Consolidated RFI List.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Repair Operations & Training Facility Federal contract opportunity
Solicitation number
W50S8H23B0001
Issued by
Department of the Army New York Army National Guard

About this file

This consolidated document contains questions and responses related to a construction contract solicitation for repair and renovation work at an operations and training facility. Key details include:

  • The solicitation is for Project #08-2001 to renovate a two-story, 43,029 square foot facility at Niagara Falls International Airport in New York. Scope includes renovations to mechanical, plumbing and fire protection systems.

  • The NAICS code is 236220 for general building construction, with a small business size standard of $45 million average annual revenue. Project value is estimated between $10-25 million.

  • The solicitation number is W50S8H23B0001 and it is being offered as a competitive 8(a) small business set-aside.

  • The pre-bid conference date has passed and the bid due date is extended to July 25, 2023. Award is anticipated by September 30, 2023 if funds are available and prices received are within an awardable range.

  • The owner agency is the Department of the Army New York Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Operations & Training Facility, newest first.
File Type Posted
C4 Abstract OF1419.pdf PDF
C4 Bid Opening Sign-In.pdf PDF
B6 Hazardous Material Report.pdf PDF
B8 W50S8H-23-B-0001 IFB-P00001.pdf PDF
B8 W50S8H-23-B-0001 IFB-P00001 Amend.pdf PDF
B7 Site Visit Sign-In.pdf PDF
B7 Pre-Bid Conference Slides Final.pptx PPTX presentation
01.3 Drawing Mechanical Ph1.pdf PDF
03.1 Drawing Civil Storm Ph3.pdf PDF
03.3 Drawing Structural Ph3.pdf PDF
03.7 Drawing Fire Alarm Ph3.pdf PDF
03.10 Drawing Electrical Ph3.pdf PDF
H8 Specs.pdf PDF
01.2 Drawing Plumbing Ph1.pdf PDF
02.1 Drawing Architectural Demo Ph2.pdf PDF
03.2 Drawing Civil Utility Ph3.pdf PDF
03.4 Drawing Architectural Demo Ph3.pdf PDF
03.6 Drawing Fire Protection Ph3.pdf PDF
03.11 Drawing Telecom Ph3.pdf PDF
03.12 Drawing Reference Drawings Ph3.pdf PDF
A2 JA FAR Part 6 Advantor SAM Post.pdf PDF
01.1 Drawing Architectural Ph1.pdf PDF
01.4 Drawing Electrical Ph1.pdf PDF
02.2 Drawing Architectural Ph2.pdf PDF
03.08 Drawing Plumbing Ph3.pdf PDF
B8 W50S8H-23-B-0001 IFB.pdf PDF
01.0 Drawing General.pdf PDF
03.5 Drawing Architectural Ph3.pdf PDF
03.09 Drawing Mechanical Ph3.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Consolidated RFI List - Project RVKG 08-2001 - Repair Operations & Training Facility
RFI #TitleQuestionResponse
1Bid extension RequestBid due date has been extended from 18 July 2023 at 1:00PM EST to 25 July 2023 at 1:00PM EST.
2Carpet TilePlease provide manufacturer, style, and color of CPT-104. If information is not available, can a photo please be shared to match the carpet?1) CPT-104 shall meet the following specifications:

a) PRODUCT TYPE: Carpet Tile

b) STYLE NAME: Rule Breaker Tile (Mohawk)

c) STYLE NUMBER: QA134

d) COLOR NAME: Charcoal

e) COLOR NUMBER: 979

2) Each room receiving CPT-104 shall receive black rubber or black vinyl cove base.

3 Ceramic Tile Note on Drawing:

AT FLOOR TO WALL TILE TRANSITIONS, AND WALL TO WALL TILE TRANSITIONS AT

EXPANSION JOINT IN

WASHROOMS 226, 214 PROVIDE SCHLUTER DILEX-HKW COVE TRIM.

Confirming Dilex HKW is accurate?

Schluter Dilex HKW is a PVC profile for applications that have limited to no substrate movement. Schluter - HKS - is a floor and wall cove, designed to absorb substrate movement.

Please confirm which product should be included in base bid. At floor to wall tile transitions, and wall to wall tile transitions at expansion joints in washrooms 226, 214 provide Schluter Dilex-HKS cove trim.

Note: Expansion joint within washrooms is located along column lines 6/6a and 19/19a

4As built DrawingsAs-Builts for B901 are available and instructions for accessing them via the DoD SAFE Site have been posted to the solicitation post at SAM.gov
5HAZMAT ReportHazardous Building Materials Assessment report has been uploaded to the solicitation post at SAM.gov
6Gas ServicePer Pg p001, note 13 reads existing utilities can be installed conforming to code. This conflicts with note 2 on P-102. NYS 2020 code section 404.6 reads underground penetrations prohibited. Gas service must enter above slab from exterior through wall and can go back underslab if it is covered with a removable plate. Please adviseIn accordance with UFC 1-200-01 (with Change 2, 01 Nov 2018 which was applicable at the time of notice to proceed for B services), The DOD uses NFPA 54 as the governing document for fuel gas piping systems. Per NFPA 54 (2018) Sec. 1.3, the provisions of NFPA 54 "shall not be applied retroactively to existing systems that were in compliance with the provisions of the code in effect at the time of installation." Connect new natural gas piping to existing system in Mechanical Room as shown on P-102.
74inch ductile Iron SanitaryPer Sheet PD-121-01 note 5 says to remove 4" ductile iron sanitary. Requesting more details to confirm if this is actually sanitary sewer line, Since the 4” Ductile Iron used for sanitary sewer is extremely odd.Pipe material for sewer line replacement was provided in SOW for B902 renovation.
8Invert LevelPer pg.P001 note 2, invert elevations established before pipe is installed. Have the existing inverts been recorded and available?See civil drawings C-201 for proposed sanitary and storm sewer invert elevations within 5-feet of the building exterior.
9Absorbers-Hammer ArrestorsNo shock absorbers/hammer arrestors are listed in the plumbing fixture schedule on P-601 Please advise.Refer to General Note #20, P-001 and detail C2/P-501 for water hammer arrestor provision requirements.
10Expansion LoopNote 21 on sheet P-001 instructs to provide a manufactured expansion loop or fabricated expansion loop on systems crossing building expansion joints. No manufactured loops are in the plumbing fixture schedule and no detail showing dimensions for fabricated loops. Please advise.A manufactured expansion joint or pipe expansion loop is required at each pipe above ground passing through the following (3) column lines: 6/6a, 19/19a, and D (only for the center wing of the building). Additional detail regarding pipes crossing these building expansion joints will be provided in the Conformed Set of drawings.
11ADA LavatoriesIf ADA lavatories and sinks have skirts would the trap and pipe guards still be required?Yes; insulation for p-trap and pipe guards are required at all ADA-compliant lavatories and sinks.
12Piping and ComponentsPer Sheet PD102 note 2 to demolish all piping and components in tunnel. Requesting more detail for how many lines, what they serve, point of disconnect, capping or re-using.Detailed as-built drawings are not available to verify the existing piping systems in the utility tunnels. It is assumed the existing condenser water, existing hot water, and existing domestic water distribution lines route along the utility tunnels to reach each area of the building. The existing condenser water and existing hot water systems are to be demolished and removed in their entirety. The existing domestic water system must be demolished and replaced with a new domestic water service in the Mechanical Room indicated on drawing P-102.
13Existing LinesPer all demo drawings note 2 is not shown in corridors of column line B-C, 2-3, and 12-13. New drawing show new lines installed. Are there existing lines that need to be removed in these corridors?Detailed as-built drawings are not available to verify the existing piping systems in the utility tunnels. It is assumed the existing condenser water, existing hot water, and existing domestic water distribution lines route along the utility tunnels to reach each area of the building. Any existing appurtenances above grade in the utility tunnels no longer needed or made obsolete by new work must be removed, including the areas referenced in this question.
14fixed Permanent PlatformPer Sheet P101 for BFP-3, No detail on elevation of device and code reads that the centerline of device must be between 18"-60" above finished floor. If installed higher than max height, a fixed permanent platform must be installed. Please advise.The proper detail reference for BFP-3 is shown in detail A4/M-501. No fixed permanent platform is required.
15Point of TerminationPg P101 for BFP-3, discharge piping is not shown and would need point of termination.Refer to detail A4/M-501 for continuation to Mechanical for make-up water line installations.
16Term Point Hub DrainPer sheet P101, discharge from SP-1 per note 3 shows termination point at a hub drain that has a funnel. No detail showing this hub drain and would suggest a backwater valve immediately downstream of the hub drainDischarge from SP-1 to funnel and associated hub drain must meet requirements of IPC 2015, Sec. 802.2 including sanitary trap, air gap, and air break. No backwater valve is required in this instance.
17Bid Ext RequestBid due date has been extended from 18 July 2023 at 1:00PM EST to 25 July 2023 at 1:00PM EST.
18Existing SanitaryDrawing V-101 shows the manhole on the east side ( elevation 601.32 ) as abandoned . Drawing CD-102 details 5 and 6 indicate elimination of sanitary and clean out within ten feet of the building. Is remaining underground sanitary to be abandoned in place? If so, is lateral to be capped and sealed at manhole connection?See P-102 for all utilities within 5-feet of the building. See C-110 for cleanout connection.
19Temp Fire ProtectionAre there requirement for temporary fire protection with 2-1/2" FHV during construction as recommended NY NFPA13? Per Drawing sheet ( FD-101)There are no temporary fire protection requirements shown in the contract documents beyond those outlined in NFPA 241 (included on F-001).
20Sprinkler Flow TestCan a flow test that was previously performed and within the last year be used in the calculations? Drawing Sheet (F-001)F-001 and UFC 3-600-01 require that the water flow test must be within 6 months of hydraulic calculations submission. Per note #2 on F-001, the contractor is required to perform an updated water flow test.
21Solenoid Valve-ElevatorDo we provide a solenoid valve for the feed to the elevator for the shunt trip operation? Drawing Sheet ( FD-101 )A solenoid valve is not required for the shunt trip. Shunt trip is operated by flow switch activation via the fire alarm system. Reference F-101, FA101, & FA501.
22Concealed PipingWill concealed piping B in vestibule 7 room 101 be in a warm space? Drawing Sheet ( F-101 )If this question is related to Vestibule 101A, yes, a unit heater is provided in this vestibule and will be heated. Reference MH102.
23R128A Separate ZoneWhat is actually desired for making the data rm 128 a "separate zone”? Drawing Sheet ( F-101 )A control valve w/ tamper, check valve, and water flow switch, as shown on F-101 and FA101.
24Sprinkler finish colorWhat color sprinkler finish for the corrosion resistant type heads called out? Drawing Sheet ( F-101 )Provide white finish for the sprinklers where corrosion resistant sprinklers are required.
25PE StampIs a PE stamp acceptable for the stamping of the shop drawings? Drawing Sheet ( F-101 )This is acceptable, as outlined in specification section 21 13 13.0010; 1.4.1.
26Domestic Water Line DepthDrawing CD-101 shows demolition of the existing domestic water line coming into the south side of the building at 3.5 foot of depth. Drawing C-102 shows separate new fire and domestic lines coming in with no mention of depth. Are additional requirements listed or required to assure these lines will not freeze?Note on CD-101 states 3' to 5', not 3.5'. Approximate frost depth for the region is 59-inches. Fire water line should be at least 2-feet below the frost depth. Domestic water line should be at least 6-inches below the frost depth.
27Backflow PreventorBackflow Preventer (BFP-3) is a WATTS Model LF909S which is discontinued, please advise.The Watts LF909-FS Large is the manufacturer's comparable model for BFP-1. The Watts LF909-FS Small is the manufacturer's comparable model for BFP-2 and BFP-3.
28Site visit RequestTo provide a competitive bid, the demo subcontractor has requested a site visit prior bid. Please advise.No additional site visit is authorized for this project.
29Substitution requestSubstitution request: HDPE partitions in lieu of phenolic material and HDPE lockers in lieu of powder coated steelProvide phenolic toilet room and shower partitions as specified and Provide powder coated steel lockers as specified