Window marking
Legend:
Floor box for 18 modules
Trap
2.32
58.18
5.22
16.42
18M
AR-12
Room Description Floor type
Room No Floor section m2Floor elements and thicknessas per design Area
Floor Finish Schedule
Vestibule
1. Entrance mat system, 20mm,
2. Setting mortar, 20mm
4. Vapor retarder
5. Compacted gravel,150mm
6. Compacted soil
Lobby Area
109 Restroom Entrance Hall
1. Stone tile, 20mm,
2. Setting mortar, 20mm
4. Underfloor heating pipe, 25mm
5. Exteruded polystyrene board, 25mm
7. Vapor retarder
8. Compacted gravel,150mm
9. Compacted soil
3. Leveling screed, 50mm
3. Slab on grade,125mm
Install stone base 150x20mm, matching with flooring material
6. Slab on grade,125mm
2 1 2 3 4 5
6 7 8 9
3 4 5 6
1 2
Emco ecoline pioneer 22 mm, Color: Anthrachite
Color: Imperial grey, Dimension: 620x620x20 mm
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Floor Finish Schedule
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note:
This sheet shall be read in conjunction with sheets AR-3,4,6,10,11,47-50,54
Wallbase:
level 0.000
7.89 м2
88.86 м2
35.00 м Joints of stone flooring and base to be matched.
AR-13
Room Description Floor type
Room No Floor section m2Floor elements and thicknessas per design Area
Floor Finish Schedule
1. Decorative river rock
3. Leveling screed, 50mm
5. Vapor retarder
6. Compacted gravel,150mm
7. Compacted soil
1. Carpet , 5-10mm, Samur halı 500x500 mm
2. Carpet adhesive
4. Underfloor heating pipe, 25mm
5. Exteruded polystyrene board, 25mm
7. Vapor retarder
8. Compacted gravel,150mm
9. Compacted soil
3. Screed(thickness based on floor finish th.)
4. Slab on grade, 125 mm
6. Concrete slab, 125 mm
4.1 1 2 3 4 5
6 7 8 9
Lobby Area 102
Wallbase:
Staff Office
Cloakroom
Model: High density 1601, Pattern: Quarter turn
Install wood wall base 100x20mm, finish: coated oak
2. Protection coating for exposed concrete
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Floor Finish Schedule
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note:
This sheet shall be read in conjunction with sheets AR-3,4,10,11,47-50,54
4 5 6 7
1 2 3
Wallbase:
Install curb h=150x50mm, level 0.000
3.30 м2
14.81 м2
22.00 м
6.00 м
AR-14
Room Description Floor type
Room No Floor section m2Floor elements and thicknessas per design Area
Floor Finish Schedule
2. Carpet adhesive
4. Underfloor heating pipe, 25mm
5. Exteruded polystyrene board, 25mm
7. Vapor retarder
8. Compacted gravel,150mm
9. Compacted soil
3. Screed(thickness based on floor finish th.)
6. Concrete slab, 125 mm
4.2 1 2 3 4 5
6 7 8 9
Conference Room 1
Conference Room 2
Conference Room 3
Translator Booth 1
Translator Booth 2
1. Ceramic tile, Vitra concreta gray R10, Dimension: 600x600 mm
2. Tile adhesive
4. Anti-fracture membrane (extends 150mm through walls)
5. Leveling screed
6. Underfloor heating pipe, 25mm
3. Waterproofing 5.1
Restroom (Men) 110 1 2 3 4 5
8 9 10 11
1. Carpet , 5-10mm, Samur halı 500x500 mm
Model: High discovery 1306, Pattern: Qquarter turn
7. Exteruded polystyrene board, 25mm
8. Slab on grade, 125 mm
10. Compacted gravel,150mm
11. Compacted soil
9. Vapor retarder
Restroom (Women) 111
Install wood wall base 100x20mm, finish: coated oak
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Floor Finish Schedule
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note:
This sheet shall be read in conjunction with sheets AR-3,4,6,10,11,47-50,54
Wallbase:
level 0.000
168.27 м2
18.00 м
24.83 м2
AR-15
Room Description Floor type
Room No Floor section m2Floor elements and thicknessas per design Area
Floor Finish Schedule
1. Ceramic tile, Vitra cardostone antrasit mosaic mat, D: 300x600 mm
2. Tile adhesive
4. Anti-fracture membrane (extends 150mm through walls)
5. Leveling screed
6. Underfloor heating pipe, 25mm
3. Waterproofing Restroom (Disabled) 112
7. Exteruded polystyrene board, 25mm
8. Slab on grade, 125 mm
10. Compacted gravel,150mm
11. Compacted soil
9. Vapor retarder
Janitor Closet 113
5.2 1 2 3 4 5
8 9 10 11
Stage104 6 1. 'Haro' Hardwood flooring, 20 mm, finish: dark brown oak
2. Fire-rated plywood, 20 mm (glued on acoustical underlayment)
4. 20 mm plywood base
5. U shaped floor floater
3. 12 mm thick rubber based acoustical floor underlayment (glued on plywood base)
Install wood wall base 100x20mm, 1 2 3
4 6 finish: coated oak
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Floor Finish Schedule
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note:
This sheet shall be read in conjunction with sheets AR-3,4,6,10,11,47-50,54
Wallbase:
level 0.000
6.93 м2
34.59 м2
14.00 м
6. Metal structure
AR-16
Room Description Floor type
Room No Floor section m2Floor elements and thicknessas per design Area
Floor Finish Schedule
1. Resilient tile thickness, 3 mm, Kalyon Yapı Zemin
2. Adhesive
4. Slab on grade, 125 mm
5. Vapor retarder
3. Screed, 100mm
Service & Storage (Lobby) 115
6. Compacted gravel, 150 mm
7. Compacted soil
Storage (CF 1) 116
Storage (CF 2) 117
7.1
Storage (CF 3) 118
Install rubber base, color:dark grey, height: 80-100 mm 4 5 6 7
1 2 3 Dimension: 500x500x2,5 mm, Color: Caviar foggy blue
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Floor Finish Schedule
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note:
This sheet shall be read in conjunction with sheets AR-3,4,6,10,11,47-50,54
7.2
Wallbase:
Mechanical Room 119
Electrical Room 120
Install rubber base, color:dark grey, height: 80-100 mm
Wallbase:
1. Epoxy floor coating thickness, 3 mm, Basf Mastertop
3. Slab on grade, 125 mm
4. Vapor retarder
2 Screed, 100mm
5. Compacted gravel, 150 mm
6. Compacted soil
4 5 6
1 2 3 Color: Dark grey level 0.000
24.19м2
52.00 м
13.67м2
20.00 м
AR-17
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Floor Finish Schedule
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o Room Description
Floor type Room No Floor section m2Floor elements and thicknessas per design
Area
Kitchenette 202
Restroom (Mezzanine) 203
1. Ceramic tile, Vitra cardostone antrasit mosaic mat,
2. Tile adhesive
4. Anti-fracture membrane (extends 150mm through walls)
5. Leveling screed
6. Underfloor heating pipe, 25mm
3. Waterproofing
7. Exteruded polystyrene board, 25mm
8. Composite decking slab 150 mm
Dimension: 300x600 mm
Note:
This sheet shall be read in conjunction with sheets AR-3,4,6,10,11,47-50,54
Install rubber base, color:light grey, 7.3 height: 80-100 mm
1 2 3 4
5 6 7
1. Resilient tile thickness, 3 mm, Kalyon Yapı Zemin
2. Adhesive
5. Exteruded polystyrene board, 25mm
6. Composite decking slab 150 mm
7. Steel structural beam
3. Screed,50mm
Dimension: 250x500x2,5 mm, Color: Polished concrete light grey
4. Underfloor heating pipe, 25mm
5.2 1 2 3 4
7 8 9
9. Steel structural beam
Wallbase:
