This document is a Performance Work Statement (PWS) Annex A detailing the Maintenance Performance Requirement Summary (PRS) for equipment repair shop operations and materiel maintenance services. The PRS establishes quality standards, sampling methods, and acceptable quality levels (AQL) for six primary maintenance categories.
Under Materiel Maintenance – General, the contractor must establish and operate equipment repair shops with quality standards aligned to Army Regulation (AR) 750-1, DA Pamphlet 750-8, and applicable publications, using random sampling with 95% AQL for both shop management and technical inspection tasks. The Materiel Maintenance Support section requires repairs to be performed in accordance with maintenance requests and equipment Technical Manuals (TMs), Technical Bulletins (TBs), and OEM equivalent publications, with random sampling and 95% AQL, while also achieving minimum rejection rates of 97% for mechanical work and 98% for electrical work to ensure first-time pass rates. Materiel Maintenance – Programs/Efforts encompasses base operations metrics with timeliness and quality standards (95% AQL), tire maintenance per TM 9-2610-200-14 (95% AQL), wheel alignment support (95% AQL), and glass repairs to original design configurations with air and watertight seals (95% AQL). The Allied Trades section covers welding and nondestructive testing performed by AWS-certified welders and ANSI/ASNT CP-189 certified persons (95% AQL), while Repair Parts and Materiel Management requires Standard Pricing item management in compliance with DFAS-IN Regulation 37-1 Chapter 13 (95% AQL). Production Control operations must manage maintenance workload effectively with technically capable personnel and multiple equipment receiving points, meeting work completion timelines with 95% AQL. All requirements employ random, periodically scheduled surveillance sampling of in-process and completed work, records, logs, and files.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS Annex A – Maintenance Performance Requirement Summary (PRS)
Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)
MATERIEL MAINTENANCE – GENERAL
5.1.1 Establish, operate, and manage equipment repair shops, and supporting functions.
Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance and ISM Operating Manual.
Random sampling (shop/activity scheduled periodically)
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 95%
5.1.4 Perform technical inspections in accordance with the maintenance request.
Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance (COR) guidance.
Random (shop/activity scheduled periodically)
Lot: All in-process and completed work orders, files, logs, and SOPs at time of
MATERIEL MAINTENANCE SUPPORT
5.2.1 Perform repairs IAW work request and applicable equipment TMs or equivalent publications.
Quality: Repairs will be IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment Technical Manuals (TMs), Technical Bulletins (TBs), Modification Work Orders (MWOs), Safety of Use Messages (SOUMs), Special Technical Inspection and Repairs (STIRs), other applicable Government technical publications, or OEM equivalent publications when a Government technical publication is not available.
Random sampling
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing
5.2.1 Ensure minimum rejection rates for mechanical and electrical repair work completed are met in order to meet first time pass rates.
Quality: IAW AR 750-1 and DA PAM 750-1IAW AR 750-1, Appendix B-11, paragraphs (a-d)
Random (shop/activity scheduled periodically)
Lot: Equipment that has completed the repair cycle and has been deemed as ready for issue (RFI) back to the customer.
AQL: 97% for mechanical AQL: 98% for electrical
MATERIEL MAINTENANCE – PROGRAMS/EFFORTS
5.3.2 Meet performance metrics found in AR 750-1 for base operations metrics.
Timeliness: Tasks completed within time allowed by the specific equipment publication or within times estimated at work induction or other program standard as designated by Chief, Materiel Maintenance/COR.
Quality: Perform maintenance IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment TMs, TBs, MWOs, SOUMs, STIRs, other applicable government technical publications, or OEM equivalent publications when a government technical publication is not available.
Random (shop/activity scheduled periodically)
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 95%
5.3.8 Maintain, repair, and replace tires on rims.
Quality: IAW TM 9-2610-200-14
Random (shop/activity scheduled periodically)
Lot: The number of line items on receipts processed on the day of surveillance.
5.3.9 Provide wheel alignment support.
Quality: IAW applicable TMs and standards.
Random (shop/activity scheduled periodically)
Lot: All in process and completed work related to replacing front axle components (tie-rod/sway bar).
5.3.10 Perform glass repairs for vehicles.
Quality: Glass shall be installed to original design configurations with seals that are air and watertight.
Random (shop/activity scheduled periodically)
Lot: All in process and completed glass repair work as well as all existing logs and files at time of surveillance.
AQL: 95%
ALLIED TRADES
5.4.1 Perform welding, and Non-destructive testing as required.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work performed IAW work request and applicable military and industry standards. Welding performed by AWS certified welders;
NDI performed by ANSI/ASNT CP-189 certified persons.
Random (shop/activity scheduled periodically)
Lot: All in process and completed welding, as well as all existing logs and files at time of surveillance.
AQL: 95%
REPAIR PARTS AND MATERIEL MANAGEMENT TASKS
5.5.6 Manage Standard Pricing (SP) items.
Timeliness: Meet SP turn- in criteria for timeliness of turn-ins.
Quality: IAW DFAS-IN Reg 37-1 Chapter 13, finance & accounting policy, implementation, unserviceable turn-ins, and current army guidance.
Periodic
Lot: The numbers of SP items processed during the period at time of surveillance.
PRODUCTION CONTROL
5.6.1 Operate a production control capability that effectively manages the maintenance workload; provide personnel technically capable of performing all tasks found in the applicable maintenance LIS End User Manual. Operate multiple equipment receiving points; provide order statuses.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: IAW work request, AR 750-1, DA PAM 750-1, DA PAM 750-8, applicable LIS publications, local policies and procedures.
Random
Lot: All in process and completed work as well as all existing logs and files at time of surveillance
AQL 95%