Shipping and Storage Container, Guided Missile P/N 13556595
Contract Data Requirements List (CDRL)
EXHIBIT A
W31P4Q-17-R-0063
DATE – 01 Jan 2017
Joint Air-to-Ground Missile
EXPORT CONTROL ACT WARNING: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25."
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD contractors only; Critical Technology; 30 April 2014. Other requests shall be referred to: Project Manager, JAMS, SFAE-MSL-JA, Redstone Arsenal, AL 35898- 5710.
RRCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q‐17‐R‐0063
F. CONTRACTOR:
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Production Status Report
3. SUBTITLE 17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐MGMT‐81255
5. CONTRACT REFERENCE
[SOW 27]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
Monthly
12. DATE OF FIRST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
N/A Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 14 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Dave Brown
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
1/17/2017 DD FORM 1423‐1, Feb 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 page(s)
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management
Plan
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐MISC‐80711A
5. CONTRACT REFERENCE
[SOW 42]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
N/A Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 14 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Dave Brown
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Production Line Changes
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐MISC‐80711A
5. CONTRACT REFERENCE
[SOW 46]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Required
12. DATE OF FIRST SUBMISSION
N/A
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
As Required
13. DATE IF SUBSEQUENT SUBM.
N/A Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 14 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Dave Brown
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Test Plan
3. SUBTITLE
First Article Test (FAT) Plan
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐NDTI‐80566A
5. CONTRACT REFERENCE
[SOW 56], [SOW 64]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
See 16 Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 14 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blks 12 & 13: Submit NLT 28 days prior to testing.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Mark Tillman
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Test Plan
3. SUBTITLE
Product Acceptance Performance Oriented Packaging (POP) Plan
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐NDTI‐80566A
5. CONTRACT REFERENCE
[SOW 59]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
See 16 Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 14 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blks 12 & 13: Submit NLT 28 days prior to testing.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Mark Tillman
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
First Article Test (FAT) Report
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐NDTI‐80809B
5. CONTRACT REFERENCE
[SOW 58], [SOW 67]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
See 16 Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 28 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blks 12 & 13: Submit NLT 28 days after testing.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Mark Tillman
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
Product Acceptance Performance Oriented Packaging (POP) Report
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐NDTI‐80809B
5. CONTRACT REFERENCE
[SOW 61]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
See 16 Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 28 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blks 12 & 13: Submit NLT 28 days after testing.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Mark Tillman
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Bill of Materials (BOM) for Diminishing Manufacturing Sources and Material Shortages Management
3. SUBTITLE 17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐PSSS‐81656A
5. CONTRACT REFERENCE
[SOW 40]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
30 DPT EOC Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 14 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Dave Brown
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE 17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐SESS‐80639D
5. CONTRACT REFERENCE
[SOW 32]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
See 16
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
See 16 Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval of ECPs within 60 days after submittal.
Blk 9: DS shall be that of the most restrictive document being changed. For ECW see end of 1423 CDRL Package.
Blks 12 & 13: The Contractor shall submit formal ECPs to propose updates for Government controlled documents.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Sam Johnson
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Request for Variance (RFV)
3. SUBTITLE 17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐SESS‐80640D
5. CONTRACT REFERENCE
[SOW 34]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
See 16
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
See 16 Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval of ECPs within 14 days after submittal.
Blk 9: DS shall be that of the most restrictive document being changed. For ECW see end of 1423 CDRL Package.
Blks 12 & 13: The Contractor shall submit formal RFVs to deviate from Government controlled documents.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Sam Johnson
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Notice of Revision (NOR)
3. SUBTITLE 17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐SESS‐80642D
5. CONTRACT REFERENCE
[SOW 32]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
See 16
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
See 16 Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval of NORs within 60 days after submittal.
Blk 9: DS shall be that of the most restrictive document being changed. For ECW see end of 1423 CDRL Package.
Blks 12 & 13: The Contractor shall submit NORs concurrently with the formal ECP, DI‐
SESS‐80369.
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Sam Johnson
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Form Approved
OMB NO. 0704‐0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704‐0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ Other __X__
D. SYSTEM/ITEM
JAGM SSC
E. CONTRACT/PR NO.
W31P4Q-17-R-0063
F. CONTRACTOR:
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Configuration Audit Plan
3. SUBTITLE
Physical Configuration Audit (PCA) Plan
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI‐SESS‐81646B
5. CONTRACT REFERENCE
[SOW 95]
6. REQUIRING OFFICE
SFAE‐MSL‐JAP
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
See 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE IF SUBSEQUENT SUBM.
N/A Draft Final
Reg Repro
16. REMARKS
Blk 8: Government Approval or Disapproval within 21 days of receipt. Contractor shall submit revisions and comment responses within 14 days after receipt of Government comments.
Blk 9: For DS and ECW see end of 1423 CDRL Package.
Blk 12: Submit NLT 28 days prior to First Article Test (FAT).
Blk 14: Submission shall be via EDMS.
SFAE‐MSL‐JAP 1
See 16
15. Total 1
G. PREPARED BY
Sam Johnson
H. DATE
1/17/2017
I. APPROVED BY
Sam Johnson
J. DATE
Exhibit A
CDRL BLOCK 9 DISTRIBUTION STATEMENTS AND EXPORT CONTROL
DISTRIBUTION TYPE AND DESCRIPTION
A. Approved for public release; distribution is unlimited.
B. Distribution Authorized to U.S. Government Agencies Only; Administrative and Operational Use; 18 Aug 2014. Other requests for this document shall be referred to Joint Attack Munition Systems (JAMS) Project Office, ATTN: SFAE-MSL- JA, Redstone Arsenal, AL 35898-5710.
C. Distribution authorized to U.S. Government Agencies and their Contractors Only;
Administrative and Operational Use; 18 Aug 2014. Other requests for this document shall be referred to Joint Attack Munition Systems (JAMS) Project Office, ATTN: SFAE-MSL-JA, Redstone Arsenal, AL 35898-5710.
D. Distribution Authorized to DOD and U.S. DOD Contractors Only; Administrative and Operational Use; 18 Aug 2014. Other requests for this document shall be referred to Joint Attack Munition Systems (JAMS) Project Office, ATTN: SFAE-MSL- JA, Redstone Arsenal, AL 35898-5710.
E. Distribution Authorized to DOD Only; Administrative and Operational Use; 18 Aug 2014. Other requests for this document shall be referred to Joint Attack Munition Systems (JAMS) Project Office, ATTN: SFAE-MSL-JA, Redstone Arsenal, AL 35898-5710.
F. Further distribution only as directed by: Project Manager, Joint Attack Munition Systems (JAMS) Project Office, ATTN: SFAE-MSL-JA, Redstone Arsenal, AL 35898-5710 or higher DOD Authority. Critical Technology, 18 Aug 2014.
EXPORT CONTROL ACT STATEMENT
UNLESS OTHERWISE APPROVED BY THE JAMS PROJECT OFFICE, ALL
ENGINEERING TECHNICAL DATA, SOFTWARE AND COST DATA SHALL BE
SUBJECT TO EXPORT RESTRICTIONS AS FOLLOWS:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. Seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. Seq.
Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
File details come from the government source that posted it. Updated .