W51DQV25A0002 Amd 003_Specs_REGISTER.pdf

PDF 381 KB Posted

Attached to
RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3: CHANNEL BOTTOM AND WALL IMPROVEMENTS PROJECT LOCATION: SAN JUAN, PUERTO RICO
Solicitation number
W51DQV25RA002
Issued by

About this file

The document is a Submittal Register for the Rio Puerto Nuevo Project Supplemental Contract 3, a comprehensive federal contract document detailing required submittals across multiple construction and engineering disciplines. The register spans 36 pages and provides a detailed tracking mechanism for various preconstruction, product data, shop drawings, test reports, certificates, and other technical submissions required throughout the project lifecycle.

The submittal register covers an extensive range of technical sections including site preparation, concrete work, steel structures, electrical systems, water infrastructure, dredging, stone and riprap installations, geotechnical work, and marine construction. Each entry specifies the specific submittal type, associated specification section, paragraph number, classification (such as G RO or G DO), approval requirements, and potential action codes. The document appears to be a critical administrative tool for ensuring comprehensive documentation and compliance across multiple technical domains for a flood control project located in San Juan, Puerto Rico.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 36 PAGES

RIO PUERTO NUEVO PROJECT SUPPLEMENTAL CONTRACT 3

01 11 00 SD-01 Preconstruction Submittals

1.4Preconstruction Logistics Plan

01 22 00 SD-01 Preconstruction Submittals

1.5 G ROSchedule of Values

SD-07 Certificates

1.5.1Utility Invoices

3.1.1 G RORequest For Progress Payment

01 30 00 SD-01 Preconstruction Submittals

1.6.3Draft Joint Risk Register

1.6.4List of Subcontractors

SD-07 Certificates

1.7.1.2 G ROPartnering Meeting(s) Written

Synopsis

3.3Signature Authority

3.4Drug-Free Work Place Record

01 32 01 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

SD-07 Certificates

3.6.2 G ROPeriodic Schedule Update

01 35 25 SD-01 Preconstruction Submittals

3.2 G DODive Operations Plan

SD-07 Certificates

1.6.2 G DODive Personnel Qualifications

3.2.1Daily Dive Logs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 36 PAGES

