This solicitation is for a competitive 8(a) small business set-aside construction contract to renovate the two-story 43,029 SF Operations & Training Facility, Building 901, at Niagara Falls International Airport in New York. The project magnitude is estimated between $10 million and $25 million. The North American Industry Classification code is 236220 and the size standard for small businesses is average annual revenue of $45 million for the past three years. The solicitation was issued by the Department of the Army New York Army National Guard. Interested parties are encouraged to attend the pre-bid conference and site visit. Bids must conform to the invitation for bids and be submitted through the System for Award Management by the response date. Award will be made to the responsible bidder offering the most advantageous price. Funds are not presently available but are anticipated to become available by 30 September 2023, at which time award will be made if prices are within an awardable range.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH UFC 1-200-01, "GENERAL BUILDING REQUIREMENTS", NOVEMBER 2018 CHANGE 2; UFC 3-600-01, "FIRE PROTECTION ENGINEERING FOR FACILITIES", MAY 2019 CHANGE 3; UFC 4-010-01, "DOD MINIMUM ANTITERRORISM STANDARD FOR BUILDINGS"; DECEMBER 2018; INTERNATIONAL BUILDING CODE (IBC) 2018 EDITION;
NFPA 1, "FIRE CODE", 2018 EDITION; NFPA 13, "STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS", 2019 EDITION; NFPA 24, "STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES", 2019 EDITION; NFPA 101, "LIFE SAFETY CODE" 2018 EDITION; NFPA 241, "SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS" 2019 EDITION; NFPA 2001, "STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS" 2018 EDITION. UFC SHALL
TAKE PRECEDENCE OVER NFPA REQUIREMENTS.
THE INTENT AND EXTENT OF THE FIRE PROTECTION SYSTEM DESIGN IS PERFORMANCE-BASED IN NATURE, AND IS DIAGRAMMATIC ONLY. IT IS NOT INTENDED TO SHOW EVERY PIPE, FITTING, COMPONENT, ETC. SYSTEM DESIGN SHALL BE DETERMINED BY THE BUILDING FEATURES, UFC 3-600-01, NFPA 13, MANUFACTURER REQUIREMENTS AND RECOMMENDATIONS.
CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BID WITH THE PROJECT DOCUMENTS AND SPECIFICATIONS TO BECOME FAMILIAR WITH THE SITE AND SCOPE OF WORK. NOTIFY ENGINEER OF RECORD WITH ANY DISCREPANCIES OUTSIDE THIS DESIGN INTENT. ANY CHANGE ORDER REQUEST AS A RESULT OF LACK OF COORDINATION BETWEEN TRADES SHALL BE DENIED.
ADHERE TO AND OBTAIN ALL PERMITS, LICENSES, AND ALL FEDERAL GOVERNMENT REQUIREMENTS.
DO NOT SCALE PLANS FOR THE PURPOSE OF ESTABLISHING DIMENSIONS. FIELD DIMENSIONS GOVERN.
FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE PARTITIONS. FIRE STOPPING SHALL BE OF UL LISTED ASSEMBLY.
1.
2.
3.
4.
5.
6.
GENERAL NOTES
CONTRACTOR SHALL SUBMIT COMPLETE SHOP DRAWINGS WITH HYDRAULIC CALCULATIONS, MATERIAL SPECIFICATION BROCHURE AND A COPY OF THEIR WATER SUPPLY RESULTS TO CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE FOR REVIEW PRIOR
TO COMMENCING FABRICATION AND INSTALLATION.
CONTRACTOR SHALL PERFORM A WATER FLOW TEST PRIOR TO DEVELOPMENT OF THEIR SHOP DRAWINGS AND HYDRAULIC CALCULATIONS TO CONFIRM THE AVAILABLE WATER SUPPLY. THE WATER FLOW TEST INFORMATION SHALL BE WITHIN 6 MONTHS
OF SHOP DRAWING AND HYDRAULIC CALCULATION SUBMITTAL.
FIRE SUPPRESSION CONTRACTOR SHALL INSTALL SYSTEM PIPING AND COMPONENTS IN A WORKMANSHIP LIKE MANNER. CHANGES IN INSTALLATION AS A RESULT OF POOR CRAFTSMANSHIP SHALL BE AS DIRECTED BY CONTRACTING OFFICER'S TECHNICAL
REPRESENTATIVE AND SHALL BE AT NO ADDITIONAL COST TO THE OWNER.
ANY ADDITIONAL OFFSETS OR FITTINGS REQUIRED FOR PROPER INSTALLATION, COORDINATION WITH OTHER TRADES, AND/OR TO
MAINTAIN PROPER CLEARANCES SHALL BE PROVIDED FOR A COMPLETE AND WORKING SYSTEM.
NOT ALL PIPING, VALVES AND APPURTENANCES ARE SHOWN ON THE PLANS. REFER TO SPECIFICATIONS AND DETAILS FOR
ADDITIONAL INFORMATION.
ALL CONTROL VALVES ON THE FIRE PROTECTION SYSTEM SHALL BE ELECTRICALLY SUPERVISED PER UFC 3-600-01. COORDINATE THE TYPE AND EXACT LOCATION OF FLOW AND SUPERVISORY SWITCHES BETWEEN FIRE PROTECTION AND FIRE ALARM CONTRACTORS. FIRE ALARM SYSTEM, SUPERVISION AND WIRING SHALL BE PROVIDED UNDER THE SAFETY AND SECURITY
DIVISION.
SUPPRESSION SYSTEM(S) SHALL BE DESIGNED FOR A MAXIMUM WORKING PRESSURE OF 175 PSI IN ACCORDANCE WITH NFPA 13.
SPRINKLER SYSTEM(S) SHALL BE HYDROSTATICALLY TESTED IN ACCORDANCE WITH NFPA 13.
ALL VALVES SHALL HAVE A PERMANENTLY AFFIXED SIGN PER NFPA 13 INDICATING ITS FUNCTION AND SECURED TO THE VALVE
WITH SUITABLE CHAIN.
HANGER MATERIAL, SPACING AND METHOD OF ATTACHMENT SHALL BE IN ACCORDANCE WITH NFPA 13 AND MANUFACTURER'S
REQUIREMENTS.
SPRINKLER SYSTEM PIPING IS NOT REQUIRED TO BE PROVIDED WITH SEISMIC BRACING AS THE SITE IS CLASSIFIED AS A SEISMIC
DESIGN CATEGORY A.
MAINTAIN A MINIMUM OF 18" CLEARANCE BELOW SPRINKLER DEFLECTOR(S) AND ANY PERMANENT OR TEMPORARY
OBSTRUCTION(S) PER NFPA 13.
ONLY LISTED OR APPROVED DEVICES AND MATERIALS AS SPECIFIED IN NFPA 13 SHALL BE INSTALLED THROUGHOUT THE SYSTEM.
ALL SPRINKLERS SHALL BE INSTALLED ACCORDING TO THEIR LISTED SPACING AND OBSTRUCTION REQUIREMENTS.
CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL FIRE PROTECTION DEVICES WITH ALL OTHER TRADES.
PROVIDE SYSTEM(S) WITH FLUSHING CONNECTIONS PER NFPA 13.
PROVIDE A PERMANENTLY ATTACHED AND STENCILED PLACARD TO THE RISER STATING THE REQUIRED DESIGN CRITERIA FOR
EACH DESIGNED SYSTEM PER NFPA 13. THE USE OF INDELIBLE MARKER IS PROHIBITED.
AT LEAST SIX (6) SPARE SPRINKLERS OF EACH TYPE, TEMPERATURE, AND ORIFICE SIZE USED IN THE SYSTEM INCLUDING A SPECIAL WRENCH FOR EACH FIRE SPRINKLER SHALL BE KEPT IN A CABINET WHERE AMBIENT TEMPERATURE WILL AT NO TIME
EXCEED 100°F PER NFPA 13.
QUICK RESPONSE SPRINKLER REDUCTIONS ARE NOT PERMITTED.
SPRINKLER PROTECTION IS NOT REQUIRED IN THE NONCOMBUSTIBLE CONCEALED SPACE ABOVE THE CEILING PER NFPA 13. THE UTILITY TUNNELS BENEATH THE FIRST FLOOR ARE CONSIDERED NON-COMBUSTIBLE CONCEALED SPACES PER NFPA 13 AND DO
NOT REQUIRE SPRINKLER PROTECTION.
FITTING AND COUPLING HOUSINGS SHALL BE MALLEABLE IRON CONFORMING TO ASTM A47/A47M.
THE FIRE PROTECTION PIPING MUST BE LABELED AS REQUIRED BY UFC 3-600-01 SECTION 9-6.8.
DEMOLISH EXISTING STANDPIPE AND HOSE VALVE PIPING, HANGERS, FITTINGS, ETC. BACK TO THE UNDERGROUND FLANGE LOCATED IN THE SUB-BASEMENT. PROVIDE BLIND FLANGE AT EXISTING 4" WATER LINE ENTRY. NEW FIRE SPRINKLER SYSTEM TO START AT NEW 6" WATER MAIN ENTRY INTO THE BUILDING IN THE SUB-BASEMENT. REFERENCE FD AND CIVIL DRAWINGS.
REFER TO WET-PIPE SPRINKLER SYSTEM SPECIFICATION 21 13 13.00 10 FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
FIRE SUPPRESSION NOTES
FIRE SUPPRESSION LEGEND
OH
LIGHT HAZARD
0.10 GPM/SQ.FT OVER 1500 SQ.FT, 250 GPM
HOSE ALLOWANCE, AND K-FACTOR: 5.6
ORDINARY HAZARD
0.20 GPM/SQ.FT OVER 2500 SQ.FT, 250 GPM
HOSE ALLOWANCE, AND K-FACTOR: 8.0
ELECTRIC ALARM BELLF
SS
CHECK VALVE
DOUBLE CHECK BACKFLOW PREVENTER
SIAMESE FIRE DEPARTMENT
CONNECTION
WALL-MOUNTED BACKFLOW
ASSEMBLY TEST HEADER
NON-SPRINKLERED SPACENS
1. CONTRACTOR SHALL SUBMIT COMPLETE SHOP DRAWINGS WITH DESIGN CALCULATIONS AND PRODUCT DATA FOR EACH TYPE OF PRODUCT, TO OWNER'S TECHNICAL REPRESENTATIVE FOR REVIEW PRIOR TO COMMENCING FABRICATION AND
INSTALLATION. FAILURE TO COMPLY IS AT THE RISK OF THE CONTRACTOR.
2. PROVIDE CLEAN AGENT NOTIFICATION APPLIANCES WITH SIGNAGE LABELING APPLIANCES FOR PRE-DISCHARGE AND
DISCHARGE AS INDICATED IN SECTION 3.1.1 OF THE CLEAN AGENT SPECIFICATION.
3. CLEAN AGENT SYSTEM LAYOUT AND DESIGN SHALL BE PERFORMED AND CALCULATED IN ACCORDANCE WITH NFPA 2001, AND MANUFACTURER'S REQUIREMENTS AND RECOMMENDATIONS. VOLUME OF DISCHARGE SHALL INCLUDE THE AREA
UNDER THE RAISED FLOOR (DATA CENTER-128).
4. SEE PLAN DRAWINGS FOR DEVICE QUANTITIES. CLEAN AGENT RISER DIAGRAM IS DIAGRAMMATIC AND NOT INTENDED TO
SHOW EACH COMPONENT, DEVICE, APPLIANCE, ETC.
5. LOCATE CONTROL/ RELAY MODULE WITHIN 3'-0" OF CONTROL DEVICE.
6. CONTRACTOR SHALL PROVIDE ALL NECESSARY AND REQUIRED SYSTEM PROGRAMMING TO MEET THE DESIGN INTENT AND
CODE COMPLIANCE.
7. BREAKER SERVING THE CLEAN AGENT RELEASING PANEL SHALL BE PAINTED RED AND PROVIDED WITH A NON-SWEEP
DEVICE (LOCK).
8. THE CLEAN AGENT PANEL SHALL IDENTIFY THE ELECTRICAL PANEL WHERE THE CLEAN AGENT CIRCUIT BREAKER IS
LOCATED.
9. REFER TO CLEAN AGENT SYSTEM SPECIFICATIONS 21 22 00.00 40 FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
CLEAN AGENT NOTES
CLEAN AGENT FIRE SUPPRESSION
STORAGE TANKCA
DATE/TIME: 11/03/21 AT 3:20 PM
PERFORMED BY: NATHAN SHEWFELT-POND
STATIC PRESSURE (HYDRANT #900): 60 PSIG
RESIDUAL PRESSURE (HYDRANT #900): 42 PSIG
PITOT PRESSURE (HYDRANT #901): 38 PSIG
GPM FLOWING (AT RESIDUAL): 1,034 GPM
GPM FLOWING (AT 20-PSIG): 1,592 GPM
COEFFICIENT: 0.9
BUTT-SIZE: 2.5-INCH
ELEVATION OF TEST HYDRANT: 598’ AMSL
ELEVATION OF BUILDING: 603’ AMSL
WATER FLOW TEST INFORMATION:
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
P
O B o x
S y ra c u s e
N Y
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:2
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
F-001
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N L
E G
E N
D A
N D
G E
N E
R A
L N
O T
E S
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
1 2 4 6 7 8 9 16
12' 13'10' 15'
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
9' 16'
E'
SEE C4/FD102 SEE C4/FD102
M A
T C
H L
IN
E S
E E
A /F
D
M A
T C
H L
IN
E S
E E
A /F
D
KEYNOTES:
SEE SHEET F-001 FOR GENERAL NOTES AND
LEGEND.
THE FIRE HOSE VALVE SYSTEM SHALL BE REMOVED
IN ITS ENTIRETY. STARTING AT THE 4"
UNDERGROUND WATER LINE ENTRY IN THE STEAM
ROOM. REMOVAL SHALL INCLUDE VALVES,
BACKFLOW ASSEMBLY, PIPING, HANGERS, FITTINGS,
COUPLINGS, CABINETS, HOSE, ETC. PROVIDE BLIND
FLANGE AT 4" WATER LINE ENTRY INTO THE
BUILDING IN THE STEAM ROOM.
THE EXISTING FIRE ALARM SYSTEM SHALL BE
REMOVED IN ITS ENTIRETY, INCLUDING RACEWAYS,
CONDUIT, CONDUCTORS, POWER SUPPLIES,
CABINETS, FIRE ALARM CONTROL PANEL, HEAT
DETECTORS, SMOKE DETECTORS, NOTIFICATION
APPLIANCES, MANUAL PULL STATIONS, ETC. COPPER
PHONE LINES TO REMAIN. SEE #4 BELOW.
THE EXISTING COPPER PHONE LINES UTILIZED FOR
THE FIRE ALARM SYSTEM MONITORING SHALL BE
REUSED FOR THE NEW FIRE ALARM AND MASS
NOTIFICATION SYSTEM. THE EXISTING COPPER
LINES SHALL BE PROTECTED DURING
CONSTRUCTION AND RELOCATED TO THE NEW
LOCATION OF THE FIRE ALARM AND MASS
NOTIFICATION CONTROL PANEL. RELOCATION AND
PROTECTION OF LINES SHALL BE COORDINATED BY
THE CONTRACTOR. SEE ELEC/TELE DRAWINGS FOR
LOCATION.
GENERAL NOTES:
1.
2.
3.
4.
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
B o x
S y ra c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:5
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
FD101
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N D
E M
O
B A
S E
M E
N T
/F
IR
S T
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
SCALE: 1/8" = 1'-0"A1
FIRE SUPPRESSION DEMOLITION PLAN - BASEMENT/FIRST FLOOR
KEY # KEYNOTE DESCRIPTION
EXISTING HOSE VALVE CABINET TO BE
REMOVED.
EXISTING 2" VERTICAL PIPING TO FIRE HOSE
CABINET ON SECOND FLOOR TO BE
REMOVED.
EXISTING 2.5" PIPING TO BE REMOVED.
EXISTING 4" PIPING TO BE REMOVED.
EXISTING 2" PIPING TO BE REMOVED.
EXISTING FIRE ALARM CONTROL PANEL TO BE
REMOVED. SEE GENERAL NOTE #4
REGARDING EXISTING COPPER PHONE LINES.
16 17 18 19 21 23 24
20 22
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
16'
E'
M A
T C
H L
IN
E S
E E
A /F
D
M A
T C
H L
IN
E S
E E
A /F
D
FD102
B4
12' 13'10' 15'
L'
9' 16'
SEE A1/FD101 SEE A1/FD101
STEAM ROOM
SEE SHEET F-001 FOR GENERAL NOTES AND LEGEND.
THE FIRE HOSE VALVE SYSTEM SHALL BE REMOVED IN
ITS ENTIRETY. STARTING AT THE 4" UNDERGROUND
WATER LINE ENTRY IN THE STEAM ROOM. REMOVAL
SHALL INCLUDE VALVES, BACKFLOW ASSEMBLY,
PIPING, HANGERS, FITTINGS, COUPLINGS, CABINETS,
HOSE, ETC. PROVIDE BLIND FLANGE AT 4" WATER LINE
ENTRY INTO THE BUILDING IN THE STEAM ROOM.
THE EXISTING FIRE ALARM SYSTEM SHALL BE REMOVED
IN ITS ENTIRETY, INCLUDING RACEWAYS, CONDUITS,
CONDUCTORS, POWER SUPPLIES, CABINETS, FIRE
ALARM CONTROL PANEL, HEAT DETECTORS, SMOKE
DETECTORS, NOTIFICATION APPLIANCES, MANUAL PULL
STATIONS, ETC.
GENERAL NOTES:
1.
2.
3.
KEYNOTES:
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
B o x
S y ra c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:5
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
FD102
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N D
E M
O
F
IR
S T
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
SCALE: 1/8" = 1'-0"A1
FIRE SUPPRESSION DEMOLITION PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0"C4
FIRE PROTECTION DEMO PLAN - BASEMENT ELECTRICAL
SCALE: 1/8" = 1'-0"B4
FIRE PROTECTION DEMO PLAN - SUB BASEMENT
KEY # KEYNOTE DESCRIPTION
EXISTING HOSE VALVE CABINET TO BE
REMOVED.
EXISTING 2" VERTICAL PIPING TO FIRE HOSE
CABINET ON SECOND FLOOR TO BE
REMOVED.
4" CONTINUES INTO STEAM ROOM. SEE
DETAIL B4/FD102.
EXISTING 4" PIPING TO BE REMOVED.
EXISTING 4" BACKFLOW TO BE REMOVED.
4" CONNECTION TO 4" UNDERGROUND PIPING.
12' 13'10' 15'
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
9' 16'
E'
M A
T C
H L
IN
E S
E E
A /F
D
M A
T C
H L
IN
E S
E E
A /F
D
SEE SHEET F-001 FOR GENERAL NOTES AND
LEGEND.
THE FIRE HOSE VALVE SYSTEM SHALL BE REMOVED
IN ITS ENTIRETY. STARTING AT THE 4"
UNDERGROUND WATER LINE ENTRY IN THE STEAM
ROOM. REMOVAL SHALL INCLUDE VALVES,
BACKFLOW ASSEMBLY, PIPING, HANGERS, FITTINGS,
COUPLINGS, CABINETS, HOSE, ETC. PROVIDE BLIND
FLANGE AT 4" WATER LINE ENTRY INTO THE
BUILDING IN THE STEAM ROOM.
THE EXISTING FIRE ALARM SYSTEM SHALL BE
REMOVED IN ITS ENTIRETY, INCLUDING RACEWAYS,
CONDUIT, CONDUCTORS, POWER SUPPLIES,
CABINETS, FIRE ALARM CONTROL PANEL, HEAT
DETECTORS, SMOKE DETECTORS, NOTIFICATION
APPLIANCES, MANUAL PULL STATIONS, ETC.
GENERAL NOTES:
1.
2.
3.
KEYNOTES:
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
B o x
S y ra c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:0
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
FD103
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N D
E M
O
A S
S E
M B
L Y
/S E
C O
N D
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
SCALE: 1/8" = 1'-0"A1
FIRE SUPPRESSION DEMO - PARTIAL SECOND FLOOR/ ASSEMBLY
KEY # KEYNOTE DESCRIPTION
EXISTING HOSE VALVE CABINET TO BE
REMOVED.
EXISTING 2" VERTICAL PIPING TO FIRE HOSE
PIPING FROM FIRST FLOOR TO BE REMOVED.
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
16'
E'
M A
T C
H L
IN
E S
E E
A /F
D
M A
T C
H L
IN
E S
E E
A /F
D
SEE SHEET F-001 FOR GENERAL NOTES AND
LEGEND.
THE FIRE HOSE VALVE SYSTEM SHALL BE REMOVED
IN ITS ENTIRETY. STARTING AT THE 4"
UNDERGROUND WATER LINE ENTRY IN THE STEAM
ROOM. REMOVAL SHALL INCLUDE VALVES,
BACKFLOW ASSEMBLY, PIPING, HANGERS, FITTINGS,
COUPLINGS, CABINETS, HOSE, ETC. PROVIDE BLIND
FLANGE AT 4" WATER LINE ENTRY INTO THE
BUILDING IN THE STEAM ROOM.
THE EXISTING FIRE ALARM SYSTEM SHALL BE
REMOVED IN ITS ENTIRETY, INCLUDING RACEWAYS,
CONDUIT, CONDUCTORS, POWER SUPPLIES,
CABINETS, FIRE ALARM CONTROL PANEL, HEAT
DETECTORS, SMOKE DETECTORS, NOTIFICATION
APPLIANCES, MANUAL PULL STATIONS, ETC.
GENERAL NOTES:
1.
2.
3.
KEYNOTES:
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
B o x
S y ra c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:1
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
FD104
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N D
E M
O
S E
C O
N D
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
SCALE: 1/8" = 1'-0"A1
FIRE SUPPRESSION DEMO - PARTIAL SECOND FLOOR
KEY # KEYNOTE DESCRIPTION
EXISTING HOSE VALVE CABINET TO BE
REMOVED.
EXISTING 2" VERTICAL PIPING TO FIRE HOSE
PIPING FROM FIRST FLOOR TO BE REMOVED.
12' 13'10' 15'
A
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
9' 16'
E'
PPE TRAINING BAG
STORAGE
COMMANDER
CEM
SECOND OFFICER
OPERATIONS CHIEF
MECHANICAL
RECORDS STAGING/
STORAGE
PLANS &
RESOURCES CHIEF
SECURE STORAGE
(CRYPTO)
STAN/EVAL
ITE
STAGING/STORAGE
MEN
COMM OPEN OFFICE
COMM OPEN OFFICE
WEST STAIR
SF COMMANDER
SF FIRST
SERGEANT
LAW
ENFORCEMENT
DESK
INFORMATION
PROTECTION CHIEF
SF/ COMM
CORRIDOR
UTC PREVENTIVE
MAINTENANCE
CHIEF OF SECURITY
SF/ COMM
CORRIDOR
ELEV MACHINE RM
LOWER LANDING
FLIGHT CHIEFS
HOTEL W/S
SF/ CATM
CORRIDOR
CATM ADMIN
CATM NCOIC
021A
WEAPONS
MAINTENANCE
TRAINING ROOM
MECHANICAL
SF/ CATM
CORRIDOR
WEAPONS
CLEARING
EQUIPMENT
LOCKERS
PPE TRAINING BAG
STORAGE
OPERATIONS
SUPER
WS
SUPPLY MOBILITY
MANAGEMENT
WS
W/C 1
W/C 2
BUDGET OFFICE
FSS C/S
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
SEE B4/F-102
SEE B4/F-102
SHARED WAITING
ROOM
DATA CENTER
COMM C/S
PROGRAM
MANAGEMENT
SF OPEN OFFICE
SF XO/NCO
COMM OPEN OFFICE
COMM CORRIDOR
VEST
101A
VAULT
016A
AREA OPEN TO ABOVE.
SEE F-103.
NS
NS
SHARED WAITING
ROOM
4 4
4 4
SF W/S
ELEC WEST 1
129A
NS
M A
T C
H L
IN
E S
E E
A /F
-1
M A
T C
H L
IN
E S
E E
A /F
-1
OH
MEN
MEN
134A
CA
SEE SHEET F-001 FOR GENERAL NOTES AND
LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN
ACCORDANCE WITH UFC 3-600-01 AND NFPA 13, WITH
UFC TAKING PRECEDENCE.
CONTRACTOR SHALL COORDINATE ALL NEW
SUPPRESSION WORK WITH OTHER TRADES.
SPRINKLER DESIGN HAZARD CLASSIFICATION FOR
THE BUILDING SHALL BE LIGHT HAZARD UNLESS
NOTED OTHERWISE.
THE UTILITY TUNNELS BENEATH THE FIRST FLOOR
ARE CONSIDERED NON-COMBUSTIBLE CONCEALED
SPACES PER NFPA 13 AND DO NOT REQUIRE
SPRINKLER PROTECTION.
GENERAL NOTES:
1.
2.
3.
4.
5.
KEYNOTES:
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
B o x
S y ra c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:3
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
F-101
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N P
L A
N
B A
S E
M E
N T
/F
IR
S T
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
SCALE: 1/8" = 1'-0"A1
FIRE SUPPRESSION PLAN - PARTIAL FIRST FLOOR/ BASEMENT
KEY # KEYNOTE DESCRIPTION
CONTROL VALVE AND FLOW SWITCH FOR
ELEVATOR MACHINE ROOM. SEE FA101 &
FA501 FOR CONNECTIONS TO FIRE ALARM
SYSTEM.
PROVIDE SPRINKLER PROTECTION AT THE
BOTTOM OF THE PIT. SUPPLY PIPING TO PIT
SPRINKLER DOWNSTREAM OF CONTROL
VALVE AND FLOW SWITCH FOR ELEVATOR
MACHINE ROOM, 24" ABOVE BOTTOM OF PIT.
PROVIDE SPRINKLER PROTECTION UNDER
STAIR LANDING.
CLOUD/FLOATING CEILING FEATURE IN THIS
AREA. COORDINATE SPRINKLER
INSTALLATION WITH EXPOSED AND LOWER
CEILING. REFERENCE THE REFLECTED
CEILING PLANS FOR ELEVATION AND
LOCATIONS.
COORDINATE SPRINKLER PIPE ROUTING
FROM CEILING ABOVE SHARED WAITING
ROOM-101 TO VESTIBULE WITH HORIZONTAL
CHASE. REFERENCE ARCHITECTURAL
DRAWINGS FOR CHASE DETAIL. CONCEAL
SUPPLY PIPING TO VESTIBULE INSIDE
CHASE TO ABOVE VESTIBULE. PIPING SHALL
NOT BE VIEWABLE FROM FLOOR LEVEL
AFTER FINAL FINISHES ARE INSTALLED.
COORDINATE AND PROVIDE SPRINKLER
PROTECTION UNDER AND AROUND
EXPOSED DUCTWORK IN THIS AREA PER
NFPA 13.
COORDINATE CLEAN AGENT TANK
LOCATION WITH THE EXISTING EQUIPMENT
IN THE ROOM. PROVIDE REQUIRED
CLEARANCE AROUND TANK. INSTALL PER
NFPA 2001. REFERENCE FA101, FA501,
FA502, AND THE SPECIFICATIONS FOR
FURTHER INFORMATION.
PROVIDE QUICK RESPONSE, BRASS
UPRIGHTS WITH HEAD GUARDS IN THIS
AREA.
PROVIDE SEPARATE ZONE FOR THE
SPRINKLER PROTECTION IN THE DATA
CENTER-128. ROUTE DRAIN TO EXTERIOR
OF THE BUILDING.
PROVIDE CORROSION RESISTANT FINISH
ON THE SPRINKLERS IN THIS AREA.
A
B
D
C
E
F
G
H
FINANCIAL
MANAGEMENT
OFFICER
FSS C/S
ID CARDS
RETENTION
102A
RECRUITING OPEN
OFFICE
FIN/ REC CORRIDOR
FINANCE OPEN
OFFICE
WOMEN
122 EAST STAIR
JAN
STORAGE
RECRUITING
CONSULT
EAST VEST
102B
CEM
FSS HUDDLE
110A
FSS CORRIDOR
PERSONNEL SUPER
COMMANDER
OPERATIONS
OFFICERS
PPE TRAINING BAG
STORAGE
115MECHANICAL
HUDDLE / STORAGE
FSS OPEN OFFICE
FSS CORRIDOR
OH
OH
OH
OH
OH
FINANCE C/S OFC
103A
RECRUITING
SUPERVISOR
RECRUITING
STORAGE
107A
EDUCATION &
TRAINING OFFICE
SHARED TESTING
M A
T C
H L
IN
E S
E E
A /F
-1
M A
T C
H L
IN
E S
E E
A /F
-1
OH
F-102
A4
LACTATION
120A
ELEC EAST 1
110B
OH
238 SF
INSTALLATION
PERSONNEL
READINESS
118A
SEE SHEET F-001 FOR GENERAL NOTES AND
LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN
ACCORDANCE WITH UFC 3-600-01 AND NFPA 13, WITH
UFC TAKING PRECEDENCE.
CONTRACTOR SHALL COORDINATE ALL NEW
SUPPRESSION WORK WITH OTHER TRADES.
SPRINKLER DESIGN HAZARD CLASSIFICATION FOR
THE BUILDING SHALL BE LIGHT HAZARD UNLESS
NOTED OTHERWISE.
THE UTILITY TUNNELS BENEATH THE FIRST FLOOR
ARE CONSIDERED NON-COMBUSTIBLE CONCEALED
SPACES PER NFPA 13 AND DO NOT REQUIRE
SPRINKLER PROTECTION.
GENERAL NOTES:
1.
2.
3.
4.
5.
12' 13'10' 15'
L'
9' 16'
MECHANICAL
SF/ CATM
CORRIDOR
OH
ELECTRICAL
OH
SEE A1/F-101 SEE A1/F-101
NS
KEYNOTES:
23 2422
A
B
STEAM ROOM
OH
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
B o x
S y ra c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:4
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
F-102
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N P
L A
N
F
IR
S T
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
SCALE: 1/8" = 1'-0"A1
FIRE SUPPRESSION PLAN - PARTIAL FIRST FLOOR
SCALE: 1/8" = 1'-0"B4
FIRE SUPPRESSION PLAN - BASEMENT ELECTRICAL ROOM
KEY # KEYNOTE DESCRIPTION
6" UNDERGROUND PIPING ENTRY. SEE CIVIL
DRAWING C-110 FOR CONTINUATION.
6" DOUBLE CHECK BACKFLOW PREVENTION
ASSEMBLY WITH TAMPER SWITCHES.
6" PIPING TO SUPPLY FIRE SPRINKLER
SYSTEM. PIPING ROUTED THROUGH PIPE
CHASE TO EAST STAIRWELL. SEE A1/F-102
FOR CONTINUATION.
FDC PIPING UP TO NEW SIAMESE FDC ON
FIRST FLOOR. SEE A1/F-102 FOR
CONTINUATION.
BACKFLOW TEST OUTLET PIPING UP TO FIRST
FLOOR. SEE A1/F-102 FOR CONTINUATION.
SIAMESE FIRE DEPARTMENT CONNECTION.
BACKFLOW TEST OUTLET.
FLOOR CONTROL VALVE ASSEMBLY FOR
FIRST FLOOR.
6" WATER SUPPLY FROM SUB-BASEMENT.
PROVIDE SPRINKLER PROTECTION UNDER
STAIR LANDING.
CLOUD/FLOATING CEILING FEATURE IN THIS
AREA. COORDINATE SPRINKLER
INSTALLATION WITH EXPOSED AND LOWER
CEILING. REFERENCE THE REFLECTED
CEILING PLANS FOR ELEVATION AND
LOCATIONS.
COORDINATE FDC AND BACKFLOW TEST
OUTLET PIPE ROUTING INSIDE CHASE/BOX.
REFERENCE ARCHITECTURAL DRAWINGS FOR
FURTHER DETAIL OF CHASE. REF A-552/A4.
COORDINATE AND PROVIDE SPRINKLER
PROTECTION UNDER AND AROUND EXPOSED
DUCTWORK IN THIS AREA PER NFPA 13.
PROVIDE CORROSION RESISTANT FINISH ON
THE SPRINKLERS IN THIS AREA.
SCALE: 1/8" = 1'-0"A4
FIRE SUPPRESSION PLAN - SUB BASEMENT
12' 13'10' 15'
A
B
D
C
E
L'
K'
J'
H'
G'
F'
F
G
H
9' 16'
E'
CONTRACTING
SUPER
229A
CONTRACTING
OPEN OFFICE
WOMEN
MEN
MSG COMMANDER
230B
MSG DEPUTY
COMMANDER
230C
MSG OPEN OFFICE
MSG FIRST
SERGEANT
230E
MSG CHIEF
230D
MULTIMEDIA
STUDIO/STORAGE
231B
SECOND FLOOR
CONFERENCE
PUBLIC AFFAIRS
ADMIN OPEN
OFFICE
231 PUBLIC AFFAIRS
OIC
231A
ASSEMBLY
LANDING
UPPER LANDING
MSG CORRIDOR
COMMAND
CORRIDOR
IGI 1
IGI 2
IGI STAFF
205W
JAG OPEN OFFICE
JAG 2
JAG 1
WOMEN
MEN
SMALL
CONFERENCE
STORAGE
160D
BREAK ROOM
OH
OH
OH
WEST STAIR
TELECOM ROOM
MULTI PURPOSE
ROOM A
160A
COMMAND POST
224B
JAN
223A
OH
ROOF BELOW
NS
2 2
ROOF BELOW
ASSEMBLY
CORRIDOR
MSG OPEN OFFICE
MULTI PURPOSE
ROOM B
160B
ELEC WEST 2
223B
NS
AV CLOSET
160C
OH
NS NS
R O
O F
B E
L O
W
M A
T C
H L
IN
E S
E E
A /F
-1
M A
T C
H L
IN
E S
E E
A /F
-1
NS
OH
CA
CONTROL PANEL
224C
CMD POST OFC 1
224D
CMD POST OFC 2
224E
TRAP
224A
OPEN TO BELOW
SEE SHEET F-001 FOR GENERAL NOTES AND
LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN
ACCORDANCE WITH UFC 3-600-01 AND NFPA 13, WITH
UFC TAKING PRECEDENCE.
CONTRACTOR SHALL COORDINATE ALL NEW
SUPPRESSION WORK WITH OTHER TRADES.
SPRINKLER DESIGN HAZARD CLASSIFICATION FOR
THE BUILDING SHALL BE LIGHT HAZARD UNLESS
NOTED OTHERWISE.
GENERAL NOTES:
1.
2.
3.
4.
KEYNOTES:
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
B o x
S y ra c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:5
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
F-103
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N P
L A
N
S E
C O
N D
F L O
O R
/A S
S E
M B
L Y
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
SCALE: 1/8" = 1'-0"A1
FIRE SUPPRESSION PLAN - PARTIAL SECOND FLOOR/ASSEMBLY
KEY # KEYNOTE DESCRIPTION
PROVIDE SPRINKLER PROTECTION AT TOP OF
STAIRWELL.
COORDINATE SPRINKLER INSTALLATION WITH
DIFFERING CEILING HEIGHTS. REFERENCE
THE REFLECTED CEILING PLANS FOR
ELEVATION CHANGE LOCATIONS.
PROVIDE QUICK RESPONSE, BRASS
UPRIGHTS WITH HEAD GUARDS IN THIS AREA.
PROVIDE SEPARATE ZONE FOR THE
SPRINKLER PROTECTION IN THE TELECOM
ROOM-158. ROUTE DRAIN TO EXTERIOR OF
THE BUILDING.
COORDINATE CLEAN AGENT TANK LOCATION
WITH THE EXISTING EQUIPMENT IN THE
ROOM. PROVIDE REQUIRED CLEARANCE
AROUND TANK. INSTALL PER NFPA 2001.
REFERENCE FA103, FA501, FA502, AND THE
SPECIFICATIONS FOR FURTHER
INFORMATION.
A
B
D
C
E
F
G
H
16'
WING COMMANDER
211C
EXECUTIVE
SUPPORT
211B
VICE COMMANDER
211A
CLOS
211D
COMMAND JAG (3)
211F
COMMAND CHIEF
MASTER SERGEANT
211E
COMMAND SUITE
EAST STAIR
MEN
WOMEN
COMMAND
CONFERENCE
SAFETY/ IG OPEN
OFFICE
WSHRA
DDR
INSPECTOR
GENERAL
IGQ
E/O 1
E/O 2
OPEN OFFICE
WING PLANS
OFFICER
SAFETY OFFICER
ROOF BELOW
NS
4 4
ROOF
BELOW
M A
T C
H L
IN
E S
E E
A /F
-1
M A
T C
H L
IN
E S
E E
A /F
-1
ELEC EAST 2
202B
OH
IGQ STAFF
205E
COMMAND
CORRIDOR
JAG AD 2
WS
JAG AD 1
WS
SEE SHEET F-001 FOR GENERAL NOTES AND
LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN
ACCORDANCE WITH UFC 3-600-01 AND NFPA 13, WITH
UFC TAKING PRECEDENCE.
CONTRACTOR SHALL COORDINATE ALL NEW
SUPPRESSION WORK WITH OTHER TRADES.
SPRINKLER DESIGN HAZARD CLASSIFICATION FOR
THE BUILDING SHALL BE LIGHT HAZARD UNLESS
NOTED OTHERWISE.
GENERAL NOTES:
1.
2.
3.
4.
KEYNOTES:
KEY PLAN
SCALE: = 1'-0"
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
P O
N D
J O
B
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
PLAN NORTH
0 8 168
1/8"
Q P
K D
E S
IG
N
S o u th
S a lin a S tr e e t
S u it e
B o x
S y ra c u s e
-0
Q P
K J
O B
ORIGINAL SHEET SIZE - ANSI D (22" X 34")
/1
/2
:2
:5
P M
B
IM
/1
N
Y A
N G
N ia g a ra
F a lls R e p a ir O
T
F a c ili ty /1
N
Y A
N G
N
IA
G
A R
A M
E P
F
P v
.r v t
F-104
100% B3 SUBMITTAL
F
IR
E S
U P
P R
E S
S
IO
N P
L A
N
S E
C O
N D
F L O
O R
R E
N O
V A
T E
O P
E R
A T
IO
N
S A
N D
T R
A
IN
IN
G
F A
C
IL
IT
Y
B
U
IL
D
IN
G
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
N
IA
G A
R A
F A
L L S
A
IR
R E
S E
R V
E S
T A
T
IO
N
N E
W Y
O R
K A
IR
N
A T
IO
N
A L G
U A
R D
A p p ro v e r
N D
S
N D
S
B T
H
M
A R
C H
SCALE: 1/8" = 1'-0"A1
FIRE SUPPRESSION PLAN - PARTIAL SECOND FLOOR
KEY # KEYNOTE DESCRIPTION
FLOOR CONTROL VALVE ASSEMBLY FOR
SECOND FLOOR.
6" WATER SUPPLY UP FROM FIRST FLOOR.
PROVIDE SPRINKLER PROTECTION AT TOP OF
STAIRWELL.
CLOUD/FLOATING CEILING FEATURE IN THIS
AREA. COORDINATE SPRINKLER
INSTALLATION WITH EXPOSED AND LOWER
CEILING. REFERENCE THE REFLECTED
CEILING PLANS FOR ELEVATION AND
LOCATIONS.
| F-001 - FIRE SUPPRESSION LEGEND AND GENERAL NOTES |
| FD101 - FIRE SUPPRESSION DEMO - BASEMENT/FIRST FLOOR |
| FD102 - FIRE SUPPRESSION DEMO - FIRST FLOOR |
| FD103 - FIRE SUPPRESSION DEMO - ASSEMBLY/SECOND FLOOR |
| FD104 - FIRE SUPPRESSION DEMO - SECOND FLOOR |
| F-101 - FIRE SUPPRESSION PLAN - BASEMENT/FIRST FLOOR |
| F-102 - FIRE SUPPRESSION PLAN - FIRST FLOOR |
| F-103 - FIRE SUPPRESSION PLAN - SECOND FLOOR/ASSEMBLY |
| F-104 - FIRE SUPPRESSION PLAN - SECOND FLOOR |
File details come from the government source that posted it. Updated .