Solicitation Amendment_W51DQV25RA0020003_10July2025.pdf
PDF 1 MB Posted
- Solicitation number
- W51DQV25RA002
- Issued by
-
Department of the Army
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Rio Puerto Nuevo Flood Control Project, Supplemental Contract 3. The amendment modifies the original solicitation (W51DQV25RA002) with several key changes: updating the Contract Line Item Number (CLIN) schedule, adding FAR clause 52.249-2, removing several other FAR clauses, and updating specifications and drawings. The proposal due date is 29 July 2025 at 4:00 p.m. Atlantic Standard Time.
The amendment includes a detailed CLIN schedule with 91 line items covering a wide range of construction and infrastructure work, including mobilization, erosion control, environmental monitoring, excavation, drainage, utility work, fencing, landscaping, and various specialized construction tasks. The pricing arrangement for most items is firm fixed price, with some estimated quantities noted. The project is located in San Juan, Puerto Rico, and is being executed by the U.S. Army Corps of Engineers, with a total proposed price to be determined by the contractor. Notable items include drilled shaft installations, storm drainage piping, sheet pile work, concrete structures, and utility infrastructure improvements.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 20
0003 10 JUL 2025 113454
W51DQV
W2SR TF VIPR
383 FRANKLIN D ROOSEVELT AVENUE, SAN JUAN PR 00918-0000
SAN JUAN 00918-0000
PUERTO RICO
JACLYN YOCUM, EMAIL: JACLYN.C.YOCUM@USACE.ARMY.MIL TELEPHONE: (787)
200-2398
SCD: PAS:
W51DQV25RA002
19 MAY 2025
SEE SECTION G - CONTRACT ADMINISTRATION DATA
THE PURPOSE OF THIS AMENDMENT IS TO: 1) UPDATED THE CLIN SCHEDULE (SEE ATTACHMENT 1), 2) ADD FAR CLAUSE 52, 249-2, 3) REMOVE FAR CLAUSE 52.212-1, 52.212-3 (DEVIATION), 52.212-4, 52.212-5 (DEVIATION), 52.244-6, 52.216-7 ALT I, 52.249-3, AND 252.244-7000, AND 4) UPDATE THE SPECIFICATIONS AND
DRAWINGS. SEE THE CONTINUATION PAGE FOR MORE DETAIL.
PROPOSAL DUE DATE IS JULY 29, 2025, BY 4:00 P.M. (AST).
W512DQV25RA002 AMD 0003
CONTINUATION PAGE
1. This amendment is to update the following:
i. Section 00 10 00 – Solicitation, Contract Line Item Number (CLIN) Schedule. See Attachment 1.
ii. Section 00 72 00 - General Conditions. The following Reference clauses have been added or removed:
52.212-1 Instructions to Offerors-Commercial Products and Commercial Services Sep 2023 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services Nov 2023 52.216-7 Allowable Cost and Payment. (Alternate I) Aug 2018 Alternate I Feb 1997 52.244-6 Subcontracts for Commercial Products and Commercial Services Jan 2025 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Apr 2012
Removal of Improvements).
252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023
iii. Section 00 72 00 - General Conditions. The following Full Text clauses have been removed in their entirety:
52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services.
(DEVIATION 2025-O0003 and 2025-O0004) May 2024 Deviation 2025-O0004 (Mar 2025) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial
Products and Commercial Services. (DEVIATION 2025-O0003 and 2025-O0004) (Jan 2025) Deviation 2025- O0004 (Mar 2025)
iv. SPECIFICATIONS:
A. In some Volume 1 sections, asterisks appear before and after the line or lines where amendments have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.
B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Volume 1 of 3 – Procurement and Contracting Requirements:
Section 00 10 00 has been reviewed.
DELETE Section 00 10 00 and REPLACE with the attached revised Section 00 10 00.
Volume 2 of 3 – Technical Specifications:
Project Table of Contents has been reviewed.
DELETE Project Table of Contents and REPLACE with the attached revised Project Table of Contents.
Submittal Register has been reviewed.
DELETE Submittal Register and REPLACE with the attached revised Submittal Register.
Section 01 45 00 has been reviewed.
DELETE Section 01 45 00 and REPLACE with the attached revised Section 01 45 00.
W512DQV25RA002 AMD 0003
Section 01 52 10 has been reviewed.
DELETE Section 01 52 10 and REPLACE with the attached revised Section 01 52 10.
Section 02 41 00 has been reviewed.
DELETE Section 02 41 00 and REPLACE with the attached revised Section 02 41 00.
Section 02 42 00 has been reviewed.
DELETE Section 02 42 00.
Section 03 20 00 has been reviewed.
DELETE Section 03 20 00 and REPLACE with the attached revised Section 03 20 00.
Section 31 00 00 has been reviewed.
DELETE Section 31 00 00 and REPLACE with the attached revised Section 31 00 00.
Volume 3 of 3 – Appendices:
N/A.
v. DRAWINGS:
Sheet GC101 has been reviewed.
DELETE Sheet GC101 and REPLACE with the attached revised Sheet GC101.
Sheet GC102 has been reviewed.
DELETE Sheet GC102 and REPLACE with the attached revised Sheet GC102.
Sheet CD102 has been reviewed.
DELETE Sheet CD102 and REPLACE with the attached revised Sheet CD102.
Sheet SB204 has been reviewed.
DELETE Sheet SB204 and REPLACE with the attached revised Sheet SB204.
Sheet SB213 has been reviewed.
DELETE Sheet SB213 and REPLACE with the attached revised Sheet SB213.
2. The proposal due is July 29, 2025, by 4:00 p.m. AST.
3. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge all amendments may cause rejection of the proposal.
4. All other terms and conditions remain unchanged and in full force and effect.
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule Additional Information/Notes – This Section is to be submitted in Stage 2
Item Supplies/Service Quantity Unit Unit Price Amount
Mobilization and Demobilization
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
1 Job
Erosion and Sediment Control and Turbidity Monitoring
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
1 Job
Environmental Species Monitoring
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
1 Job
Vibration Control and Monitoring
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
1 Job
Contracting Officer's Field Office (Fixed Costs)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
1 Job
Attachment 1
Contracting Officer's Field Office (Recurring Costs) (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
Months
Partnering Regroups (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Each
As-Built Drawings & Close Out Submittals
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Job
Clearing and Grubbing (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Acre
Demolition
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Demolition - Remnant Removal at De Diego Bridge
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Temporary Bypass Sheet Pile (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
324,552
Square Foot
Permanent Sheet Piles (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
27,765
Transition Sheet Piles - RPN (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
24,857
Transition Sheet Piles - Josefina (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
7,947
Demonstration Wall
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Drilled Shaft - Type 5B (Estimated
Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
30,729
Linear Foot
Drilled Shaft - Type 6A (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
82,560
Drilled Shaft - Type 6B (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
78,554
Drilled Shaft - Type 6C (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Drilled Shaft Cap Beam
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Jet Grout Seals (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task
3,589
Jet Grouting - Ground Improvement
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
1 Job
Guardrail (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
3,206 Linear Foot
Handrail (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
4,417 Linear Foot
Channel Excavation (Sta 83+40 to Sta. 118+50) (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
260,274 252,594
Cubic Yard
Channel Excavation (Sta 118+50 to Sta. 147+40) (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
119,337 107,406
Cubic Yard k3ct9jcy Line k3ct9jcy Line
Embankment Excavation (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
208,182 306,696
Cubic Yard
Backfill - Fill #1 (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
5,045 2,712
Cubic Yard
Backfill - Fill #2 (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
30,249 22,436
Cubic Yard
Wall Groundwater Drains and Filter (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
9,445 Linear Foot
Finish Grading (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
54,931 Square Yard
Gabion Baskets for Bedding (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this
4,623 Each k3ct9jcy Line k3ct9jcy Line requirement in accordance with the
Pricing Arrangement: Firm Fixed Price
Marine Mattress (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
15,105 Square Foot
Riprap - Class III (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
3,961 1,254
Short Ton
Riprap - Class IV (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
9,573 11,257
Short Ton
Riprap - Class VII (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
8,379 9,654
Short Ton
Riprap - Class VIII (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
1,272 1,424
Short Ton
Articulating Concrete Block k3ct9jcy Line k3ct9jcy Line k3ct9jcy Line
Revetment (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
31,974
Concrete Armor Units (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
15,105
15" RCP Headwalls (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
36" RCP Headwalls (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
48" RCP Headwalls (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Storm Drainage Piping - 15" RCP (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this
Storm Drainage Piping - 18" RCP (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Storm Drainage Piping - 24" RCP (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Storm Drainage Piping - 30" RCP (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Storm Drainage Piping - 36" RCP (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Storm Drainage Piping - 42" RCP (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Storm Drainage Piping - 48" RCP
(Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Storm Drainage Piping - 60" RCP (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Concrete Double Box Culvert - 5'x6.1' (CIP)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
30" Flapgate (Estimated Quantity, The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
36" Flapgate (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
42" Flapgate (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task
60" Flapgate (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Drop Inlets (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Storm Drainage Manholes (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Stormwater Bypass
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Concrete Slab on Grade (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Square Yard
Utility Bridge - Drilled Shaft - Middle Pier (Estimated Quantity, The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Utility Bridge - Precast Beams (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Utility Bridge - Middle Pier Cap
(CIP)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Utility Bridge - Bridge Slab
(CIP)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
48" DIP Waterline Crossing
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Traffic Control
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Granular Subbase Course (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
16,077 Square Yard
Asphaltic Concrete Pavement (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
2,653 4,863
Short Ton
Asphaltic Concrete Pavement Milling Asphalt (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
16,077 Square Yard
Parking Lot Striping
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
1 Job
Permanent Access Road (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Pricing Arrangement: Firm Fixed Price
3,994 Square Yard
Chain Link Fencing (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
2,512 Linear Foot k3ct9jcy Line
Ornamental Fencing (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Metal Steps
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Vehicular Gates (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Bollards (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Sodding (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
25,974
Seeding (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and
28,958 perform all task necessary for this
Restoration
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
TRS Overtopping (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
TRS Overtopping - Dewatering Equipment Standby (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Months
LUMA Electrical Power Charges
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Allowance of $282,501.00.
AT&T/Liberty Telecommunications Charges
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Claro Telecommunications Charges.
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.
Allowance of $4,364.00
Sanitary Siphon - Temporary Retaining Structures
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Sanitary Siphon - Headwalls
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Sanitary Siphon - Influent Box, Effluent Box, and Piping
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Sanitary Siphon - Boring and Jacking
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans
Concrete Privacy Wall Replacement
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in
Debris Removal for Dredging and Excavation (Estimated Quantity, Note 2)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
Short Ton
Municipal Tax (5.5% of the Subtotal Line Items 0001 through 0090)
The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the
TOTAL PROPOSED PRICE (LINE ITEMS 0001 – 0091): $____________________________________________
*NOTE: QUANTITIES SHOWN ARE ESTIMATED; ACTUAL QUANTIES MAY VERY SEE FAR CLAUSE 52.211-18 “VARIATION
IN ESTIMATED QUANTITY” UNDER SECTION 00 72 00.
**CLINS 0082 AND 0084 ARE ESTIMATED COST FROM UTILITY PROVIDER
File details come from the government source that posted it. Updated .