Solicitation Amendment_W51DQV25RA0020002_26June2025.pdf
PDF 743 KB Posted
- Solicitation number
- W51DQV25RA002
- Issued by
-
Department of the Army
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Rio Puerto Nuevo Flood Control Project in San Juan, Puerto Rico. The amendment updates two key sections: Section 00 21 16 (Instructions to Proposers) and the FAR Clause 52.202-1 (Definitions), and extends the proposal due date to July 29, 2025, by 4:00 PM AST. The amendment modifies the submission requirements for the technical proposal, specifying page limits for different volumes, including a 90-page maximum for the Technical Approach (Volume I, Tab A), with allowances for 11"x17" pages to be counted as single pages. Offerors are required to acknowledge receipt of this amendment, and failure to do so may result in proposal rejection. All other terms and conditions remain unchanged and in full force and effect.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 3
0002 26 JUN 2025 113454
W51DQV
W2SR TF VIPR
383 FRANKLIN D ROOSEVELT AVENUE, SAN JUAN PR 00918-0000
SAN JUAN 00918-0000
PUERTO RICO
JACLYN YOCUM, EMAIL: JACLYN.C.YOCUM@USACE.ARMY.MIL TELEPHONE: (787)
200-2398
SCD: PAS:
W51DQV25RA002
19 MAY 2025
SEE SECTION G - CONTRACT ADMINISTRATION DATA
RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3: CHANNEL BOTTOM AND WALL IMPROVEMENTS, SAN JUAN, PUERTO RICO.
THE PURPOSE OF THIS AMENDMENT IS TO: 1) UPDATED TABLE 1 UNDER SECTION 00 21 16 AND 2) UPDATE FAR CLAUSE 52.202-1 - DEFINITIONS. SEE THE
CONTINUATION PAGE FOR MORE DETAIL.
THE PROPOSAL DUE DATE HAS BEEN EXTENDED TO JULY 29, 2025, BY 4:00 PM (AST).
CONTINUATION PAGE
1. This amendment is to update the following:
i. Section 00 21 16 – Instructions to Proposers
1.3 Each paragraph should be single spaced and shall be separated by at least one blank line. A standard, 10-point minimum font size or larger applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be produced in landscape mode.
The following volumes shall be submitted:
TABLE 1
Volume Tab Title Maximum Pages
VOLUME I - TECHNICAL PROPOSAL – STAGE ONE
I A Factor I - Technical Approach *90
I B Factor II - Organizational Structure and Quality Control 40
I C Factor III - Risk and Resource Identification 20
I D Factor IV – Past Performance No page limit
VOLUME II - SMALL BUSINESS DOCUMENTS – STAGE TWO
II A SMALL BUSINESS PARTICIPATION PLAN (FACTOR 5) Stage Two
No page limit
VOLUME III - PRICE AND PROFORMA INFORMATION (STAGE TWO)
III A Standard Form 1442 Solicitation, Offer and Award - with box 19 acknowledgement of all amendments and a completed Section 00 10 00 – Solicitation, Contract Line Item Number (CLIN) Schedule
No page limit
B Bid Guarantee No page limit
III C Proposal Data Sheet (Attachment 4) Section 00101, Representations, Certifications and Other
Statements of Offerors Determination of Responsibility Form (Attachment 5) Small Business Subcontracting Plan (SBSP) – ONLY FOR
LARGE BUSINESSES
No page limit
*Factor I - Schedule will be counted towards the 90 pages. The Government has no problem with the contractors using 11"x17" page size and that can be counted as only 1 page each.
NOTE: Volumes that exceed the page limitation in the above table will not be evaluated beyond the total allowable number of pages.
ii. Section 00 72 00 – Conditions of the Contract General Conditions
52.201-1 52.202-1 Definitions. June 2020
iii. Note: Any reference to “Section 00700” in the Specifications are intended to refer to Section 00 72 00.
2. The proposal due date has been extended to, July 29, 2025, by 4:00 p.m. AST.
3. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge all amendments may cause rejection of the proposal.
4. All other terms and conditions remain unchanged and in full force and effect.