03.4 Drawing Architectural Demo Ph3.pdf
PDF 3 MB Posted
- Attached to
- Repair Operations & Training Facility Federal contract opportunity
- Solicitation number
- W50S8H23B0001
About this file
This solicitation is for a construction contract to renovate a two-story, 43,029 square foot Operations and Training Facility at Niagara Falls International Airport in New York. The project magnitude is between $10 million and $25 million. The North American Industry Classification code is 236220, with a small business size standard of $45 million average annual revenue for the past three years. This action has been identified as a priority on the National Guard's list and is being solicited as a competitive 8(a) small business set-aside. Interested parties are encouraged to attend the pre-bid conference and site visit. Award will be made to the responsible bidder submitting the most advantageous bid based on price and price-related factors. Funds are not presently available but are anticipated to become available by September 30, 2023. No contract award will be made until funds are appropriated.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
UP
1 2
6 7 8 9 11 14 16
12' 13'10' 15'
A
B
D
C
E
L'
K'
J'
H'
G'
F'
6a
F
G
H
9' 16'
E'
M A T C
H
LI
N E
AD-203 A1
R01
R02
R02
R02
R01
R01
WALLS TO REMAIN
R03
R04 R05
R08R08
R07
R09
R10
R09
R10
R09
R10
R17R17 R17
R03
R03
R03
R03
R03
R03 R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03 R03
R03R03
R03
R03
R03
R03
R03
R03R03R03 R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R07
R05
R07
R09
R10
R09
R10
R09
R10
R10
R09
R10
R09
R10
R09
R10
R09
R10 R09
R10
R10 R10R10R09R10 R09R10
R09
R10
R09
R10
R09
R10
R09R10 R09
R10
R09
R10
R09R10
R09R10
R04 R04
R04
R04
R04
R04
R05
R04
R04
R28
R04
R04
R04
R04
R04 R04 R04
R04
R04 R04 R04
R04
R04
R04 R04
R04
R04
R04
R04R04
R09R10R09R10R09R10R09R10R09R10R09R10R09R10
R09
R10
R09
R10
R09
R10
R09
R10
R09R10 R09R10
R03
R08
R08
R08
R08
R08 R08
R08
R08
R08
R08
R08R08
R08R08R08 R08R08
R08R08R08
R08R08
R08R08
R08
R08
R08R08
R08R08
R08R08
R08R08
R08
R08
R08
R08
R08
R08R08R08R08
R08
R08
R08
R08
R08
R08
R08 R08 R08 R08 R08 R08
R08 R08 R08 R08 R08 R08 R08
R08 R08 R08R08
R08
R08 R08 R08
R08
R08
R08R08
R08R08
R08R08
COMMUNICATIONS
FLIGHT CC
130A
LAT
PUBLIC AFFAIRS
SUPER
133A
PUBLIC AFFAIRS
QA / TRAINING
COMMUNICATION
LAN MANAGER
NCC 120
LAN
129 125A
129A
COMMUNICATIONS
FOCAL POINT 101
143B
143A
144A
AD-202A1 B1
'-7
8'
-2
'-9
'-8
'-8
'-8
'-6
19'-6" 8'-3" 19'-7"
2'
-0
47'-0"
281'-8"
'-1
1"
'-4
'-4
'-4
'-4
'-6
19'-6" 18'-8" 18'-11 1/2" 1" 18'-3 1/2" 18'-8" 18'-8" 18'-8" 18'-8" 18'-8"
AD-201
B1
EXISTING STAIR CMU AND PLASTER
WALLS TO REMAIN AT STAIR SHAFT
8'-7"
R04 R04
R03
R18
R04R09R10
R04
R04 R04
R04
R18
R18
WALLS TO REMAIN
WALLS TO REMAIN
R04
R05
R05
R05
R04R04
R04
R04
R04
R05 R04
R04
R03
COILING DOOR
AT EXIST MO TO BE
REMOVED
SIM
R21
R21
R04
R01
R01
R01
R04
R21
R05
R04
R22
R22
R10
R10 R10
WALL TO REMAIN
REMOVE EXISTING
CONCRETE STAIR, FLOOR,
AND CHEEKWALLS; SEE SITE
DWGS FOR BACKFILL AND
GRADING
R03
R03
R25
R25
R24
R24
R24
R24
R24
R24
R24R24
R24
R24
FO EXIST STEAM
TUNNEL FOUNDATION
WALL BELOW SLAB
FO EXIST STEAM TUNNEL
FOUNDATION WALL BELOW SLAB
AD-203
B1
REMOVE EIFS FINISH,
BRICK VENEER/CMU
TO REMAIN
R04
R04
R03
R03 R03
R04
R08
R03
R08
R03
R25R03
R03
R26
REMOVE EXISTING 2X2 FLOOR ACCESS PANEL,
SEE STRUCTURAL DWGS FOR CONC INFILL
R04
COORDINATE END OF
TRENCHING WITH STEAM
TUNNEL LOCATION; SEE
REFERENCE DRAWINGS
R18
145A
145B
COMMUNICATIONS ADMIN
/ COMMUNICATIONS PLANS
CORRIDOR
JC
LATRINE
R09
R27 R27
R27
R03
R27
R03
R10
R03
/SEE D5 AD-102
FOR CONTINUATION;
R03
STEAM ROOM
REMOVE DEBRIS AND
LOOSE CONC MASONRY
UNITS AT STAIR LANDING
EXIST CONC STAIRS
TO REMAIN
DRAWING AFD-51-401 SECTION #1
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #2
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #3
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #4
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #5
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #6
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #7
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #8
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #9
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
APPROXIMATE AREA OF EXISTING DEPRESSED CONC SLAB,
SEE KEYED NOTE 'R21'
APPROXIMATE AREA SHOWN FOR FLOOR SLAB REMOVALS.
COORDINATE WITH PLUMBING DRAWINGS FOR EXACT LOCATION &
EXTENTS OF UNDERSLAB PIPING. PATCH SLAB SEE DETAIL C1/AD-103
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
P
O B o x
S yr a c u s e
N Y
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:2
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-101
100% B3 SUBMITTAL
B901
P A
R T
IA
L
D E
M O
L
IT
IO
N
P L A
N
B A
S E
M E
N T
/F
IR
S T
F L
O O
R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL FLOOR PLAN - FIRST FLOOR
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE: 1/8" = 1'-0"
D5
DEMO FLOOR PLAN - BASEMENT
NOTE:
SEE AD-103 & AD-104 FOR ALL GENERAL
REMOVAL NOTES
SCALE:
A5
GRAPHIC LEGEND - REMOVALS
NTS
SCALE:
C2
EXISTING SECTION LEGEND
NTS
NOTE: EXISTING UTILITY TUNNELS ARE NOT SHOWN IN
THEIR ENTIRETY; SEE EXISTING BUILDING DRAWINGS
INCLUDED WITH THIS DRAWING SET
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957 FOR
ALL WORK IN, ABOVE, OR AROUND THESE TUNNELS
18 19 21 23
13' 15'
20 22
AA
BB
DD
CC
E
L'
K'
J'
H'
G'
F'
F
G
H
16'
E'
M A T C
H
LI
N E
R03
R03
R09R10 R09R10 R09R10 R09R10
R03
R03 R03 R03 R03
R03
R03
R03 R03
R03
R03
R03
R03
R03
R03
R03
R03
R03
R03 R03
R03
R03
R03
R03
R03
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09R10R09 R10R09 R10R09R10R09R10R09 R10
R05
R07
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08R08
R08
R08
R08
R08
R08
R08
R08R08
R08R08
R08R08
R08R08
R08R08R08R08R08R08R08
R04 R04 R04 R04
R04
R04
R04
R04
R04
R04
R04
R04
R04R04
R04
R04
R05
R04 R04R04
R08 R08 R08
FINANCE
CC FSS COMMANDER
READINESS & PLANS
ID CARDS
RETENTION
EDUCATION &
TRAINING
CUSTOMER SERVICE
MALE LATRINE
FINANCE CUSTOMER
SERVICE
CONTRACTING
102A
19a
AD-202C3 C1
18'-8" 18'-8" 18'-8" 18'-3 1/2" 1" 18'-11 1/2" 18'-8" 19'-6"
19'-7" 8'-3" 19'-6"
'-7
8'
-2
'-9
'-8
'-8
'-8
'-6
2'
-0
47'-0"
281'-8"
AD-201
B1
AD-203
B1
EXISTING STAIR CMU AND PLASTER
WALLS TO REMAIN AT STAIR SHAFT
R04
R04
R04 R04
R03
R05
R07
WALLS TO REMAIN
R04
R04
R18
R04
R21
R03
R03 R25
R24
R24
R24
R10
FO EXIST STEAM
TUNNEL FOUNDATION
WALL BELOW SLAB
FO EXIST STEAM TUNNEL
FOUNDATION WALL BELOW SLAB
AD-201A1
REMOVE EXIST STEEL
GUARDRAIL. PATCH AND REPAIR
CONCRETE
REMOVE EXIST CONC APRON.
SEE SITE DWGS
REMOVE EXIST STEEL
GUARDRAIL
REMOVE EXIST WALK-OFF
MAT. PROVIDE CONCRETE
FILL REPAIR
R03
R03 R03
R03
R03
R03
R04
R03
R03
R04
R04
R04
REMOVE EXISTING 2X2 FLOOR
ACCESS PANEL, SEE STRUCTURAL
DWGS FOR CONC INFILL
HUMAN RESOURCE
ADVISOR
107A PERSONNEL ENLISTMENT
MANAGER
115A
118A
112A
CORRIDOR
R07
/SEE D5 AD-102
FOR CONTINUATION;
12' 13'10'
15'
L'
9'
16'
EXISTING METAL STAIR;
SALVAGE; SEE ELEVATIONS FOR
ADDITIONAL WORK SCOPE
R03
PROVIDE OPENING IN EXISTING WALL
FOR DOOR OPENINGS; COORDINATE
SIZE AND LOCATION WITH PLANS AND
SCHEDULES
REMOVE EXIST EIFS
FINISH; BRICK AND
CMU BACKUP TO
REMAIN (EXTERIOR OF
EXISTING ELEC ROOM)
REMOVE EXIST STEEL STAIR &
HANDRAILS. PATCH AND REPAIR
CONCRETE
ELEC SERVICE RM
DRAWING AFD-51-401 SECTION #1
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #2
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #3
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #4
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #5
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #6
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #7
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #8
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #9
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
APPROXIMATE AREA OF EXISTING DEPRESSED CONC SLAB,
SEE KEYED NOTE 'R21'
APPROXIMATE AREA SHOWN FOR FLOOR SLAB REMOVALS.
COORDINATE WITH PLUMBING DRAWINGS FOR EXACT LOCATION &
EXTENTS OF UNDERSLAB PIPING. PATCH SLAB SEE DETAIL C1/AD-103
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:2
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-102
100% B3 SUBMITTAL
B901
P A
R T
IA
L D
E M
O L
IT
IO
N P
L A
N
F
IR
S T
F L
O O
R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL FLOOR PLAN - FIRST FLOOR
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE: 1/8" = 1'-0"
D5
DEMO PARTIAL FLOOR PLAN - ELEC ROOM
NOTE:
SEE AD-103 & AD-104 FOR ALL GENERAL
REMOVAL NOTES
SCALE:
A5
GRAPHIC LEGEND - REMOVALS
NTS
SCALE:
C2
EXISTING SECTION LEGEND
NTS
DN
1 2
7 8 9 11 14
12' 13'10' 15'
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
9' 16'
E'
M A T C
H
LI
N E
AD-203 A1
R03
R03
R03 R03
R03 R03 R03 R03
R03R03
R03
R03
R03
R03
R03
R03 R03
R03
R03
R03
R03R03
R03
R03
R03 R03
R03
R03
R03
R04
R04
R04
R04
R04
R04
R04
R04
R04
R04 R04R04
R04
R04 R04 R04
R04
R04
R04 R04
R04
R04
R04
R04
R04
R04R04
R04
R04
R04
R05
R07
R04
R04
OPEN TO
BELOW
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09
R10
R09R10
R09
R10
R09 R10R09 R10R09 R10R09 R10R09 R10R09 R10
R09 R10 R09 R10 R09 R10 R09R10 R09 R10 R09 R10 R09 R10 R09 R10
R09
R10
R09
R10
R08R08R08R08R08
R08
R08 R08
R08
R08
R08
R08 R08
R08 R08
R08
R08
R08
R08
R08
R08
R08
R08 R08 R08 R08 R08 R08 R08 R08 R08
R08
R08
R08 R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R04
R04
R08
R08
R08
R09
R10
R09
R10
SUPPORT GROUP
FLIGHT SAFETY
WING CONFERENCE
ROOM
203A
203B
OCCUPATIONAL
SAFETY
201A
INSPECTOR GENERAL
202A
MEO
INFORMATION
PROTECTION
COMMUNICATIONS
ROOM
SECURITY FORCES
243B
SFS COMMANDER
243A
SFS COMMANDER
SECURITY
FORCES
242A
SECURITY FORCES
'-7
8'
-2
'-9
'-8
'-8
'-6
'-1
1"
'-4
'-4
'-4
'-4
'-2
19'-6" 18'-8" 18'-11 1/2" 1" 18'-3 1/2" 18'-8" 18'-8" 18'-8" 18'-8"19'-6" 18'-8" 18'-11 1/2" 1" 18'-3 1/2" 18'-8" 18'-8" 18'-8" 18'-8"
WALLS TO REMAIN
R17
REMOVE STAIRS AND ASSOCIATED
HAND AND GUARDRAIL
WALLS TO REMAIN
AD-202A1 B1
SIM
EXISTING 8" CMU BACK-
UP WALL TO REMAIN
EXISTING 8" CMU BACK-
UP WALL TO REMAIN
R09R10
WALLS TO REMAIN
R09 R10
R04
R21
R01
R25 R25
R25
AD-201
B1
281'-8" 281'-8"
R03
R03 R03
R03
R03 R03
R03
R07
REMOVE EXIST
KITCHENETTE
207A
207B
207C
INSPECTOR GENERAL, IGI
INSPECTIONS, DIRECTORS
OF INSPECTIONS, WING
PLANS OFFICE
200A 200B
INSPECTOR
GENERAL
COMPLAINTS
RESOLUTION
244A
244B
244C
CORRIDOR
R27
R27
R09
REMOVE CHAIN
LINK FENCE W/
BARBED WIRE
TOP & (6) BOLTED
POSTS W/
BASEPLATES
1. PATCH AND REPAIR ALL EXPOSED CONCRETE AT COLUMNS, DECK, AND BEAMS.
2. REMOVE LOOSE AREAS OF CONCRETE TOPPING, PROVIDE CONCRETE TOPPING AND
SELF LEVELING CEMENT BASED FINISHING UNDERLAYMENT TO FEATHER AT EXISTING SLAB
AREAS
3. REMOVE ALL EXISTING HANGERS, CONDUITS, BLOCKING AND BRACKETRY WHICH IS NO
LONGER USED. PATCH REMAINING HOLES. SEE MEP AND FP DRAWIGNS FOR ENTIRETY OF
REMOVAL SCOPE
4. EXISTING CONCRETE COLUMNS, BEAMS, EXPOSED SLAB EDGES AND UNDERSIDES OF
FLOOR SLABS ARE INTENDED TO BE VISIBLE UPON PROJECT COMPLETION IN AREAS
WHERE CLOUD CEILINGS ARE INDICATED.
5. REPAIR ALL CONCRETE IMPERFECTIONS BETWEEN 1/4” AND 1/2" DEEP WITH
POLYMER MODIFIED PORTLAND CEMENT BASED CONCRETE RESURFACER
BLEND FLUSH WITH ADJACENT SURFACES.
6. REPAIR ALL CONCRETE IMPERFECTIONS BETWEEN 1/4” AND 1/2" DEEP WITH
POLYMER MODIFIED CALCIUM ALUMINATE CEMENT BASED CONCRETE
PATCHING COMPOUND. BLEND FLUSH WITH ADJACENT SURFACES.
7. PORTIONS OF THE EXISTING BUILDING MUST REMAIN OPERATIONAL FOR THE
DURATION OF CONSTRUCTION
8. PROVIDE TEMPORARY WALLS WHERE NOTED PRIOR TO START OF
DEMOLITION.
9. SEE A-100 SERIES DRAWINGS FOR KEYED NOTES INDICATING PERMENANT
WALLS TO BE CONSTRUCTED PRIOR TO START OF DEMOLITION
10. REMOVE CEMENTITIOUS PARGE COATING FROM SURFACE OF EXISTING CONCRETE
FOUNDATION TO THE FULL EXTENT OF NEW INSULATION LOCATIONS. REPAIR EXISTING
FOUNDATIONS TO PROVIDE FLUSH SURFACE FOR INSTALLATION OF INSULATION.
11. ALL EXISTING TERRAZZO FLOOR FINISH TO REMAIN, UNLESS NOTED OTHERWISE.
PREPARE TERRAZZO TO RECIEVE FLOOR FINISHES AS SCHEDULED.
12. REMOVE EXISTING TERRAZZO BASE ( NOT INDICATED ON PLAN).
13. PATCH CONC SLAB WITH LEVELING COMPOUND AT ALL MASONRY PARTITION
REMOVALS.
14.COORDINATE NEW PENETRATIONS FOR ELECTRICAL, HEATING AND PLUMBING. VERIFY
LOCATION AND SIZE OF CONDUIT AND PIPE PENETRATIONS WITH MECHANICAL, PLUMBING
& ELECTRICAL SUB CONTRACTORS. REFER TO MEP AND STRUCTURAL DRAWINGS FOR
PATCHING REQUIREMENTS.
15. ALL INTERIOR WALLS SHOWN WITH DASHED LINES SHALL BE REMOVED UNLESS NOTED
OTHERWISE.
GENERAL REMOVAL NOTES:
DRAWING AFD-51-401 SECTION #1
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #2
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #3
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #4
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #5
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #6
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #7
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #8
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #9
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
CONC AS
SPECIFIED.
PROVIDE VAPOR BARRIER IF
ONE CURRENTLY EXISTS. LAP
WITH EXIST AND TAPE.
PROVIDE 4x4 - W1.4xW1.4 WWF
SET ON BOLSTERS 1 1/2" FROM
TOP.
EXIST SLAB ON GRADE.
PROVIDE CRUSHER RUN,
COMPACT TO 95%
PROCTOR DENSITY.
SAWCUT EXISTING REINFORCED
CONC SLAB 1/2" MIN. SCARIFY EDGES
TO AMPLITUDE OF 1/4". CLEAN & COAT
W/ BONDING AGENT PRIOR TO
CONCRETE INSTALLATION.
CRACK ISOLATION
MEMBRANE:
SCHLUTER KERDI
WATERPROOFING
MEMBRANE.
SANITARY PIPING WITH SAND BEDDING.
AT CONC INFILL
LOCATIONS.
MAINTAIN POSITIVE
SLOPE. DO NOT
UNDERMINE 6" BEARING
LEDGE.
SCORE 1" DEEP CJ @ 6'-0" oc MAX
AND AT EACH CORNER.
CONC MATERIALS:
PORTLAND CEMENT: ASTM C150 TYPE 1
AGGREGATE: ASTM C33, CRUSHED LIMESTONE
DESIGN MIX:
3000 PSI, 28 DAY COMPRESSIVE STRENGTH;
W / C RATIO 0.58 MAX (NON-AIR ENTRAINED, 3/4" MAX
AGGREGATE SIZE).
SLUMP:
3" MAX
REPAIR VB IF DAMAGED
BY CUTTING.
MIN
6"
D
EP
TH
4"
V
IF
M
AT
C H
E
XI
ST
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:3
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-103
100% B3 SUBMITTAL
B901
P A
R T
IA
L D
E M
O L
IT
IO
N P
L A
N
S E
C O
N D
F L
O O
R /A
S S
E M
B L
Y
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL FLOOR PLAN - SECOND FLOOR
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE: 1 1/2" = 1'-0"
C1
SLAB ON GRADE - CUT/PATCH DTL
SCALE:
C2
19 21 23
13' 15'
20 22
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
16'
E'
M A T C
H
LI
N E
AD-201A1
R09R10 R09R10 R09R10 R09R10 R09R10
R09R10
R09
R10
R09
R10
R09
R10
R03
R03
R03
R03 R03
R03
R03
R03 R03
R03 R03 R03
R03R03R03R03R03
R04
R04
R04
R04
R04
R04R04 R04
R04
R04
R04
R04R05
R05R04R04 R04
R09R10R09R10R09R10R09R10R09R10R09R10
R08R08R08R08
R08
R08R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08
R08 R08
R08
R08
R08
R08R08R08R08R08R08R08
223A
223B
JUDGE ADVOCATE
EXECUTIVE OFFICER 229
FSS
WING COMMANDER'S
SUITE
231A
231C
LAT
231B
COMMAND CHEIF
CLASSROOM
19a
18'-8" 18'-8" 18'-8" 18'-3 1/2" 1" 18'-11 1/2" 18'-8" 19'-6"18'-8" 18'-8" 18'-8" 18'-3 1/2" 1" 18'-11 1/2" 18'-8" 19'-6"
19'-7" 8'-3" 19'-6"
'-7
8'
-2
'-9
'-8
'-8
'-8
'-6
1'
-1 0"
47'-4"
R07
R04
WALLS TO REMAIN
AD-202C3 C1
R04R21
R01
R25
AD-203
B1
AD-201
B1
281'-8"
R03
R26
231D
FEMALE LAT
R09
R03 R03 R10
R10
R09
1. PATCH AND REPAIR ALL EXPOSED CONCRETE AT COLUMNS, DECK, AND BEAMS.
2. REMOVE LOOSE AREAS OF CONCRETE TOPPING, PROVIDE CONCRETE TOPPING AND
SELF LEVELING CEMENT BASED FINISHING UNDERLAYMENT TO FEATHER AT EXISTING SLAB
AREAS
3. REMOVE ALL EXISTING HANGERS, CONDUITS, BLOCKING AND BRACKETRY WHICH IS NO
LONGER USED. PATCH REMAINING HOLES. SEE MEP AND FP DRAWIGNS FOR ENTIRETY OF
REMOVAL SCOPE
4. EXISTING CONCRETE COLUMNS, BEAMS, EXPOSED SLAB EDGES AND UNDERSIDES OF
FLOOR SLABS ARE INTENDED TO BE VISIBLE UPON PROJECT COMPLETION IN AREAS
WHERE CLOUD CEILINGS ARE INDICATED.
5. REPAIR ALL CONCRETE IMPERFECTIONS BETWEEN 1/4” AND 1/2" DEEP WITH
POLYMER MODIFIED PORTLAND CEMENT BASED CONCRETE RESURFACER
BLEND FLUSH WITH ADJACENT SURFACES.
6. REPAIR ALL CONCRETE IMPERFECTIONS BETWEEN 1/4” AND 1/2" DEEP WITH
POLYMER MODIFIED CALCIUM ALUMINATE CEMENT BASED CONCRETE
PATCHING COMPOUND. BLEND FLUSH WITH ADJACENT SURFACES.
7. PORTIONS OF THE EXISTING BUILDING MUST REMAIN OPERATIONAL FOR THE
DURATION OF CONSTRUCTION
8. PROVIDE TEMPORARY WALLS WHERE NOTED PRIOR TO START OF
DEMOLITION.
9. SEE A-100 SERIES DRAWINGS FOR KEYED NOTES INDICATING PERMENANT
WALLS TO BE CONSTRUCTED PRIOR TO START OF DEMOLITION
10. REMOVE CEMENTITIOUS PARGE COATING FROM SURFACE OF EXISTING CONCRETE
FOUNDATION TO THE FULL EXTENT OF NEW INSULATION LOCATIONS. REPAIR EXISTING
FOUNDATIONS TO PROVIDE FLUSH SURFACE FOR INSTALLATION OF INSULATION.
11. ALL EXISTING TERRAZZO FLOOR FINISH TO REMAIN, UNLESS NOTED OTHERWISE.
PREPARE TERRAZZO TO RECIEVE FLOOR FINISHES AS SCHEDULED.
12. REMOVE EXISTING TERRAZZO BASE ( NOT INDICATED ON PLAN).
13. PATCH CONC SLAB WITH LEVELING COMPOUND AT ALL MASONRY PARTITION
REMOVALS.
14.COORDINATE NEW PENETRATIONS FOR ELECTRICAL, HEATING AND PLUMBING. VERIFY
LOCATION AND SIZE OF CONDUIT AND PIPE PENETRATIONS WITH MECHANICAL, PLUMBING
& ELECTRICAL SUB CONTRACTORS. REFER TO MEP AND STRUCTURAL DRAWINGS FOR
PATCHING REQUIREMENTS.
15. ALL INTERIOR WALLS SHOWN WITH DASHED LINES SHALL BE REMOVED UNLESS NOTED
OTHERWISE.
GENERAL REMOVAL NOTES:
DRAWING AFD-51-401 SECTION #1
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #2
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #3
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #4
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #5
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #6
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #7
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #8
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
DRAWING AFD-51-401 SECTION #9
REFERENCE: WING ADMINISTRATION BUILDING TYPE AB-W
MILLS & PETTICORD ARCHITECTS ENGINEERS, 1957
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:4
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-104
100% B3 SUBMITTAL
B901
P A
R T
IA
L D
E M
O L
IT
IO
N P
L A
N
S E
C O
N D
F L
O O
R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL FLOOR PLAN SECOND FLOOR
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE:
C2
7 8 9 11 14 16
10'
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
9' 16'
E'
M A T C
H
LI
N E
R12
R13
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12 R12R12R12R12R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12 R12
R12
R12
R12 R12 R12
R12R12R12R12
R12
R12
R12
'-7
8'
-2
'-9
'-8
'-8
'-8
'-6
19'-6" 8'-3" 19'-7"
1' -8
47'-0"
'-1
1"
'-4
'-4
'-4
'-4
'-6
19'-6" 18'-8" 18'-11 1/2" 1" 18'-3 1/2" 18'-8" 18'-8" 18'-8" 18'-8" 18'-8"
OPEN TO ABOVE
REMOVE METAL FABRICATED
TRUSS IN ENTRY. REMOVE AND
SALVAGE AIRPLANE TO RETURN
TO OWNER.
R18
R18
R18
281'-8"
R12
R12
R13
R12
R12
R12
R12 R12
R12
R13
APPROXIMATE AREA SHOWN FOR REMOVAL OF CEILING FINISH.
CONTRACTOR TO VERIFY MATERIAL OF CEILING
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:4
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-105
100% B3 SUBMITTAL
B901
P A
R T
IA
L
D E
M O
L
IT
IO
N
C E
IL
IN
G P
L A
N
F
IR
S T
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL REFLECTED CEILING PLAN - FIRST FLOOR
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE:
C5
GRAPHIC LEGEND - REMOVALS
19 21 23
13' 15'
20 22
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
16'
E'
M A T C
H
LI
N E
R12 R12 R12 R12 R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12
R12 R12R12
R12
R12
R12R12
R12
R12 R12
19a
18'-8" 18'-8" 18'-8" 18'-3 1/2" 1" 18'-11 1/2" 18'-8" 19'-6"
19'-7" 8'-3" 19'-6"
'-7
8'
-2
'-9
'-8
'-8
'-8
'-6
1'
-8
47'-0"
R18
R18
281'-8"
R12
R12
APPROXIMATE AREA SHOWN FOR REMOVAL OF CEILING FINISH.
CONTRACTOR TO VERIFY MATERIAL OF CEILING
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:4
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-106
100% B3 SUBMITTAL
B901
P A
R T
IA
L
D E
M O
L
IT
IO
N
C E
IL
IN
G P
L A
N
F
IR
S T
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL REFLECTED CEILING PLAN - FIRST FLOOR
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE:
C5
7 8 9 11 14 16
12' 13'10' 15'
A
B
D
C
L'
K'
J'
H'
G'
F'
9' 16'
E'
M A T C
H
LI
N E
R12 R12 R12
R12 R12 R12
R12
R12 R12
R12
R12R12
R12
R12 R12
R12
R12
R12
R12
R12
R12
R12
R12R12R12
R12
R12
R12 R12
R12
R12
R12 R12 R12 R12 R12
R12
'-1
1"
'-4
'-4
'-4
'-4
'-6
'-7
8'
-2
'-7
'-4
19'-6" 18'-8" 18'-11 1/2" 1" 18'-3 1/2" 18'-8" 18'-8" 18'-8" 18'-8" 18'-8"
R13
R13
R13
R13
281'-8"
R13 R13
APPROXIMATE AREA SHOWN FOR REMOVAL OF CEILING FINISH.
CONTRACTOR TO VERIFY MATERIAL OF CEILING
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:5
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-107
100% B3 SUBMITTAL
B901
P A
R T
IA
L D
E M
O L
IT
IO
N C
E
IL
IN
G
P L
A N
S
E C
O N
D F
L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL REFLECTED CEILING PLAN - SECOND FLOOR
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE:
C5
19 21 23 24
13' 15'
A
B
D
C
L'
K'
J'
H'
G'
F'
16'
E'
M A T C
H
LI
N E
M A T C
H
LI
N E
R12 R12 R12 R12 R12 R12
R12 R12
R12 R12R12R12R12R12
R12R12
R12 R12 R12
19a
18'-8" 18'-8" 18'-8" 18'-3 1/2" 1" 18'-11 1/2" 18'-8" 19'-6"
'-4
'-7
8'
-2
'-7
281'-8"
APPROXIMATE AREA SHOWN FOR REMOVAL OF CEILING FINISH.
CONTRACTOR TO VERIFY MATERIAL OF CEILING
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:5
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-108
100% B3 SUBMITTAL
B901
P A
R T
IA
L D
E M
O L
IT
IO
N C
E
IL
IN
G
P L
A N
S
E C
O N
D F
L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL REFLECTED CEILING PLAN - SECOND FLOOR
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE:
C5
4 6 7 8 9 11 14 16
12' 13'10' 15'
A
B
D
C
E
L'
K'
J'
H'
G'
F'
6a
F
G
H
9' 16'
E'
M A T C
H
LI
N E
ROOF AREA 'A' ROOF AREA 'A'
ROOF AREA 'C'
ROOF AREA 'D'
ROOF AREA 'E'
52'-0"
36'-11"
'-4
'-7
/2
1'
-1
1/ 2"
47'-4"
AD-203 A1
R14R15
R16
R18
R18
R18
R14R15
R14R15
R16
R16
R16
R16
R16
R16
R16
R16
R16
R16
AD-202A1 B1
R19
'-4
1'-6"
R16
R16
8' -5
/4
7'
-9
/4
'-7
/2
4'-11" 9'-2" 4'-7"
R20
'-5
'-2
1' -6
1'-6"
1'-6"
1'-6"
1' -6
1' -6
1'
-6
R20
R20
R20
R20
R20
R20
1'-6"
/SEE D5 AD-110
R20 R20
R20
R16 R16
R20
R20 R20
AD-201
B1
AD-203
B1
A-602
APPROXIMATE AREA SHOWN FOR REMOVAL OF EXIST CONC ROOF
DECK OVERHANG. SEE KEYED REMOVAL NOTE '20'.
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:5
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-109
100% B3 SUBMITTAL
B901
P A
R T
IA
L
D E
M O
L
IT
IO
N
P L A
R
O O
F
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL ROOF PLAN
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW ASSEMBLY
R10 REMOVE EXISTING WALL ASSEMBLY DOWN TO ASSOCIATED STRUCTURAL
FLOOR SLAB. EXISTING STRUCTURE AND FLOOR SLABS TO REMAIN
R11 REMOVE EIFS FINISH AND BRICK VENEER
R12 REMOVE SUSPENDED ACOUSTICAL CEILING PANELS AND GRID. GC
COORDINATE ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R13 REMOVE GWB SOFFITS, CEILINGS, AND FRAMING. GC COORDINATE
ELECTRICAL TO REMOVE LIGHTING, ETC PRIOR TO REMOVAL
R14 REMOVE EXIST ROOF ASSEMBLY COMPLETELY. EXIST ROOF SLAB TO REMAIN
R15 REMOVE ROOF TOP EQUIPMENT, CURBS, AND FLASHING. SEE MECHANICAL
DRAWINGS FOR REMOVALS.
R16 REMOVE ROOF FLASHINGS / COPINGS AT ROOF PERIMETER
R17 REMOVE EXIST STAIRS AND PLASTER FACE. CMU BACK UP WALL TO REMAIN.
R18 REMOVE EXISTING CANOPY, CONC SLAB, AND EXTERIOR COLUMNS AND
ASSOCIATED FOUNDATIONS IN THEIR ENTIRETY.
R19 SAWCUT EXIST CONC ROOF DECK TO PROVIDE OPENING FOR ELEVATOR
SHAFT
R20 SAWCUT EXIST CONC ROOF DECK OVERHANG FLUSH WITH FACE OF CONC
BEAM BELOW
R21 REMOVE LOOSE SETTING BED MORTAR FROM EXISTING 2" DEPRESSED
CONCRETE SLAB AREAS. PROVIDE CONCRETE FILL REPAIR
R22 REMOVE EXISTING CONCRETE SLAB PER STRUCTURAL DWGS
R23 REMOVE EIFS FINISH AND BRICK VENEER, EXISTING BACKUP WALL TO
REMAIN
R24 SAW CUT SLAB AND EXCAVATE FOR NEW UNDERSLAB PIPING & REMOVALS (
SEE PLUMBING DWGS FOR SIZES, LOCATIONS AND DEPTHS). SEE DTL
C1/AD-103. COORD EXTENTS OF REMOVALS WITH PLUMBING CONTRACTOR &
EXISTING CONDITIONS. DO NOT UNDERMINE EXISTING FOUNDATIONS
R25 PROVIDE CONC SLAB REPAIR AT REMOVAL OF EXISTING VERTICAL SUPPLY
PIPING TO FIRE HOSE CABINET. COORDINATE WITH FIRE PROTECTION
DEMOLITION DRAWINGS
R26 REMOVE EXISTING CASEWORK IN ITS ENTIRETY
R27 REMOVE TERRAZZO FLOOR & BASE.
R28 ABATE EXIST 9X9 TILE (SEE ABATEMENT REPORT FOR ADDITIONAL AREAS).
SCALE:
C5
17 18 19 21 23
13' 15'
20 22
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
16'
E'
M A T C
H
LI
N E
ROOF AREA 'A'
ROOF AREA 'B'
'-4
'-7
/2
47'-4"
1'
-1
1/ 2"
19a
R18
R18
R16
R16
R16
R16
R16
R16
R16
R14
R14
R15
R15
AD-202C3 C1
R20
R20
R20
R20
R20
R20
R20R20 1' -6
1'-6"
1' -6
1' -6
1'-6"
AD-203
B1
AD-201A1
AD-201
B1
A-602
12' 13'10' 15'
L'
9' 16'
SAWCUT EXISTING CONC OVERHANG
FLUSH WITH EXIST BRICK VENEER
REMOVE EXISTING
ROOF OVERBUILT, CLG
SOFFIT, STEEL
COLUMNS AND BEAMS
AT EXIST ELEC ROOM.
EXIST CONC ROOF
DECK TO REMAIN
APPROXIMATE AREA SHOWN FOR REMOVAL OF EXIST CONC ROOF
DECK OVERHANG. SEE KEYED REMOVAL NOTE '20'.
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u ite
B o x
S yr a c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
D A
T E
/7
/2
:1
:0
P
M B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A A
R C
H v
.r v t
AD-110
100% B3 SUBMITTAL
B901
P A
R T
IA
L D
E M
O L
IT
IO
N
P L
A N
R
O O
F
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D N
IA
G
A R
A F
A L
L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L
G U
A R
D
G L
K
J M
L
J S
P
J M
L
M
A R
C H
SCALE: 1/8" = 1'-0"
A1
DEMOLITION PARTIAL ROOF PLAN
KEYED NOTES-DEMOLITION
NUMBER NOTE
R01 REMOVE CONCRETE MASONRY WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE. GRIND OFF REMAINING PROTRUSIONS, PATCH AND
PREPARE FLOORS TO RECEIVE SCHEDULED FINISH OR WALL ASSEMBLY
R02 REMOVE WOOD/METAL FRAMED WALL ASSEMBLY FROM FLOOR TO
STRUCTURE ABOVE.
R03 REMOVE DOOR AND FRAME.
R04 REMOVE CARPET OR RESILIENT FLOOR FINISH INCLUDING BASE AND
ACCESSORIES. PREPARE FLOOR TO RECEIVE SCHEDULED FLOOR FINISH.
R05 REMOVE CERAMIC TILE AND PREPARE FLOOR TO RECEIVE SCHED FINISH.
R07 REMOVE ALL TOILET ACCESSORIES AND TOILET PARTITIONS. SEE PLUMBING
DRAWINGS FOR ADDITIONAL REMOVAL WORK NOT SHOWN.
R08 REMOVE WALL ASSEMBLIY FROM STRUCTURAL COLUMN
R09 REMOVE EXISTING WINDOW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .