17. 100% Design KAZCENT - ES.pdf
PDF 1 MB Posted
- Solicitation number
- W5J9JE-22-R-0004
About this file
This solicitation is for design-build construction services for a Kazakhstan conference center project. The U.S. Army Corps of Engineers seeks to award a firm-fixed-price contract to build a prefabricated metal training facility in Almaty, Kazakhstan that will serve as a regional platform for training with Central Asian states. The scope involves constructing a large conference room that can divide into three smaller rooms with movable wall panels. The estimated value is between $1-5 million. The North American Industry Classification System code is 236220 and Project Service Code is Y1JZ. The period of performance is approximately 270 calendar days from notice to proceed. No site visit is scheduled. The solicitation is full and open competition under NAICS 236220 with a size standard of $39.5 million. Offerors must ensure active System for Award Management registration is current and valid at time of proposal submission. Performance and payment bonds are required.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Almaty, 2020
WORKING DRAWINGS
Contract No. H92277-19-C-0004 KazCent Conference Center Bostandyk (Kalinin) Region, Zharokov Street, 210/1, Almaty City, Kazakhstan
"Integra Engineering Group" LLP
State License No. 15018832
_февраль
General Information
The project was carried out on the basis of Technical Assignment, as well as assignments issued by related groups, and in accordance with the rules and regulations of the Republic of Kazakhstan.
The building is classified in second category of power supply.
This section provides:
- Power supply;
- removal of KL-10kV networks;
Power supply of the facility is carried out from different sections of the existing TP 15150.
Power cable adopted with armored copper core brand VBbSHv-1. The cable is laid in trench below the ground. At the intersection point with other underground utilities and the road, the cable is protected by a double-wall HDPE pipes.
The reroute of KL-10kV networks was made between couplings No. 1 and No. 2. The power cable should be taken with an armored aluminum housing brand ASB-10kV. The cable is laid in a trench below the ground. At the intersection with underground utilities and the road, the cable is protected by a double-wall HDPE pipes.
Reference documents
Attached documents
Note
The list of reference and attached documents
Designation
Specification of equipment, products andH92277-19-C-0004 -ES.SO materials (on the 1st sheet)
General Information
Technical-economic indicators
Electrical Installation RulesPUE RK 2015
Power supply category - II
Installed power Ru = 137.17 kW
Design capacity Рr=89,16kW
Annual consumption of el. energy - 268,3 thousand kW.h
Cable list. Cable selection table 0.4kV. The volume of earthwork.
Single line power supply
The length of KL-0,4 kV-0,0195 km
Layout of 0.4kV and 10kV networks. Sections 1-1, 2-2, 3-3.
The length of KL-10kV-0,069 km
Item
No. Description
Description Note
Chief Project Engineer Orazalin K.K.
This project has been developed in accordance with applicable norms and rules on the territory of the Republic of Kazakhstan, and ensures the safety of life and health of people during the operation of the facility, subject to the measures provided by the drawings.
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
A g re e d
A g re e d
C h a p te r G P
C h a p te r E W S
C h a p te r H S
E s e n k u lo v
A k im b e rg e n o v
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
GSL No. 15018832
H92277-19-C-0004 - ES
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Beisakhmetov
Zhusupov
Norm.Control Celebi B.
C. P. Engineer Orazalin K. K.
ES-1
General Information
Format А3
Onsite power networks
K a s y m ja n
C h a p te r E O M
S a d y ro v .1
.1
C h a p te r R C
B e re z in a
.1
.1
.1
11.19
11.19
11.19
11.19
Mains voltage KL-10 kV-10 kV
Mains voltage KL-0,4 kV-380B
ES-2
I SECTION
RU-0,4kW
II SECTION
Т2Т1
Single line power supply
1- N
250А
QF
RU-10kW
QF1 QF2
QFQF QF
AVR
QFQF
existing loads
QFQFQFQF
existing loads
250А
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
GSL No. 15018832
H92277-19-C-0004 - ES
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Beisakhmetov
Zhusupov
Norm.Control Celebi B.
C. P. Engineer Orazalin K. K.
Format А3
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Onsite power networks11.19
11.19
11.19
11.19
1- N
250А
QF
250А
ShR
Рr=89,16кВт
Ru=137,17kW
Ir=142,59 А
W1 KL-0.4kV in trench with sleeve
W2 KL-10kV in trench with sleeve
Cable coupling sleeve
ES-3
Scale 1:500
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
GSL No. 15018832
H92277-19-C-0004 - ES
Onsite power networks
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Beisakhmetov
Zhusupov
Norm.Control Celebi B.
C. P. Engineer Orazalin K. K.
Format А3
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Layout of 0.4kV and 10kV networks. Sections 1-1, 2-2, 3-3.
11.19
11.19
11.19
11.19
Т1-57м
3-3
1005050
10050 25
Т2-11м
1-1
10050 25
25 100 2550
Т3-9м
2-2
Signal tape
S ig n a l ta p e ст.200 ст.200 ст .2х оп уск кер.200-К ст.200
0.1
9.9
9.9
869.65
9.7
9.7
9.5
9.4
9.1
9.0
9.4
869.25
9.6
9.1
9.4
9.4
9.5 1 86
9.4
9.1
9.1
9.5
8.9
9.6
8.6
9.4
9.5
8.5
8.6
8.6
8.5
8.3
8.2
8.4
8.5
868.28
7.8
7.7
9 86 7.6
867.84
7.7
8.5
8.4
7.7
7.6
7.6
7.5
7.6
7.6
7.1
8.0
А А
Бр А
А
А
А
Ц
КН
КН
3КНН
гаражи разваленКН
МН
лин.связь по забору ст .89 ст.89 Н=0.5 нед ст.100 ст .10 кя ст
.57 Н
=3 .0 ст .57 ск в.
ск в.
ск в.
8.7
8.1
9.4
9.1
7.9
7.9 вы хо д из зе мл и
7.7
5.8
8.5
9.5
8.1
8.6
6.6
8.5
6.5
5.3
8.8
ТП
АА
А гаражи
МН
ст.89 Н=0.5 ст.57 Н=3.0 ст.57 Н=3.0 ст.100 кер.200 нед.
ст .10 не д не д.
нед
2х32ст.
А
А ке р.2 не д ст .89
Н =0
.5
К
-41
-4050
-40
-4050
-4100
-40
7.7 не д.
не д.
8.8
8.4
8.7
8.5
8.2
8.1
7.9
7.7
7.6
7.6
7.3
Ц
Ц
ЦЦ Ц ЦЦ
А
А ст.2х200 ст.2х40 нед.
ст .2х чуг.100 чуг.100 ст .57 ст.57 Н=2.5 вы хо д
9.0
9.1
8.7
7.9
7.1
6.8
8.0
8.0 ж ир оу л.
8.0
К К
Т
2.5
2.5
3.7
3%
3.0%
3.5%
4.1%
5%
868.25
867.97
869.20
869.42
869.56
869.01
869.64
869.20
868.00
869.02
868.72
868.20
869.00
869.50
870.00
869.10
869.40
868.85
868.50
869.13
868.90
868.40
869.04
868.07
867.40
869.50
868.70
868.00
867.50
868.50
869.00
869.20
868.15
869.20
868.97
867.90
869.13
869.20
868.25
869.20
867.25
868.25
867.97
869.20
869.05
869.42
869.56
869.01
869.64
869.20
868.00
868.72
868.20
869.00
869.50
870.00
869.10
869.40
868.85
868.50
869.13
868.90
868.40
869.04
868.07
867.40
869.50
868.70
868.00
867.50
868.50
869.00
869.20
0,000
V1 К1
V1 К1
1-V1
W2
W
1-N1
1-N1
ShR removal point No. 1 cable coupling sleeve removal point No. 2 cable coupling sleeve
HDPE pipe
D = 100mm
2.5
35.5
10.5
R
R
3.5 W2
HDPE pipe
D = 100mm
R
Ю
С
1-N2
1-N2
LLP "AlmatyGeoCenter"
LLP "Integra Engineering Group"
Topographic survey
Data
Director
Surveyor
Contractor
Owner
Object
Sadykov Ch.K.
Editor Mukataeva E.V.
Topographic map L-23-4,8
Abenova A.O.
February 05, 2019
Sagidullaev J.Kh.
Bostandyk Region
Scale 1:500
Zharokov Street, 210/1
Attention to Customer and Contractor!
Prior to design, coordinate the passage of underground and belowground engineering communications with representatives of relevant services.
Otherwise, AlmatyGeoCenter LLP will not be held responsible for any damage to engineering networks, if the precaution is not taken.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text А
AutoCAD SHX Text Б
AutoCAD SHX Text В
AutoCAD SHX Text 5/1
AutoCAD SHX Text 4/1
AutoCAD SHX Text А/1
AutoCAD SHX Text Б/2
AutoCAD SHX Text Б/1
AutoCAD SHX Text W1
AutoCAD SHX Text W1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ES-4
Start Point
Cable, wire designation
Right-of-way
End Point
Route section of cable, wire
Cable, wire
Length, on the project cross section
Qty, number andClass m laid
1-N1 El. Room of the proposed buildingExisting TP15150 1 section 36Within TP Building-9.5m; in the trench-20.5m (including HDPE pipe VBbSHv-1 3х70+1x35
Ø100mm-15m); Within proposed building 4m; for cable junction-2m
Excavationg trenches for 1st cable line m m
Types of works unit
The amount of earthwork removed from the trench m3
The amount of earthwork to be backfilled m3
The amount of land to be removed m3
The volume of sand to be backfilled in the trench m3
Steel pipe ∅100 cable routing Trench type
Quantity
Signal tape LSE-300
VOLUME OF EARTHWORK
Т1
Total
1-V1 Take-out point No. 2 cable couplingTake-out point No. 1 cable coupling 70ACB-10 3х120
Normal mode Cable
NoteCable length of cable Рr, kw Ir, А mA, power current Torque
U, % loss of voltage permissible current, A class, section normal mode emergency mode
К1 К2 К3 К4
T°sr T°gr T°cab.kW * m
PUE
Ir х 1,2
0.4kV cable selection table
3х70+1x35 VBbSHv-1
Т2 from the cable line
In the trench-69m (including steel pipe Ø100mm-24m);
m cross section
Qty, number andClass number
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
GSL No. 15018832
H92277-19-C-0004 - ES
Onsite power networks
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Beisakhmetov
Zhusupov
Norm.Control Celebi B.
C. P. Engineer Orazalin K. K.
Format А3
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
Cable list. Cable selection table
0.4kV. The volume of earthwork.
removal of cable insulation for cable junction-1m
11.19
11.19
11.19
11.19
1-N2 El. Room of the proposed buildingExisting TP15150 2 section 36Within TP Building-9.5m; in the trench-20.5m (including HDPE pipe VBbSHv-1 3х70+1x35
Ø100mm-15m); Within proposed building 4m; for cable junction-2m
142,59 36 89,16 3219,48 0,631-N1 275 253 275 171,6
142,59 36 89,161-N2 275 253 275 171,63219,48 0,63 3х70+1x35 VBbSHv-1
10,26
6,84
3,42
16,47
10,98
5,49
5,49
3,42
2,97
1,98
0,99
0,99
3,24
2,16
1,08
1,08
Т3
Name and technical characteristicPosition
1 2 3 4 65 87 9
Power cable for voltage 1kV. with copper cores
VBbSHv-1 with polyvinyl chloride insulation and sheath, armored, KazenergokabelGOST16442-80 *, section 3x70 + 1x35mm2 km m³Fine sifted land
Double-wall corrugated HDPE pipe Ø100mmx5mm mD-100mm
4KVNTp-1-70 / 120 Internal cable terminal / 1 kV installation for cables
Signal tape 300mm wide, 1.0mm thick with the word "Caution" LSE-300 m
Armored power cable for voltage 10kV. with aluminum conductors with PVC insulation, section 3x120mm2 ASB-10kV Camcable km
Heat shrinkable sleeve coupling with 10kV bolt connector 3STp-10-70 / 120 install in RU-0,4 TPCircuit breaker 250A, 35kA EKF PROxima 380V VA-99 250/250А 3R
LLP YUG
Electrocomplekt pieces 2 questionnaire document
Type, brand, designation
QtyManufacturing plant
Equipment products, material code, unit of rement measu- Note
Mass unit, kg with a cross-section of 70-120mm2 pieces pieces
O ri g In v N o
S ig n a n d D a te
R e p l.
I n v N o
ES.SO-1
Stage Sheet Sheets
Qty. Doc.NoRev. Sheet Sign. Date
Drawn by
Checked by
WD
LLP
"Integra Engineering Group KZ"
GSL No. 15018832
H92277-19-C-0004 - ES.SO
Onsite power networks
Facility: KazCent Conference Center
Address: Almaty City, Kazakhstan, Bostandyk (Kalinin) Region, Zharokov Street, 210/1
Beisakhmetov
Zhusupov
Norm.Control Celebi B.
C. P. Engineer Orazalin K. K.
Format А3
Specification of equipments, products and materials
11.19
11.19
11.19
11.19
0,072
5,49
0,070
| Sheets and Views |
| Титулка 1 |
File details come from the government source that posted it. Updated .