Mezzanine Lounge 201
1. Carpet , 5-10mm, Samur halı 500x500 mm
2. Carpet adhesive
4. Underfloor heating pipe, 25mm
5. Exteruded polystyrene board, 25mm
6. Composite decking slab 150 mm
3. Screed(thickness based on floor finish th.)
7. Steel structural beam
Model: High discovery 1306, Pattern: Qquarter turn4.2 1 2 3 4
5 6 7Install wood wall base 100x20mm, finish: coated oak
Wallbase:
level +3.500
2.32м2
7.86м2
11.00 м
58.75м2
8.00 м
AR-18
Room Description Floor type
Room No Floor section m2Floor elements and thicknessas per design Area
Floor Finish Schedule
Storage (Mezzanine) 204
10.50m2 Lobby Mezzanine & Stair205
1. Stone tile, 20mm,
2. Setting mortar, 20mm
4. Composite decking slab 150 mm
3. Leveling screed, 50mm
5. Steel structural beam
Color: Imperial grey, Dimension: 620x620x20 mm
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Floor Finish Schedule
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Note:
This sheet shall be read in conjunction with sheets AR-3,4,6,10,11,47-50,54
8.24m2
Install rubber base, color:light grey, 11.00 m
7.2 height: 80-100 mm
1. Resilient tile thickness, 3 mm, Kalyon Yapı Zemin
2. Adhesive
4. Composite decking slab 150 mm
5. Steel structural beam
3. Screed,70-80mm
Dimension: 500x500x2,5 mm, Color: Caviar foggy blue
4 5
1 2 3
4 5
1 2 3
5.00 m
Wallbase:
level +3.500
Install stone base 150x20mm, matching with flooring material
Wallbase:
Joints of stone flooring and base to be matched.
+3.000
+3.500 +3.500+3.500
+2.700
+2.550
+2.700
+2.900 +3.000
+2.700
+2.700
+5.000
+2.700 x
A
2x36
2x36
A
A
A
A
A AA
A
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
EXIT
ВЫХОД
E X I T
В Ы Х О Д
EXIT
ВЫХОД
A
A
A
+5.000
58505850 5850 3635 2805
29250
1 2 3 4 5 6
А
Б
В
5/1
4/1
А/1
+5.000
+2.700
+2.700
+2.550
Б/2 +2.700
A
A
+3.000
+2.700
+2.700
Б/1
16912 1090
Slope
45 degrees
Format А2
0 21
SCALE BAR (M)
3 4 5
Reflected Ceiling Plan 1-st Floor
Reflected Ceiling Plan.
1-st floor ±0.000. Sc: 1/100
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-19
Note:
This sheet shall be read in conjunction with sheets AR-3,6,28-30,47-50
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Gypsum Wall Board
Acoustical Ceiling Panel
Cloud Ceiling Panel
Composite Panel
Supply Diffuser
Slot Diffuser
Return Diffuser
Anemostat Diffuser
Legend
Recessed linear LED light 15W/m
A
A
2x36
A
A
Recessed LED downlight 20W ∅197mm
Round pendant LED light: ∅647mm- 47W, ∅900mm- 95W
2x36
A
Pendant LED light 36W IP65
Recessed LED square light 33W 600x600mm
Recessed LED spotlight 3W ∅80mm
Recessed LED downlight 24W ∅120mm
Hidden LED striplight 15W/m
Motion detector
Emergency recessed LED downlight 20W ∅197mm
Recessed LED downlight 18W ∅199mm
Emergency recessed LED downlight 18W ∅199mm
Emergency pendant LED light 36W IP65
Emergency recessed LED square light 33W 600x600mm
Emergency recessed LED downlight 24W ∅120mm
Pendant linear LED light 22W
A
Surface mounted linear LED light 48W
Emergency surface mounted linear LED light 48W
Emergency Round Pendant LED light: ∅647mm- 47W, ∅900mm- 95W
A
Projection device
Recessed ceiling type speaker
WiFI
Fire alarm detector
Heat detector
Recessed ceiling type speaker
Screen
Return Diffuser
Return Diffuser
Smoke exhaust fan
Acces panel for equipment
Supply Diffuser
+2.700 The level of the ceiling
Interior GWB Partition with Metal Profiles
Strip LED Lighting
AutoCAD SHX Text
OS
AutoCAD SHX Text
OS
AutoCAD SHX Text
OS
AutoCAD SHX Text
OS
M
+6.600
+7.000
+7.000
+6.600
+7.000
+7.000
+7.300+7.300 +7.300
+7.000+7.000
+6.050 +5.700
A
A AA
A A
A
A
A x
5850 58505850 28053635
29250
21 3 4 5 6
А
Б
В
5/14/1
2215 3045
А/1 x
A
A
A
A
Б/1
EXIT
ВЫХОД
EXIT
ВЫХОД
P
P P
P
A
A
A
A
+6.500
Open Above
Open Above
Б/1
+6.600 +6.500 +6.500 +6.600+6.600 +6.500 +6.500
+6.030
+5.730
+6.030
+6.180
+6.030
+5.730
+5.870
+6.180
+6.320
+5.870
+5.720
+6.500
Format А2
0 21
SCALE BAR (M)
3 4 5 Reflected Ceiling Plan.
