W51DQV25A0002 Amd 003_Specs_01 45 00.pdf
PDF 34 KB Posted
- Solicitation number
- W51DQV25RA002
- Issued by
-
Department of the Army
About this file
This document is a Section 01 45 00 specification for the Resident Management System (RMS) Contractor Mode for the Rio Puerto Nuevo Project Main Channel Design Supplemental Contract 3 in San Juan, Puerto Rico. The specification outlines detailed requirements for the contractor's use of the RMS Contractor Mode (RMS CM), a web-based project management system used by the U.S. Army Corps of Engineers to track and manage contract administration, finances, quality control, submittal monitoring, scheduling, and data exchange.
Key requirements include mandatory daily updates to the RMS database, tracking of contractor and subcontractor information, correspondence, equipment, management reporting, Request for Information (RFI) processes, payment requests, quality control reporting, hazard analysis, and submittal management. The contractor must be prepared to transition from the current RMS to a new Construction Management Platform (CMP) at any time during the contract performance. The specification provides comprehensive technical requirements for the computer system, including minimum hardware and software specifications, and emphasizes that the RMS CM is an integral part of the contractor's quality control management.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rio Puerto Nuevo Project Main Channel Design Supplemental Contract 3 San Juan, Puerto Rico
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 45 00
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
PART 1 GENERAL
1.1 REFERENCES
1.2 CONTRACT ADMINISTRATION
1.2.1 Electronic Communications
1.2.2 Other Factors
1.3 RMS SOFTWARE
1.3.1 RMS CONTRACTOR'S MODE (CM)
1.4 SYSTEM REQUIREMENTS
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
1.6 CONTRACT DATABASE
1.7 DATABASE MAINTENANCE
1.7.1 Administration
1.7.1.1 Contractor Information
1.7.1.2 Subcontractor Information
1.7.1.3 Correspondence
1.7.1.4 Equipment
1.7.1.5 Management Reporting
1.7.1.6 Request For Information (RFI)
1.7.2 Finances
1.7.2.1 Pay Activity Data
1.7.2.2 Payment Requests
1.7.3 Quality Control (QC)
1.7.3.1 Daily Contractor Quality Control (CQC) Reports
1.7.3.2 Deficiency Tracking
1.7.3.3 QC Requirements
1.7.3.4 Three-Phase Control Meetings
1.7.3.5 Labor and Equipment Hours
1.7.3.6 Accident/Safety Reporting
1.7.3.7 Features of Work
1.7.3.8 Hazard Analysis
1.7.4 Submittal Management
1.7.5 Schedule
1.7.6 Import/Export of Data
1.8 IMPLEMENTATION
1.9 MONTHLY COORDINATION MEETING
1.10 NOTIFICATION OF NONCOMPLIANCE
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
SECTION 01 45 00 Page 1 W51DQV25RA002 Amendment 0003
SECTION 01 45 00 Page 2
SECTION 01 45 00
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety and Occupational Health (SOH) Requirements
1.2 CONTRACT ADMINISTRATION
The Government will use the Resident Management System (RMS) to assist in its monitoring and administration of this contract. The Contractor uses the Government-furnished Construction Contractor Mode of RMS, referred to as RMS CM, to record, maintain, and submit various information throughout the contract period. The Contractor mode user manuals, updates, and training information can be downloaded from the RMS web site (https://rms.usace.army.mil/datafiles/rmsdocwebsite/default.html). The joint Government-Contractor use of RMS facilitates electronic exchange of information and overall management of the contract. RMS provides the means for the Contractor to input, track, and electronically share information with the Government in the following areas:
Administration Finances Quality Control Submittal Monitoring Scheduling Import/Export of Data
The Contractor must be prepared to transition from the Resident Management System (RMS) to the new Construction Management Platform (CMP) at any time during the period of performance of this contract, once the USACE enterprise implements this change. The Contractor's obligation to transition from RMS to the CMP system is a requirement of this contract.
Therefore, additional time or cost increase to complete this transition will not be considered. In the event of the transition, RMS project information will be migrated to CMP by the government and available in the CMP system. After the transition, the Contractor must utilize the CMP system to perform all contract administration functions previously required in RMS, including all areas listed above. After the transition, “RMS” and “CMP” will be synonymous for all “Resident Management System” and “RMS” references in this contract’s specification. To facilitate the transition from RMS to CMP, online training for the CMP system will be made available to the Contractor with enough time to train staff, prior to the transition occurring.
SECTION 01 45 00 Page 3
1.2.1 Electronic Communications
For ease and speed of communications, exchange correspondence and other documents (i.e., Correspondence and Payment Requests) in electronic format via RMS unless otherwise approved by the Contracting Officer.
Correspondence, pay requests, and other documents comprising the official contract record are also to be provided in paper format with signatures and dates where necessary. Paper documents will govern in the event of discrepancy with the electronic version.
1.2.2 Other Factors
Particular attention is directed to Contract Clause, SCHEDULES FOR CONSTRUCTION CONTRACTS, Contract Clause, PAYMENTS, Section 01 32 01 PROJECT SCHEDULE, Section 01 33 00 SUBMITTAL PROCEDURES, and Section 01 45 04 CONTRACTOR QUALITY CONTROL, which have a direct relationship to the reporting to be accomplished through RMS. Also, there is no separate payment for establishing and maintaining the RMS database; costs associated will be included in the contract pricing for the work.
1.3 RMS SOFTWARE
RMS is a Windows-based program that can be run on a Windows-based PC meeting the requirements as specified in Section 1.4. The Government will make available the RMS software to the Contractor after award of the construction contract. Prior to the Preconstruction Conference, download, install, and use the latest version of the RMS software from the Government's RMS Internet Website. Any program updates of RMS will be made available to the Contractor via the Government RMS Website as the updates become available.
1.3.1 RMS CONTRACTOR'S MODE (CM)
RMS Contractor's Mode, or RMS CM, is the replacement for Quality Control System. The database remains the same. References to RMS in this specification include RMS CM.
1.4 SYSTEM REQUIREMENTS
The following is the minimum system configuration required to run RMS and Contractor Mode:
Minimum RMS System Requirements
Hardware
Windows-based PC 1.5 GHz 2 core or higher processor
RAM 8 GB
Hard drive disk 200 GB space for sole use by the RMS system
Monitor Screen resolution 1366 x 768
Mouse or other pointing device
SECTION 01 45 00 Page 4
Minimum RMS System Requirements
Windows compatible printer Laser printer must have 4 MB+ of RAM
Connection to the Internet minimum 10 Mbs per user
Software
MS Windows Windows 7 x 64 bit (RMS requires 64 bit O/S) or newer
Word Processing software Viewer for MS Word 2013, MS Excel 2013, or newer
Microsoft.NET Framework Coordinate with the Contracting Officer for free version required
Email MAPI compatible
Virus protection software Regularly upgraded with all issued manufacturer's updates and is able to detect most zero day viruses.
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
After contract award, download instructions for the installation and use of RMS from the Government RMS Internet Website.
1.6 CONTRACT DATABASE
Prior to the preconstruction conference, the Government will provide the Contractor with basic contract award data to use for RMS. The Government will provide data updates to the Contractor as needed. These updates will generally consist of submittal reviews, correspondence status, Quality Assurance (QA) comments, and other administrative and QA data.
1.7 DATABASE MAINTENANCE
Establish, maintain, and update data in the RMS database throughout the duration of the contract at the Contractor's site office. Submit data updates to the Government (e.g., daily reports, submittals, RFIs, schedule updates, payment requests) using RMS. The RMS database typically includes current data on the following items:
1.7.1 Administration
1.7.1.1 Contractor Information
Contain within the database the Contractor's name, address, telephone numbers, management staff, and other required items. Within 7 calendar days of receipt of RMS software from the Government, deliver Contractor administrative data in electronic format in RMS.
1.7.1.2 Subcontractor Information
Contain within the database the name, trade, address, phone numbers, and other required information for all subcontractors. A subcontractor is listed separately for each trade to be performed. Assign each
SECTION 01 45 00 Page 5 subcontractor/trade a unique Responsibility Code provided in RMS. Within 7 calendar days of receipt of RMS software from the Government, deliver subcontractor administrative data in electronic format.
1.7.1.3 Correspondence
Identify all Contractor correspondence to the Government with a serial number. Prefix correspondence initiated by the Contractor's site office with S. Prefix letters initiated by the Contractor's home (main) office with H. Letters are numbered starting from 0001. (e.g., H-0001 or S-0001).
The Government's letters to the Contractor will be prefixed with C.
1.7.1.4 Equipment
Contain within the Contractor's RMS database a current list of equipment planned for use or being used on the jobsite including the most recent and planned equipment inspection dates.
1.7.1.5 Management Reporting
RMS includes a number of reports that Contractor management can use to track the status of the project. The value of these reports is reflective of the quality of the data input and is maintained in the various sections of RMS. Among these reports are Progress Payment Request worksheet, Quality Assurance/Quality Control (QA/QC) comments, Submittal Register Status, Three-Phase Control checklists.
1.7.1.6 Request For Information (RFI)
Exchange all RFIs using the built-in RFI generator and tracker in RMS.
1.7.2 Finances
1.7.2.1 Pay Activity Data
Include within the RMS database a list of pay activities that the Contractor develops in conjunction with the construction schedule. The sum of pay activities equals the total contract amount including modifications. Each pay activity must be assigned to a Contract Line Item Number (CLIN). The sum of the activities equals the amount of each CLIN.
The sum of all CLINs equals the contract amount.
1.7.2.2 Payment Requests
Prepare all progress payment requests using RMS. Complete the payment request worksheet, prompt payment certification, and payment invoice in RMS. Update the work completed under the contract, measured as percent or as specific quantities, at least monthly. After the update, generate a payment request report using RMS. Submit the payment request, prompt payment certification, and payment invoice with supporting data using RMS CM. A signed paper copy of the approved payment request is also required and will govern in the event of discrepancy with the electronic version.
1.7.3 Quality Control (QC)
RMS provides a means to track implementation of the three-phase QC System, prepare daily reports, identify and track deficiencies, document progress of work, and support other Contractor QC requirements. Maintain this data on a daily basis. Entered data will automatically output to the
SECTION 01 45 00 Page 6
RMS-generated daily report. Provide the Government a Contractor Quality Control (CQC) Plan within the time required in Section 01 45 04 CONTRACTOR QUALITY CONTROL. Within 7 calendar days of Government acceptance, submit an RMS update reflecting the information contained in the accepted CQC Plan: schedule, pay activities, features of work, submittal register, QC requirements, and equipment list.
1.7.3.1 Daily Contractor Quality Control (CQC) Reports
RMS includes the means to produce the Daily CQC Report. The Contractor can use other formats to record basic QC data. However, the Daily CQC Report generated by RMS must be the Contractor's official report. Summarize data from any supplemental reports by the Contractor and consolidate onto the RMS-generated Daily CQC Report. Submit daily CQC Reports as required by Section 01 45 04 CONTRACTOR QUALITY CONTROL. Electronically submit reports to the Government within 24 hours after the date covered by the report.
Also provide the Government a signed, printed copy of the Daily CQC Report.
1.7.3.2 Deficiency Tracking
Use RMS to track deficiencies. Deficiencies identified by the Contractor will be numerically tracked using its QC punch list items. Maintain a current log of its QC punch list items in the RMS database. The Government will log the deficiencies it has identified using its QA punch list items.
The Government's QA punch list items will be included in its export file to the Contractor. Regularly update the correction status of both QC and QA punch list items.
1.7.3.3 QC Requirements
Develop and maintain a complete list of QC testing and required structural and life-safety special inspections required by the International Code Council, transferred and installed property, and user training requirements in RMS. Update data on these QC requirements as work progresses and promptly provide the information to the Government via RMS.
1.7.3.4 Three-Phase Control Meetings
Maintain scheduled and actual dates and times of preparatory and initial control meetings in RMS.
1.7.3.5 Labor and Equipment Hours
Log labor and equipment exposure hours on a daily basis. The labor and equipment exposure data will be rolled up into a monthly exposure report.
1.7.3.6 Accident/Safety Reporting
The Government will issue safety comments, directions, or guidance whenever safety deficiencies are observed. The Government's safety comments will be provided via RMS CM. Regularly update the correction status of the safety comments. In addition, use RMS to advise the Government of any accidents occurring on the jobsite. A brief supplemental entry of an accident is not to be considered as a substitute for completion of mandatory reports, e.g., ENG Form 3394 and OSHA Form 300.
1.7.3.7 Features of Work
Include a complete list of the features of work in the RMS database. A
SECTION 01 45 00 Page 7 feature of work is associated with multiple pay activities. However, each pay activity (see subparagraph PAYMENT ACTIVITY DATA of paragraph FINANCES) will only be linked to a single feature of work.
1.7.3.8 Hazard Analysis
Use RMS CM to develop a hazard analysis for each feature of work included in the CQC Plan. The Activity Hazard Analysis will include information required by EM 385-1-1 Section 1-6.
1.7.4 Submittal Management
For Design-Bid-Build contracts, the Government will provide the initial submittal register in electronic format. For Design-Build contracts, the Designer of Record is responsible for developing the submittal register in electronic format. Thereafter, maintain a complete list of submittals including completion of data columns. Dates when submittals are received and returned by the Government will be included. Use RMS CM to track and transmit submittals. ENG Form 4025, submittal transmittal form, and the submittal register update is produced using RMS. RMS will be used to update, store, and exchange submittal registers and transmittals. In addition to requirements stated in section 01 33 00 SUBMITTAL PROCEDURES, actual submittals are to be stored in RMS CM with hard copies also provided. Exception will be where the Contracting Officer specifies only hard copies required, where size of document cannot be saved in RMS CM, and where samples, spare parts, color boards, and full-size drawings are to be provided.
1.7.5 Schedule
Develop a construction schedule consisting of pay activities in accordance with Section 01 32 01 PROJECT SCHEDULE. Input and maintain in the RMS database the schedule either manually or by using the Standard Data Exchange Format (SDEF) (see Section 01 32 01 PROJECT SCHEDULE). Include with each pay request the updated schedule. Provide electronic copies of transmittals.
1.7.6 Import/Export of Data
RMS includes the ability to import schedule data using SDEF.
1.8 IMPLEMENTATION
Use of RMS CM as described in the preceding paragraphs is mandatory.
Ensure that sufficient resources are available to maintain contract data within the RMS CM system. RMS CM is an integral part of the Contractor's management of quality control.
1.9 MONTHLY COORDINATION MEETING
Update the RMS CM database each workday. At least monthly, generate and submit a schedule update. At least 1 week prior to submittal, meet with the Contracting Officer to review the planned progress payment data submission for errors and omissions.
Make required corrections prior to Government acceptance of the export file and progress payment request. Payment requests accompanied by incomplete or incorrect data submittals will not be accepted. The Government will not process progress payments until all required
SECTION 01 45 00 Page 8 corrections are processed.
1.10 NOTIFICATION OF NONCOMPLIANCE
The Contracting Officer will notify the Contractor of any detected noncompliance with the requirements of this specification. Take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, will be deemed sufficient for the purpose of notification.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
SECTION 01 45 00 Page 9
| 01 45 00 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM |
| 01 45 00 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 CONTRACT ADMINISTRATION |
| 1.2.1 Electronic Communications |
| 1.2.2 Other Factors |
| 1.3 RMS SOFTWARE |
| 1.3.1 RMS CONTRACTOR'S MODE CM |
| 1.4 SYSTEM REQUIREMENTS |
| 1.5 RELATED INFORMATION |
| 1.5.1 RMS User Guide |
| 1.6 CONTRACT DATABASE |
| 1.7 DATABASE MAINTENANCE |
| 1.7.1 Administration |
| 1.7.1.1 Contractor Information |
| 1.7.1.2 Subcontractor Information |
| 1.7.1.3 Correspondence |
| 1.7.1.4 Equipment |
| 1.7.1.5 Management Reporting |
| 1.7.1.6 Request For Information RFI |
| 1.7.2 Finances |
| 1.7.2.1 Pay Activity Data |
| 1.7.2.2 Payment Requests |
| 1.7.3 Quality Control QC |
| 1.7.3.1 Daily Contractor Quality Control CQC Reports |
| 1.7.3.2 Deficiency Tracking |
| 1.7.3.3 QC Requirements |
| 1.7.3.4 Three-Phase Control Meetings |
| 1.7.3.5 Labor and Equipment Hours |
| 1.7.3.6 Accident/Safety Reporting |
| 1.7.3.7 Features of Work |
| 1.7.3.8 Hazard Analysis |
| 1.7.4 Submittal Management |
| 1.7.5 Schedule |
| 1.7.6 Import/Export of Data |
| 1.8 IMPLEMENTATION |
| 1.9 MONTHLY COORDINATION MEETING |
| 1.10 NOTIFICATION OF NONCOMPLIANCE |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION NOT USED |
File details come from the government source that posted it. Updated .