About this file

These are engineering design drawings for the Rio Puerto Nuevo Flood Control Project, Supplemental Contract 3, located in San Juan, Puerto Rico. The technical drawings detail the channel bottom and wall improvements, specifically focusing on construction sequencing, demolition plans, and channel wall elevations for both the left and right channel walls. The project involves complex infrastructure modifications, including sheet pile installation, drilled shaft construction, utility relocations, and channel excavation across multiple reaches (labeled R1-R9 and LC-1 to LC-4). The drawings provide comprehensive technical specifications for construction activities downstream and upstream of Roosevelt Avenue, with specific notes on excavation depths, utility protection, power line relocations, and staged construction approaches. The project is being executed by the U.S. Army Corps of Engineers, with an amendment dated December 22, 2023, and is part of a larger flood control infrastructure improvement initiative.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-1

-10

-10

-1

-1

-1

-5

-5

-5

-5

-5

-5

-5

-5

-5

-5

-5 -5

-5

-5

-5

-5

IE

.3

T E :1 .9

Ø C o n c re te P ip e

(D E S T R

O Y E

D

H E

A D

W A L L

T O

J O

S E D

E D

IE

G O A

V E

RIO PIEDRAS

M A

R G

A R

IT

A C

H A

N N

E L

M A

R G

A R

IT

A C

H A

N N

E L

R

IO

P

U E

R T

O N

U E

V O

RIO PUERTO NUEVO

CALLE 25

RIO PIE

DRAS

RIO PIEDRAS

RIO PIE

DRAS

S

IE

.4

T E :3 .8

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

IE

.2

T E :4 .2

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

IE

:1 .3

T E :4 .3

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

IE

:3 .3

T E :5 .0

D ia C o n c re te P ip e

H E

A D

W A L L

IE

:0 .7

T E :3 .6

Ø

C O

N C

R E T E P

IP

E

IE

:6 .7

T E :9 .6

Ø

C O

N C

R E T E P

IP

E

W M

36" Di ameter C oncret e Pipe

D ia m e te r C o n c re te P ip e

IE

:4 .7

T E :6 .8

D ia C o n c re te P ip e

H E

A D

W A L L

IE

:4 .7

T E .6

C

IP

Ø

IE

.7

T E .5

C

IP

Ø

(C L O

G G

E D

IE

:4 .6

T E :1 .1

C B

D ia m e te r

C o n c re te P ip e

D ia m e te r C o n cr e te P ip e

IE

:5 .0

T E :6 .0

D ia C o n c re te P ip e

H E

A D

W A L L

IE

:2 .3

T E :5 .2

C B

IE

:3 .6

T E :5 .6

"ØC

O

N C

R E T E P

IP

E

IE

.3

Ø P

V C P

IP

E

D R

O P

IE

.0

T E :5 .1

"ØC

O

N C

R E T E P

IP

E

" D ia m et er C on cr et e P ip e

S

IG

N A L L

O S T

S A

N

IT

A R

Y P

IP

E

Ø

IE

:6 .1

T E :7 .1

"ØC

O

N C

R E T E P

IP

E

10" Ø CIP WATER PIPE.

D ia m e te r

C o n c re te P ip e

D ia m e te r C o n c re te P ip e

IE

:1 .5

T E :6 .4

C B

IE

:4 .1

T E :7 .6

C B

D ia m e te r

C o n c re te P ip e

24" Diameter Concrete Pipe

IE

.0

T E .8

C B

IE

:3 .4

T E :6 .9

C B

IE

:2 .2

T E :6 .8

C B

24" D iam eter C oncrete Pipe

IE

:4 .4

T E :8 .0

C B

IE

:4 .3

T E :6 .9

S M

H

IE

:2 .5

T E :6 .9

C B

IE

:3 .7

Ø P

V C P

IP

E

D R

O P

D ia m et er C on cr et e P ip e

D ia m e te r C o n cr e te P ip e

24" Dia mete r Co ncr ete Pip e

24" Diameter Concrete Pipe

IE

:2 .2

T E :7 .1

C B

IE

-2 .4

T E :7 .0

M H

C on cr et e P ip e

D ia m et er

IE

:3 .0

T E :7 .1

C B

D ia m et er C on cr et e P ip e

IE

:5 .3

T E :6 .9

C B

" D ia m et er C on cr et e Pi pe

IE

:2 .7

T E :7 .1

C B

24" Diameter

Con cret e Pi pe

IE

:3 .8

T E :7 .1

C B

IE

:5 .6

T E :7 .1

C B

24" Diameter Concrete Pipe

D ia m e te r C o n c re te P ip e

18" Diameter

Co ncre te P ipe

9_

1C on cr et e P ip e

D ia m

:2 .1

T E :7 .1

C B

18" Dia meter C oncret e Pipe

Ø C

O N

C R

E T

E P

IP

E

IE

:5 .0

T E :7 .0

C B

C on cr et e P ip e

D ia m

Ø C

O N

C R

E T

E P

IP

E

W M

SWALE

" D ia m et er C on cr et e P ip e

W M

IE

:1 .6

T E :7 .3

C B

D ia m e te r

C o n c re te P ip e

IE

:3 .0

T E :7 .3

C B

D ia m e te r

C o n c re te P ip e

SWALE

IE

:6 .4

T E :7 .4

C B

IE

.9

T E :7 .4

S M

H

W M

W M

W M

S W

A

LE

IE

:4 .7

T E :7 .5

S M

H

W M

D ia m e te r C o n cr e te P ip e

" Ø P .V .C

C O

N C R E

TE

P

IP

E

2" Ø

IE

:6 .2

T E :7 .6

C B

W A T E

R V

A L V E

C o n c re te P ip e

D ia m e te r

C o n c re te P ip e

D ia m e te r

IE

:5 .1

T E :7 .6

S M

H

W M

C

IP

Ø

IE

.4

T E :7 .8

S M

H

V A L V E

W A T E

R

IE

.7

T E :7 .8

S M

H

8" Diameter PVC Pipe

IE

:7 .5

T E :8 .0

C B

IE

:1 .0

T E :7 .9

C B

D ia m e te r

C o n c re te P ip e

IE

.7

T E :7 .9

S M

H

IE

.2

D ro p "Ø P

V C

IE

:5 .5

T E :7 .8

S M

H

8" Diameter PVC Pipe

18" Diameter

Co ncre te P ipe

IE

:3 .8

T E :7 .8

C B

SWALE

IE

.4

T E :8 .0

S M

H

J U

N C T

IO

N B

O X

W A T E

R P

IP

E

W M

IE

:5 .8

T E :8 .1

C B

Ø P .V .C

IE

:3 .6

T E :8 .0

S M

H

W M

D ia m e te r

C o n c re te P ip e

IE

:3 .8

T E :8 .1

C B

D ia m e te r

C o n c re te P ip e

D ia m e te r

C o n c re te P ip e

IE

:4 .2

T E :8 .1

C B

D ia m e te r

C o n c re te P ip e

IE

:5 .3

T E :8 .1

S M

H

W M

IE

:4 .3

T E :8 .1

C B

18" Diameter Concrete Pi pe

IE

:4 .4

T E :8 .0

C B

IE

:6 .9

T E :8 .2

C B

IE

:1 .1

Ø C

O N

C R E T E P

IP

E

D R

O P

W M

SWALE

IE

.0

T E :8 .3

C B

W M

IE

.3

T E :8 .4

S M

H

W M

W M

W M

W M

IE

:5 .5

T E :8 .4

C B

IE

:4 .1

T E .3

C B

IE

:5 .3

T E :8 .5

S M

H

12" Ø P.V.C.

" D iamete r C on cre te

Pip e

GATE

IE

:5 .6

T E :8 .5

S M

H

IE

:s e a le d

T E :8 .6

S M

H

W M

IE

:4 .8

T E :8 .4

C B

Ø C

O N

C R

E T

E P

IP

E

Ø P .V .C

T R

A N S F O

R M

E R

IE

:4 .4

T E :8 .6

C B

IE

:6 .6

T E :8 .6

S M

H

C

IP

Ø

J U

N C T

IO

N B

O X

W A T E

R P

IP

E

IE

:5 .9

T E :8 .7

S M

H

IE

.6

T E :8 .7

S M

H

IE

:1 .0

"Ø P

V C P

IP

E

D R

O P

W M

IE

:5 .9

T E :8 .8

S M

H

W M

6" Ø CONCRETE PIPE

12" Ø P.V.C.

W M

IE

:4 .3

T E :9 .0

C B

W M

24" Diameter Concrete Pipe

IE

:6 .8

T E :9 .0

S M

H

IE

.6

T E .0

Ø P

V C P

IP

E

W M

W M

IE

:5 .5

T E :9 .1

C B

IE

:6 .9

T E :9 .1

S M

H

IE

:6 .6

T E :9 .1

S M

H

D ia m e te r

C o n c re te P ip e

12" Ø P.V.C.

W M

T R

A N S F O

R M

E R

P R E P

A

T R

A N S F O

R M

E R

P R E P

A

T R

A N S F O

R M

E R

P R E P

A

W M

V A L V E

W A T E

R

IE

:7 .3

T E :9 .4

S M

H

T R

A N S F O

R M

E R

P R E P

A

IE

T E :9 .5

S M

H

W M

W M

T R

A N S F O

R M

E R

T R

A N S F O

R M

E R

Ø C

O N

C R

E T

E P

IP

E

6" Ø CONCRETE PIPE

IE

:6 .5

T E :9 .6

S M

H

12" Ø P.V.C.

W M

J U

N C T

IO

N B

O X

W A T E

R P

IP

E

W M

D ia m e te r

C o n c re te P ip e

Ø C

O N

C R

E T E P

IP

E

IE

.0

T E :8 .7

S M

H

IE

:9 .6

T E :1 .8

S T R

M M

H

W M

W M

IE

.2

T E :8 .7

S M

H

IE

:7 .4

T E :1 .1

S M

H

W M

D ia m e te r

C o n c re te P ip e

W M

12" Ø P.V.C.

T O P O

F P

IP

E

' D

E P T H

D O

N E B

Y O

T H E

R S

T E S T H

O L

T

P O

F P

IP

E

' D

E P T H

D O

N E B

Y O

T H E

R S

T E S T H

O

:6 .6

T E :1 .5

S M

H

IE

:4 .1

T E :8 .6

C B

(C L O

G G

E D

IE

:3 .9

T E :1 .6

C B

D ia m e te r P

V C P ip e

(C L O

G G

E D

IE

:4 .7

T E :1 .9

C B

IE

:8 .4

T E :1 .3

S M

H

25 NE STREET

12" Ø P.V.C.

IE

:3 .6

T E :7 .0

C B

IE

:8 .2

T E :1 .8

S T R

M M

H

IE

:8 .8

T E :1 .9

S M

H

D R

O P E le v .0

Ø P .V .C

IE

:7 .1

T E :1 .0

C B

D ia m e te r

C o n c re te P ip e

D ia m e te r

C o n c re te P ip e

IE

:1 .8

T E :1 .2

C B

IE

:7 .7

T E :1 .3

C B

D ia m e te r

C o n c re te P ip e

IE

:1 .4

T E :1 .4

C B

IE

:8 .2

T E :1 .4

C B

D ia m e te r

C o n c re te P ip e

IE

:5 .3

T E :7 .4

S M

H

WM

IE

:1 .0

T E :1 .7

S T R

M M

H

IE

:9 .4

T E :1 .9

C B

IE

:1 .2

T E :1 .9

S M

H

W M

M E T E

R

W A T E

R

IE

:8 .7

T E :1 .9

C B

IE

:8 .7

T E :1 .9

C B

IE

:8 .7

T E :1 .0

C B

D ia m e te r

C o n c re te P ip e

8" Ø P .V .C

I:

.8

Ø P .V .C

I:

.8

Ø P .V .C

10" Diameter PVC Pipe

IE

:8 .4

T E :1 .1

C B

IE

:8 .4

T E :1 .1

C B

W M

IE

:6 .3

T E :1 .1

C B

12" Ø P.V.C.

W M

B O

X

D T

U L L B

O X

E L E

C T R

IC

.8

T E :1 .1

C B

I:

.8

Ø P .V .C

I:

.4

Ø P .V .C

IE

:4 .4

T E :1 .3

C B

IE

:6 .4

T E :1 .2

C B

IE

:6 .9

T E :1 .3

C B

D ia m et er P

V C P ip e

P

IP

E S N

IU

IE

:S e a le d

T E :1 .4

S M

H

IE

:C

L O

G G

E D

T E :1 .4

S M

H

IE

:1 .5

T E :1 .4

S M

H

12" Ø P.V.C.

W M

M E T E

R

W A T E

R

IE

:C

L O

G G

E D

T E :1 .2

S M

H

E M

H

O P T

IC

B

O X

A T

T F

IB

W M

(N

IU

G A S V

A L V E

IE

:1 .5

T E :1 .6

C B

IE

:C

L O

G G

E D

T E :1 .7

S M

H

W a te r

M e te r

T o ta l G a s S ta ti o n

G A S V

A L V E

B O

X

D T

B

X

D T

E L E

C T R

IC

C

A B L E S

"U N

D E

R G

R O

U N

D

A

E S

IG

N

W V

C E

N T E

N N

IA

L B

O X

W M

IE

:1 .4

T E :1 .7

C B

B O

X

A T

T

P

IP

E S N

IU

B O

X

D T

:8 .4

T E :1 .8

C B

W M

IE

:C

L O

G G

E D

T E :1 .8

S M

H

E B

12" Ø P.V.C.

B O

X

D T

D ia m e te r P V C P ip e

IE

:C

L O

G G

E D

T E :1 .8

S M

H

P U L L B

O X

E L E

C T

E

C T R

IC

C

A B L E S

"U N

D E

R G

R O

U

E S

IG

N

IE

:4 .6

T E :1 .9

S T R

M M

H

E B

IE

:C

L O

G G

E D

T E :1 .9

S M

H

E B

E B

W V

Sa n J ua n G as

Sa n J ua n G as

S A

N J

U A

N G

A S

IE

:3 .3

T E :7 .1

C B 1

Ø C

IP

W

A T

E R P

IP

E

T M

H

B O

X

D T

.9

T E :1 .3

S T R

M M

H

10" Diameter PVC Pipe

IE

:4 .6

T E :1 .3

S T R

M M

H

T B

B O

X

F

IB

E R O

P

:4 .5

T E :1 .4

S T R

M M

H

D ia m e te r P

V C P ip e

B O

X

C A

V

.8

T E :1 .5

S T R

M M

H

B O

X

D T

T B

D ia m e te r P

V C P ip e

IE

:6 .3

T E :1 .6

C B

B O

X

D T

M

H

Ø P .V .C

Ø P .V .C

B O

X

D T

C

T V B

O X

T M

H

B O

X

D T

X

D T O P

B O

X

D T

IC

E S S

IG

N

G A S S

T A T

IO

N 'S

B O

X

D T O P

T M

H

IE

:7 .4

T E :1 .2

C B

B O

X

D T

C P ip e

" D ia m

X

D T

X

A T

:9 .0

T E :1 .7

S M

H

IE

:5 .1

T E :8 .5

S M

H

Ø P

IP

E

IE

:1 .6

T E :1 .2

S T R

M M

HIE

:1 .9

"Ø

O P

T R

A N S F O

R M

E R

P R E P

A

L W

.7

L W

.2

LW=20.13

E M

H

E M

H

J U

N C T

IO

N B

O X

C O

M M

U N

IC

A T

IO

N

E M

H

IE

:1 .3

T E :1 .5

C B

IE

:1 .1

T E :5 .6

C o n c re te P ip e

H E

A D

W A L L

R A

IS

E R

W C

O M

M U

N

IC

A T

IO

N

P O

W E

R P

O L E

T R

A N S F O

R M

E R

P R E P

A

P O

L E

T R

A F F

IC

LW=21.59

P O

L E

T R

A F F

IC

LW=22.43

LW= 22.94

EP

IPE

3"

LW=23.57

LW

.5

LW=23

.65

L W

.9

L W

.1

G U

Y W

IR

E

LW

= 24.93

LW= 24.97

L W

.9

LW=25.03

L W

.8

L W

.4

L W

.6

LW= 26.14

C o n cr e te P

D ia m e te r

L W

.1

5LW=26.28

LW

.4

L W

.3

L W

.8

LW

= 28.05

LW= 26.90

LW=27.0

L W

.3

L W

L W

.4

LW= 2

7.9

LW

=2

7.

LW= 28.97

L W

.9

LW=30.12

L W

.2

P O

L E

T R

A F F

IC

LW

=31.09

P O

L E

T R

A F F

IC

LW=32.95

LW=33.10

L W

.6

LW=33.76L

W

.3

LW= 3

3.9

L W

.2

LW

=3

6.

