This document is a Performance Work Statement (PWS) Annex A outlining the Maintenance Performance Requirement Summary (PRS) for equipment repair and maintenance operations. The PRS establishes quality standards, sampling methods, and acceptable quality levels (AQL) for contractor performance across multiple maintenance categories.

The maintenance requirements span six primary functional areas: Materiel Maintenance—General (establishing and operating repair shops with 95% AQL); Materiel Maintenance Support (performing repairs per technical manuals and work requests with 95% AQL for general work, 97% for mechanical repairs, and 98% for electrical repairs); Materiel Maintenance—Programs/Efforts (meeting base operations metrics with 95% AQL, tire maintenance per TM 9-2610-200-14 with 95% AQL, wheel alignment per applicable standards with 95% AQL, glass repairs with air and watertight seals at 95% AQL, and sensitive item maintenance at 100% AQL); Allied Trades (welding and nondestructive testing by certified personnel at 95% AQL); Repair Parts and Materiel Management (managing Standard Pricing items per DFAS-IN Reg 37-1 Chapter 13 at 95% AQL); and Production Control (managing maintenance workload and equipment receiving points at 95% AQL). All requirements reference compliance with Army Regulations (AR 750-1, AR 190-11, AR 710-2), DA Pamphlets (DA PAM 750-1, DA PAM 750-8), applicable technical manuals, and local installation policies. Sampling methods are primarily random or periodic shop/activity inspections of in-process and completed work, records, and files.

View the file

Other files

File Type Posted
Att 0033 FSGA - QA Round 1 - 14OCT26.xlsx XLSX spreadsheet
Att 0002 Staffing and Labor Mix 9-24.xlsx XLSX spreadsheet
W519TC26RA056 Conformed Thru AMD 0002.pdf PDF
W519TC26RA056 AMD 0002 SF 30.pdf PDF
Att 0007 DOL WD_2015-4485_Rev32.pdf PDF
Att 0026 Annex C - Transportation PRS 10-7.pdf PDF
Att 0001 Performance Work Statement (PWS) Stewart 9-24.pdf PDF
Att 0009 Purchasing and Invoicing Guide 18SEP26.pdf PDF
W519TC26RA056 AMD 0001 SF 30.pdf PDF
B08 - Solicitation - W519TC26RA056 - FINAL.pdf PDF
Att 0028 Annex E - Definitions Acronyms and Abbreviations.pdf PDF
Att 0027 Annex D - Environmental Requirements.pdf PDF
Att 0004 Letter of Consent.pdf PDF
Att 0026 Annex C - Transportation PRS.pdf PDF
Att 0003 Performance Questionnaire.pdf PDF
Att 0002 Staffing and Labor Mix.xlsx XLSX spreadsheet
Att 0010 Blocked File Extensions.pdf PDF
Att 0005 Cost Price Matrix 21AUG2026.xlsx XLSX spreadsheet
Att 0009 Purchasing and Invoicing Guide.pdf PDF
Att 0030 eCRAFT_Labor Build Workbook_23JUN2026.xlsx XLSX spreadsheet
Att 0024 Annex A - Maintenance PRS.pdf PDF
Att 0015 Subcontractor Cost Information Submission.pdf PDF
Att 0031 eCRAFT_Labor Rate Workbook_MAY2026.xlsx XLSX spreadsheet
Att 0029 Annex F - Publications and Forms.pdf PDF
Att 0032 Industry QandA Template.xlsx XLSX spreadsheet
Att 0007 DOL WD_2015-4485_Rev31.pdf PDF
Att 0011 Contract References Spreadsheet.xlsx XLSX spreadsheet
Att 0006 SF1408 Preaward Survey of Prospective Contractor Accounting System.pdf PDF
Att 0025 Annex B - Supply PRS.pdf PDF
Att 0001 Performance Work Statement (PWS) Stewart - 21AUG26.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Annex A – Maintenance Performance Requirement Summary (PRS)

Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)

MATERIEL MAINTENANCE – GENERAL

5.1.1 Establish, operate, and manage equipment repair shops, and supporting functions.

Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance and ISM Operating Manual.

Random sampling (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 95%

5.1.4 Perform technical inspections in accordance with the maintenance request.

Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance (COR) guidance.

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work orders, files, logs, and SOPs at time of

MATERIEL MAINTENANCE SUPPORT

5.2.1 Perform repairs IAW work request and applicable equipment TMs or equivalent publications.

Quality: Repairs will be IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment Technical Manuals (TMs), Technical Bulletins (TBs), Modification Work Orders (MWOs), Safety of Use Messages (SOUMs), Special Technical Inspection and Repairs (STIRs), other applicable Government technical publications, or OEM equivalent publications when a Government technical publication is not available.

Random sampling

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing

5.2.1 Ensure minimum rejection rates for mechanical and electrical repair work completed are met in order to meet first time pass rates.

Quality: IAW AR 750-1 and DA PAM 750-1

Random (shop/activity scheduled periodically)

Lot: Equipment that has completed the repair cycle and has been deemed as ready for issue (RFI) back to the customer.

AQL: 97% for mechanical AQL: 98% for electrical

MATERIEL MAINTENANCE – PROGRAMS/EFFORTS

5.3.2 Meet performance metrics found in AR 750-1 for base operations metrics.

Timeliness: Tasks completed within time allowed by the specific equipment publication or within times estimated at work induction or other program standard as designated by Chief, Materiel Maintenance/COR.

Quality: Perform maintenance IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment TMs, TBs, MWOs, SOUMs, STIRs, other applicable government technical publications, or OEM equivalent publications when a government technical publication is not available.

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 95%

5.3.8 Maintain, repair, and replace tires on rims.

Quality: IAW TM 9-2610-200-14

Random (shop/activity scheduled periodically)

Lot: The number of line items on receipts processed on the day of surveillance.

5.3.9 Provide wheel alignment support.

Quality: IAW applicable TMs and standards.

Random (shop/activity scheduled periodically)

Lot: All in process and completed work related to replacing front axle components (tie-rod/sway bar).

5.3.10 Perform glass repairs for vehicles.

Quality: Glass shall be installed to original design configurations with seals that are air and watertight.

Random (shop/activity scheduled periodically)

Lot: All in process and completed glass repair work as well as all existing logs and files at time of surveillance.

AQL: 95%

5.3.11 Perform maintenance and services of sensitive items.

Quality: AR 190-11, AR 710-2 and AR 750-1.

Monthly

Lot: All parts/items in process

AQL: 100%

ALLIED TRADES

5.4.1 Perform welding, and Non-destructive testing as required.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work performed IAW work request and applicable military and industry standards. Welding performed by AWS certified welders;

NDI performed by ANSI/ASNT CP-189 certified persons.

Random (shop/activity scheduled periodically)

Lot: All in process and completed welding, as well as all existing logs and files at time of surveillance.

AQL: 95%

REPAIR PARTS AND MATERIEL MANAGEMENT TASKS

5.5.6 Manage Standard Pricing (SP) items.

Timeliness: Meet SP turn- in criteria for timeliness of turn-ins.

Quality: IAW DFAS-IN Reg 37-1 Chapter 13, finance & accounting policy, implementation, unserviceable turn-ins, and current army guidance.

Periodic

Lot: The numbers of SP items processed during the period at time of surveillance.

PRODUCTION CONTROL

5.6.1 Operate a production control capability that effectively manages the maintenance workload; provide personnel technically capable of performing all tasks found in the applicable maintenance LIS

Timeliness: Work completed IAW time estimates given at work induction.

Quality: IAW work request, AR 750-1, DA PAM 750-1, DA PAM 750-8, applicable LIS publications, local policies and procedures.

Random

Lot: All in process and completed work as well as all existing logs and files at time of surveillance

AQL 95%

End User Manual. Operate multiple equipment receiving points; provide order statuses.