Amendment 0003, vendor questions and Government responses.

View the file

Other files

File Type Posted
Attachment_04_-_Deliverable_Hardware_Matrix_-_03.16.2017.pdf PDF
JAGM_SSC_Amendment_0005.pdf PDF
JAGM_SSC_Amendment_0004.pdf PDF
JAGM_SSC_Amendment_0002.pdf PDF
JAFM_SSC_Amendment_0001.pdf PDF
Attachment_02_-_DOCUMENT_SUMMARY_LIST_(DSL)_-_01.17.2017.pdf PDF
Attachment_03_-TECHNICAL_DATA_PACKAGE_(TDP)_13556595_-_01.17.2017.pdf PDF
Attachment_10_-_SECTION_L_-_INSTRUCTION_FOR_PROPOSAL_PREPARATION_-_01.17.2017.pdf PDF
Attachment_08_-_UNIT_PRICE_TABLE_-_01.17.2017.pdf PDF
Exhibit_A_-_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_01.17.2017.pdf PDF
Attachment_06_-_PRODUCTION_READINESS_PROCESS_MANUAL_-_01.17.2017.pdf PDF
Attachment_04_-_DELIVERABLE_HARDWARE_MATRIX_-_01.17.2017.pdf PDF
Attachment_13_-_SPECIAL_CLAUSES.pdf PDF
JAGM_SSC_RFP_17-R-0063_OFFICIAL.pdf PDF
Attachment_09_-GOVERNMENT_FURNISH_PROPERTY_(GFP)_-_01.17.2017.pdf PDF
Attachment_01_-STATEMENT_OF_WORK_(SOW)_-_01.17.17.pdf PDF
Attachment_11_-_SECTION_M_-_BASIS_FOR_AWARD_-_01.17.2017.pdf PDF
Attachment_05_-CONTRACT_SECURITY_CLASSIFICATION_DATA_(DD254)_WITH_SECURITY_CLASS_GUIDE_(SCG)_-_01.24.2017.pdf PDF
Attachment_07_-_PALLET_UNIT_CONFIGURATION_-_01.17.2017.pdf PDF
Attachment_12_-_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE_FORM_-_01.17.2017.pdf PDF
Attachment_03_-_Technical_Data_Package_13556595_-_01.17.2017.pdf PDF
Exhibit_A_-_CDRLs_-_01.17.2017.pdf PDF
JAGM_SSC_Draft_RFP.pdf PDF
Attachment_05_-_DD254_SCG_and_SCG_attached_-_01.24.2017.pdf PDF
Attachment_12_-_Past_Performance_Evaluation_Questionnaire_Form_-_01.17.2017.pdf PDF
Attachment_09_-_Government_Furnished_Property_-_01.17.2017.pdf PDF
Attachment_07_-_Pallet_Unit_Configuration_-_01.17.2017.pdf PDF
Attachment_10_-_Section_L_v4.0_-_01.17.2017.pdf PDF
Attachment_01_-_SSC_SOW_Rev_1.5_-_01.17.17.pdf PDF
Attachment_04_-_Deliverable_Hardware_Matrix_-_01.17.2017.pdf PDF
Attachment_11_-_Section_M_v4.0_-_01.17.2017.pdf PDF
Attachment_06_-_Production_Readiness_Process_Manual_-_01.17.2017.pdf PDF
Attachment_02_-_Document_Summary_List_-_01.17.2017.pdf PDF
Attachment_08_-_Pricing_Table_-_01.17.2017.pdf PDF
Attachment_12_-_Past_Performance_Evaluation_Questionnaire_Form_-_01.17.2017.pdf PDF
JAGM_SSC_Draft_RFP.pdf PDF
Attachment_04_-_Deliverable_Hardware_Matrix_-_01.17.2017.pdf PDF
Attachment_01_-_SSC_SOW_Rev_1.5_-_01.17.17.pdf PDF
Attachment_09_-_Government_Furnished_Property_-_01.17.2017.pdf PDF
Attachment_06_-_Production_Readiness_Process_Manual_-_01.17.2017.pdf PDF
Attachment_07_-_Pallet_Unit_Configuration_-_01.17.2017.pdf PDF
Exhibit_A_-_CDRLs_-_01.17.2017.pdf PDF
Attachment_11_-_Section_M_v4.0_-_01.17.2017.pdf PDF
Attachment_10_-_Section_L_v4.0_-_01.17.2017.pdf PDF
Attachment_08_-_Pricing_Table_-_01.17.2017.pdf PDF
Attachment_02_-_Document_Summary_List_-_01.17.2017.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

W31P4Q

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

BRITTANY A QUINN

EMAIL: BRITTANY.A.QUINN2.CIV@MAIL.MIL

W31P4Q-17-R-0063

2017FEB09

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 3

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: BRITTANY A QUINN

Buyer Office Symbol/Telephone Number: CCAM-TMA/(256)313-2033

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

PLEASE BE AWARE: THE LAST DAY FOR OFFERORS QUESTIONS IS

15 MARCH 2017.

A-1. Below are the Questions and Answers that were submitted by the offerors.

1. Is this program in Draft status? There is multiple references in the 'draft solicitation' and amendment 0001 indicating no due date extensions for proposals will be granted, yet the solicitation shows that it's still in 'Draft' status. Can you please clarify? When does the USG anticipate releasing official RFP for this program?

Government Response: The official RFP was released Feb. 9. The solicitation, attachments, and any amendments are located under the downloadable files. The due date for proposals is 17 March 2017.

2. The JAGM Container being made in this RFQ is 13556595, Rev A. Is this correct?

Government Response: Yes.

3. Regarding question #2 on Amendment 0002, your answer was that companies had to do all of the testing because this was a new, unique part. However, the drawing package for this RFQ is the same drawing package that we had for the 2016 order. Same container. Please clarify.

Government Response: Although the drawing package is extremely similar to one that was built to in 2016, through the creation of an updated Technical Data Package, it received a different part number and thus must be POP tested.

4. Our company is under the belief that the JAGM SSC tool in container must be temperature stable prior to testing. Testing is performed at temperature conditions. Our company needs to install the JAGM SSC Fit Check Tool in the container and then temperature condition it prior to testing, which may take many hours. Having a second tool, there could be one container in a chamber conditioning while testing another container. If the testing was only for 2 containers, this would not be an issue, but testing 6 units adds a lot of time and costs. Is it possible to receive a second Government furnished tool for testing?

Government Response: No, the Government does not plan to furnish a second JAGM SSC Fit Check Tool for testing.

5.This company is a HUBZone and woman owned small business company. Can this company subcontract/team up with another company for this job? Does the subcontractor have to be ISO 9000 certified?

Government Response: Yes. However, IAW FAR 52.219-14, Limitations on Subcontracting, the small business concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials. No, in a prime contractor/subcontractor relationship, the subcontractor does not have to be ISO 9000 certified. In the event of a joint venture, however, the expectation would be that both parties would be ISO 9000 certified.

6. Are there other drawings that give a more comprehensive detail and bill of materials for the crates? What specific type of wood if any is required, pine, oak, poplar etc? Is the wood to be heat treated, pressure treated, kiln dried etc? The drawing I found does spec type the nail to be used but does not spec the material of the nails. Are they hot dipped zinc, stainless steel, etc? Also, the paint question, What type of paint is to be used? If it is regular commercially available paint we can do it, if it is some special paint maybe not. More comprehensive drawings would be helpful. The drawing that is supplied makes it seem as though the Government wants the crates palletized which may be the case but do they need to be palletized AFTER filling them with ammunition? Is it possible that the palletization is simply to get them where they will be filled?

Government Response: Attachment 07 Pallet Unit Configuration provides dimensions to which pallets (on which the empty JAGM SSCs shall be shipped to the JAGM All-Up-Round manufacturer) shall be built. Attachment 07 Pallet Unit Configuration also provides dimensions for a Filler Assembly that shall to be included in a shipment of SSCs on a pallet in instances where the unit load (SSC quantity) does not equal three, six or nine. Attachment 07 Pallet Unit Configuration does not provide instructions for building a crate, nor does the

2 3

W31P4Q-17-R-0063 0003

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Government intend for the offeror to build crates. The Government requires the offeror to build the pallet and filler assemblies (if required) IAW Attachment 07 Pallet Unit Configuration. The Government has not specified, and does not intend to specify, type of wood or other materials not already called out in Attachment 07 Pallet Unit Configuration. The offeror does, however, have the responsibility for ensuring the JAGM SSCs reach the JAGM All-Up-Round manufacturer undamaged and should choose the materials accordingly. In reference to part 5 of this question, the SSCs should be painted IAW the requirements of the TDP in this RFP, which requires CARC paint. Please refer to the TDP for additional information on the requirement.

*** END OF NARRATIVE A0004 ***