LW=36.54

L W

.2

LW=39.70

LW=40.17

L W

.1

LW=41

.30

L W

.6

G

U Y W

IR

E

L W

.8

LW=41.11

L W

.4

LW= 51.65

LW= 62.00

LW= 75.08

F L

O W

F

LO

W

F

LO

W

F L O

W

F L

O W

S

S

S

S

C O c o c o c o c o c o c o

W M c o c o c o c o

W M c o

W M c o

W M

W M

C O c o

W M

W M

W M

W M

C O

W M c o

C O

C O

W M

C O c o c o

W M

W M

W M

W M

W M

W M

C O

C O

W M

W M c o

C O c o

W M

W M

W M

W M

W M

W M

C O

C O

C O c o

C O

W M c o

W M

W M

W M

W M

C O

W M

W M

W M

W M

W M

C O

C O

W M

W M

W M

C O c o c o c o

W M c o c o

W M

W M

C O c o

C O

W M

W M

W M

W M

W M

W M

C O

C O

W M

W M

W M

W M

W M

C O c o

W M

C O

W M

C O

W M

C O

C O

W M

W M

W M

W M

W M

W M

W M

C O

W M

C O

C O

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

C O

W M

W M

W M

C O

W M

C O

C O c o

W M

W M

W M

W M

C O

W M

W M

W M

W M

W M

W M

C O c o

W M

W M c o

W M

W M

C O

C O

W M

W M

W M

C O

C O

W M

C O

W M

W M

W M

W M

C O

W M

W M

C O

C O

W M

C O

C O c o

W M

W M W

M

W M

W M

W M

C O

C O

W M

W M

W M

W M

C O

C O

W M

W M

C O c o

C O

W M

W M

C O

C O

W M

W M

W M

W M

W M

W M

C O

W M

W M

C O

W M

W M c o

W M c o

W M

W M

W M

W M c o

W M

C O

W M

W M

W M c o c o

W M

W M

C O

W M

W M

C O

W M

W M

W M

W M

W M

W M

C O

W M

C O

W M

W M

C O

W M

C O

C O

W M

W M

W M

C O c o

W M

W M

W M

W M

W M

W M

W M

W M

C O

C O

C O

C O

W M

W M

W M

C O

W M

C O

W M

W M

W M

W M

W M

W M

C O

W M

W M

C O

W M

W M

W M

W M

W M

C O

C O

W M

W M

C O

C O

W M

C O

W M

W M

W M

W M

W M

C O

W M

W M

W M

C O

W M

C O

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

C O

W M c o

W M

C O

W M

W M

C O

W M

W M

W M

W M c o

C O

C O

W V

W V

W M

W V

W M

C O

W V

W M

C O

W M

W V

W V

W M

W M

C O

C O

W M

W M

C O

C O

WM

W M

W M

W M

W M

W M

C O

W M

W M

W V

W M

W M

W V

W M

W V

W V

W V

C O

W

C O

W

C O

P P

C L

C O

T L P

L P

C

L P

C

A L P

CONSTRUCTION LIMITS

CONSTRUCTION LIMITS

LEFT CHANNEL WALL

RIGHT CHANNEL WALL

EXIT ONLY

CONSTRUCTION ACCESS

R4

EXIST. TOP OF BANK

DI D-2.0

MH D-3.1

CB D-3.2

MH D-4.1

MH D-6.1

MH D-8.1

MH D-9.1

MH D-10.1

HW D-7.1

MH D-5.1

TO BE REMOVED

ELECTRICAL POWER LINE

TO BE REMOVED

ELECTRICAL POWER LINE

SEE SHEETS CF101 AND CF102

AT BRIDGE PIERS

STONE PROTECTION

SEE NOTE 1.F

WATER UTILITY BRIDGE

FOR GRADING LIMITS

SEE SHEET CF101

EXIST. 2D WALLS

SEE SHEET CT111

CONSTRUCTION ACCESS

EXIST. 2D WALLS

EXIST. 2D WALLS

SEE SHEET CD101

REMOVE METAL REMNANTS

FOR OUTAGE AND SEQUENCE PLAN

SEE D1 SHEET ES105

POWER LINE

SEE SHEET ES102

AFTER RELOCATION

POWER LINE

SUBSTATION

EXIST. ELECTRICAL

SEE SHEET CU113

COFFERCELL

SEE SHEET CU113A

COFFERCELL

INFLUENT BOX

EFFLUENT BOX

SEE SHEET CU111

SEWER SIPHON PIPES

4-20" DIP SANITARY

EXIST. SIPHON CROSSING

36" RCP SAN SEWER

(MUNICIPALITY OF SAN JUAN)

EXIST. STORMWATER PUMP STATION

SHEET PILE L2

TEMP. GRADE CONTROL

SHEET PILE L4

GRADE CONTROL

PERM.

SHEET PILE L3

GRADE CONTROL

PERM.

ACCESS

CONST.

ACCESS

CONST.

DI D-2.1

DI D-1.1

TO EL. -100 AT MIDDLE PIER

DRILL CONFIRMATION BORING

SEE SHEET CO302

DEMONSTRATION WALL #1

SEE SHEET CO302

DEMONSTRATION WALL #2

SEE SHEET CO302

DEMONSTRATION WALL #3

R4

SEE NOTES 4 AND 5

UNDER RIO PIEDRAS

WATER MAIN

EXIST. 48" DIP

WATER MAIN)

(48" DIP

EXIST. BEND

SEE SHEET CD102

DEMOLISHED

RETAINING WALL TO BE

EXIST. CONC.

DEMOLISHED BY OTHERS

CONSTRUCTION LIMITS TO BE

EXIST. HOUSES ALONG CALLE 25 WITHIN

RESTORED TO ORIGINAL CONDITION

CONSTRUCTION OPERATIONS, SHALL BE

PLATFORM, IF DEMOLISHEDTO PERFORM

EXISTING CONCRETE LOADING/UNLOADING

NOTES

SEE REACH R3

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

A R

C A

D

IS

N

C A

U S

E W

A Y B

L V

D

M E

T A

IR

IE

L

A

S U

IT

E

S A

N J

U A

N P

U E

R T

O R

IC

O

R

IO

P

U E

R T

O N

U E

V O P

R O J E

C T

C H

A N

N E

L B

O T

T O

M A

N D W

A L L I

M P

R O

V E

M E

N T S

S U

P P

L E

M E

N T

A L C

O N

T R

A C

T

F E

B R

U A

R Y

S K F

O R

C E V

IP

R

F

R A

N K

L

IN

D

E L

A N

O R

O O

S E

V E

L T A

V E

N U

E

S A

N J

U A

N P

U E

R T

O R

IC

O

88+ 3388+

89+

+0

+0

85+

88+

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

1+

2+

3+

-0+25

0+00

S S

GC101

G A

IT

A N

S

G A

IT

A N

C

R A

Y M

O

A1 100' 200'0

NORTH

PLAN

SCALE: 1" = 100'

LEGEND

NEIGHBORHOOD

NEMESIO CANALES

R1

CALLE 25

C O

N S

T R

U C

T

IO

N A

C C

E S

S

AND STAGING AREA

CONSTRUCTION ACCESS

AND STAGING AREA

CONSTRUCTION ACCESS

A N

D S

T A

G

IN

G A

R E

A

C O

N S

T R

U C

T

IO

N A

C C

E S

S

L W

.3

C O

N S

T R

U C

T

IO

N A

C C

E S

S

A N

D S

T A

G

IN

G A

R E

A

C O

N S

T R

U C

T

IO

N A

C C

E S

S

STAGING AREA

S T

A

IM

P

R O

V E

M E

N T L

IM

IT

S

C N

T C

H A

N N

E L

R3

R5

LC-1

A N

D S

T A

G

IN

G A

R E

A

C O

N S

T R

U C

T

IO

N A

C C

E S S

GENERAL SHEET NOTES

NEIGHBORHOOD

NEMESIO CANALES

LC-2

CALLE 25

R O

O S

E V

E L T A

V E E

B

R O

O S

E V

E L T A

V E

W B

L7B

L7A

D E D

IE

G O E

X P

R E

S S

W A

Y E

B

D E D

IE

G O E

X P

R E

S S

W A

Y W

B

S

G A

IT

A N

L1A

FLOW

RIO PIEDRAS

C O

N S

T R

U C

T

IO

N O

F F

E A

T U

R E

S

D O

W N

S T

R E

A M O

F R

O O

S E

V E

L T A

V E

CONSTRUCTION SEQUENCE: REACH A - DOWNSTREAM OF ROOSEVELT AVE.

L1A

L1B

R 2A

R2B R2C

L6B

L6A

L6C

RIGHT CHANNEL WALL

CONSTRUCTION ACCESS. SEE SHEET CS150

TYPICAL REACH NOMENCLATURE

SHEET PILE. SEE SHEET CO001 FOR NOMENCLATURE

EXISTING TOP OF BANK

INITIAL CHANNEL EXCAVATION (PRIOR TO INSTALLING R4 SHEET PILES)

LEFT CHANNEL WALL

RC-1

A

RC-1

B

CONSTRUCT DRILLED SHAFTS2.

REMOVE EXISTING PRIVACY WALL1.

REACH RC-1B: (STA. 109+46 TO STA. 115+25)

CONSTRUCT DRILLED SHAFTS2.

REMOVE EXISTING PRIVACY WALL1.

REACH RC-1A: (STA. 106+00 TO STA. 108+82)

REACHES IN-CUT

(CONT'D)

GENERAL SHEET NOTES

CONTRACTING OFFICER.

BEEN ATTAINED. REMOVAL REQUIRES REVIEW AND AUTHORIZATION BY THE

SHAFT CONCRETE PLACEMENT OR THE FULL COMPRESSIVE STRENGTH HAS

EXTRACTED UNTIL 28 DAYS AFTER COMPLETION OF ADJACENT DRILLED

TEMPORARY BYPASS AND TRANSVERSE SHEET PILES SHALL NOT BE 3.

ACCORDINGLY. SEE CO PLAN SHEETS FOR STAFF GAUGE LOCATIONS.

MONITORING RIVER STAGES AND ADJUSTING WORK WITHIN THE CHANNEL

FACE THE RIGHT CHANNEL (EAST BANK). CONTRACTOR IS RESPONSIBLE FOR

DOWNSTREAM PROJECT LIMITS DURING CONSTRUCTION. ORIENT GAUGE TO

CONTRACTOR SHALL INSTALL A STAFF GAUGE AT THE UPSTREAM AND 2.

SIPHON CONSTRUCTION. SEE SHEET CU111.I.

SEE CF AND CU SHEET SERIES

STORMWATER PIPE, MANHOLE AND CATCH BASIN CONSTRUCTION. H.

PERMANENT). SEE E SHEET SERIES.

ELECTRICAL POWER LINE RELOCATIONS (TEMPORARY AND G.

SEE SB AND CU SHEET SERIES.

48" WATERMAIN UTILITY BRIDGE CONSTRUCTION AND INSTALLATION. F.

EXCAVATION, AND DISPOSAL. SEE CG AND CF SHEET SERIES.E.

LOCATIONS

SHEET PILE SCHEDULE AND SHEETS CO101 TO CO105 FOR SHEET PILE

PERM AND TEMP SHEET PILE INSTALLATION. SEE SHEET CO001 FOR D.

SEE SHEET G-005 AND CO SHEET SERIES.

PROVISIONS TO MAINTAIN CHANNEL BYPASS REQUIREMENTS. C.

DRILLED SHAFT CONSTRUCTION. SEE CO SHEET SERIES.B.

REACHES OF CONSTRUCTION. SEE SHEETS GC101 TO GC104.A.

FEATURE OF WORK LISTED BELOW:

SHEETS AND THE PARTICULAR SEQUENCING ESTABLISHED FOR EACH

ACCORDANCE WITH THE CONSTRUCTION REACHES SHOWN IN THESE GC

PLAN SHALL INTEGRATE THE FOLLOWING FEATURES OF WORK IN

PLAN IN ACCORDANCE WITH THE SPECIFICATION SECTION 01 11 00. THE PCL

CONTRACTOR SHALL SUBMIT THE PRE-CONSTRUCTION LOGISTICS (PCL) 1.

REMOVE SHEET PILE L7B6.

CONSTRUCT OUTLET 5.

CONSTRUCT DRILLED SHAFTS4.

INSTALL OUTLET BYPASS3.

INSTALL TEMP. BYPASS SHEET PILE L7B2.

RELOCATE POWERLINES TO CALLE 251.

WORK REACH CONCURRENT WITH REACH L7A, SEE GEN NOTE 5

REACH L7B: (STA. 109+25 TO STA. 114+00) SEE GEN NOTE 4

PRIOR TO INSTALLATION OF 48" WATER MAIN

CONSTRUCT DRILLED SHAFTS AND CAP AT BRIDGE,2.

INSTALL TEMP. SHEET PILE L7A1.

WORK REACH CONCURRENT WITH REACH R4

REACH L7A: (STA. 106+75 TO STA. 109+25) SEE GEN NOTE 4

INSTALL SHAFTS AND REMOVE SHEET PILE L6A.6.

INSTALL TEMP. BYPASS SHEET PILE L6A5.

REMOVE EXISTING SIPHON4.

COMISSION SIPHON.3.

INSTALL SIPHON SHAFTS AND INFLUENT BOX.2.

(SEE SHEETS CU113 TO CU115)

TEMP. BYPASS SHEET PILE L6C AND COFFERCELL.

INSTALL BYPASS-COFFERCELL L6B, 1.

WORK REACH L6 CONCURRENT WITH REACH R2B

L6C: STA. 100+55 TO STA. 101+36

L6B (COFFERCELL): STA. 100+13 TO STA. 100+55

L6A: STA. 99+55 TO STA. 100+13

REACH L6:

CONSTRUCT OUTFALL SLAB4.

INSTALL DRILLED SHAFTS3.

INSTALL TEMP. BYPASS FOR STORMWATER P.S. OUTLET2.

STEP 6

INSTALL TEMP. BYPASS SHEET PILE L1B PRIOR TO REACH L1A1.

REACH L1B: (STA. 99+25 TO STA. 99+55)

(AFTER REACH L1B STEP 1 IS COMPLETE)

RELOCATE POWER LINE BACK TO PERMANENT LOCATION6.

REMOVE SHEET PILES L1A AND L25.

CONSTRUCT DRILLED SHAFTS AT REACH L1A4.

AND FILL TO WORKING PLATFORM.

INSTALL TEMP. BYPASS SHEET PILE L1A 3.

RELOCATE POWER LINE. FILL TO WORKING PLATFORM2.

GRADE CONTROL SHEET PILE L4.

GRADE CONTROL SHEET PILE L3, AND PERM.

INSTALL TEMP. GRADE CONTROL SHEET PILE L2, PERM. 1.

REACH L1A: (STA. 97+50 TO STA. 99+25)

REACHES IN-FILL

WATER MAIN IS OUT-OF-SERVICE)

(UPON VERIFICATION FROM PRASA THAT

WITH RIPRAP WHILE THE PIPE IS IN PLACE

SHALL PROTECT THE EXCAVATION AND GAP

PILES OVER THE EXIST. 48" WATER MAIN AND

IN THE LEFT CHANNEL BANK BYPASS SHEET

CONTRACTOR SHALL LEAVE AN EFFECTIVE GAP 5.

SHEETS AND SHAFTS

THE INSTALLATION OF THE REMAINING GAP

REMOVAL OF THE WATER MAIN

AND L7B

SOILS IN THE GAP BETWEEN SHEET PILES L7A

RIPRAP EROSION AND FLOOD PROTECTION OF

SHAFT OR SHEET INSTALLATION

PROVISIONS FOR SERVICE OUTAGE DURING

BRIDGE SHAFTS ON THE LEFT CHANNEL BANK

THE INSTALLATION OF THE SHEET PILES AND

SEQUENCING FOR THE FOLLOWING:

DEVELOP AND SUBMIT A WORK PLAN AND

SERVICE. IF WATER MAIN IS IN SERVICE,

VERIFY IF WATER MAIN HAS BEEN PUT BACK IN

INSTALLATION. COORDINATE WITH PRASA TO

BEFORE SHEET PILES L7A AND R4

VERIFY LOCATION OF EXIST. 48" WATER MAIN

CONTRACTOR SHALL OPEN-CUT AND FIELD 4.

CONSTRUCT DRILLED SHAFTS2.

ESTABLISH CONSTRUCTION ACCESS1.

REACH LC-2: (STA. 114+00 TO STA. 118+50)

REMOVE EXISTING CONCRETE WALL3.

CONSTRUCT DRILLED SHAFTS2.

RELOCATE POWER LINES1.

REACH LC-1: (STA. 101+36 TO STA. 108+50)

REACHES IN-CUT

REMOVE TRANSITION STONE TO APPROVED AREAS5.

REMOVE SHEET PILE R5 AND CONTRACT 2 TRANSITION SHEETS4.

INSTALL DRILLED SHAFTS3.

FILL TO WORKING PLATFORM2.

TRANSITION SHEET PILES

INSTALL TEMP. BYPASS SHEET PILE R5. TIE TO CONTRACT 2 1.

REACH R5: (STA. 115+25 TO STA. 118+50)

REMOVE EXIST. 48" WATERMAIN9.

INSTALL WATERMAIN8.

COMPLETE BRIDGE7.

CONSTRUCT RIGHT CHANNEL WALL SHAFTS6.

INSTALL LEFT SIDE BRIDGE BEAMS AND DECK5.

REMOVE SHEET PILE R44.

INSTALL MIDDLE BRIDGE SHAFT AND CAP3.

INSTALL TEMP. BYPASS SHEET PILE R42.

TO 97+00 TO MINIMIZE WSE UPSTREAM.

EXCAVATE CHANNEL TO FULL DEPTH AND WIDTH FROM STA. 83+401.

WORK REACH CONCURRENT WITH REACH L7A

REACH R4: (STA. 108+82 TO STA. 109+46) SEE GEN NOTE 4

REMOVE SHEET PILE R34.

INSTALL DRILLED SHAFTS3.

INSTALL TEMP. BYPASS SHEET PILE R3.2.

CLEAR AND GRUB1.

REMOVE EX. CONCRETE WALL AND SOIL TO EL. 0.0 IN AREA SHOWN.

INSTALLED AND PRIOR TO INSTALLING R3 SHEETS ON RIGHT BANK,

REACH R3: (STA. 101+00 TO STA. 106+00) AFTER LC-1 DRILL SHAFTS ARE

INSTALL SHAFTS AND REMOVE SHEET PILE R2A.6.

INSTALL TEMP. BYPASS SHEET PILE R2A.5.

REMOVE EXIST. SIPHON.4.

COMMISSION SIPHON.3.

INSTALL SIPHON SHAFTS AND EFFLUENT BOX.2.

TEMP. BYPASS SHEET PILE R2C, AND COFFERCELL.

INSTALL BYPASS-COFFERCELL SHEET PILE R2B, 1.

WORK REACH R2 CONCURRENT WITH REACH L6B

R2C: STA. 100+58 TO STA. 101+00

R2B (COFFERCELL): STA. 100+09 TO STA. 100+58

SEE REACH L1A STEP 6)

R2A: STA. 99+25 TO STA. 100+09 (WORK CONCURRENTLY WITH REACH L1A,

REACH R2:

REMOVE SHEET PILE R14.

INSTALL DRILLED SHAFTS3.

INSTALL TEMP. BYPASS SHEET PILE R12.

CLEAR AND GRUB EXIT RAMP1.

REACH R1: (STA. 95+70 TO STA. 99+25)

REACHES IN-FILL

AMENDMENT 0003

/2

/2

R E

V

IS

E D T

O A

C C

O M

P A

N Y A

M E

N D

M E

N T

A

D

EC

EM

BE

R

2, H

O W

E R

M

IS

T

JOSEFINA CHANNEL

JOSEFINA CHANNEL

S H

O W

E R

M

IS

T

W a te r

M e te r

E c o m a x x G a s S ta ti o n

CALLE ANTARTICA

RIO

PIE

DRAS

RIO PIEDRAS

RIO

PIE

DRAS

R

IO

P

IE

D R

AS

RIO PIEDRAS

IE

:0 .1

T E :3 .1

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

IE

:0 .4

T E :3 .4

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

IE

:0 .6

T E :3 .6

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

IE

:0 .9

T E :3 .4

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

IE

:1 .3

T E :4 .3

Ø C o n c P ip e

H E

A D

W A L L

48" Diam eter Concrete Pipe

IE

:2 .3

T E :7 .3

H .0 ' x W

.1

B o x C u lv e rt

H E

A D

W A L L

IE

:2 .7

T E :8 .8

Ø

C O

N C

R E T E P

IP

E

D ia m e te r

C o n c re te P ip e

IE

:1 .1

T E :3 .6

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

D ia m e te r

C o n c re te P ip e

IE

.9

T E .7

Ø C

O N

C R E T E P

IP

E

H E

A D W

A L L

IE

:4 .5

T E :7 .3

C B

D ia m e te r

C o n c re te P ip e

IE

.3

T E .0

H E

A D W

A L L

IE

.9

T E .3

(D E S T R

O Y E

D

H E

A D W

A L L

IE

.3

T E .1

C o n c re te P ip e "Ø

O V E

R F L O

W P

O N

D S

T R

U C T U

R E

IE

.1

T E .0

S E p ip e w it h F la p V a lv e

C o n c re te P ip e "Ø

H E

A D W

A

:1 .9

T E :6 .0

Ø

C O

N C

R E T E P

IP

E

A N

D T

R A S

H A

R E

A

W O

O D E

N S

T R

U C T U

R E

N O

T F

O U

N D

C O

N C

R E T E P

IP

E

IE

:6 .3

T E :7 .3

C B

IE

:4 .6

T E :1 .6

S T R

M M

H

D ia m e te r

C o n c re te P ip e

P V

C P

D ia m e te r

IE

:2 .3

T E :7 .3

H .0 ' X w

.1

B o x C u lv e rt

H E

A D

W A L L

IE

:3 .9

T E :7 .5

C B

C o n c re te P

D ia m e te r

IE

:5 .6

T E :7 .7

Ø C o n c re te P ip e

H E

A D

W A L L

12" Diameter Concrete Pipe

IE

:4 .5

T E :7 .8

C B

IE

:C

L O

G G

E D

T E :7 .9

C B

D ia m e te r

C o n c re te P ip e

W =1

8" X H

=1 8"

C on cr et e

B ox

D ia m e te r

C o n c re te P ip e

IE

:6 .7

T E :8 .2

C B

S

IG

N A L L

O S T

S T O

R M S

E W

E R P

IP

E

H .0 X W

.1

B o x C u lv e rt

H .0 X W

.1

B o x C u lv e rt

IE

:C

L O

G G

E D

T E :8 .4

S M

H

IE

:4 .7

T E :8 .6

C B

8" Ø CONCRETE PIPE

42" Diameter Concrete Pipe

IE

:7 .7

T E :1 .0

C B

IE

:5 .7

T E :9 .0

C B2

D ia m e te r

C o n c re te P ip e

IE

:6 .4

T E :9 .1

C B

IE

:3 .6

T E :9 .1

S T R

M M

H

IE

.5

D R

D ia m e te r

C o n c re te P ip e

Co nc re te P ip e

" D ia m

D ia m e te r

C o n c re te P ip e

IE

.8

CONCRETE PIPE

8" Ø

(S

IG

N A L L

O S T

W A T E

R L

IN

E

IE

:C

L O

G G

E D

T E :9 .7

S M

H

8" Ø C

O N C R

ETE

P

IP

E

IE

:9 .8

8" Ø CONCRETE PIPE

IE

:6 .8

T E :9 .7

S M

H

30" Diameter Concrete Pipe

P V

C P

D ia m e te r

Ø C

IP

W

A T

E R P

IP

E

IE

:7 .7

T E :1 .0

C B

42" Diameter Concrete Pipe

IE

:8 .3

T E :1 .0

C B

IE

:7 .2

T E :1 .1

C B

Concrete Pipe

24" Diameter

IE

:7 .6

T E :1 .3

C B

IE

:8 .9

T E :1 .4

S M

H

D ia m e te r

C o n c re te P ip e

Ø C

IP

W

A T

E R P

IP

E

D ia m e te r

C o n c re te P ip e

IE

:1 .9

T E :1 .7

C B

IE

:1 .8

T E :1 .3

C B

24" Dia meter Co ncrete Pipe

IE

:9 .4

T E :1 .3

C B

24" Diameter Concrete Pipe

D ia m e te r

C o n c re te P ip e

IE

:8 .0

T E :1 .5

C B

IE

:8 .6

T E :1 .7

C B

IE

:8 .6

T E :1 .8

C B

D ia m e te r

C o n c re te P ip e

24" Diameter Concrete Pipe

IE

.2

"Ø C

O N

C R E T E P

IP

E

D R

O P

(F

IL

L W

IT

H D

IR

T

IE

:9 .4

T E :1 .8

C B

D ia m e te r

C o n c re te P ip e

IE

:1 .1

T E :1 .9

C B

F

IB

E R O

P T

IC

L

IN

E S

IN

S

ID

E T

E L E P

H O

N E

S A

N J

U A

N G

A S B

O X

E M

H

18" Diameter PVC Pipe

IE

:C

L O

G G

E D

T E :1 .1

C B

IE

.2

D R

O P

Concrete Pipe

36" Diameter

IE

:1 .5

T E :1 .4

C B

(A N

IM

A L C

A G

E S

S T R

U C T U

R E

M E T A L W

O O

D

D ia m e te r P

V C P ip e

IE

:1 .7

T E :1 .4

C B

24" Diameter Concrete Pipe

18" Diameter PVC Pipe

B O

X

D T

:9 .7

T E :1 .5

C B

IE

:1 .8

T E :1 .5

C B

18" Ø CONCRETE PIPE

C o n c re te P ip e

D ia m e te r

B O

X

D T

:5 .3

T E :1 .9

C B

IE

.7

T E .6

J U

N C T

IO

N B

O X

C

IP

W

A T E

R P

IP

E

IE

:1 .7

T E :1 .6

C B

IE

:1 .6

T E :1 .8

C B

30" Di amete r C onc ret e P ipe

(N

IU

F U S E B

O X

(N

IU

M A

N H

O L E

E L E

C T R

IC

IE

:1 .3

T E :1 .2

C B

T M

H

(F

IL

L W

IT

H D

IR

T

IE

:1 .8

T E :1 .0

C B

IE

:1 .3

T E :1 .9

C B

T M

H

B O

X

D T O P

10" Ø CIP WATER PIPE.

B O

X

D T

.5

T E :1 .1

C B

IE

:1 .2

T E :1 .1

C B

PVC P

ipe 12

" Di ameter

D ia m e te r

C o n c re te P ip e

" D ia m et er P

VC

Pi pe

IE

:1 .4

T E :1 .2

C B

C o rr u g a te d P ip e

D ia m e te r

IE

:9 .6

T E :1 .3

C B

" D iamete r P

VC

Pip e

(N

IU

T R

A N S F O

R M

E R

" D iamete r C on cre te

Pip e

O P T

IC

B

O X

A T

T F

IB

E R

C A T V B

O X

IE

:2 .4

T E :1 .5

C B

B O

X

D T

X N

IU

E L E

C T R

IC

B O

X N

IU

E L E

C T R

IC

P V

C P

D ia m e te r

IE

.1

T E :1 .6

C B

A B

U T

M E

N T

O L D B

R

ID

G E

B O

X

D T

U T

M E

N T

O L D B

R

ID

G E

IE

:1 .8

T E :1 .9

C B

B O

X

D T

.7

T E :1 .2

C B

E L E

C T R

IC

B

O X

E M

P T Y

B O

X

D T

(N

IU

T R

A N S F O

R M

E R

Ø C

IP

W

A T E

R P

IP

E

(F

IL

L W

IT

H D

IR

T

IE

:8 .6

T E :1 .0

C B

(S

IG

N A L L

O S T

W A T E

R L

IN

E

D ia m e te r

C o n c re te P ip e

18" Diameter PVC Pipe

IE

:1 .9

T E :1 .1

C B

IE

:7 .5

T E :1 .2

D ia m e te r P

V C P ip e

IE

:1 .7

T E :1 .2

C B

42" Diameter Concrete Pipe

B O

X

E L E

C T R

IC

(N

IU

M A

N H

O L E

E L E

C T R

IC

(N

IU

F U S E B

O X

12" Dia mete r Co ncr ete Pip e

B O

X

E L E

C T R

IC

30" Diameter Concrete Pipe

W A T E

R V

A L V E

(S

IG

N A L L

O S T

E L E

C T R

IC

L

IN

E

IE

:7 .3

T E :1 .0

S T R

M M

H

M A

N H

O L E

E L E

C T R

IC

T R

A N S F O

R M

E R

IE

:1 .7

T E :1 .2

C B

IE

:1 .9

T E :1 .3

S M

H

P R

IM

A R

Y

S U K

V

T R

A N S F O

R M

E R

P E

D E S T A L

IE

:1 .9

T E :1 .4

S M

H

M A

N H

O L E

E L E

C T R

IC

M A

N H

O L E

E L E

C T R

IC

IE

:1 .6

T E :1 .6

C B

M A

N H

O L E

E L E

C T R

IC

T R

A N S F O

R M

E R

(N

IU

M A

N H

O L E

E L E

C T R

IC

P E

D E S T A L

(N

IU

M A

N H

O L E

E L E

C T R

IC

(N

IU

M A

N H

O L E

E L E

C T R

IC

P R

IM

A R

Y S

E C T

IO

N

P M -3

N

T R

A N S F O

R M

E R N

IU

(N

IU

M A

N H

O L E

E L E

C T R

IC

(N

IU

M A

N H

O L E

E L E

C T R

IC

IE

.4

T E :1 .4

C B

W

IT

H C

O V E

R

E M

H

S H

O W

E R

(N

IU

C O

N C

R E T E P

A D

(N

IU

E L E

C T R

IC

M

A N

H O

L E

P .R .A .S .A

W A T E

R H

O L E

H

IR

A M B

IR

T H

O R

N

W A T E

R D

IS

P E

N S E

R

P R

A S

A

W A T E

R D

IS

P E

N S E

R

P R

A S

A W

A T E

R D

IS

P E

N S E

R

P R

A S

A

IE

.8

T E :1 .9

S T O

R M M

H

W A T E

R V

A L V E

L W

.0

LW=22.35

LW=23.02

LW

=2

2.

LW=22.90

L W

.9

LW=24.31

LW=25.46

L W

.7

LW=24.91

LW=23.90

LW=26.54

L W

.9

LW= 24.51

IE

:6 .5

T E :1 .7

C B

IE

:6 .8

T E :1 .8

C B

L W

.3

L W

.5

L W

.7

LW=27.00

LW

=2

6.

L W

.8

LW

=2

7.

LW

=2

7.7

L W

.1

L W

.5

LW

=3

1.

LW

=3

2.3

L W

.1

L W

.4

LW=34

.22

LW=33.34

L W

.9

L W

.1

LW=36.92

L W

.3

LW

=3

7.

LW

.2

LW

: 66.70

LW

: 67.31

LW

: 68.29

LW

: 68.64

5 5

FLO

W

FLOW

W M

W

MC

O

C O

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M c o

W M c o

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M

W M c o

W M

W M

W M

W M c o

W M

W M c o

W M

W M c o

W M

W

MW

M W M

W M

W M

P C P

T L P

T L P

P P

C

C O

EXIST. TOP OF BANK

LEFT CHANNEL WALL

CONSTRUCTION LIMITS

ACCESS

CONSTRUCTION TRANSITION SHEETS

EXIST. CNT 2

RIGHT CHANNEL WALL

C1 C2

GONDOLA CABLES

EXIST.

DOUBLE CULVERT

EXIST.

TO BE REMOVED

ELECTRICAL POWER LINE

(SEE SHEET CU101

10" WATERLINE

SEE NOTE 2

SEE NOTE 2

SEE NOTE 2

VALVES

PROTECT PRASA

50'

OUTFALL D-12

OUTFALL D-13

OUTFALL D-14

OUTFALL D-15

OUTFALL D-16

OUTFALL D-18

OUTFALL D-19

OUTFALL D-20

SEE SHEET ES103

POWER LINE

SHEET PILE L8

BYPASS

SHEET PILE J-L1

BYPASS

WINGWALL J-L2

SHEET PILE

WINGWALL J-R2

SHEET PILE

SHEET PILE J-R1

BYPASS

SHEET PILE L9

BYPASSSHEET PILE R6

BYPASS

SHEET PILE R8

BYPASS

WINGWALL R9

SHEET PILE

WINGWALL L10

SHEET PILE

SHEET PILE R7

PERM. GRADE CONTROL

SHEET PILE J-C1

GRADE CONTROL

SHEET PILE J-C2

GRADE CONTROL

SEE SHEET GC104

SHEET PILE J-M1

D-21

OUTFALL

D-17

OUTFALL

SEE SHEET CO302

DEMONSTRATION WALL #5

SEE SHEET CO302

DEMONSTRATION WALL #6

SEE SHEET CO302

DEMONSTRATION WALL #4

SEE SHEET CS150

ACCESS

CONSTRUCTION

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

A R

C A

D

IS

N

C A

U S

E W

A Y B

L V

D

M E

T A

IR

IE

L

A

S U

IT

E

S A

N J

U A

N P

U E

R T

O R

IC

O

R

IO

P

U E

R T

O N

U E

V O P

R O J E

C T

C H

A N

N E

L B

O T

T O

M A

N D W

A L L I

M P

R O

V E

M E

N T S

S U

P P

L E

M E

N T

A L C

O N

T R

A C

T

F E

B R

U A

R Y

S K F

O R

C E V

IP

R

F

R A

N K

L

IN

D

E L

A N

O R

O O

S E

V E

L T A

V E

N U

E

S A

N J

U A

N P

U E

R T

O R

IC

O

D

D

D

D

D

D

D

D

D

D

0 1 0 1

0 J

J

J

J

J

J

NORTH

PLAN

A1

SCALE: 1" = 100' 100' 200'0 GC102

G

K E

L L E

R

S

G A

IT

A N

C

R A

Y M

O

CALLE ANTARTICA

CALLE ANTARTICA

C A

L L E A

R G

E L

IA

AND STAGING AREA

CONSTRUCTION ACCESS

STAGING AREA

AMPHITHEATRE

TITO PUENTE

COLISEUM

ROBERTO CLEMENTE

R O

O S

E V

E L T A

V E

S T

A

IM

P

R O

V E

M E

N T L

IM

IT

S

C N

T C

H A

N N

E L

AND STAGING AREA

CONSTRUCTION ACCESS

C O

N S

T R

U C

T

IO

N A

C C

E S

S

LUIS MUNOZ PARK

LUIS MUNOZ PARK

LEGEND

FLOW

RIO PIEDRAS

FL

OW

RIO

PI

EDRAS

FLOW

JOSEFINA

RC-2

LC-3

S

G A

IT

A N

LC

-4

STAGING AREA

STAGING AREA

CHANNEL EXCAVATION

RC-

SEE S

HEET C

S1

CONSTRUCTIO

N A

CCES

S

L8

CONSTRUCTION ACCESS. SEE SHEET CS150

TYPICAL REACH NOMENCLATURE

SHEET PILE

EXISTING TOP OF BANK

CHANNEL EXCAVATION

C O

N S

T R

U C

T

IO

N O

F F

E A

T U

R E

S

U P

S T

R E

A M O

F R

O O

S E

V E

L T A

V E

CONSTRUCTION OF REACH B - UPSTREAM OF ROOSEVELT AVE.

EXCAVATE SOILS BELOW MHHW LIMITS AND DISPOSE OF AT ODMDS. 3.

8 SHEET CF303C.

EXCAVATE SOILS ABOVE MHHW AND DISPOSE OF AT LA CHULETA. SEE NOTE 2.

REMOVE RIPRAP AND GRADE CONTROL SHEET PILES AT STA. 123+50.1.

REMOVE BYPASS SHEET PILE R8 SHEETS.3.

INSTALL DRILLED SHAFTS.2.

SHEET PILE WINGWALL R9.

INSTALL SHEETS TEMP. BYPASS SHEET PILE R8 AND 1.

AND R9: (STA. 147+40 TO STA. 148+10)

REACH R8: (STA. 145+00 TO STA. 147+40)

INSTALL DRILLED SHAFTS.4.

INSTALL PERM. GRADE CONTROL SHEET PILE R7.3.

INSTALL OUTFALL DOUBLE CULVERT BYPASS.2.

BACKFILL TO CREATE WORKING PLATFORM.

INSTALL TEMP. BYPASS SHEET PILE R6 AND 1.

NOTE: REACH R6 ENCOMPASSES SHEET PILE R7

REACH R6: (STA. 129+00 TO STA. 136+25)

REACHES IN-FILL

RIGHT CHANNEL WALL

EXCAVATE SOILS TO EL. 0. SEE NOTE 2.4.

REPLACE GONDOLA CABLES.3.

INSTALL DRILLED SHAFTS.2.

WITH LEFT CHANNEL WALL)

RELOCATE GONDOLA CABLES (CONCURRENT 1.

REACH RC-3: (STA. 133+50 TO STA. 145+00)

EXCAVATE SOILS TO EL. 0.00. SEE NOTE 2.4.

CONNECTION.

INSTALL OUTFALL BYPASS AND NEW HEADWALL 3.

INSTALL DRILLED SHAFTS.2.

RELOCATE 10" DIP.1.

REACH RC-2: (STA. 123+50 TO STA. 129+00)

REACHES IN-CUT

RGARCIA03@SANJUAN.PREMAIL:

PHONE: 787-602-4683

RAUL GARCIA, DIRECTOR OF OPERATIONS AT MUNICIPALITY OF SAN JUAN

POINT OF CONTACT:

IMPACTING GONDOLA CABLES.

(MUNICIPALITY OF SAN JUAN) PRIOR TO CONSTRUCTION ACTIVITIES

CONTRACTOR SHALL COORDINATE WITH OWNER OF GONDOLA CABLES 5.

SEE SHEET CO001 FOR SHEET PILE SCHEDULE.4.

SEE SHEET CS150 FOR PROJECT ACCESS PLAN.3.

SHEET PILE OR DRILLED SHAFT INSTALLATION.

AREA TO BE EXCAVATED TO EL. 0.00 PRIOR TO OPPOSITE BANK BYPASS 2.

SEE SHEET GC1O1 FOR NOTES.1.

GENERAL SHEET NOTES

INSTALL DRILLED SHAFTS.2.

PER DIRECTION OF OWNER. SEE NOTE 5.

RELOCATE OR REMOVE GONDOLA CABLES, 1.

REACH LC-4: (STA. 143+00 TO STA. 147+40)

INSTALL STORMWATER OUTFALL PIPES.4.

EXCAVATE SOILS TO EL 0.00. SEE NOTE 2.3.

INSTALL DRILLED SHAFTS.2.

SEE SHEET ES103.

CLEAR AND GRUB AND RELOCATE POWER LINES, 1.

REACH LC-3: (STA. 130+00 TO STA. J0+50)

REACHES IN-CUT

SEQUENCE.

SEE SHEET GC103 FOR MAIN CHANNEL TRANSITION CONSTRUCTION 2.

TIE TRANSITION SHEET PILE WINGWALL L10.1.

REACH L10: (STA. 147+40 TO STA. 148+10)

INSTALL DRILLED SHAFTS BEHIND BYPASS SHEET PILES J-R1 AND L9.3.

BACKFILL BEHIND BYPASS SHEET PILES L9 AND J-R1/J-R2.2.

INSTALL TEMP. BYPASS SHEET PILE L9.1.

AND SOILS ARE EXCAVATED

TO BE PERFORMED AFTER RC-3 SHAFTS ARE INSTALLED

REACH L9: (STA. 134+10 TO STA. 143+00)

SEE SHEET GC104 FOR JOSEFINA TRANSITION CONST. SEQUENCE.4.

DIVERT NEW JOSEFINA CHANNEL.3.

INSTALL TEMP. BYPASS SHEET PILES J-R1 AND J-R22.

DEMOLISH AND REMOVE JOSEFINA CONCRETE CHANNEL.1.

TO BE PERFORMED AFTER REACHES J-L1/J-L2 AND RC-3 EXCAVATION

REACH J-R1 (STA. J0+00 TO STA. J3+00) AND J-R2 (STA. J3+00 TO STA. J3+63)

EXCAVATE NEW JOSEFINA CHANNEL WIDTH TO EL. 0.00. SEE NOTE 2.4.

REMOVE BYPASS SHEET PILE J-L13.

INSTALL DRILLED SHAFTS2.

INSTALL TEMP. BYPASS SHEET PILE J-L11.

REACH J-L1: (STA. J0+00 TO STA. J3+00) AND J-L2: (STA. J3+00 TO STA. J3+63)

REMOVE BYPASS SHEET PILE L8 SHEETS.4.

INSTALL DRILLED SHAFTS.3.

INSTALL TEMP. BYPASS SHEET PILE L8.2.

REMOVE CONTRACT 2 TIE-IN TRANSITION SHEETS.1.

AND SOILS EXCAVATED

TO BE PERFORMED AFTER RC-2 SHAFTS ARE INSTALLED

REACH L8: (STA. 123+50 TO 130+00)

REACHES IN-FILL

LEFT CHANNEL WALL

R E

V

IS

E D T

O A

C C

O M

P A

N Y A

M E

N D

M E

N T

/2

/2

AMENDMENT 0003

A

D

EC

EM

BE

R

2, -10

-5

-5

-5

-5 -5

N E S tr e e t

S

IG

N

CYCLONE F

ENCE

IRON FENCE

IRON FENCE

IRON FENCE

RIO PIEDRAS

RIO PIEDRAS

P U

M P S

T A T

IO

N J

U A

N

IE

.4

T E :3 .8

C o n c re te P ip e

H e a d W a ll

F la p V a lv e

W M

36" Dia meter Co ncrete Pipe

D ia m e te r C o n c re te P ip e

IE

:2 .3

T E :5 .2

C B

S

IG

N

B U

M P A

H E

A D

IE

:3 .6

T E :5 .6

"ØC

O

N C

R E T E P

IP

E

IE

.3

Ø P

V C P

IP

E

D R

O P

IE

.0

T E :5 .1

"ØC

O

N C

R E T E P

IP

E

" D ia m et er C on cr et e Pi pe

S

IG

N A L L

O S T

S A

N

IT

A R

Y P

IP

E

Ø

D ia m e te r

C o n c re te P ip e

D ia m e te r C o n c re te P ip e

IE

:1 .5

T E :6 .4

C B

D ia m e te r

C o n c re te P ip e

24" Diameter Concrete Pipe

24" D iam eter C oncrete Pipe

IE

:2 .5

T E :6 .9

C B

24" Dia meter Co ncre te P ipe

24" Diameter Concrete Pipe

IE

-2 .4

T E :7 .0

M H

P

IL

E S

S H

E E

T

IE

:5 .3

T E :6 .9

C B

" D ia m et er C on cr et e Pi pe

IE

:2 .7

T E :7 .1

C B

24" Diameter

Con crete

Pip e

IE

:3 .8

T E :7 .1

C B

IE

:5 .6

T E :7 .1

C B

24" Diameter Concrete Pipe

D ia m e te r C o n c re te P ip e

18" Diameter

Con cret e Pi pe

9_

C on cr et e P ip e

D ia m

.1

T E :7 .1

C B

Ø C

O N

C R

E T

E P

IP

E

IE

:5 .0

T E :7 .0

C B

Ø C

O N

C R

E T

E P

IP

E

SWALE

" D ia m et er C on cr et e Pi pe

IE

:1 .6

T E :7 .3

C B

D ia m e te r

C o n c re te P ip e

IE

:3 .0

T E :7 .3

C B

SWALE

N

E S

T R

E E

T

IE

:6 .4

T E :7 .4

C B

W M

W M

S W

A

LEIE

:4 .7

T E :7 .5

S M

H

W M

D ia m e te r C o n c re te P ip e

" Ø P .V .C

C O

N C R E

TE

P

IP

2" Ø

C o n c re te P ip e

D ia m e te r

C o n c re te P ip e

D ia m e te r

IE

:5 .1

T E :7 .6

S M

H

W M

IE

.4

T E :7 .8

S M

H

V A L V E

W A T E R

IE

.7

T E :7 .8

S M

H

IE

:1 .0

T E :7 .9

C B

S

ID

E W

A L K

IE

.7

T E :7 .9

S M

H

N

E

STREET

IE

.2

D ro p "Ø P

V C

IE

:5 .5

T E :7 .8

S M

H

SI

D

EW

ALK

SI

D

EW

ALK

S

ID

E W

A

LK

SIDEWALK

18" Diameter

Con cret e Pi pe

SWALE

S

ID

E W

A L

K

J U

N C T

IO

N B

O X

W A T E R P

IP

E

W M

IE

:5 .8

T E :8 .1

C B

Ø P .V .C

SI

DEW

ALK

N

E S

T R

E E T

W M

A R

R

K

IN

G

D ia m e te r

C o n c re te P ip e

IE

:3 .8

T E :8 .1

C B

D ia m e te r

C o n c re te P ip e

IE

:4 .2

T E :8 .1

C B

D ia m e te r

C o n c re te P ip e

SIDEWALK

IE

:5 .3

T E :8 .1

S M

H

W M

18" Diameter Concrete Pipe

IE

:4 .4

T E :8 .0

C B

IE

:1 .1

Ø C

O N

C R E T E P

IP

E

D R

O P

S

ID

E W

A L K

SI

D

EW

ALK

W M

SWALE

IE

.0

T E :8 .3

C B

W M

S

ID

E W

A L

K

S

ID

E W

A L

K

S

ID

E W

A L

K

IE

.3

T E :8 .4

S M

H

W M

CYCLONE FENCE

W M

W M

W M

IE

:5 .5

T E :8 .4

C B

IE

:4 .1

T E .3

C B

IE

:5 .3

T E :8 .5

S M

H

12" Ø P.V.C.

18" Di amete r C onc ret e P ipe

IE

:5 .6

T E :8 .5

S M

H

IE

:s e a le d

T E :8 .6

S M

H

S

ID

E W

A L K

W M

IE

:4 .8

T E :8 .4

C B

S

ID

E W

A L

K

Ø P .V .C

IE

:4 .4

T E :8 .6

C B

SIDEWALK

B U

M P A

H E

A D

S

IG

N

S

ID

E W

A

LK

J U

N C T

IO

N B

O X

W A T E R P

IP

E

IE

:5 .9

T E :8 .7

S M

H

IE

.6

T E :8 .7

S M

H

A R

R

K

IN

G

A R

R

K

IN

G

A R

R

K

IN

G

W M

W M

IE

:5 .9

T E :8 .8

S M

H

6" Ø CONCRETE PIPE

SIDEWALK

A D

A R

A M

P

S

IG

N

25 NE STREET

12" Ø P.V.C.

SIDEWALK

S

ID

E W

A L

K

S

ID

E W

A L K

W M

IE

:4 .3

T E :9 .0

C B

W M

24" Diameter Concrete Pipe

SIDEWALK

IE

:6 .8

T E :9 .0

S M

H

W M

W M

IE

:5 .5

T E :9 .1

C B

IE

:6 .6

T E :9 .1

S M

H

A R

R

K

IN

G

A R

R

K

IN

G

12" Ø P.V.C.

23 NE STREET

W M

T R

A N S F O

R M

E R

P R E P

A

S

ID

E W

A L K

A R

R

K

IN

G

SIDEWALK

T R

A N S F O

R M

E R

P R E P

A

T R

A N S F O

R M

E R

P R E P

A

S

ID

E W

A L

K

W M

S

ID

E W

A L

K

S

ID

E W

A L

K

V A L V E

W A T E R

IE

:7 .3

T E :9 .4

S M

H

W M

T R

A N S F O

R M

E R

P R E P

A

25 NE STREET

S

ID

E W

A L

K

W M

SIDEWALK

Ø C

O N

C R

E T

E P

IP

E

6" Ø CONCRETE PIPE

12" Ø P.V.C.

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

A R E

A

G R E E

N

W M

J U

N C T

IO

N B

O X

W A T E R P

IP

E

W M

S

ID

E W

A L K

AREA

GREEN

S

ID

E W

A L

K

F U

E L T

A N

K

IE

.0

T E :8 .7

S M

H

N

E S

T R

E E

T

S

ID

E W

A L

K

N

E S

T R

E E

T

SIDEWALK

S

ID

E W

A L

K

W M

SIDEWALK

S

ID

E W

A L

K

SIDEWALK

W M

SI

D

EW

ALK

IE

.2

T E :8 .7

S M

H

S

ID

E W

A L

K

W M

GATE

W M

S

ID

E W

A L

K

G A Z E B

O

12" Ø P.V.C.

IRON FENCE

SIDEWALK

G A Z E B

O

SIDEWALK

SIDEWALK

SIDEWALK

S

ID

E W

A L

K

IE

:4 .1

T E :8 .6

C B

S

ID

E W

A L

K

SIDEWALK

S

ID

E W

A L K

K

IO

S K

CONCRETE FENCE

D ia m e te r P

V C P ip e

S L A B

C O

N C

R E T E

IE

:8 .4

T E :1 .3

S M

H

25 NE STREET

G A Z E B

O

12" Ø P.V.C.

IE

:3 .6

T E :7 .0

C B

S L

N

C R

CONCRETE WALL

CONCRETE WALL

CONCRETE

WALL

IE

:8 .8

T E :1 .9

S M

H

D R

O P E le v .0

Ø P .V .C

CONCRETE WALL

P P

W

U P

W

U P

W

P P

W P P

W

U P

W

P P

W

P P

W

P P

W

P P

W

P P

W

P P

W

P P

W P P

W

P P

W

P P

W

P P

W

P P

W

P P

W

P P

W

P P

W

P P

W

P P

W

L P C

T E L P

W

P P

W

P P

W

P P

W

P P

W

P P

W

U P

W

L P C

L P C

L P C

U P

W

L P

W

T E L P

W

C O

U R T

B A S

K E T B

A

B R

IS

R O

O M

D

IN

IN

G

S

ID

E W

A L

K

S T O

R A

G E

A R

E

E N

A R

E

E N

B A S

K E T B

A L L C

O U

R T

B A S

K E T B

A L L C

O U

R T

C L A S S R

O O

M S

IN

P

U E R T O N

U E

V O

F

IR

S T U

S A P

R E S B

Y T E R

IA

N C

H U

R C

H

C L A S S R

O O

M S

S C

H O

O L N

E M

E S

IO

R C

A N

A L E S I I

IE

:5 .3

T E :7 .4

S M

H

W M

CYCLONE FENCE

IE

:8 .7

T E :1 .9

C B

IE

:8 .7

T E :1 .9

C B

SIDEWALK

SIDEWALK

SIDEWALK

C Y

C L

O N

E F

E N

C E

D ia m e te r

C o n c re te P ip e

W M

12" Ø P.V.C.

CYCLONE FENCE

CYCLONE FENCE

C Y

C L

O N

E F

E N

C E

CONCRETE

WALL

A R

R

K

IN

G

C O

N C

R E

T E F

E N

C E

C O

N C

R E

T E F

E N

C E

CONCRETE FENCE

CONCRETE FE

NCE

IRON FENCE

S T O

R A

G E

C Y

C L

O N

E F

E N

C E

CYCLONE F

ENCE

CONCRETE WALL

P P

W

L W

.2

LW=20.13

A B

A N

D O

N E

D

P O

W E R P

O L E

T R

A N S F O

R M

E R

P R E P

A

LW=21.59

LW=22.43

LW=23.57

LW=23

.65

L W

.9

G U

Y W

IR

E

LW

= 24.93

LW= 24.97

L W

.8

L W

.4

L W

.6

LW= 26.14

LW

.4

L W

.3

L W

.8

LW

= 28.05

LW=27.0

L W

.3

L W

.4

LW= 2

7.9

LW

=2

7.

S

ID

E W

A L K

S

ID

E W

A L K

SI

DEW

ALK

S

ID

E W

A L

K

S

ID

E W

A L

K

S

ID

E W

A L

K

S

ID

E W

A L

K

S

ID

E W

A L

K

S

ID

E W

A L K

S

ID

E W

A L K

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

BUILDING #40

S

ID

E W

A L

K

LW= 28.97

L W

.9

L W

.2

LW=32.95

LW

=3

6.

LW=39.70

LW=41

.30

LW= 51.65

C O c o c o c o

W M c o c o c o c o

W M c o

W M c o

W M

W M

C O c o

W M

W M

W M

W M

W M

C O c o

C O

W M

C O c o c o

W M

W M

W M

W M

W M

W M

C O

W M

W M c o c o

W M

W M

W M

W M

W M

W M

C O

C O c o

C O

W M c o

W M

W M

W M

W M

C O

W M

W M

W M

C O

W M

C O c o c o c o c o c o

W M

W M

C O c o

W M

W M

W M

W M

W M c o

W M

W M

C O

W M

C O

W M

W M

W M

W M

C O

W M

W M

W M

C O

W M

W M

W M

W M

C O

C O c o

W M

W M

W M

W M

W M

W M

C O c o

W M

W M

C O c o

W M

W M

C O

C O

W M

C O

W M

W M

W M

C O

W M

W M

C O

C O

W M

C O

C O c o

W M

W M W

M

W M

W M

W M

C O

C O

W M

W M

C O

C O

W M

C O c o

C O

W M

W M

C O

C O

W M

W M

W M

W M

W M

W M

C O

W M

W M

W M

W M c o c o

W M

W M

W M

W M c o

W M

C O

W M

W M c o c o

W M

W M

C O

W M

W M

C O

W M

W M

W M

W M

W M

W M

C O

W M

W M

C O

W M

C O

W M

C O

C O

W M

W M

C O c o

W M

W M

W M

W M

W M

W M

W M

W M

W M

C O

C O

C O

C O

W M

W M

W M

C O

W M

C O

W M

W M

W M

W M

W M

W M

C O

W M

W M

C O

W M

W M

W M

W M

W M

C O

C O

W M

W M

C O

C O

W M

C O

W M

W M

W M

W M

W M

C O

W M

W M

W M

C O

W M

C O

W M

W M

W M

W M

W M

W M

W M

W M

W M

C O

W M

W M

W M c o

C O

W M

W M

C O

W

MW

M

W M

W M c o

C O

W V

W V

W V

W V

N °0

'4

.2

"E

.2

N °1

'1

.4

"E

.8

CHANNEL C/L

CONSTRUCTION LIMITS

CONSTRUCTION LIMITS

8 10

RIGHT CHANNEL WALL

LEFT CHANNEL WALL

UTILITY BRIDGE

48" WATERLINE

BE PERFORMED BY OTHERS

HOUSES ALONG CALLE 25 TO

DEMOLITION OF EXISTING

0 1

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

A R

C A

D

IS

N

C A

U S

E W

A Y B

L V

D

M E

T A

IR

IE

L

A

S U

IT

E

S A

N J

U A

N P

U E

R T

O R

IC

O

R

IO

P

U E

R T

O N

U E

V O P

R O J E

C T

C H

A N

N E

L B

O T

T O

M A

N D W

A L L I

M P

R O

V E

M E

N T S

S U

P P

L E

M E

N T

A L C

O N

T R

A C

T

F E

B R

U A

R Y

S K F

O R

C E V

IP

R

F

R A

N K

L

IN

D

E L

A N

O R

O O

S E

V E

L T A

V E

N U

E

S A

N J

U A

N P

U E

R T

O R

IC

O

M A T C

H L

IN

E S

T A

M A

T C

H L

IN

E S

T A . 1

NORTH

PLAN

60' 120'0

GENERAL SHEET NOTES

A1

SCALE: 1" = 60' CD102

R A

Y M

O

W

B A

U M

Y

A L

O

DEMOLITION PLAN

M O

L

IT

IO

N P

L A

N O

F

KEY MAP

CD102

CD101

CD103

CD104

CD105

FLOW

REMOVE CYLCONE FENCE38 REMOVE CONCRETE PIPE37 REMOVE CATCH BASIN36 REMOVE CONCRETE PIPE35 AND CONCRETE PIPEREMOVE HEADWALL 34 REMOVE CONCRETE FENCE33 REMOVE CONCRETE FENCE32 REMOVE CONCRETE PIPE31 SEE SHEET CU103RECONNECT TO SEWER LINE.RELOCATE SEWER MANHOLE AND30 FUTURE SIPHON DESIGNRELOCATE SEWER LINE BASED ON29 REMOVE CATCH BASIN28 REMOVE PARKING AREA27 REMOVE RESIDENTIAL STRUCTURE26 REMOVE RESIDENTIAL STRUCTURE25 REMOVE RESIDENTIAL STRUCTURE24 REMOVE RESIDENTIAL STRUCTURE23 REMOVE CONCRETE PIPE22 REMOVE CONCRETE WALL21 REMOVE CYLCONE FENCE20

RIO PIEDRAS

CALLE 25

CALLE 25

C

ALL

E

CALLE 23

S

G A

IT

A N

AND REMOVE ABANDONED PIPE.

TO FIELD VERIFY LOCATION

ALIGNMENT. CONTRACTOR

ABANDONED SAN SEWER

SEE SHEET V-105 FOR SURVEYED 36" 25

48" WATER MAIN

TO NEAREST JOINT FOR CONST. OF

REMOVE AND RESTORE SIDEWALK 24

CMU WALL

REMOVE AND REPLACE IN-KIND 23

REMOVE CONCRETE PIPE22

REMOVE CATCH BASIN 21

REMOVE CONCRETE PIPE20

REMOVE CONCRETE PIPE19

SEE SHEET CU103

REMOVE EXIST. 48" WATERLINE. 18

COMPLETION OF WORK.

CONSTRUCTION SHALL BE RESTORED TO EXISTING CONDITIONS UPON

PARKING AREAS OUTSIDE OF CHANNEL WALLS THAT ARE AFFECTED BY 2.

INFORMATION.

SEE SHEET CD101 GENERAL NOTES 1 THROUGH 6 FOR SHEET REFERENCE 1.

REMOVE CYCLONE FENCE17

REMOVE CONCRETE PIPE16

REMOVE CATCH BASIN15

REMOVE CONCRETE PIPE14

AND CONCRETE PIPE

REMOVE HEADWALL 13

REMOVE CONCRETE PRIVACY WALL12

REMOVE CONCRETE PIPE11

ON SHEET CU110

AND REPLACE AS SHOWN

REMOVE SEWER MANHOLE 10

REMOVE CYCLONE FENCE9

REMOVE CATCH BASIN8

REMOVE ASPHALT PARKING AREA7

REMOVE CONCRETE PIPE6

FOOTINGS TO EL. -17

REMOVE CONCRETE WALL AND 5

REMOVE CYCLONE FENCE4

PROPERTY OWNER

OFFICER AND COORDINATE WITH

DIRECTION OF THE CONTRACTING

REMOVE AND RELOCATE KIOSK PER3

REMOVE CONCRETE LINING2

REMOVE FLAP VALVE AND HEADWALL1

DEMOLITION NOTES

R E

V

IS

E D T

O A

C C

O M

P A

N Y A

M E

N D

M E

N T

AMENDMENT 0003

A

D

EC

EM

BE

R

2, EC

EM

BE

R

2, U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

C

KS

O

N

VI

LL

E

D

IS

TR

IC

T

SA

N M

AR

C

O B

LV

D

JA

C

KS

O

N

VI

LL

E, F L

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

C

KS

O

N

VI

LL

E

D

IS

TR

IC

T

SA

N M

AR

C

O B

LV

D

JA

C

KS

O

N

VI

LL

E, F L

D

EC

EM

BE

R

2,

GC101
GC102
CD102

File details come from the government source that posted it. Updated .