W51DQV25A0002 Amd 003_Specs_PROJECT.pdf

PDF 24 KB Posted

Attached to
RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3: CHANNEL BOTTOM AND WALL IMPROVEMENTS PROJECT LOCATION: SAN JUAN, PUERTO RICO
Solicitation number
W51DQV25RA002
Issued by

About this file

The document is a Project Table of Contents for the Rio Puerto Nuevo Project Main Channel Design Supplemental Contract 3 located in San Juan, Puerto Rico. The comprehensive table of contents spans multiple divisions including Procurement and Contracting Requirements, General Requirements, Existing Conditions, Concrete, Metals, Wood/Plastics/Composites, Finishes, Electrical, Earthwork, Exterior Improvements, Utilities, Transportation, and Waterway and Marine Construction. Key technical specifications include dredging, marine construction, channel protection, electrical systems, concrete work, geotechnical activities, earthwork, utility installations, and various marine and infrastructure improvements. The project appears to involve comprehensive flood control and channel enhancement work, with detailed technical specifications covering multiple engineering and construction disciplines.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rio Puerto Nuevo Project Main Channel Design Supplemental Contract 3 San Juan, Puerto Rico

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 31 32 GEOTECHNICAL DATA REPORT (SEE SEPARATE FILE)

00 33 50 WEATHER, WATER STAGE AND TIDE DATA

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 25 OWNER SAFETY REQUIREMENTS - DIVING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04 CONTRACTOR QUALITY CONTROL

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 52 10 CONTRACTING OFFICER'S FIELD OFFICE

01 55 26 TRAFFIC CONTROL

01 57 20 ENVIRONMENTAL PROTECTION

01 57 25 TURBIDITY AND DISPOSAL MONITORING

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 02 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 22 13 VIBRATION AND NOISE MONITORING REQUIREMENTS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00 CONCRETE ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS

03 35 00 CONCRETE FINISHING

03 39 00 CONCRETE CURING

03 41 00 PRECAST, PRESTRESSED CONCRETE BRIDGE GIRDERS

DIVISION 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL HAND RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING

06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE RAILINGS

DIVISION 09 - FINISHES

09 97 02 PAINTING: COAL TAR EPOXY

DIVISION 26 - ELECTRICAL

PROJECT TABLE OF CONTENTS Page 1 W51DQV25RA002 Amendment 0003

Rio Puerto Nuevo Project Main Channel Design Supplemental Contract 3 San Juan, Puerto Rico

26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 56 00 EXTERIOR LIGHTING

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 23 19 UNWATERING

31 32 23 JET GROUTING

31 36 00 GABION MATTRESS

31 41 16 METAL SHEET PILING

31 52 10 TEMPORARY RETAINING STRUCTURES

31 63 29 DRILLED CONCRETE PIERS AND SHAFTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16 COLD MILLING ASPHALT PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 15 00 AGGREGATE SURFACING

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 00 FENCES AND GATES

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 05 07 PILOT TUBE GUIDED BORING AND JACKING

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

DIVISION 34 - TRANSPORTATION

34 71 13 VEHICLE CRASH BARRIERS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

35 20 26 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW - ULLAGE

PROFILE

35 20 27 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE

HYDRAULIC DREDGE

35 31 19 STONE AND CHANNEL PROTECTION FOR STRUCTURES

35 31 19.20 ARTICULATING CONCRETE BLOCK REVETMENTS

35 31 19.26 CONCRETE ARMOR UNITS

35 42 35 MARINE MATTRESS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2 W51DQV25RA002 Amendment 0003

PROJECT TABLE OF CONTENTS

File details come from the government source that posted it. Updated .