01 35 26 SD-01 Preconstruction Submittals

1.17 G DODive Operations Plan

1.8.1 G DOAccident Prevention Plan

SD-06 Test Reports

1.5Monthly Exposure Reports

1.13Notifications and Reports

1.13.2 G DOReports

1.13.3LHE Inspection Reports

SD-07 Certificates

1.7.1.3 G DOCrane Operators, Signal Persons

and Riggers

1.8.3.2 G DOStandard Lift Plan

1.8.3.3 G DOCritical Lift Plan

1.8.3.4 G DONaval Architecture Analysis

1.9 G DOActivity Hazard Analysis (AHA)

1.10.1Confined Space Entry Permit

1.10.1Hot Work Permit

1.13.4 G DOCertificate of Compliance

1.15 G DOLicense Certificates

1.15.1 G DORadiography Operation Planning

Work Sheet

1.15.1 G DOPortable Gauge Operations

Planning Worksheet

01 45 04 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 36 PAGES

01 45 04 1.5 G ROWork Schedule

SD-07 Certificates

3.7.2 G ROLaboratory Qualifications

3.2.2Letter of Authority

01 50 02 SD-01 Preconstruction Submittals

1.4.1 G ROMobilization/Demobilization Plan

1.4.2 G ROSecurity Plan

1.4.3 G DOVegetation Protection and

Restoration Plan

1.4.4 G RODocumentation Of Existing

Conditions and Post-construction

Restoration

SD-02 Shop Drawings

3.5Contractor's Temporary Facilities

3.2.6Temporary Electric Drawings

01 52 10 SD-02 Shop Drawings

2.1Contracting Officer's Field Office

01 55 26 SD-01 Preconstruction Submittals

1.3 G ROTraffic Control Plan

01 57 20 SD-01 Preconstruction Submittals

1.6 G DOEnvironmental Protection Plan

SD-03 Product Data

1.11 G ROMeteorological Monitoring

SD-07 Certificates

1.5.1.1 G DOManatee Observer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 36 PAGES

01 57 20 1.5.1.2 G DOPuerto Rican Boa Monitor

Qualifications

SD-11 Closeout Submittals

3.2.2Logs/Final Summary Report

3.2.3 G DOProject Environmental Summary

Sheet

01 57 25 SD-03 Product Data

3.1.1.1 G ROCalibration Standard

SD-06 Test Reports

3.1.2 G ROTurbidity Monitoring

01 74 19 SD-01 Preconstruction Submittals

1.7 G DOConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 G DOFinal Construction Waste

Diversion Report

01 78 02 SD-02 Shop Drawings

1.3 G ROAs-Builts

SD-03 Product Data

1.3.3 G ROAs-Built Record of Equipment

and Materials

1.4.1 G DOWarranty Management Plan

1.4.5 G DOWarranty Tags

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 36 PAGES

01 78 02 1.6 G DOFinal Cleaning

SD-11 Closeout Submittals

1.3 G DOLoad Rating Analysis Report

02 22 13 SD-01 Preconstruction Submittals

1.2.1 G DOVibration Control Specialist

1.2.1 G DOVibration Control Specialist

Alternate

1.2.2 G DOVibration Monitoring

Technician(s)

1.2.3 G DOStructural Inspection/Evaluation

Engineer

3.2 G DOPre-Construction Structural

Survey

3.3 G DOVibration Control Plan

3.4 G DONoise Control Plan

SD-06 Test Reports

3.6Vibration Monitoring Report

3.7Noise Monitoring Report

3.5Daily Instrument Logs

3.8 G DOPost-Construction Structural

Survey

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G RODemolition Plan

1.9Existing Conditions

1.3.1 G ROGondola Cables

1.9.1 G ROLuma Equipment Inventory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 36 PAGES

02 41 00 SD-07 Certificates

1.6 G RONotification

SD-11 Closeout Submittals

3.3.3Receipts

03 11 13 SD-02 Shop Drawings

3.1.1 G DOFormwork

3.1.2 G RO Stay-In-Place Metal Bridge Deck

Forms

SD-03 Product Data

2.2Form Materials

2.2.5Form Releasing Agents

SD-05 Design Data

2.1 G RO Calculations

SD-06 Test Reports

3.5Inspection

03 15 00 SD-03 Product Data

2.1 G ROPreformed Joint Filler

3.1.2 G ROSplicing

2.2 G ROWaterstops

2.3 G ROBridge Bearing Pads

2.4 G ROBridge Joint Seal

3.1.1 G ROCuring Compound Or Bituminous

Paint

2.5 G ROWaterproofing Membrane

SD-04 Samples

2.2.2 G ROSplicing Waterstops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 36 PAGES

03 20 00 SD-02 Shop Drawings

3.1 G DOReinforcement

SD-03 Product Data

2.8 G DOMaterials

2.4.1 G DOMechanical Butt-Splices

3.1.3.2 G DOMechanical Butt-Splices

SD-06 Test Reports

2.8 G DOTests, Inspections, and

Verifications

1.3.2 G DOTest Butt-Splices

SD-07 Certificates

2.4 G DOReinforcing Steel

1.3.1 G DOQualification of Steel Bar

Butt-Splicers

03 31 01 SD-01 Preconstruction Submittals

3.5.2.6.6 G DORandom Sampling Plan

3.1.1 G DOConcrete Placement Plan

3.4 G DODeck Concrete Placement

Procedure Plan

2.1.3.3.2Quality Control Plan

1.4.1 G DOQuality Control Personnel

Certifications

1.4.1 G DOQuality Control Organizational

Chart

1.4.3 G DOLaboratory Accreditation

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 36 PAGES

03 31 01 1.2 G RO Concrete Mixture Proportions

2.2 G ROBatch Plant

2.2.5 G ROConcrete Mixers

2.2.6 G ROConveying Equipment

2.2 G ROPlacing Equipment

2.2.8 G RODeck Screeds

3.1.4 G DOConstruction Joint Treatment

3.2.4 G DOHot-Weather Placing

2.1.1 G DOCementitious Materials

2.1.3 G DOAdmixtures

3.2.2 G DOPumping Concrete Materials and

Methods

2.1.5 G DONonshrink Grout

SD-04 Samples

2.1.2 G ROAggregates

1.4.6 G ROCementitious Materials, Admixtures, and Curing

Compound

SD-05 Design Data

1.2 G RO Concrete Mix

SD-06 Test Reports

3.5.2.3 G DOQuality of Aggregates

3.5.2.10 G ROMixer Uniformity

2.1 G DOTests and Inspections

3.5 G DOTests and Inspections

2.1.4 G DOWater

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 36 PAGES

03 31 01 3.5.2.6.3 G DOSlump Loss

2.1.3.4 G DOCumulative Mass Loss

1.2Concrete Mix

2.1.1.2 G DOFly Ash

2.1.1.3 G DOPozzolan

2.1.1.5 G DOSlag

2.2.8 G DOTolerance

3.5.2.6.6 G DOCompressive Strength Tests

3.5.2.6.1 G DOAir Content

3.5.2.6.3 G DOSlump Test

3.5.2.6.10G DOPermeability

SD-07 Certificates

1.4 G ROConcrete Field Testing

Technicians

1.4 G ROConcrete Construction Inspector

(CCI)

2.1.1 G DOCementitious Materials

2.1.1.6 G DOBlended Hydraulic Cement

2.1.3.1 G DOAir-Entraining Admixture

2.1.3.6 G DOOther Chemical Admixtures