Mezzanine Floor
Reflected Ceiling Plan.
Mezzanine floor +3.500. Sc: 1/100
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
AR-20
Note:
This sheet shall be read in conjunction with sheets AR-4,6,30,31,47-50,54
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Gypsum Wall Board
Acoustical Ceiling Panel
Cloud Ceiling Panel
Composite Panel
Supply Diffuser
Slot Diffuser
Return Diffuser
Anemostat Diffuser
Legend
Recessed linear LED light 15W/m
A
A
2x36
A
A
Recessed LED downlight 20W ∅197mm
Round pendant LED light: ∅647mm- 47W, ∅900mm- 95W
2x36
A
Pendant LED light 36W IP65
Recessed LED square light 33W 600x600mm
Recessed LED spotlight 3W ∅80mm
Recessed LED downlight 24W ∅120mm
Hidden LED striplight 15W/m
Motion detector
Emergency recessed LED downlight 20W ∅197mm
Recessed LED downlight 18W ∅199mm
Emergency recessed LED downlight 18W ∅199mm
Emergency pendant LED light 36W IP65
Emergency recessed LED square light 33W 600x600mm
Emergency recessed LED downlight 24W ∅120mm
Pendant linear LED light 22W
A
Surface mounted linear LED light 48W
Emergency surface mounted linear LED light 48W
Emergency Round Pendant LED light: ∅647mm- 47W, ∅900mm- 95W
A
Projection device
Recessed ceiling type speaker
WiFI
Fire alarm detector
Heat detector
Recessed ceiling type speaker
Screen
Return Diffuser
Return Diffuser
Smoke exhaust fan
Acces panel for equipment
Supply Diffuser
+2.700 The level of the ceiling
GWB control joints
Interior GWB Partition with Metal Profiles
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
OS
M
AR-21
Item no.
ОП 30-40У1 3045x3975 мм 2
2 3200x1790 мм 1 individual
ДМНГ 21-16У3 2100x1640 мм 1
ДМHГ 21-10Уп4.1 2100x935 мм 3
2100x1640 мм 0
Specification of Wall Openings
0,000 3,500 individual individual individual individual
NotesOpening size quantity, pcs Designation Description Total
ОП 32-18У
ДМHГ 21-10Ул
14.2 individual5 2100x1640 мм 3ДВнГ 21-16 _
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
H92277-19-C-0004 - AR
KazCent Conference Center
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Salamatov U.
Celen N.
D. Manager Celebi B.
Rough openings will be coordinated by the door and window manifucturers.
Hollow metal doors shall have minimum 1 mm thickness and hollow metal frames shall have minimum 1.5 mm thickness.
This sheet shall be read in conjunction with sheets AR-3,4,6-8,47,48
Specification of Wall Openings
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Schüco Aluminum glazed partition, double glazed (24 mm)
Door: Heat insulated, double panels, double hand reverse
Frame: Finish: anthracite gray RAL 7016, thickness: 70mm, heat insulated
Hardware: Panic hardware with mortise lock and exterior lever, door closer, threshold, hinges, weatherstrip, sill sweep
DTEC Exterior metal door, unglazed
Door: Heat insulated, double panels, double hand reverse, hollow metal, thickness: 56 mm, finish: anthracite gray RAL 7016, Frame: Hollow metal, Finish: anthracite gray RAL 7016, thickness: 145mm, heat insulated
Hardware: Panic hardware with mortise lock and exterior lever, threshold, hinges,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .