RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3: CHANNEL BOTTOM AND WALL IMPROVEMENTS PROJECT LOCATION: SAN JUAN, PUERTO RICO
Solicitation number
W51DQV25RA002
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Rio Puerto Nuevo Flood Control Project, Supplemental Contract 3. The amendment modifies the original solicitation (W51DQV25RA002) with several key changes: updating the Contract Line Item Number (CLIN) schedule, adding FAR clause 52.249-2, removing several other FAR clauses, and updating specifications and drawings. The proposal due date is 29 July 2025 at 4:00 p.m. Atlantic Standard Time.

The amendment includes a detailed CLIN schedule with 91 line items covering a wide range of construction and infrastructure work, including mobilization, erosion control, environmental monitoring, excavation, drainage, utility work, fencing, landscaping, and various specialized construction tasks. The pricing arrangement for most items is firm fixed price, with some estimated quantities noted. The project is located in San Juan, Puerto Rico, and is being executed by the U.S. Army Corps of Engineers, with a total proposed price to be determined by the contractor. Notable items include drilled shaft installations, storm drainage piping, sheet pile work, concrete structures, and utility infrastructure improvements.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 20

0003 10 JUL 2025 113454

W51DQV

W2SR TF VIPR

383 FRANKLIN D ROOSEVELT AVENUE, SAN JUAN PR 00918-0000

SAN JUAN 00918-0000

PUERTO RICO

JACLYN YOCUM, EMAIL: JACLYN.C.YOCUM@USACE.ARMY.MIL TELEPHONE: (787)

200-2398

SCD: PAS:

W51DQV25RA002

19 MAY 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

THE PURPOSE OF THIS AMENDMENT IS TO: 1) UPDATED THE CLIN SCHEDULE (SEE ATTACHMENT 1), 2) ADD FAR CLAUSE 52, 249-2, 3) REMOVE FAR CLAUSE 52.212-1, 52.212-3 (DEVIATION), 52.212-4, 52.212-5 (DEVIATION), 52.244-6, 52.216-7 ALT I, 52.249-3, AND 252.244-7000, AND 4) UPDATE THE SPECIFICATIONS AND

DRAWINGS. SEE THE CONTINUATION PAGE FOR MORE DETAIL.

PROPOSAL DUE DATE IS JULY 29, 2025, BY 4:00 P.M. (AST).

W512DQV25RA002 AMD 0003

CONTINUATION PAGE

1. This amendment is to update the following:

i. Section 00 10 00 – Solicitation, Contract Line Item Number (CLIN) Schedule. See Attachment 1.

ii. Section 00 72 00 - General Conditions. The following Reference clauses have been added or removed:

52.212-1 Instructions to Offerors-Commercial Products and Commercial Services Sep 2023 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services Nov 2023 52.216-7 Allowable Cost and Payment. (Alternate I) Aug 2018 Alternate I Feb 1997 52.244-6 Subcontracts for Commercial Products and Commercial Services Jan 2025 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Apr 2012

Removal of Improvements).

252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023

iii. Section 00 72 00 - General Conditions. The following Full Text clauses have been removed in their entirety:

52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services.

(DEVIATION 2025-O0003 and 2025-O0004) May 2024 Deviation 2025-O0004 (Mar 2025) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial

Products and Commercial Services. (DEVIATION 2025-O0003 and 2025-O0004) (Jan 2025) Deviation 2025- O0004 (Mar 2025)

iv. SPECIFICATIONS:

A. In some Volume 1 sections, asterisks appear before and after the line or lines where amendments have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.

B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.

Volume 1 of 3 – Procurement and Contracting Requirements:

Section 00 10 00 has been reviewed.

DELETE Section 00 10 00 and REPLACE with the attached revised Section 00 10 00.

Volume 2 of 3 – Technical Specifications:

Project Table of Contents has been reviewed.

DELETE Project Table of Contents and REPLACE with the attached revised Project Table of Contents.

Submittal Register has been reviewed.

DELETE Submittal Register and REPLACE with the attached revised Submittal Register.

Section 01 45 00 has been reviewed.

DELETE Section 01 45 00 and REPLACE with the attached revised Section 01 45 00.

W512DQV25RA002 AMD 0003

Section 01 52 10 has been reviewed.

DELETE Section 01 52 10 and REPLACE with the attached revised Section 01 52 10.

Section 02 41 00 has been reviewed.

DELETE Section 02 41 00 and REPLACE with the attached revised Section 02 41 00.

Section 02 42 00 has been reviewed.

DELETE Section 02 42 00.

Section 03 20 00 has been reviewed.

DELETE Section 03 20 00 and REPLACE with the attached revised Section 03 20 00.

Section 31 00 00 has been reviewed.

DELETE Section 31 00 00 and REPLACE with the attached revised Section 31 00 00.

Volume 3 of 3 – Appendices:

N/A.

v. DRAWINGS:

Sheet GC101 has been reviewed.

DELETE Sheet GC101 and REPLACE with the attached revised Sheet GC101.

Sheet GC102 has been reviewed.

DELETE Sheet GC102 and REPLACE with the attached revised Sheet GC102.

Sheet CD102 has been reviewed.

DELETE Sheet CD102 and REPLACE with the attached revised Sheet CD102.

Sheet SB204 has been reviewed.

DELETE Sheet SB204 and REPLACE with the attached revised Sheet SB204.

Sheet SB213 has been reviewed.

DELETE Sheet SB213 and REPLACE with the attached revised Sheet SB213.

2. The proposal due is July 29, 2025, by 4:00 p.m. AST.

3. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge all amendments may cause rejection of the proposal.

4. All other terms and conditions remain unchanged and in full force and effect.

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule Additional Information/Notes – This Section is to be submitted in Stage 2

Item Supplies/Service Quantity Unit Unit Price Amount

Mobilization and Demobilization

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

Erosion and Sediment Control and Turbidity Monitoring

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

Environmental Species Monitoring

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

Vibration Control and Monitoring

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

Contracting Officer's Field Office (Fixed Costs)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

Attachment 1

Contracting Officer's Field Office (Recurring Costs) (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

Months

Partnering Regroups (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Each

As-Built Drawings & Close Out Submittals

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Job

Clearing and Grubbing (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Acre

Demolition

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Demolition - Remnant Removal at De Diego Bridge

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Temporary Bypass Sheet Pile (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

324,552

Square Foot

Permanent Sheet Piles (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

27,765

Transition Sheet Piles - RPN (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

24,857

Transition Sheet Piles - Josefina (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

7,947

Demonstration Wall

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Drilled Shaft - Type 5B (Estimated

Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

30,729

Linear Foot

Drilled Shaft - Type 6A (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

82,560

Drilled Shaft - Type 6B (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

78,554

Drilled Shaft - Type 6C (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Drilled Shaft Cap Beam

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Jet Grout Seals (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task

3,589

Jet Grouting - Ground Improvement

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

Guardrail (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

3,206 Linear Foot

Handrail (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

4,417 Linear Foot

Channel Excavation (Sta 83+40 to Sta. 118+50) (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

260,274 252,594

Cubic Yard

Channel Excavation (Sta 118+50 to Sta. 147+40) (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

119,337 107,406

Cubic Yard k3ct9jcy Line k3ct9jcy Line

Embankment Excavation (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

208,182 306,696

Cubic Yard

Backfill - Fill #1 (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

5,045 2,712

Cubic Yard

Backfill - Fill #2 (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

30,249 22,436

Cubic Yard

Wall Groundwater Drains and Filter (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

9,445 Linear Foot

Finish Grading (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

54,931 Square Yard

Gabion Baskets for Bedding (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this

4,623 Each k3ct9jcy Line k3ct9jcy Line requirement in accordance with the

Pricing Arrangement: Firm Fixed Price

Marine Mattress (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

15,105 Square Foot

Riprap - Class III (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

3,961 1,254

Short Ton

Riprap - Class IV (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

9,573 11,257

Short Ton

Riprap - Class VII (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

8,379 9,654

Short Ton

Riprap - Class VIII (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

1,272 1,424

Short Ton

Articulating Concrete Block k3ct9jcy Line k3ct9jcy Line k3ct9jcy Line

Revetment (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

31,974

Concrete Armor Units (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

15,105

15" RCP Headwalls (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

36" RCP Headwalls (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

48" RCP Headwalls (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Storm Drainage Piping - 15" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this

Storm Drainage Piping - 18" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 24" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 30" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 36" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 42" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 48" RCP

(Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 60" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Concrete Double Box Culvert - 5'x6.1' (CIP)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

30" Flapgate (Estimated Quantity, The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

36" Flapgate (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

42" Flapgate (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task

60" Flapgate (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Drop Inlets (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Storm Drainage Manholes (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Stormwater Bypass

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Concrete Slab on Grade (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Square Yard

Utility Bridge - Drilled Shaft - Middle Pier (Estimated Quantity, The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Utility Bridge - Precast Beams (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Utility Bridge - Middle Pier Cap

(CIP)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Utility Bridge - Bridge Slab

(CIP)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

48" DIP Waterline Crossing

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Traffic Control

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Granular Subbase Course (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

16,077 Square Yard

Asphaltic Concrete Pavement (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

2,653 4,863

Short Ton

Asphaltic Concrete Pavement Milling Asphalt (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

16,077 Square Yard

Parking Lot Striping

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

Permanent Access Road (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

3,994 Square Yard

Chain Link Fencing (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

2,512 Linear Foot k3ct9jcy Line

Ornamental Fencing (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Metal Steps

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Vehicular Gates (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Bollards (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Sodding (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

25,974

Seeding (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and

28,958 perform all task necessary for this

Restoration

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

TRS Overtopping (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

TRS Overtopping - Dewatering Equipment Standby (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Months

LUMA Electrical Power Charges

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Allowance of $282,501.00.

AT&T/Liberty Telecommunications Charges

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Claro Telecommunications Charges.

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Allowance of $4,364.00

Sanitary Siphon - Temporary Retaining Structures

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Sanitary Siphon - Headwalls

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Sanitary Siphon - Influent Box, Effluent Box, and Piping

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Sanitary Siphon - Boring and Jacking

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Concrete Privacy Wall Replacement

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in

Debris Removal for Dredging and Excavation (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Short Ton

Municipal Tax (5.5% of the Subtotal Line Items 0001 through 0090)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

TOTAL PROPOSED PRICE (LINE ITEMS 0001 – 0091): $____________________________________________

*NOTE: QUANTITIES SHOWN ARE ESTIMATED; ACTUAL QUANTIES MAY VERY SEE FAR CLAUSE 52.211-18 “VARIATION

IN ESTIMATED QUANTITY” UNDER SECTION 00 72 00.

**CLINS 0082 AND 0084 ARE ESTIMATED COST FROM UTILITY PROVIDER