2.1.7 G DOEpoxy Resin

2.1.6 G DOLatex Bonding Compound

2.1.5 G DONonshrink Grout

03 35 00 SD-01 Preconstruction Submittals

3.1.3 G DOFinishing Plan

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 36 PAGES

03 35 00 1.3.1Sample Wall Panels

2.1Latex Bonding Compound

2.2Epoxy Resin

03 39 00 SD-01 Preconstruction Submittals

3.1 G DOConcrete Curing Plan

SD-03 Product Data

2.1 G DOConcrete Curing Materials

SD-06 Test Reports

3.2 G ROTesting and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1 G DOCuring Compound

03 41 00 SD-02 Shop Drawings

2.2.1 G RO Precast, Prestressed Florida

I-Beam 36 Concrete Bridge

Girders

3.1.1 G RO Precast, Prestressed Florida

I-Beam 36 Concrete Bridge

Girders

1.5.1Placement

1.5.1 G RO Tolerances

SD-03 Product Data

2.2.4 G RO Mixture

1.5.1 G RODisposition

2.2.6 G ROEquipment

2.2.6Tensioning

2.2.7 G RODetensioning

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 36 PAGES

03 41 00 1.4 G RODelivery, Storage, and Handling

2.2.8 G ROCuring of Girders

SD-06 Test Reports

3.1.4 G ROTest Reports

2.2.8 G ROConcrete Test Cylinders

SD-07 Certificates

2.3.2Certificates of Compliance

1.5.1 G RORecords

3.1.4 G RORecords

1.6 G ROManufacturer Qualifications

05 50 13 SD-03 Product Data

2.3Corner Guards

3.5.2.1Filler Metal

2.1.8Access Hatches

SD-06 Test Reports

3.3Bolt Testing Reports

SD-07 Certificates

1.3Welder Qualifications

05 51 00 SD-02 Shop Drawings

2.1 G ROIron and Steel Hardware

2.1 G ROSteel Shapes and Plates

2.2.1 G ROMetal Stair System

SD-03 Product Data

2.4.1 G ROStructural Steel Plates and

Shapes

2.3.2 G ROConcrete Anchors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 36 PAGES

05 51 00 2.2.3 G ROProtective Coating

2.3.1 G ROSteel Stair Components

SD-08 Manufacturer’s Instructions

2.4.1 G ROStructural Steel Plates and

Shapes

2.2.3 G ROProtective Coating

05 52 00 SD-02 Shop Drawings

1.2.1 G ROFabrication Drawings

3.2 G ROIron and Steel Hardware

3.2 G ROSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 G ROStructural-Steel Plates, Shapes, and Bars

1.2.1 G ROStructural-Steel Tubing

1.2.1 G ROCold-Drawn Steel Tubing

1.2.1 G ROConcrete Inserts

3.2 G ROAnchorage Devices

2.1.2 G ROProtective Coating

2.2.4 G ROSteel Railings and Handrails

1.2.1 G ROAnchorage and Fastening

Systems

SD-07 Certificates

1.4.2 G DOWelding Procedures

1.4.3 G DOWelder Qualification

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 36 PAGES

05 52 00 3.2Installation Instructions

06 73 01 SD-02 Shop Drawings

1.3 G DOInstallation Drawings, Templates, and Directions

SD-03 Product Data

1.3 G DOFRP Grating

1.3 G DOClips and Anchorage

SD-06 Test Reports

2.1.1Bearing Strength Testing

2.1.1Flexural Properties

2.1.1Ultraviolet Testing

2.1.1Shear Strength

2.1.1Tensile Properties

2.1.1Toxicity Testing

2.1.1Coefficient of Lineal Thermal

Expansion

2.1.1Flame Spread Testing

SD-07 Certificates

1.3Manufacturer's Sample Warranty

1.3Certification of Anchorage

System compliance with ASCE

7-16

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 36 PAGES

06 73 01 1.3Proof Of Certification From A

Minimum Of Two Quality

Assurance Programs For Its

Facilities Or Products (Ul, Dnv, Abs, Uscg, Aarr)

SD-08 Manufacturer’s Instructions

1.4Shipping, Handling, And Erection

Procedures

1.4Care and Maintenance

Instructions

SD-09 Manufacturer’s Field

Reports

3.1Manufacturer's Certification of

Installation

SD-11 Closeout Submittals

3.2.1Manufacturer's Warranty

06 82 14 SD-01 Preconstruction Submittals

1.3.1 G DOQualifications of Manufacturer

1.3.2 G DOQualifications of Engineer of

Record

SD-02 Shop Drawings

1.3.2 G DOInstallation Drawings

SD-03 Product Data

2.1.2 G DOFRP Pipe and Tube

2.1.2 G DORailings/Guards

2.1.2 G DOAnchorage Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 36 PAGES

06 82 14 2.1.2 G DOAdhesives

2.1.2 G DOResins

2.1.2 G DOHardeners

1.3.1Manufacturer's Sample Warranty

SD-06 Test Reports

2.1.3Ultraviolet Test Reports

2.1.3Thermal Expansion Test Reports

2.1.3Flame Spread Test Reports

SD-07 Certificates

1.3.1Proof of Certification from a minimum of two quality assurance programs for its facilities or products (UL, DNV, ABS, USCG, AARR)

SD-08 Manufacturer’s Instructions

3.2.2Manufacturer's Instructions

SD-09 Manufacturer’s Field

Reports

3.1Manufacturer's Certification of

Installation

SD-11 Closeout Submittals

3.2.1Manufacturer's Warranty

09 97 02 SD-01 Preconstruction Submittals

1.2 G DOSafety, Health, and

Environmental Requirements

1.2.1 G DOSafety Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 36 PAGES

09 97 02 1.2.1.5 G DORespiratory Protection Plan

1.2.2.1 G DOAirborne Sampling Plan

1.2.2 G DOMedical Surveillance Plan

1.2.2.2 G DOWorker Protection Plan

1.2.3 G DOEnvironmental Protection Plan

1.2.3.1Waste Manifest

1.2.3.1 G DOWaste Disposal Plan

1.2.3.2 G DOWater Quality Plan

1.2.3.3 G DOSoil Quality Plan

SD-03 Product Data

Part 2 G DOManufacturer's Product Data

Sheet

SD-04 Samples

Part 2 G DOProduct Samples

2.1 G DOSpecial Paint Formulas

SD-06 Test Reports

1.2.3.3Soil Quality Test Report

3.4Inspection Reports

1.2.2.2Medical Status Report

1.2.2.3Change in Medical Status Report

1.2.2.1 G DOAir Monitoring Test Plan

1.2.2.1Air Monitoring Test Report

SD-07 Certificates

1.4.1Certified EHS Professional

1.4.2Certified Lead Laboratory

1.4.3SSPC QP 1 Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 36 PAGES

09 97 02 1.4.4SSPC QP 2 Certificate

1.4.4 G DOQualified Hazardous Paint

Removal Contractor

1.4.5Coating Thickness Gage

Qualification

26 08 00 SD-06 Test Reports

3.1 G DOAcceptance Tests and

Inspections

SD-07 Certificates

1.4.1 G DOQualifications

1.4.3 G DOAcceptance Test and Inspections

Procedure

26 56 00 SD-02 Shop Drawings

1.5.1.1 G DOLuminaire Drawings

SD-03 Product Data

2.2 G DOLuminaires

2.3 G DOLight Sources

2.4 G DOLED Drivers

1.6.1 G DOLuminaire Warranty

2.5.2.1 G DOPhotosensors

2.6 G DOBrackets

SD-05 Design Data

1.5.2 G DOLuminaire Design Data

1.5.6 G DOPhotometric Plan

SD-06 Test Reports

1.5.3 G DOANSI/IES LM-79 Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 36 PAGES

26 56 00 1.5.4 G DOANSI/IES LM-80 Test Report

1.5.5 G DOANSI/IES TM-21 Test Report

SD-10 Operation and Maintenance

Data

1.7.1 GLighting System

1.7.2 GExterior Lighting Control System

3.3.1.1 G DOMaintenance Staff Training Plan

3.3.1.2 G DOEnd-User Training Plan

31 00 00 SD-01 Preconstruction Submittals

3.6 G DOShoring and Sheeting

1.4.3Water Control Plan

3.3 G DOIn-Channel Excavation Plan

3.6.2 G DOGeotechnical Engineer

2.1 G DOBorrow Site

1.7 G DODisposal Site

SD-03 Product Data

3.9 G DOUtilization of Excavated Materials

3.5Opening of any Excavation or

Borrow Pit

SD-06 Test Reports

3.17Testing

2.1Borrow Site Testing

SD-07 Certificates

3.17Testing

3.17 G DOLaboratory Qualifications

31 05 19 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 36 PAGES

31 05 19 3.2 G DO Layout

3.3.2 G DO Seams

SD-03 Product Data

2.1.2 G DO Thread

2.2 G DO Manufacturing Quality Control

Sampling and Testing

SD-04 Samples

3.1Quality Assurance Samples

SD-06 Test Reports

3.1.2 G DO Quality Assurance Tests

SD-07 Certificates

2.1.1 G DO Geotextile

31 11 00 SD-03 Product Data

2.1.1Tree Wound Paint

31 23 19 SD-01 Preconstruction Submittals

1.8.1 G DOUnwatering Design Package

1.6 G DOWork Plan

SD-06 Test Reports

1.9.1Fabrication And Workmanship

Records

1.9.1Installation, Operation, And

Removal Records

1.9.2Inspection

1.9.1Piezometer Installation Records

1.9.1Relief Well Installation Records

31 32 23 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 36 PAGES

31 32 23 1.6.1.1 G DOExperience

1.11 G DOGrouting Plans

2.2 G DOGrout Mix Proportions

3.1.3 G DOJet Grouting Containment Plan

1.4 G DODrilling Deviation Measurement

1.6.5 G DOSample Log

SD-02 Shop Drawings

3.1 G DOJet Grouting

SD-03 Product Data

3.1.1 G DODrilling and Grouting Equipment

3.1.1 G DOGrout Plant

3.2.5 G DOBorehole Camera

SD-06 Test Reports

3.2.2 G DOField and Laboratory Testing

1.6.6Metering Equipment

1.6.2 G DOInstrument For Drilling Deviation

Measurements

1.6.6 G DOFactory Calibrations On

Instruments Used For Control Of

Jet Grouting

1.6.6 G DOFactory Calibration On Drilling

Deviation And Borehole Surveying

Instruments

SD-11 Closeout Submittals

3.1.2 G DOFinal Demonstration Test Report

3.3.1 G DOFinal Jet Grouting Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 36 PAGES

31 32 23 3.3.2 G DORecord Drawings Of Jet Grout

Installation

31 36 00 SD-01 Preconstruction Submittals

3.4 G DOInstallation Plan

SD-03 Product Data

1.4.3 G ROProduct Data

SD-04 Samples

1.4.1Gabions

1.4.3Wire Mesh

SD-06 Test Reports

1.4.3 G ROTest Reports

SD-07 Certificates

2.1.3 G ROStone Fill

1.4.3 G ROCertificate Of Compliance

SD-09 Manufacturer’s Field

Reports

1.4.3 G ROMill Certifications

31 41 16 SD-01 Preconstruction Submittals

1.5.1 G DOWork Plan

1.5.3 G DOMonitoring Plan

SD-02 Shop Drawings

1.5.2 G DOSteel Sheet Piling

1.5.2 G DOSheet Pile Splicing

SD-03 Product Data

3.3.2.2Driving

3.3.1 G DOPile Driving Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 36 PAGES

31 41 16 3.3.6 G DOPulling and Redriving

SD-05 Design Data

1.5.4 G DODesign Calculations

SD-06 Test Reports

2.3.1Materials Tests

SD-07 Certificates

1.5.4 G DOSheet Pile Contractor Experience

1.5.4 G DOSheet Pile Design Experience

1.5.5 G DOSurveyor Experience

1.5.6 G DOSupervisor Experience

1.5.7 G DORig Operator Experience

SD-11 Closeout Submittals

3.6Pile Driving Record

31 52 10 SD-01 Preconstruction Submittals

1.8 G DOTRS Work Plan

3.2 G DOTremie Concrete Placement Plan

SD-02 Shop Drawings

1.4.1 G DOShop Drawings

SD-05 Design Data

1.4 G DOTemporary Retaining Structure

Design Calculations

2.2 G DOTremie Mix Design

SD-07 Certificates

1.7.2 G DOConcrete Tremie Slab Contractor

Experience

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 36 PAGES

31 52 10 1.7.1 G DOTemporary Retaining Structure

(TRS) Contractor Experience

31 63 29 SD-01 Preconstruction Submittals

3.1 G DOConfirmation Boring Drilling

3.1 G DOCorrelation Boring Drilling

3.2.3 G DODemonstration Wall

1.6.10 G DOSurvey

SD-02 Shop Drawings

3.2.4 G DOShaft Installation Plan

2.6.2 G DOCasing Installation

2.6.3 G DOExcavation

3.10.1 G DOConcreting

3.2.2 G DOSheeting and Shoring

SD-05 Design Data

3.1Correlation Boring Report

3.1Confirmation Boring Report

3.2.3 G DODemonstration Wall Report

3.18 G DOShaft Installation Record Form

3.18 G DOSlurry Data

3.5 G DOSlurry

3.4 G DOCleanup

3.18 G DOConcreting Data

SD-06 Test Reports

3.5.2.3 G DOSlurry Test Reports

3.14.4 G DOSlump Loss Test

3.13.1 G DOCSL Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 36 PAGES

31 63 29 3.2.2 G DOCondition of Existing Structures

3.9 G DOIndividual Shaft Installation

Records

SD-07 Certificates

1.6.7 G DODrilled Shaft Contractor

Experience

1.6.7.1 G DOSite Superintendent

1.6.7.2 G DOSupervisor Experience

1.6.7.3 G DODrill Operator Experience

1.6.7.4 G DOCross Hole Sonic Logging (CSL)

Testing Experience

1.6.7.5 G DOUltrasonic or Sonar Shaft

Excavation Measuring Device

Testing System Experience

1.6.7.6 G DOShaft Inspection Device

Experience

3.5.2.3 G DOSoil Testing Laboratory

1.6.9 G DOQuality Control Personnel

Qualifications

1.6.11 G DOGeotechnical Engineer

Qualifications

1.6.12 G DOStructural Engineer Qualifications

1.6.8 G DOWelding Qualifications

SD-08 Manufacturer’s Instructions

3.11.4 G DOMechanical Butt

32 11 23 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 36 PAGES

32 11 23 1.4 G ROPlant, Equipment, and Tools

SD-06 Test Reports

3.11.1 G ROIn-Place Tests

32 12 16 SD-03 Product Data

2.4 G ROMix Design

SD-04 Samples

2.3Asphalt Cement Binder

2.2Aggregates

SD-06 Test Reports

2.2 G ROAggregates

SD-07 Certificates

2.3 G ROAsphalt Cement Binder

32 15 00 SD-03 Product Data

1.4 G ROPlant, Equipment, and Tools

SD-06 Test Reports

2.3.1 G ROInitial Tests

3.11.1 G ROIn-Place Tests

32 16 19 SD-03 Product Data

2.1Concrete

2.6.5Biodegradable Form Release

Agent

3.2Biodegradable Form Release

Agent

SD-06 Test Reports

3.8Field Quality Control

32 17 23 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 36 PAGES

32 17 23 2.1.1.1 G ROSurface Preparation Equipment

List

2.1.2 G ROApplication Equipment List

3.2Exterior Surface Preparation

1.3.1 G DOSafety Data Sheets

2.2 G ROMaterials

3.3.2 G ROThermoplastic compound

SD-06 Test Reports

2.2 G ROMaterials

3.3.2 G ROThermoplastic Compound

3.4.1Test Reports

SD-07 Certificates

1.3.2 G DOQualifications

2.2 G DOMaterials

1.3.1 G DOVolatile Organic Compound

3.3.2Thermoplastic Compound

SD-08 Manufacturer’s Instructions

3.3.2 G ROThermoplastic Compound

32 31 00 SD-02 Shop Drawings

2.1 G ROFence Assembly

3.2.1.1 G ROLocation of Gate, Corner, End, and Pull Posts

2.1 G ROGate Assembly

2.2.12 G ROGate Hardware and Accessories

Part 3 G ROErection/Installation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 36 PAGES

32 31 00 2.1 G ROFence Assembly

2.1 G ROGate Assembly

2.2.12 G ROGate Hardware and Accessories

2.3.1 G ROZinc Coating

2.2.1 G ROFabric

2.2.7 G ROStretcher Bars

2.3.3 G ROConcrete

2.2.15 G ROBarbed Wire

2.2.16 G ROBarbed Wire Supporting Arms

2.3.5 G ROPrivacy Screen

SD-04 Samples

2.2.1 G ROFabric

2.2.6 G ROBraces

2.2.2 G ROLine Posts

2.2.4 G ROTop Rail

2.3.2 G ROTension Wire

2.2.7 G ROStretcher Bars

2.2.10 G ROGate Posts

2.2.12 G ROGate Hardware and Accessories

2.2.14 G ROWire Ties

2.3.5 G ROPrivacy Screen

SD-05 Design Data

1.5 G DOReinforced Concrete Or

Reinforced Concrete Block Privacy

Wall

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 36 PAGES

32 31 00 1.3.1Certificates of Compliance

SD-08 Manufacturer’s Instructions

2.1Fence Assembly

2.1Gate Assembly

2.1Hardware Assembly

2.1Accessories

SD-11 Closeout Submittals

3.3Recycled Material Content

32 92 19 SD-03 Product Data

2.1Fertilizer

SD-06 Test Reports

2.1Topsoil

SD-07 Certificates

2.1Seed

32 92 23 SD-03 Product Data

2.3Fertilizer

2.2.3Topsoil composition

SD-07 Certificates

2.1sods

33 05 07 SD-01 Preconstruction Submittals

G DO Guided Boring and Jacking Plan

SD-06 Test Reports

3.1.3 G DO PPilot Guide And Driven Casing

Test

SD-07 Certificates

1.6.1Certified Of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 36 PAGES

33 05 07 SD-11 Closeout Submittals

3.1Driving Records

33 11 00 SD-01 Preconstruction Submittals

3.3.4 G DO Disinfection Method

3.1.1 G DO 48' Existing Watermain Work

Plan

SD-02 Shop Drawings

2.1.1 G RO Pipe, Fittings, Joints and

Couplings

2.1.2.1 G RO Butterfly Valve

2.1.2.2 G RO Combination Air Valve

2.1.2 G RO Extension Stems

SD-03 Product Data

2.1.1 G RO Pipe, Fittings, Joints and

Couplings

2.1.2 G RO Valves

3.2.2 G RO Valve Boxes

2.2.1 G RO Pipe Restraint

2.2.2 G RO Tapping Sleeves

3.2.2 G RO Corporation Stops

2.2.4 G RO Detectable Marking Tape

SD-06 Test Reports

3.3.3Leakage Test

3.3.3Hydrostatic Pressure Test

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 36 PAGES

33 11 00 2.1.1Pipe, Fittings, Joints and

Couplings

2.1.2Valves

SD-08 Manufacturer’s Instructions

2.1.1.1Ductile Iron Piping

33 30 00 SD-01 Preconstruction Submittals

1.3.1 G DO Contractor's License

1.5 G DO Bypass Pumping Plan

SD-02 Shop Drawings

3.1.1 G DO Installation Drawings

SD-03 Product Data

2.2.7Precast Concrete Manholes

2.2.10Frames, Covers, and Gratings

2.2.1Gravity Pipe

2.2.8Resilient Manhole Connector

2.2.13 G DO HDPE Lining For Concrete

Structures

2.2.12 G DO Sluice Gates

2.2.4Polyethylene Encasement

2.2.2 G DO Ceramic Epoxy Lining

SD-06 Test Reports

3.3.1.1 G DO Infiltration Test

3.3.1.2 G DO Exfiltration Test

3.3.2 G DO Low-Pressure Air Test

3.2.5.1 G DO Sluice Gate Operation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 36 PAGES

33 30 00 3.4.2Acceptance Trial Operation And

Test

SD-07 Certificates

2.2.5Portland Cement

2.2.12.7 G DO Welder Certification

33 40 00 SD-01 Preconstruction Submittals

3.1.5 G ROOutfall Diversion Plan

SD-04 Samples

2.1 G ROPipe for Culverts and Storm

Drains

SD-07 Certificates

2.3.10.1Oil Resistant Gasket

3.8.1.2 G ROLeakage Test

3.8.1.1 G ROHydrostatic Test on Watertight

Joints

2.3.9 G ROFlap Gates

3.8.1.3Determination of Density

2.3.7 G ROFrame and Cover for Gratings

3.8.2.1.2 G ROPost-Installation Inspection

Report

SD-08 Manufacturer’s Instructions

3.3Placing Pipe

33 71 01 SD-02 Shop Drawings

1.3.1 G DOConnection Diagrams

1.3.1 G DOFabrication Drawings

1.3.1 G DOInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 36 PAGES

33 71 01 SD-03 Product Data

2.4.1 G DOConductors

2.3.3 G DOInsulators

2.3.1 G DOSteel Poles

2.3.8 G DONameplates

3.1.7 G DOPole Top Switch

2.3.6 G DOCutouts

2.3.7 G DOTransformer

2.3.5 G DOSurge Arresters

SD-05 Design Data

2.3.1.1 G DOSteel Pole Design

2.3.1.3 G DODrilled Shaft Foundations

2.3.1.1 G DODirect Embedment Foundation

SD-06 Test Reports

3.2 G DOField Quality Control

1.6.3 G DOGround Resistance Test Reports

SD-07 Certificates

1.3.1 G DOTransformer Losses

1.6.4 G DOQualifications of Licensed

Engineer

2.3.1.2 G DOCertification

SD-09 Manufacturer’s Field

Reports

2.5.2 G DORoutine and Other Tests

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 36 PAGES

33 71 01 1.5.1 G DOOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.5.1 G DOTransformer Test Schedule

35 20 23 SD-01 Preconstruction Submittals

1.5.1Notice Of Intent To Dredge

1.5.2Relocation Of Navigation Aids

3.1.1Relocation Of Navigation Aids

1.5.3Drag Bar

1.6 G DODredging Plan

SD-07 Certificates

3.4.4 G DOAcceptance Sections Plans

1.8.1Historical Period Shipwreck Sites

3.5Surveys

1.5.4Daily/Monthly Report Of

Operations

3.3.4Misplaced Materials

1.11Declaration Of Inspection

3.1.3Surveillance Of Ocean Disposal

35 20 26 SD-01 Preconstruction Submittals

1.5 GRevisions Or Addendum To The

Dredge Plant Instrumentation Plan

SD-07 Certificates

1.4 G DOLetter of National Dredging

Quality Management Program

Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 36 PAGES

35 20 27 SD-01 Preconstruction Submittals

1.5 GDredge Plant Instrumentation

Plan

SD-07 Certificates

1.4 G RONational Dredging Quality

Management Program Certification

35 31 19 SD-01 Preconstruction Submittals

1.7.2 G DOStone Source

3.1 G DOConstruction Methods

SD-04 Samples

2.5 G DORiprap

SD-05 Design Data

3.7 G DOSurveys

SD-06 Test Reports

1.7.3 G DOInitial Stone Test

1.7.4 G DOGradation

SD-07 Certificates

1.7.5 G DOTesting Laboratory

1.7.1 G DOWeekly Certificates

1.7.1 G DOWeekly Certificates

1.7.6 G DOWeight Scale Certificate

35 31 19.20 SD-02 Shop Drawings

3.4 G ROBlock Installation

3.3 G ROMicrogrid Installation

SD-03 Product Data

2.1 G ROArticulating Concrete Block

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 36 PAGES

35 31 19.20 2.3 G ROMicrogrid

2.6 G ROStabilized Stone Drainage Layer

SD-04 Samples

2.1Articulating Concrete Block

2.3Microgrid

SD-06 Test Reports

2.1.1.1Flume Test

SD-07 Certificates

2.3Certificates Of Compliance

35 31 19.26 SD-02 Shop Drawings

3.2 G ROUnit Installation and Layout Plan

SD-03 Product Data

2.1 G ROConcrete Armor Unit

SD-04 Samples

2.1Concrete Armor Unit

35 42 35 SD-02 Shop Drawings

2.3 G DOMechanical Connection

3.4.1 G DOMarine Mattress Fabrication Plan

3.6 G DOMarine Mattress Installation

SD-04 Samples

2.1 G DOStructural Geogrid

2.2 G DOStone Fill Materials

2.3 G DOMechanical Connection

SD-07 Certificates

2.1 G DOGeogrid

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 36 PAGES

35 42 35 3.2 G DOManufacturer's Instructions

SD-09 Manufacturer’s Field

Reports

1.4.3 G DORoll Values

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .