03.6 Drawing Fire Protection Ph3.pdf

PDF 3 MB Posted

Attached to
Repair Operations & Training Facility Federal contract opportunity
Solicitation number
W50S8H23B0001
Issued by
Department of the Army New York Army National Guard

About this file

This solicitation is for a competitive 8(a) small business set-aside construction contract to renovate the two-story 43,029 SF Operations & Training Facility, Building 901, at Niagara Falls International Airport in New York. The project magnitude is estimated between $10 million and $25 million. The North American Industry Classification code is 236220 and the size standard for small businesses is average annual revenue of $45 million for the past three years. The solicitation was issued by the Department of the Army New York Army National Guard. Interested parties are encouraged to attend the pre-bid conference and site visit. Bids must conform to the invitation for bids and be submitted through the System for Award Management by the response date. Award will be made to the responsible bidder offering the most advantageous price. Funds are not presently available but are anticipated to become available by 30 September 2023, at which time award will be made if prices are within an awardable range.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Operations & Training Facility, newest first.
File Type Posted
C4 Bid Opening Sign-In.pdf PDF
C4 Abstract OF1419.pdf PDF
Consolidated RFI List.xlsx XLSX spreadsheet
B6 Hazardous Material Report.pdf PDF
B8 W50S8H-23-B-0001 IFB-P00001.pdf PDF
B8 W50S8H-23-B-0001 IFB-P00001 Amend.pdf PDF
B7 Site Visit Sign-In.pdf PDF
B7 Pre-Bid Conference Slides Final.pptx PPTX presentation
01.2 Drawing Plumbing Ph1.pdf PDF
02.1 Drawing Architectural Demo Ph2.pdf PDF
03.2 Drawing Civil Utility Ph3.pdf PDF
03.4 Drawing Architectural Demo Ph3.pdf PDF
03.11 Drawing Telecom Ph3.pdf PDF
03.12 Drawing Reference Drawings Ph3.pdf PDF
A2 JA FAR Part 6 Advantor SAM Post.pdf PDF
01.3 Drawing Mechanical Ph1.pdf PDF
03.1 Drawing Civil Storm Ph3.pdf PDF
03.3 Drawing Structural Ph3.pdf PDF
03.7 Drawing Fire Alarm Ph3.pdf PDF
03.10 Drawing Electrical Ph3.pdf PDF
H8 Specs.pdf PDF
01.1 Drawing Architectural Ph1.pdf PDF
01.4 Drawing Electrical Ph1.pdf PDF
02.2 Drawing Architectural Ph2.pdf PDF
03.08 Drawing Plumbing Ph3.pdf PDF
B8 W50S8H-23-B-0001 IFB.pdf PDF
01.0 Drawing General.pdf PDF
03.5 Drawing Architectural Ph3.pdf PDF
03.09 Drawing Mechanical Ph3.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH UFC 1-200-01, "GENERAL BUILDING REQUIREMENTS", NOVEMBER 2018 CHANGE 2; UFC 3-600-01, "FIRE PROTECTION ENGINEERING FOR FACILITIES", MAY 2019 CHANGE 3; UFC 4-010-01, "DOD MINIMUM ANTITERRORISM STANDARD FOR BUILDINGS"; DECEMBER 2018; INTERNATIONAL BUILDING CODE (IBC) 2018 EDITION;

NFPA 1, "FIRE CODE", 2018 EDITION; NFPA 13, "STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS", 2019 EDITION; NFPA 24, "STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES", 2019 EDITION; NFPA 101, "LIFE SAFETY CODE" 2018 EDITION; NFPA 241, "SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS" 2019 EDITION; NFPA 2001, "STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS" 2018 EDITION. UFC SHALL

TAKE PRECEDENCE OVER NFPA REQUIREMENTS.

THE INTENT AND EXTENT OF THE FIRE PROTECTION SYSTEM DESIGN IS PERFORMANCE-BASED IN NATURE, AND IS DIAGRAMMATIC ONLY. IT IS NOT INTENDED TO SHOW EVERY PIPE, FITTING, COMPONENT, ETC. SYSTEM DESIGN SHALL BE DETERMINED BY THE BUILDING FEATURES, UFC 3-600-01, NFPA 13, MANUFACTURER REQUIREMENTS AND RECOMMENDATIONS.

CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BID WITH THE PROJECT DOCUMENTS AND SPECIFICATIONS TO BECOME FAMILIAR WITH THE SITE AND SCOPE OF WORK. NOTIFY ENGINEER OF RECORD WITH ANY DISCREPANCIES OUTSIDE THIS DESIGN INTENT. ANY CHANGE ORDER REQUEST AS A RESULT OF LACK OF COORDINATION BETWEEN TRADES SHALL BE DENIED.

ADHERE TO AND OBTAIN ALL PERMITS, LICENSES, AND ALL FEDERAL GOVERNMENT REQUIREMENTS.

DO NOT SCALE PLANS FOR THE PURPOSE OF ESTABLISHING DIMENSIONS. FIELD DIMENSIONS GOVERN.

FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE PARTITIONS. FIRE STOPPING SHALL BE OF UL LISTED ASSEMBLY.

1.

2.

3.

4.

5.

6.

GENERAL NOTES

CONTRACTOR SHALL SUBMIT COMPLETE SHOP DRAWINGS WITH HYDRAULIC CALCULATIONS, MATERIAL SPECIFICATION BROCHURE AND A COPY OF THEIR WATER SUPPLY RESULTS TO CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE FOR REVIEW PRIOR

TO COMMENCING FABRICATION AND INSTALLATION.

CONTRACTOR SHALL PERFORM A WATER FLOW TEST PRIOR TO DEVELOPMENT OF THEIR SHOP DRAWINGS AND HYDRAULIC CALCULATIONS TO CONFIRM THE AVAILABLE WATER SUPPLY. THE WATER FLOW TEST INFORMATION SHALL BE WITHIN 6 MONTHS

OF SHOP DRAWING AND HYDRAULIC CALCULATION SUBMITTAL.

FIRE SUPPRESSION CONTRACTOR SHALL INSTALL SYSTEM PIPING AND COMPONENTS IN A WORKMANSHIP LIKE MANNER. CHANGES IN INSTALLATION AS A RESULT OF POOR CRAFTSMANSHIP SHALL BE AS DIRECTED BY CONTRACTING OFFICER'S TECHNICAL

REPRESENTATIVE AND SHALL BE AT NO ADDITIONAL COST TO THE OWNER.

ANY ADDITIONAL OFFSETS OR FITTINGS REQUIRED FOR PROPER INSTALLATION, COORDINATION WITH OTHER TRADES, AND/OR TO

MAINTAIN PROPER CLEARANCES SHALL BE PROVIDED FOR A COMPLETE AND WORKING SYSTEM.

NOT ALL PIPING, VALVES AND APPURTENANCES ARE SHOWN ON THE PLANS. REFER TO SPECIFICATIONS AND DETAILS FOR

ADDITIONAL INFORMATION.

ALL CONTROL VALVES ON THE FIRE PROTECTION SYSTEM SHALL BE ELECTRICALLY SUPERVISED PER UFC 3-600-01. COORDINATE THE TYPE AND EXACT LOCATION OF FLOW AND SUPERVISORY SWITCHES BETWEEN FIRE PROTECTION AND FIRE ALARM CONTRACTORS. FIRE ALARM SYSTEM, SUPERVISION AND WIRING SHALL BE PROVIDED UNDER THE SAFETY AND SECURITY

DIVISION.

SUPPRESSION SYSTEM(S) SHALL BE DESIGNED FOR A MAXIMUM WORKING PRESSURE OF 175 PSI IN ACCORDANCE WITH NFPA 13.

SPRINKLER SYSTEM(S) SHALL BE HYDROSTATICALLY TESTED IN ACCORDANCE WITH NFPA 13.

ALL VALVES SHALL HAVE A PERMANENTLY AFFIXED SIGN PER NFPA 13 INDICATING ITS FUNCTION AND SECURED TO THE VALVE

WITH SUITABLE CHAIN.

HANGER MATERIAL, SPACING AND METHOD OF ATTACHMENT SHALL BE IN ACCORDANCE WITH NFPA 13 AND MANUFACTURER'S

REQUIREMENTS.

SPRINKLER SYSTEM PIPING IS NOT REQUIRED TO BE PROVIDED WITH SEISMIC BRACING AS THE SITE IS CLASSIFIED AS A SEISMIC

DESIGN CATEGORY A.

MAINTAIN A MINIMUM OF 18" CLEARANCE BELOW SPRINKLER DEFLECTOR(S) AND ANY PERMANENT OR TEMPORARY

OBSTRUCTION(S) PER NFPA 13.

ONLY LISTED OR APPROVED DEVICES AND MATERIALS AS SPECIFIED IN NFPA 13 SHALL BE INSTALLED THROUGHOUT THE SYSTEM.

ALL SPRINKLERS SHALL BE INSTALLED ACCORDING TO THEIR LISTED SPACING AND OBSTRUCTION REQUIREMENTS.

CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL FIRE PROTECTION DEVICES WITH ALL OTHER TRADES.

PROVIDE SYSTEM(S) WITH FLUSHING CONNECTIONS PER NFPA 13.

PROVIDE A PERMANENTLY ATTACHED AND STENCILED PLACARD TO THE RISER STATING THE REQUIRED DESIGN CRITERIA FOR

EACH DESIGNED SYSTEM PER NFPA 13. THE USE OF INDELIBLE MARKER IS PROHIBITED.

AT LEAST SIX (6) SPARE SPRINKLERS OF EACH TYPE, TEMPERATURE, AND ORIFICE SIZE USED IN THE SYSTEM INCLUDING A SPECIAL WRENCH FOR EACH FIRE SPRINKLER SHALL BE KEPT IN A CABINET WHERE AMBIENT TEMPERATURE WILL AT NO TIME

EXCEED 100°F PER NFPA 13.

QUICK RESPONSE SPRINKLER REDUCTIONS ARE NOT PERMITTED.

SPRINKLER PROTECTION IS NOT REQUIRED IN THE NONCOMBUSTIBLE CONCEALED SPACE ABOVE THE CEILING PER NFPA 13. THE UTILITY TUNNELS BENEATH THE FIRST FLOOR ARE CONSIDERED NON-COMBUSTIBLE CONCEALED SPACES PER NFPA 13 AND DO

NOT REQUIRE SPRINKLER PROTECTION.

FITTING AND COUPLING HOUSINGS SHALL BE MALLEABLE IRON CONFORMING TO ASTM A47/A47M.

THE FIRE PROTECTION PIPING MUST BE LABELED AS REQUIRED BY UFC 3-600-01 SECTION 9-6.8.

DEMOLISH EXISTING STANDPIPE AND HOSE VALVE PIPING, HANGERS, FITTINGS, ETC. BACK TO THE UNDERGROUND FLANGE LOCATED IN THE SUB-BASEMENT. PROVIDE BLIND FLANGE AT EXISTING 4" WATER LINE ENTRY. NEW FIRE SPRINKLER SYSTEM TO START AT NEW 6" WATER MAIN ENTRY INTO THE BUILDING IN THE SUB-BASEMENT. REFERENCE FD AND CIVIL DRAWINGS.

REFER TO WET-PIPE SPRINKLER SYSTEM SPECIFICATION 21 13 13.00 10 FOR ADDITIONAL REQUIREMENTS AND INFORMATION.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

FIRE SUPPRESSION NOTES

FIRE SUPPRESSION LEGEND

OH

LIGHT HAZARD

0.10 GPM/SQ.FT OVER 1500 SQ.FT, 250 GPM

HOSE ALLOWANCE, AND K-FACTOR: 5.6

ORDINARY HAZARD

0.20 GPM/SQ.FT OVER 2500 SQ.FT, 250 GPM

HOSE ALLOWANCE, AND K-FACTOR: 8.0

ELECTRIC ALARM BELLF

SS

CHECK VALVE

DOUBLE CHECK BACKFLOW PREVENTER

SIAMESE FIRE DEPARTMENT

CONNECTION

WALL-MOUNTED BACKFLOW

ASSEMBLY TEST HEADER

NON-SPRINKLERED SPACENS

1. CONTRACTOR SHALL SUBMIT COMPLETE SHOP DRAWINGS WITH DESIGN CALCULATIONS AND PRODUCT DATA FOR EACH TYPE OF PRODUCT, TO OWNER'S TECHNICAL REPRESENTATIVE FOR REVIEW PRIOR TO COMMENCING FABRICATION AND

INSTALLATION. FAILURE TO COMPLY IS AT THE RISK OF THE CONTRACTOR.

2. PROVIDE CLEAN AGENT NOTIFICATION APPLIANCES WITH SIGNAGE LABELING APPLIANCES FOR PRE-DISCHARGE AND

DISCHARGE AS INDICATED IN SECTION 3.1.1 OF THE CLEAN AGENT SPECIFICATION.

3. CLEAN AGENT SYSTEM LAYOUT AND DESIGN SHALL BE PERFORMED AND CALCULATED IN ACCORDANCE WITH NFPA 2001, AND MANUFACTURER'S REQUIREMENTS AND RECOMMENDATIONS. VOLUME OF DISCHARGE SHALL INCLUDE THE AREA

UNDER THE RAISED FLOOR (DATA CENTER-128).

4. SEE PLAN DRAWINGS FOR DEVICE QUANTITIES. CLEAN AGENT RISER DIAGRAM IS DIAGRAMMATIC AND NOT INTENDED TO

SHOW EACH COMPONENT, DEVICE, APPLIANCE, ETC.

5. LOCATE CONTROL/ RELAY MODULE WITHIN 3'-0" OF CONTROL DEVICE.

6. CONTRACTOR SHALL PROVIDE ALL NECESSARY AND REQUIRED SYSTEM PROGRAMMING TO MEET THE DESIGN INTENT AND

CODE COMPLIANCE.

7. BREAKER SERVING THE CLEAN AGENT RELEASING PANEL SHALL BE PAINTED RED AND PROVIDED WITH A NON-SWEEP

DEVICE (LOCK).

8. THE CLEAN AGENT PANEL SHALL IDENTIFY THE ELECTRICAL PANEL WHERE THE CLEAN AGENT CIRCUIT BREAKER IS

LOCATED.

9. REFER TO CLEAN AGENT SYSTEM SPECIFICATIONS 21 22 00.00 40 FOR ADDITIONAL REQUIREMENTS AND INFORMATION.

CLEAN AGENT NOTES

CLEAN AGENT FIRE SUPPRESSION

STORAGE TANKCA

DATE/TIME: 11/03/21 AT 3:20 PM

PERFORMED BY: NATHAN SHEWFELT-POND

STATIC PRESSURE (HYDRANT #900): 60 PSIG

RESIDUAL PRESSURE (HYDRANT #900): 42 PSIG

PITOT PRESSURE (HYDRANT #901): 38 PSIG

GPM FLOWING (AT RESIDUAL): 1,034 GPM

GPM FLOWING (AT 20-PSIG): 1,592 GPM

COEFFICIENT: 0.9

BUTT-SIZE: 2.5-INCH

ELEVATION OF TEST HYDRANT: 598’ AMSL

ELEVATION OF BUILDING: 603’ AMSL

WATER FLOW TEST INFORMATION:

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

P

O B o x

S y ra c u s e

N Y

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:2

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

F-001

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N L

E G

E N

D A

N D

G E

N E

R A

L N

O T

E S

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

1 2 4 6 7 8 9 16

12' 13'10' 15'

A

B

D

C

E

L'

K'

J'

H'

G'

F'

F

G

H

9' 16'

E'

SEE C4/FD102 SEE C4/FD102

M A

T C

H L

IN

E S

E E

A /F

D

M A

T C

H L

IN

E S

E E

A /F

D

KEYNOTES:

SEE SHEET F-001 FOR GENERAL NOTES AND

LEGEND.

THE FIRE HOSE VALVE SYSTEM SHALL BE REMOVED

IN ITS ENTIRETY. STARTING AT THE 4"

UNDERGROUND WATER LINE ENTRY IN THE STEAM

ROOM. REMOVAL SHALL INCLUDE VALVES,

BACKFLOW ASSEMBLY, PIPING, HANGERS, FITTINGS,

COUPLINGS, CABINETS, HOSE, ETC. PROVIDE BLIND

FLANGE AT 4" WATER LINE ENTRY INTO THE

BUILDING IN THE STEAM ROOM.

THE EXISTING FIRE ALARM SYSTEM SHALL BE

REMOVED IN ITS ENTIRETY, INCLUDING RACEWAYS,

CONDUIT, CONDUCTORS, POWER SUPPLIES,

CABINETS, FIRE ALARM CONTROL PANEL, HEAT

DETECTORS, SMOKE DETECTORS, NOTIFICATION

APPLIANCES, MANUAL PULL STATIONS, ETC. COPPER

PHONE LINES TO REMAIN. SEE #4 BELOW.

THE EXISTING COPPER PHONE LINES UTILIZED FOR

THE FIRE ALARM SYSTEM MONITORING SHALL BE

REUSED FOR THE NEW FIRE ALARM AND MASS

NOTIFICATION SYSTEM. THE EXISTING COPPER

LINES SHALL BE PROTECTED DURING

CONSTRUCTION AND RELOCATED TO THE NEW

LOCATION OF THE FIRE ALARM AND MASS

NOTIFICATION CONTROL PANEL. RELOCATION AND

PROTECTION OF LINES SHALL BE COORDINATED BY

THE CONTRACTOR. SEE ELEC/TELE DRAWINGS FOR

LOCATION.

GENERAL NOTES:

1.

2.

3.

4.

KEY PLAN

SCALE: = 1'-0"

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

PLAN NORTH

0 8 168

1/8"

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

B o x

S y ra c u s e

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:5

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

FD101

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N D

E M

O

B A

S E

M E

N T

/F

IR

S T

F L O

O R

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

SCALE: 1/8" = 1'-0"A1

FIRE SUPPRESSION DEMOLITION PLAN - BASEMENT/FIRST FLOOR

KEY # KEYNOTE DESCRIPTION

EXISTING HOSE VALVE CABINET TO BE

REMOVED.

EXISTING 2" VERTICAL PIPING TO FIRE HOSE

CABINET ON SECOND FLOOR TO BE

REMOVED.

EXISTING 2.5" PIPING TO BE REMOVED.

EXISTING 4" PIPING TO BE REMOVED.

EXISTING 2" PIPING TO BE REMOVED.

EXISTING FIRE ALARM CONTROL PANEL TO BE

REMOVED. SEE GENERAL NOTE #4

REGARDING EXISTING COPPER PHONE LINES.

16 17 18 19 21 23 24

20 22

A

B

D

C

E

L'

K'

J'

H'

G'

F'

F

G

H

16'

E'

M A

T C

H L

IN

E S

E E

A /F

D

M A

T C

H L

IN

E S

E E

A /F

D

FD102

B4

12' 13'10' 15'

L'

9' 16'

SEE A1/FD101 SEE A1/FD101

STEAM ROOM

SEE SHEET F-001 FOR GENERAL NOTES AND LEGEND.

THE FIRE HOSE VALVE SYSTEM SHALL BE REMOVED IN

ITS ENTIRETY. STARTING AT THE 4" UNDERGROUND

WATER LINE ENTRY IN THE STEAM ROOM. REMOVAL

SHALL INCLUDE VALVES, BACKFLOW ASSEMBLY,

PIPING, HANGERS, FITTINGS, COUPLINGS, CABINETS,

HOSE, ETC. PROVIDE BLIND FLANGE AT 4" WATER LINE

ENTRY INTO THE BUILDING IN THE STEAM ROOM.

THE EXISTING FIRE ALARM SYSTEM SHALL BE REMOVED

IN ITS ENTIRETY, INCLUDING RACEWAYS, CONDUITS,

CONDUCTORS, POWER SUPPLIES, CABINETS, FIRE

ALARM CONTROL PANEL, HEAT DETECTORS, SMOKE

DETECTORS, NOTIFICATION APPLIANCES, MANUAL PULL

STATIONS, ETC.

GENERAL NOTES:

1.

2.

3.

KEYNOTES:

KEY PLAN

SCALE: = 1'-0"

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

PLAN NORTH

0 8 168

1/8"

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

B o x

S y ra c u s e

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:5

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

FD102

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N D

E M

O

F

IR

S T

F L O

O R

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

SCALE: 1/8" = 1'-0"A1

FIRE SUPPRESSION DEMOLITION PLAN - FIRST FLOOR

SCALE: 1/8" = 1'-0"C4

FIRE PROTECTION DEMO PLAN - BASEMENT ELECTRICAL

SCALE: 1/8" = 1'-0"B4

FIRE PROTECTION DEMO PLAN - SUB BASEMENT

KEY # KEYNOTE DESCRIPTION

EXISTING HOSE VALVE CABINET TO BE

REMOVED.

EXISTING 2" VERTICAL PIPING TO FIRE HOSE

CABINET ON SECOND FLOOR TO BE

REMOVED.

4" CONTINUES INTO STEAM ROOM. SEE

DETAIL B4/FD102.

EXISTING 4" PIPING TO BE REMOVED.

EXISTING 4" BACKFLOW TO BE REMOVED.

4" CONNECTION TO 4" UNDERGROUND PIPING.

12' 13'10' 15'

A

B

D

C

E

L'

K'

J'

H'

G'

F'

F

G

H

9' 16'

E'

M A

T C

H L

IN

E S

E E

A /F

D

M A

T C

H L

IN

E S

E E

A /F

D

SEE SHEET F-001 FOR GENERAL NOTES AND

LEGEND.

THE FIRE HOSE VALVE SYSTEM SHALL BE REMOVED

IN ITS ENTIRETY. STARTING AT THE 4"

UNDERGROUND WATER LINE ENTRY IN THE STEAM

ROOM. REMOVAL SHALL INCLUDE VALVES,

BACKFLOW ASSEMBLY, PIPING, HANGERS, FITTINGS,

COUPLINGS, CABINETS, HOSE, ETC. PROVIDE BLIND

FLANGE AT 4" WATER LINE ENTRY INTO THE

BUILDING IN THE STEAM ROOM.

THE EXISTING FIRE ALARM SYSTEM SHALL BE

REMOVED IN ITS ENTIRETY, INCLUDING RACEWAYS,

CONDUIT, CONDUCTORS, POWER SUPPLIES,

CABINETS, FIRE ALARM CONTROL PANEL, HEAT

DETECTORS, SMOKE DETECTORS, NOTIFICATION

APPLIANCES, MANUAL PULL STATIONS, ETC.

GENERAL NOTES:

1.

2.

3.

KEYNOTES:

KEY PLAN

SCALE: = 1'-0"

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

PLAN NORTH

0 8 168

1/8"

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

B o x

S y ra c u s e

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:0

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

FD103

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N D

E M

O

A S

S E

M B

L Y

/S E

C O

N D

F L O

O R

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

SCALE: 1/8" = 1'-0"A1

FIRE SUPPRESSION DEMO - PARTIAL SECOND FLOOR/ ASSEMBLY

KEY # KEYNOTE DESCRIPTION

EXISTING HOSE VALVE CABINET TO BE

REMOVED.

EXISTING 2" VERTICAL PIPING TO FIRE HOSE

PIPING FROM FIRST FLOOR TO BE REMOVED.

A

B

D

C

E

L'

K'

J'

H'

G'

F'

F

G

H

16'

E'

M A

T C

H L

IN

E S

E E

A /F

D

M A

T C

H L

IN

E S

E E

A /F

D

SEE SHEET F-001 FOR GENERAL NOTES AND

LEGEND.

THE FIRE HOSE VALVE SYSTEM SHALL BE REMOVED

IN ITS ENTIRETY. STARTING AT THE 4"

UNDERGROUND WATER LINE ENTRY IN THE STEAM

ROOM. REMOVAL SHALL INCLUDE VALVES,

BACKFLOW ASSEMBLY, PIPING, HANGERS, FITTINGS,

COUPLINGS, CABINETS, HOSE, ETC. PROVIDE BLIND

FLANGE AT 4" WATER LINE ENTRY INTO THE

BUILDING IN THE STEAM ROOM.

THE EXISTING FIRE ALARM SYSTEM SHALL BE

REMOVED IN ITS ENTIRETY, INCLUDING RACEWAYS,

CONDUIT, CONDUCTORS, POWER SUPPLIES,

CABINETS, FIRE ALARM CONTROL PANEL, HEAT

DETECTORS, SMOKE DETECTORS, NOTIFICATION

APPLIANCES, MANUAL PULL STATIONS, ETC.

GENERAL NOTES:

1.

2.

3.

KEYNOTES:

KEY PLAN

SCALE: = 1'-0"

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

PLAN NORTH

0 8 168

1/8"

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

B o x

S y ra c u s e

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:1

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

FD104

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N D

E M

O

S E

C O

N D

F L O

O R

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

SCALE: 1/8" = 1'-0"A1

FIRE SUPPRESSION DEMO - PARTIAL SECOND FLOOR

KEY # KEYNOTE DESCRIPTION

EXISTING HOSE VALVE CABINET TO BE

REMOVED.

EXISTING 2" VERTICAL PIPING TO FIRE HOSE

PIPING FROM FIRST FLOOR TO BE REMOVED.

12' 13'10' 15'

A

D

C

E

L'

K'

J'

H'

G'

F'

F

G

H

9' 16'

E'

PPE TRAINING BAG

STORAGE

COMMANDER

CEM

SECOND OFFICER

OPERATIONS CHIEF

MECHANICAL

RECORDS STAGING/

STORAGE

PLANS &

RESOURCES CHIEF

SECURE STORAGE

(CRYPTO)

STAN/EVAL

ITE

STAGING/STORAGE

MEN

COMM OPEN OFFICE

COMM OPEN OFFICE

WEST STAIR

SF COMMANDER

SF FIRST

SERGEANT

LAW

ENFORCEMENT

DESK

INFORMATION

PROTECTION CHIEF

SF/ COMM

CORRIDOR

UTC PREVENTIVE

MAINTENANCE

CHIEF OF SECURITY

SF/ COMM

CORRIDOR

ELEV MACHINE RM

LOWER LANDING

FLIGHT CHIEFS

HOTEL W/S

SF/ CATM

CORRIDOR

CATM ADMIN

CATM NCOIC

021A

WEAPONS

MAINTENANCE

TRAINING ROOM

MECHANICAL

SF/ CATM

CORRIDOR

WEAPONS

CLEARING

EQUIPMENT

LOCKERS

PPE TRAINING BAG

STORAGE

OPERATIONS

SUPER

WS

SUPPLY MOBILITY

MANAGEMENT

WS

W/C 1

W/C 2

BUDGET OFFICE

FSS C/S

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

SEE B4/F-102

SEE B4/F-102

SHARED WAITING

ROOM

DATA CENTER

COMM C/S

PROGRAM

MANAGEMENT

SF OPEN OFFICE

SF XO/NCO

COMM OPEN OFFICE

COMM CORRIDOR

VEST

101A

VAULT

016A

AREA OPEN TO ABOVE.

SEE F-103.

NS

NS

SHARED WAITING

ROOM

4 4

4 4

SF W/S

ELEC WEST 1

129A

NS

M A

T C

H L

IN

E S

E E

A /F

-1

M A

T C

H L

IN

E S

E E

A /F

-1

OH

MEN

MEN

134A

CA

SEE SHEET F-001 FOR GENERAL NOTES AND

LEGEND.

FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN

ACCORDANCE WITH UFC 3-600-01 AND NFPA 13, WITH

UFC TAKING PRECEDENCE.

CONTRACTOR SHALL COORDINATE ALL NEW

SUPPRESSION WORK WITH OTHER TRADES.

SPRINKLER DESIGN HAZARD CLASSIFICATION FOR

THE BUILDING SHALL BE LIGHT HAZARD UNLESS

NOTED OTHERWISE.

THE UTILITY TUNNELS BENEATH THE FIRST FLOOR

ARE CONSIDERED NON-COMBUSTIBLE CONCEALED

SPACES PER NFPA 13 AND DO NOT REQUIRE

SPRINKLER PROTECTION.

GENERAL NOTES:

1.

2.

3.

4.

5.

KEYNOTES:

KEY PLAN

SCALE: = 1'-0"

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

PLAN NORTH

0 8 168

1/8"

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

B o x

S y ra c u s e

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:3

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

F-101

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N P

L A

N

B A

S E

M E

N T

/F

IR

S T

F L O

O R

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

SCALE: 1/8" = 1'-0"A1

FIRE SUPPRESSION PLAN - PARTIAL FIRST FLOOR/ BASEMENT

KEY # KEYNOTE DESCRIPTION

CONTROL VALVE AND FLOW SWITCH FOR

ELEVATOR MACHINE ROOM. SEE FA101 &

FA501 FOR CONNECTIONS TO FIRE ALARM

SYSTEM.

PROVIDE SPRINKLER PROTECTION AT THE

BOTTOM OF THE PIT. SUPPLY PIPING TO PIT

SPRINKLER DOWNSTREAM OF CONTROL

VALVE AND FLOW SWITCH FOR ELEVATOR

MACHINE ROOM, 24" ABOVE BOTTOM OF PIT.

PROVIDE SPRINKLER PROTECTION UNDER

STAIR LANDING.

CLOUD/FLOATING CEILING FEATURE IN THIS

AREA. COORDINATE SPRINKLER

INSTALLATION WITH EXPOSED AND LOWER

CEILING. REFERENCE THE REFLECTED

CEILING PLANS FOR ELEVATION AND

LOCATIONS.

COORDINATE SPRINKLER PIPE ROUTING

FROM CEILING ABOVE SHARED WAITING

ROOM-101 TO VESTIBULE WITH HORIZONTAL

CHASE. REFERENCE ARCHITECTURAL

DRAWINGS FOR CHASE DETAIL. CONCEAL

SUPPLY PIPING TO VESTIBULE INSIDE

CHASE TO ABOVE VESTIBULE. PIPING SHALL

NOT BE VIEWABLE FROM FLOOR LEVEL

AFTER FINAL FINISHES ARE INSTALLED.

COORDINATE AND PROVIDE SPRINKLER

PROTECTION UNDER AND AROUND

EXPOSED DUCTWORK IN THIS AREA PER

NFPA 13.

COORDINATE CLEAN AGENT TANK

LOCATION WITH THE EXISTING EQUIPMENT

IN THE ROOM. PROVIDE REQUIRED

CLEARANCE AROUND TANK. INSTALL PER

NFPA 2001. REFERENCE FA101, FA501,

FA502, AND THE SPECIFICATIONS FOR

FURTHER INFORMATION.

PROVIDE QUICK RESPONSE, BRASS

UPRIGHTS WITH HEAD GUARDS IN THIS

AREA.

PROVIDE SEPARATE ZONE FOR THE

SPRINKLER PROTECTION IN THE DATA

CENTER-128. ROUTE DRAIN TO EXTERIOR

OF THE BUILDING.

PROVIDE CORROSION RESISTANT FINISH

ON THE SPRINKLERS IN THIS AREA.

A

B

D

C

E

F

G

H

FINANCIAL

MANAGEMENT

OFFICER

FSS C/S

ID CARDS

RETENTION

102A

RECRUITING OPEN

OFFICE

FIN/ REC CORRIDOR

FINANCE OPEN

OFFICE

WOMEN

122 EAST STAIR

JAN

STORAGE

RECRUITING

CONSULT

EAST VEST

102B

CEM

FSS HUDDLE

110A

FSS CORRIDOR

PERSONNEL SUPER

COMMANDER

OPERATIONS

OFFICERS

PPE TRAINING BAG

STORAGE

115MECHANICAL

HUDDLE / STORAGE

FSS OPEN OFFICE

FSS CORRIDOR

OH

OH

OH

OH

OH

FINANCE C/S OFC

103A

RECRUITING

SUPERVISOR

RECRUITING

STORAGE

107A

EDUCATION &

TRAINING OFFICE

SHARED TESTING

M A

T C

H L

IN

E S

E E

A /F

-1

M A

T C

H L

IN

E S

E E

A /F

-1

OH

F-102

A4

LACTATION

120A

ELEC EAST 1

110B

OH

238 SF

INSTALLATION

PERSONNEL

READINESS

118A

SEE SHEET F-001 FOR GENERAL NOTES AND

LEGEND.

FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN

ACCORDANCE WITH UFC 3-600-01 AND NFPA 13, WITH

UFC TAKING PRECEDENCE.

CONTRACTOR SHALL COORDINATE ALL NEW

SUPPRESSION WORK WITH OTHER TRADES.

SPRINKLER DESIGN HAZARD CLASSIFICATION FOR

THE BUILDING SHALL BE LIGHT HAZARD UNLESS

NOTED OTHERWISE.

THE UTILITY TUNNELS BENEATH THE FIRST FLOOR

ARE CONSIDERED NON-COMBUSTIBLE CONCEALED

SPACES PER NFPA 13 AND DO NOT REQUIRE

SPRINKLER PROTECTION.

GENERAL NOTES:

1.

2.

3.

4.

5.

12' 13'10' 15'

L'

9' 16'

MECHANICAL

SF/ CATM

CORRIDOR

OH

ELECTRICAL

OH

SEE A1/F-101 SEE A1/F-101

NS

KEYNOTES:

23 2422

A

B

STEAM ROOM

OH

KEY PLAN

SCALE: = 1'-0"

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

PLAN NORTH

0 8 168

1/8"

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

B o x

S y ra c u s e

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:4

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

F-102

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N P

L A

N

F

IR

S T

F L O

O R

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

SCALE: 1/8" = 1'-0"A1

FIRE SUPPRESSION PLAN - PARTIAL FIRST FLOOR

SCALE: 1/8" = 1'-0"B4

FIRE SUPPRESSION PLAN - BASEMENT ELECTRICAL ROOM

KEY # KEYNOTE DESCRIPTION

6" UNDERGROUND PIPING ENTRY. SEE CIVIL

DRAWING C-110 FOR CONTINUATION.

6" DOUBLE CHECK BACKFLOW PREVENTION

ASSEMBLY WITH TAMPER SWITCHES.

6" PIPING TO SUPPLY FIRE SPRINKLER

SYSTEM. PIPING ROUTED THROUGH PIPE

CHASE TO EAST STAIRWELL. SEE A1/F-102

FOR CONTINUATION.

FDC PIPING UP TO NEW SIAMESE FDC ON

FIRST FLOOR. SEE A1/F-102 FOR

CONTINUATION.

BACKFLOW TEST OUTLET PIPING UP TO FIRST

FLOOR. SEE A1/F-102 FOR CONTINUATION.

SIAMESE FIRE DEPARTMENT CONNECTION.

BACKFLOW TEST OUTLET.

FLOOR CONTROL VALVE ASSEMBLY FOR

FIRST FLOOR.

6" WATER SUPPLY FROM SUB-BASEMENT.

PROVIDE SPRINKLER PROTECTION UNDER

STAIR LANDING.

CLOUD/FLOATING CEILING FEATURE IN THIS

AREA. COORDINATE SPRINKLER

INSTALLATION WITH EXPOSED AND LOWER

CEILING. REFERENCE THE REFLECTED

CEILING PLANS FOR ELEVATION AND

LOCATIONS.

COORDINATE FDC AND BACKFLOW TEST

OUTLET PIPE ROUTING INSIDE CHASE/BOX.

REFERENCE ARCHITECTURAL DRAWINGS FOR

FURTHER DETAIL OF CHASE. REF A-552/A4.

COORDINATE AND PROVIDE SPRINKLER

PROTECTION UNDER AND AROUND EXPOSED

DUCTWORK IN THIS AREA PER NFPA 13.

PROVIDE CORROSION RESISTANT FINISH ON

THE SPRINKLERS IN THIS AREA.

SCALE: 1/8" = 1'-0"A4

FIRE SUPPRESSION PLAN - SUB BASEMENT

12' 13'10' 15'

A

B

D

C

E

L'

K'

J'

H'

G'

F'

F

G

H

9' 16'

E'

CONTRACTING

SUPER

229A

CONTRACTING

OPEN OFFICE

WOMEN

MEN

MSG COMMANDER

230B

MSG DEPUTY

COMMANDER

230C

MSG OPEN OFFICE

MSG FIRST

SERGEANT

230E

MSG CHIEF

230D

MULTIMEDIA

STUDIO/STORAGE

231B

SECOND FLOOR

CONFERENCE

PUBLIC AFFAIRS

ADMIN OPEN

OFFICE

231 PUBLIC AFFAIRS

OIC

231A

ASSEMBLY

LANDING

UPPER LANDING

MSG CORRIDOR

COMMAND

CORRIDOR

IGI 1

IGI 2

IGI STAFF

205W

JAG OPEN OFFICE

JAG 2

JAG 1

WOMEN

MEN

SMALL

CONFERENCE

STORAGE

160D

BREAK ROOM

OH

OH

OH

WEST STAIR

TELECOM ROOM

MULTI PURPOSE

ROOM A

160A

COMMAND POST

224B

JAN

223A

OH

ROOF BELOW

NS

2 2

ROOF BELOW

ASSEMBLY

CORRIDOR

MSG OPEN OFFICE

MULTI PURPOSE

ROOM B

160B

ELEC WEST 2

223B

NS

AV CLOSET

160C

OH

NS NS

R O

O F

B E

L O

W

M A

T C

H L

IN

E S

E E

A /F

-1

M A

T C

H L

IN

E S

E E

A /F

-1

NS

OH

CA

CONTROL PANEL

224C

CMD POST OFC 1

224D

CMD POST OFC 2

224E

TRAP

224A

OPEN TO BELOW

SEE SHEET F-001 FOR GENERAL NOTES AND

LEGEND.

FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN

ACCORDANCE WITH UFC 3-600-01 AND NFPA 13, WITH

UFC TAKING PRECEDENCE.

CONTRACTOR SHALL COORDINATE ALL NEW

SUPPRESSION WORK WITH OTHER TRADES.

SPRINKLER DESIGN HAZARD CLASSIFICATION FOR

THE BUILDING SHALL BE LIGHT HAZARD UNLESS

NOTED OTHERWISE.

GENERAL NOTES:

1.

2.

3.

4.

KEYNOTES:

KEY PLAN

SCALE: = 1'-0"

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

PLAN NORTH

0 8 168

1/8"

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

B o x

S y ra c u s e

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:5

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

F-103

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N P

L A

N

S E

C O

N D

F L O

O R

/A S

S E

M B

L Y

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

SCALE: 1/8" = 1'-0"A1

FIRE SUPPRESSION PLAN - PARTIAL SECOND FLOOR/ASSEMBLY

KEY # KEYNOTE DESCRIPTION

PROVIDE SPRINKLER PROTECTION AT TOP OF

STAIRWELL.

COORDINATE SPRINKLER INSTALLATION WITH

DIFFERING CEILING HEIGHTS. REFERENCE

THE REFLECTED CEILING PLANS FOR

ELEVATION CHANGE LOCATIONS.

PROVIDE QUICK RESPONSE, BRASS

UPRIGHTS WITH HEAD GUARDS IN THIS AREA.

PROVIDE SEPARATE ZONE FOR THE

SPRINKLER PROTECTION IN THE TELECOM

ROOM-158. ROUTE DRAIN TO EXTERIOR OF

THE BUILDING.

COORDINATE CLEAN AGENT TANK LOCATION

WITH THE EXISTING EQUIPMENT IN THE

ROOM. PROVIDE REQUIRED CLEARANCE

AROUND TANK. INSTALL PER NFPA 2001.

REFERENCE FA103, FA501, FA502, AND THE

SPECIFICATIONS FOR FURTHER

INFORMATION.

A

B

D

C

E

F

G

H

16'

WING COMMANDER

211C

EXECUTIVE

SUPPORT

211B

VICE COMMANDER

211A

CLOS

211D

COMMAND JAG (3)

211F

COMMAND CHIEF

MASTER SERGEANT

211E

COMMAND SUITE

EAST STAIR

MEN

WOMEN

COMMAND

CONFERENCE

SAFETY/ IG OPEN

OFFICE

WSHRA

DDR

INSPECTOR

GENERAL

IGQ

E/O 1

E/O 2

OPEN OFFICE

WING PLANS

OFFICER

SAFETY OFFICER

ROOF BELOW

NS

4 4

ROOF

BELOW

M A

T C

H L

IN

E S

E E

A /F

-1

M A

T C

H L

IN

E S

E E

A /F

-1

ELEC EAST 2

202B

OH

IGQ STAFF

205E

COMMAND

CORRIDOR

JAG AD 2

WS

JAG AD 1

WS

SEE SHEET F-001 FOR GENERAL NOTES AND

LEGEND.

FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN

ACCORDANCE WITH UFC 3-600-01 AND NFPA 13, WITH

UFC TAKING PRECEDENCE.

CONTRACTOR SHALL COORDINATE ALL NEW

SUPPRESSION WORK WITH OTHER TRADES.

SPRINKLER DESIGN HAZARD CLASSIFICATION FOR

THE BUILDING SHALL BE LIGHT HAZARD UNLESS

NOTED OTHERWISE.

GENERAL NOTES:

1.

2.

3.

4.

KEYNOTES:

KEY PLAN

SCALE: = 1'-0"

1 2 3 4 5

A

B

C

D

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

P O

N D

J O

B

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

PLAN NORTH

0 8 168

1/8"

Q P

K D

E S

IG

N

S o u th

S a lin a S tr e e t

S u it e

B o x

S y ra c u s e

-0

Q P

K J

O B

ORIGINAL SHEET SIZE - ANSI D (22" X 34")

/1

/2

:2

:5

P M

B

IM

/1

N

Y A

N G

N ia g a ra

F a lls R e p a ir O

T

F a c ili ty /1

N

Y A

N G

N

IA

G

A R

A M

E P

F

P v

.r v t

F-104

100% B3 SUBMITTAL

F

IR

E S

U P

P R

E S

S

IO

N P

L A

N

S E

C O

N D

F L O

O R

R E

N O

V A

T E

O P

E R

A T

IO

N

S A

N D

T R

A

IN

IN

G

F A

C

IL

IT

Y

B

U

IL

D

IN

G

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

N

IA

G A

R A

F A

L L S

A

IR

R E

S E

R V

E S

T A

T

IO

N

N E

W Y

O R

K A

IR

N

A T

IO

N

A L G

U A

R D

A p p ro v e r

N D

S

N D

S

B T

H

M

A R

C H

SCALE: 1/8" = 1'-0"A1

FIRE SUPPRESSION PLAN - PARTIAL SECOND FLOOR

KEY # KEYNOTE DESCRIPTION

FLOOR CONTROL VALVE ASSEMBLY FOR

SECOND FLOOR.

6" WATER SUPPLY UP FROM FIRST FLOOR.

PROVIDE SPRINKLER PROTECTION AT TOP OF

STAIRWELL.

CLOUD/FLOATING CEILING FEATURE IN THIS

AREA. COORDINATE SPRINKLER

INSTALLATION WITH EXPOSED AND LOWER

CEILING. REFERENCE THE REFLECTED

CEILING PLANS FOR ELEVATION AND

LOCATIONS.

F-001 - FIRE SUPPRESSION LEGEND AND GENERAL NOTES
FD101 - FIRE SUPPRESSION DEMO - BASEMENT/FIRST FLOOR
FD102 - FIRE SUPPRESSION DEMO - FIRST FLOOR
FD103 - FIRE SUPPRESSION DEMO - ASSEMBLY/SECOND FLOOR
FD104 - FIRE SUPPRESSION DEMO - SECOND FLOOR
F-101 - FIRE SUPPRESSION PLAN - BASEMENT/FIRST FLOOR
F-102 - FIRE SUPPRESSION PLAN - FIRST FLOOR
F-103 - FIRE SUPPRESSION PLAN - SECOND FLOOR/ASSEMBLY
F-104 - FIRE SUPPRESSION PLAN - SECOND FLOOR

File details come from the government source that posted it. Updated .