RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3: CHANNEL BOTTOM AND WALL IMPROVEMENTS PROJECT LOCATION: SAN JUAN, PUERTO RICO
Solicitation number
W51DQV25RA002
Issued by

About this file

This is a Solicitation for the Rio Puerto Nuevo Flood Control Project, Supplemental Contract 3 located in San Juan, Puerto Rico, issued by the US Army Corps of Engineers Caribbean District. The solicitation is for a Design-Bid-Build (DBB) construction contract with a firm-fixed-price (FFP) valued over $500 million, targeting the improvement of channel bottom and walls. The contract will have a performance period of 2,190 calendar days, with the contractor required to begin work within 10 calendar days after receiving the notice to proceed.

The solicitation includes 91 contract line items (CLINs) covering extensive construction activities such as mobilization, erosion control, environmental monitoring, channel excavation, drilled shaft installation, utility bridge construction, storm drainage work, fencing, landscaping, and various infrastructure improvements. The procurement will use a two-stage best value source selection process, with small business participation goals including 13% overall small business participation, with specific targets for disadvantaged, women-owned, veteran-owned, and HUBZone small businesses. The solicitation was released on 19 May 2025, with proposals due by 03 July 2025 at 10:00 AM local time, to be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) website.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

W51DQV25RA002

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

1 140

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

113454

7. ISSUED BY CODE W51DQV 8. ADDRESS OFFER TO

W2SR TF VIPR

383 FRANKLIN D ROOSEVELT AVENUE, SAN JUAN PR 00918-0000

SAN JUAN 00918-0000

PUERTO RICO

JACLYN YOCUM,

EMAIL: JACLYN.C.YOCUM@USACE.ARMY.MIL

9. FOR

INFORMATION CALL:

a. NAME

JACLYN YOCUM

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

(787) 200-2398

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

PROJECT TITLE: RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3: CHANNEL BOTTOM AND WALL IMPROVEMENTS

PROJECT LOCATION: SAN JUAN, PUERTO RICO.

THIS IS A REQUEST FOR PROPOSAL (RFP) WHICH WILL RESULT IN THE AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCTION

CONTRACT.

GENERAL SCOPE OF WORK: REFER TO SECTION 00 31 32.

MAGNITUDE OF CONSTRUCTION (DFARS 236-204): OVER $500 MILLION.

THE NORTH AMERICAN INDUSTRY CLASSIFICATION IS 237990 WITH A SMALL BUSINESS STANDARD SIZE OF $45 MILLION.

IN ACCORDANCE WITH FAR 52.236-27 ATL I, AN ORGANZIED SITE VISIT HAS BEEN SCHEDULED.

*** OFFERORS ARE NOTIFIED THAT REAL ESTATE IS NOT CURRENTLY CLEARED FOR CONSTRUCTION BUT WILL BE BY ISSUANCE OF THE FULL NOTICE TO

PROCEED. ***

11. The contractor shall begin performance within 10 calendar days and complete it within 2190 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable.

(See

FAR 52.211-10 ).

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

YES NO

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by 10:00 AM (hour) local time 03 JUL 2025

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

mailto:JACLYN.C.YOCUM@USACE.ARMY.MIL

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

Created On:

18 Apr 2025, 11:52 AM Central Daylight Time

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

AMOUNTS

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

10 U.S.C. 3204(a) (

27. PAYMENT WILL BE MADE BY

) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule Additional Information/Notes – This Section is to be submitted in Stage 2

Item Supplies/Service Quantity Unit Unit Price Amount

Mobilization and Demobilization

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Pricing Arrangement: Firm Fixed Price

Job

Erosion and Sediment Control and Turbidity Monitoring

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Environmental Species Monitoring

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Vibration Control and Monitoring

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Contracting Officer's Field Office (Fixed Costs)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Contracting Officer's Field Office (Recurring Costs) (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Months

Partnering Regroups (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Each

As-Built Drawings & Close Out Submittals

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Clearing and Grubbing (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Acre

Demolition

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Demolition - Remnant Removal at De Diego Bridge

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Temporary Bypass Sheet Pile (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

324,552

Square Foot

Permanent Sheet Piles (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

27,765

Transition Sheet Piles - RPN (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

24,857

Transition Sheet Piles - Josefina (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

7,947

Demonstration Wall

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Drilled Shaft - Type 5B (Estimated

Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

30,729

Linear Foot

Drilled Shaft - Type 6A (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

82,560

Drilled Shaft - Type 6B (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

78,554

Drilled Shaft - Type 6C (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Drilled Shaft Cap Beam

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Jet Grout Seals (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task

3,589

Jet Grouting - Ground Improvement

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Guardrail (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

3,206

Handrail (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

4,417

Channel Excavation (Sta 83+40 to Sta. 118+50) (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

260,274

Cubic Yard

Channel Excavation (Sta 118+50 to Sta. 147+40) (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

119,337

Embankment Excavation (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

208,182

Backfill - Fill #1 (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

5,045

Backfill - Fill #2 (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

30,249

Wall Groundwater Drains and Filter (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

9,445

Finish Grading (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

54,931

Square Yard

Gabion Baskets for Bedding (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this

4,623 requirement in accordance with the

Marine Mattress (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

15,105

Riprap - Class III (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

3,961

Short Ton

Riprap - Class IV (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

9,573

Riprap - Class VII (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

8,379

Riprap - Class VIII (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

1,272

Articulating Concrete Block

Revetment (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

31,974

Concrete Armor Units (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

15,105

15" RCP Headwalls (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

36" RCP Headwalls (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

48" RCP Headwalls (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Storm Drainage Piping - 15" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this

Storm Drainage Piping - 18" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 24" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 30" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 36" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 42" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 48" RCP

(Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Storm Drainage Piping - 60" RCP (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Concrete Double Box Culvert - 5'x6.1' (CIP)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

30" Flapgate (Estimated Quantity, The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

36" Flapgate (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

42" Flapgate (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task

60" Flapgate (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Drop Inlets (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Storm Drainage Manholes (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Stormwater Bypass

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Concrete Slab on Grade (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Utility Bridge - Drilled Shaft - Middle Pier (Estimated Quantity, The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Utility Bridge - Precast Beams (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Utility Bridge - Middle Pier Cap

(CIP)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Utility Bridge - Bridge Slab

(CIP)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

48" DIP Waterline Crossing

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Traffic Control

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Granular Subbase Course (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

16,077

Asphaltic Concrete Pavement (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

2,653

Asphaltic Concrete Pavement (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

16,077

Parking Lot Striping

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Permanent Access Road (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

3,994

Chain Link Fencing (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task

2,512

Ornamental Fencing (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Metal Steps

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Vehicular Gates (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Bollards (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Sodding (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

25,974

Seeding (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and

28,958 perform all task necessary for this

Restoration

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

TRS Overtopping (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

TRS Overtopping - Dewatering Equipment Standby (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Months

LUMA Electrical Power Charges

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Allowance of $282,501.00.

AT&T/Liberty Telecommunications Charges

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Claro Telecommunications Charges.

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans and specifications.

Allowance of $4,364.00

Sanitary Siphon - Temporary Retaining Structures

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Sanitary Siphon - Headwalls

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Sanitary Siphon - Influent Box, Effluent Box, and Piping

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Sanitary Siphon - Boring and Jacking

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the provided plans

Concrete Privacy Wall Replacement

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in

Debris Removal for Dredging and Excavation (Estimated Quantity, Note 2)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

Municipal Tax (5.5% of the Subtotal Line Items 0001 through 0090)

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for this requirement in accordance with the

TOTAL PROPOSED PRICE (LINE ITEMS 0001 – 0091): $____________________________________________

*NOTE: QUANTITIES SHOWN ARE ESTIMATED; ACTUAL QUANTIES MAY VERY SEE FAR CLAUSE 52.211-18 “VARIATION

IN ESTIMATED QUANTITY” UNDER SECTION 00 72 00.

**CLINS 0082 AND 0084 ARE ESTIMATED COST FROM UTILITY PROVIDER

Section 00 21 00 - Instructions

FAR Clauses Incorporated by Reference

Variation Effective Date

DFARS Clauses Incorporated by Reference

Number Title

Alternate/ Deviation

Variation

Date

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements. Nov 2023

FAR Clauses Incorporated by Full Text

52.233-2 Service of Protest. (Sep 2006)

As prescribed in 33.106 , insert the following provision:

Service of Protest (Sept 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Contracting Officer, Renee Booth, via email at Meranda.R.Booth@usace.army.mil.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 Site Visit (Construction). (Alternate I) (Feb 1995) Alternate I (Feb 1995)

Alternate I (Feb 1995). If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic provision:

(b) An organized site visit has been scheduled for-

June 12, 2025 at 8:30 AM (AST)

(c) Participants will meet at-

Location will be provided by the contract administration office via telephone.

Participants should call Maria Torres at 787-220-0827 on or before June 9, 2025 to make arrangements

52.252-1 Solicitation Provisions Incorporated by Reference. (Feb 1998)

As prescribed in 52.107(a), insert the following provision:

Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

For FAR: https://www.acquisition.gov/browse/index/far

For DFARS: https://www.acquistion.gov/dfars

Number Title Effective

Alternate/ Deviation

52.204-7 System for Award Management. Nov 2024 52.204-16 Commercial and Government Entity Code Reporting Aug 2020 52.204-22 Alternative Line Item Proposal. Jan 2017 mailto:Contracting%20Officer,%20Renee%20Booth,%20via%20email%20at%20Meranda.R.Booth@usace.army.mil.%09 https://www.acquisition.gov/browse/index/far https://www.acquistion.gov/dfars

52.252-5 Authorized Deviations in Provisions. (Nov 2020)

As prescribed in 52.107(e), insert the following provision in solicitations that include any FAR or supplemental provision with an authorized deviation. Whenever any FAR or supplemental provision is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date assigned to the provision when it is used without deviation, include regulation name for any supplemental provision, except that the contracting officer shall insert "(DEVIATION)" after the date of the provision.

Authorized Deviations in Provisions (Nov 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 21 16 - Instructions to Proposers

A. PROPOSAL SUBMISSION

1.1 PROPOSAL SUBMISSION REQUIREMENTS

The Offeror’s proposal shall be submitted electronically, as described below. The use of hyperlinks in the proposal is prohibited. The offeror’s proposal due date is anticipated by no later than the date & time specified in the SF 1442 solicitation.

Each volume shall be submitted electronically in the Solicitation Module at the Procurement Integrated Enterprise Environment (PIEE) website https://PIEE.EB.MIL. Electronic copies of each volume shall be submitted through the Solicitation Module of PIEE. Any portion of the proposal that is changed (as a result of negotiations or proposal revisions) should be annotated and dated. Each volume shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 5).

NOTE: The only authorized transmission method of proposals in response to the subject solicitation is electronically via the Procurement Integrated Enterprise Environment (PIEE) website. No other transmission methods, such as facsimile, hand- carried, proprietary or DOD SAFE submissions, proposals submitted by mail, etc. will be accepted. Offers submitted via any other transmission method other than the Procurement Integrated Enterprise Environment (PIEE) website may not be evaluated.

Offerors shall verify that the information for all forms submitted are current, correct, and complete, including names of points of contact, email addresses, and telephone numbers. The Government will not evaluate any material that exceeds the page limits specified within each evaluation factor. Any material in excess of what is requested, such as corporate marketing information, will not be considered. Failing to submit or completely fill out attachments properly may result in rejection of the offer without further evaluation.

Therefore, Offerors are urged to follow instructions and raise questions through inquiries if instructions are not understood. Do not include references to material or information not found within its respective volumes. Information submitted in the wrong volumes could lead to an Offeror’s proposal being determined “Unacceptable” if materially incomplete in any aspect.

1.2 INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS: The Offeror’s proposal must be received by the Government no later than the date/time specified in the solicitation. Offerors shall submit their proposal using this link https://piee.eb.mil/.

For instructions on how to establish an account in PIEE, please refer to the Vendor User Registration guide in this link:

https://pieetraining.eb.mil/wbt/portal/portal/Vendor_Registration.pdf

Government Administrators cannot help vendors with their accounts. For issues with vendors account, please use the Vendor Customer Support link to submit an issue or contact the help desk.

Vendor Customer Support link: https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhml Help Desk:866-618-5988 Email: disa.global.servicedesk.mbx.eb-ticket-requests@mail.mil Fax: 801-605-7453 Help Desk Hours Monday - Friday, 06:30 – 24:00 EST

If there is a system outage, see below. All proposals received after the exact time specified for receipt shall be treated as late submissions and will be handled in accordance with FAR 15.208.

For instructions on how to post an offer, please refer to the Posting Offer demo:

https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.

There are two vendor roles (Proposal Manager and Proposal View Only) for the PIEE Solicitation Module. The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. Additionally, please be advised that when using the PIEE Solicitation Module, the user's e-mail address in PIEE must match the e-mail address on file in SAM.gov. Also, be advised that submitting files to the Unsolicited Proposal Module will NOT CONSTITUTE a responsive submission to this solicitation. The Proposal Manager must ensure that his or her profile is complete and has been updated as is necessary to ensure a compliant submission in accordance with this solicitation and is highly encouraged to take steps to do so at the earliest opportunity.

OFFERORS ARE STRONGLY ENCOURAGED TO AVOID WAITING UNTIL THE LAST MINUTE TO ATTEMPT TO TRANSMIT THEIR PROPOSALS. TECHNICAL ISSUES WITH UPLOAD MAY RENDER YOUR PROPOSAL TO BE LATE.

For the purposes of establishing whether a proposal submission is considered timely, the Government considers the date and time the submission is completely uploaded into the PIEE website. For multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the PIEE website. Do not assume that electronic communication is instantaneous. It can take several hours for completion of upload.

The Government intends for PIEE to serve as the primary means for submitting the proposals. Accordingly, proposals received by email, modifications thereto, or cancellations of proposals will not be accepted unless the offeror sends an email containing the required mailto:disa.global.servicedesk.mbx.eb-ticket-requests@mail.mil proposal documents along with an explanation as to why the proposal was not submitted via PIEE. Emails are to be sent to the Contract Specialist and the Contracting Officer and must be received by the Government electronic infrastructure prior to the exact time set for receipt. The offeror will be solely responsible for ensuring that the email and the proposal in its entirety are received timely. The emailed version will then serve as the offeror's official submission.

The Government is not responsible for submissions delivered to any location or to anyone other than those designated to receive proposals.

1.3 NAMING CONVENTION: To ensure submissions are received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention. Each file name shall begin with the solicitation number, followed by the word “RESPONSE”, followed by the firm’s name and, finally, a brief file description.

EXAMPLES

(1) “W51DQV25RA002 RESPONSE Firm name Volume I.pdf”

(2) “W51DQV25RA002 RESPONSE Firm name Volume II.pdf”

(3) “W51DQV25RA002 RESPONSE Firm name Volume III.pdf

1.4 SPECIFIC REQUIREMENTS: Offerors are required to submit proposals with the content specified herein. Proposals without the specified content may be determined “Unacceptable” and removed from the competition. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the Offeror.

All proposals shall contain the evaluation requirements stated herein, and each volume shall also contain: Table of Contents, List of Tables (if required), List of Figures (if required), List of Appendixes, and Name/Address/Telephone Number/e-mail address of the Offeror. Proposal clarity, organization, and cross-referencing are mandatory. No material (information not part of proposal) shall be incorporated by reference. The offeror shall submit in the proposal the requested information specified herein.

Offers providing less than 120 calendar days for Government acceptance after the date offers are due may not be considered for award.

Submissions shall be in Adobe PDF format.

Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 point or larger.

Offerors shall prepare proposals in the English language. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor.

Interested parties shall submit responses no later than the date prescribed. Offerors should time upload efforts with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Submissions after the deadline may still be uploaded to the PIEE Solicitation Module but be advised, they will be considered late and will be processed in accordance with

FAR 15.208.

1.5 Each paragraph should be single spaced and shall be separated by at least one blank line. A standard, 10-point minimum font size or larger applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be produced in landscape mode.

The following volumes shall be submitted:

TABLE 1

Volume Tab Title Maximum Pages

VOLUME I - TECHNICAL PROPOSAL – STAGE ONE

I A Factor I - Technical Approach 90

I B Factor II - Organizational Structure and Quality Control 40

I C Factor III - Risk and Resource Identification 20

I D Factor IV – Past Performance No page limit

VOLUME II - SMALL BUSINESS DOCUMENTS – STAGE TWO

II A SMALL BUSINESS PARTICIPATION PLAN (FACTOR 5) Stage Two

No page limit

VOLUME III - PRICE AND PROFORMA INFORMATION (STAGE TWO)

III A Standard Form 1442 Solicitation, Offer and Award - with box 19 acknowledgement of all amendments and a completed Section 00 10 00 – Solicitation, Contract Line Item Number (CLIN) Schedule

No page limit

B Bid Guarantee No page limit

III C Proposal Data Sheet (Attachment 4) Section 00101, Representations, Certifications and Other

Statements of Offerors Determination of Responsibility Form (Attachment 5) Small Business Subcontracting Plan (SBSP) – ONLY FOR

LARGE BUSINESSES

No page limit

NOTE: Volumes that exceed the page limitation in the above table will not be evaluated beyond the total allowable number of pages.

1.6 The Caribbean District is utilizing the stage receipt of proposals method for this project. The initial proposal submission (Stage One) will be based on 95% plans and specifications and offerors will only be required to submit a proposal consisting of the information identified in paragraph 1.8. The amendment for the Stage Two will be issued only to responsive offerors and all responsive offerors who submitted a proposal by the due date and time required for the initial receipt of proposal will move forward to Stage Two. This amendment will provide additional instructions for the submission of the required information as identified in paragraph 1.9. All proposal materials, submitted via the PIEE website, will be required to conform to the solicitation requirements.

2. PROPOSAL FILES

a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and Request for Proposal (RFP) number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11” The following additional restrictions apply:

b. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked. The following shall be included in the Narrative discussion:

2.1. VOLUME I –SUBMISSION REQUIREMENTS (TECHNICAL PROPOSAL, FACTORS 1-4):

2.1.1 For purposes of this solicitation, an “offeror” may include a group of two (2) or more entities that have formed a “contractor team arrangement,” as the term is defined in the Federal Acquisition Regulation, Part 9.6. In the case of entities that have formed a contractor team arrangement, the experience and performance history of any member of the team, whether or not gained while working with the other member(s) of the currently proposed contractor team arrangement, will be considered as a part of the evaluation of the offeror’s proposal.

An offeror that relies upon the experience and performance history of a member, members or affiliates of a proposed contractor team arrangement must provide a teaming agreement or commitment (in the case of any affiliates) signed by all parties. The teaming agreement/commitment shall:

a. Identify the legal name(s), UEI number, and cage code(s) of all entities.

b. Describe the nature of each entity’s relationship (partnership, joint venture, prime/sub or mentor/protégé) and their role on this project as a part of their proposal. The offeror will be expected to maintain that arrangement during performance of any contract awarded to that offeror under this solicitation.

c. The estimated percentage of work to be completed by each member submitted for the solicitation.

The following are to be used in determining the status of the Offeror’s team for evaluation of project submissions under Factor 4:

• In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this solicitation, the prime contractor is considered the “prime offeror”.

• In the case of joint ventures, the “prime offeror” experience can come from any of the entities involved in the venture.

• In the case of mentor/protégé relationships, the relationship must be established by the two offerors and approved by the Small

Business Administration (SBA) prior to proposal submission. Once the relationship has been approved, the “prime offeror” experience can come from any of the entities involved in the relationship. The approved mentor/protégé document from the Small Business Administration (SBA) must be submitted along with the teaming agreement.

• In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the experience (submitted project) comes from a subcontractor , the subcontractor shall submit the final cost of the work executed within the project along with the total project cost. Submission must comply with requirements under this section.

• In the case of offerors that are large, multi-functioning firms (consisting of subsidiaries), experience must only be submitted by the segment of the firm (e.g., division, group, unit, office) submitting a proposal in response to this solicitation.

• In the case of affiliates, past performance of an offeror’s “affiliate,” as that term is defined in FAR 2.101, will be evaluated (as described within this section) if the offeror demonstrates a firm commitment that the affiliate will participate meaningfully (e.g.

roles, responsibilities, etc.) in the performance of the contract. This commitment, nature of each entity’s relationship, and meaningful participation shall be described in a document signed by authorized representatives.

2.2. FACTOR 1 – TECHNICAL APPROACH (STAGE ONE):

2.2.1 In responding to this factor, the objective should be to instill confidence that the offeror thoroughly understands the requirements of the solicitation, has the adequate resources to execute, and has the expertise and experience required to successfully satisfy or exceed the solicitation requirements within the required period of performance (See Section 00700, FAR Clause 52.211- 10).

The offeror must submit a Technical Approach Plan, in a narrative form, to describe how the offeror intends to execute the project.

The technical approach must describe in detail how the offeror intends to perform key construction activities which includes, at a minimum:

• Installation of the utility bridge, sanitary siphon, 48-inch water main relocation, and channel walls.

• Construction of drilled shaft walls using slurry fluids.

• Noise and vibration controls during the sheet piles and drilled shafts installations.

• Erosion control placement in wet.

• Water diversion, surface and ground water control.

• Electrical utility relocation including coordination with local agencies and utility owners.

• Material excavation and disposal including procedures and equipment. Include methods of disposal using barges (Ocean disposal and disposal at La Chuleta or approved disposal site) and trucking as applicable.

The areas of work identified above represent areas of particular concern to the Government. Therefore, for each such area of work, the offeror must affirmatively explain whether it intends to self-perform the work or whether it intends to subcontract the work. If the offeror intends to subcontract the work, the offeror must identify the subcontractor proposed and submit a letter of commitment from that contractor using the template in Attachment 2.

2.2.2. The Technical Approach Plan must include a schedule narrative describing the construction sequence /process for successful completion of the project within the duration shown in FAR 52.211-10. The sequence of activities must represent work through the entire project from mobilization to demobilization and provide the basis for proposed timeframes of required work items proposed in the Construction Schedule, including all assumed contingencies.

2.2.3. In support of the sequence of activities, offers must include a conceptual construction schedule in the form of a Gantt, Pert, or similar graphical timeline. This summary schedule is used for evaluating the offeror’s proposal for reasonableness; the successful offer will, after contract award, replace the proposed construction schedule with a project schedule in accordance with contract requirements after award. The purpose of the conceptual construction schedule is to evaluate the offeror’s approach to satisfying the project requirements within the Period of Performance provided in the maximum contract duration, to review logic between activities, sequence of work, and evaluate the offeror’s understanding of the overall project requirements and constraints.

At a minimum, the construction schedule must clearly show the interdependence of activities (i.e schedule logic) and start and completion dates for the activities listed in paragraph 2.2.1, as well as the following:

a. Project initiation activities and demobilization of all work items

b. Preconstruction submittals (e.g., Accident Prevention Plan, Environmental Protection Plan, Quality Control Plan, etc.).

c. Critical submittals (e.g., Dewatering Plan, long lead items, Traffic Control Plan, Preconstruction Logistic Plan, Drilled Shaft

Installation Plan, etc.).

d. Procurement and delivery of long lead items.

e. Channel Excavation and material disposal.

f. Temporary sheet pile installation.

g. Drilled shaft installation.

h. Construction of the utility bridge.

i. Construction of transitions.

j. Utility relocations including the electrical and 48-inch water main.

k. Installation of the sanitary siphon including the required temporary cofferdam.

2.3. FACTOR 2 – ORGANIZATIONAL STRUCTURE AND QUALITY CONTROL (STAGE ONE):

2.3.1. Provide and organizational chart to include, at a minimum, all key personnel, and major subcontractors (and subcontractor key personnel). Provide a narrative describing lines of authority throughout key personnel and both internal and external lines of communication. This should provide a clear understanding of means of directing work internally as well as intended method of communicating with USACE counterparts, subcontractors and suppliers, and local organizations and authorities.

2.3.2. In a narrative form, describe the team’s quality control approach, corporate systems and/or processes, and capabilities to maintain quality control of construction. Describe the proposed quality control organization, including the proposed staffing plan to include positions, roles, and responsibilities.

Provide information on how you will handle internal and external requests for information, shop drawings, submittal reviews, progress meetings, contract completion, closeout, as- built, and completion documentation. Proposal must demonstrate adequate quality control processes to give the government confidence of the offeror’s ability to successfully manage the material submittal process and ensure subcontractor compliance with contract documents.

Provide a detailed explanation of how quality issues are dealt with on various types of construction projects for all items identified above and inspections, correction of non-compliant work, and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials. There is no need to submit a quality control plan or proposed staff resumes as the successful offeror will provide that after award.

2.3.3 A letter of commitment (Attachment 2) shall be included for each subcontractor performing one or more of the key construction activities identified under paragraph 2.2 Factor 1 – Technical Approach. A letter of commitment is defined as a letter from a subcontractor on official company letterhead addressed to the offeror as the prime contractor, identifying the work the subcontractor intends to perform, and stating that the subcontractor is willing to be bound to perform the identified work if the offeror is awarded a contract. A letter of commitment simply stating that a subcontractor commits to submit pricing to the offeror does not satisfy this requirement.

Identify the work intended to be self-performed by the prime offeror (Refer to Section 0700, FAR Clause 52.236-1).

2.4 FACTOR 3 – RISK AND RESOURCE IDENTIFICATION (STAGE ONE):

2.4.1. Provide a narrative outlining major risks and challenges related to the key activities identified in Factor 1 as well as the environmental and administrative conditions that may affect work. Narrative should include discussion of how risks will be mitigated proactively to prevent delays in work.

2.4.2. Provide a narrative describing means of identification, procurement, storage and transportation of key materials, equipment, and resources. Include discussion about identifying sources of general and skilled labor considering the availability and utilization of local resources, and any associated risks identified.

2.5 FACTOR 4 – PAST PERFORMANCE (STAGE ONE) NO PAGE LIMIT:

2.5.1. The submitted material must be organized sequentially under tabs for each numbered…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .