JAFM_SSC_Amendment_0001.pdf

PDF 14 KB Posted

Attached to
Joint Air-to-Ground Missile (JAGM) Shipping and Storage Containers (SSC)
Solicitation number
W31P4Q-17-R-0063
Issued by

About this file

Amendment 0001, vendor questions and Government responses.

View the file

Other files

File Type Posted
Attachment_04_-_Deliverable_Hardware_Matrix_-_03.16.2017.pdf PDF
JAGM_SSC_Amendment_0005.pdf PDF
JAGM_SSC_Amendment_0004.pdf PDF
JAGM_SSC_Amendment_0003.pdf PDF
JAGM_SSC_Amendment_0002.pdf PDF
Attachment_02_-_DOCUMENT_SUMMARY_LIST_(DSL)_-_01.17.2017.pdf PDF
Attachment_03_-TECHNICAL_DATA_PACKAGE_(TDP)_13556595_-_01.17.2017.pdf PDF
Attachment_10_-_SECTION_L_-_INSTRUCTION_FOR_PROPOSAL_PREPARATION_-_01.17.2017.pdf PDF
Attachment_08_-_UNIT_PRICE_TABLE_-_01.17.2017.pdf PDF
Exhibit_A_-_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_01.17.2017.pdf PDF
Attachment_06_-_PRODUCTION_READINESS_PROCESS_MANUAL_-_01.17.2017.pdf PDF
Attachment_04_-_DELIVERABLE_HARDWARE_MATRIX_-_01.17.2017.pdf PDF
Attachment_13_-_SPECIAL_CLAUSES.pdf PDF
JAGM_SSC_RFP_17-R-0063_OFFICIAL.pdf PDF
Attachment_09_-GOVERNMENT_FURNISH_PROPERTY_(GFP)_-_01.17.2017.pdf PDF
Attachment_01_-STATEMENT_OF_WORK_(SOW)_-_01.17.17.pdf PDF
Attachment_11_-_SECTION_M_-_BASIS_FOR_AWARD_-_01.17.2017.pdf PDF
Attachment_05_-CONTRACT_SECURITY_CLASSIFICATION_DATA_(DD254)_WITH_SECURITY_CLASS_GUIDE_(SCG)_-_01.24.2017.pdf PDF
Attachment_07_-_PALLET_UNIT_CONFIGURATION_-_01.17.2017.pdf PDF
Attachment_12_-_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE_FORM_-_01.17.2017.pdf PDF
Attachment_03_-_Technical_Data_Package_13556595_-_01.17.2017.pdf PDF
Exhibit_A_-_CDRLs_-_01.17.2017.pdf PDF
JAGM_SSC_Draft_RFP.pdf PDF
Attachment_05_-_DD254_SCG_and_SCG_attached_-_01.24.2017.pdf PDF
Attachment_12_-_Past_Performance_Evaluation_Questionnaire_Form_-_01.17.2017.pdf PDF
Attachment_09_-_Government_Furnished_Property_-_01.17.2017.pdf PDF
Attachment_07_-_Pallet_Unit_Configuration_-_01.17.2017.pdf PDF
Attachment_10_-_Section_L_v4.0_-_01.17.2017.pdf PDF
Attachment_01_-_SSC_SOW_Rev_1.5_-_01.17.17.pdf PDF
Attachment_04_-_Deliverable_Hardware_Matrix_-_01.17.2017.pdf PDF
Attachment_11_-_Section_M_v4.0_-_01.17.2017.pdf PDF
Attachment_06_-_Production_Readiness_Process_Manual_-_01.17.2017.pdf PDF
Attachment_02_-_Document_Summary_List_-_01.17.2017.pdf PDF
Attachment_08_-_Pricing_Table_-_01.17.2017.pdf PDF
Attachment_12_-_Past_Performance_Evaluation_Questionnaire_Form_-_01.17.2017.pdf PDF
JAGM_SSC_Draft_RFP.pdf PDF
Attachment_04_-_Deliverable_Hardware_Matrix_-_01.17.2017.pdf PDF
Attachment_01_-_SSC_SOW_Rev_1.5_-_01.17.17.pdf PDF
Attachment_09_-_Government_Furnished_Property_-_01.17.2017.pdf PDF
Attachment_06_-_Production_Readiness_Process_Manual_-_01.17.2017.pdf PDF
Attachment_07_-_Pallet_Unit_Configuration_-_01.17.2017.pdf PDF
Exhibit_A_-_CDRLs_-_01.17.2017.pdf PDF
Attachment_11_-_Section_M_v4.0_-_01.17.2017.pdf PDF
Attachment_10_-_Section_L_v4.0_-_01.17.2017.pdf PDF
Attachment_08_-_Pricing_Table_-_01.17.2017.pdf PDF
Attachment_02_-_Document_Summary_List_-_01.17.2017.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

W31P4Q

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

BRITTANY A QUINN

EMAIL: BRITTANY.A.QUINN2.CIV@MAIL.MIL

W31P4Q-17-R-0063

2017FEB09

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 2

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: BRITTANY A QUINN

Buyer Office Symbol/Telephone Number: CCAM-TMA/(256)313-2033

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A-1. Below are the Questions and Answers that were submitted by the offerors.

1. When I tried accessing Attachment 03 it worked and I was able to access a documents titled 'Technical Data Package'.

However, there are no drawings, just a list of Part Numbers.

Government Response: When you open the PDF file, you have to click on the paperclip on the left hand side to access the drawings. If you see no paperclip, try going to View and selecting Show/Hide. Then click on Navigation Panes, the menu that shows up should have

Attachments on it. If you click on that, it should populate.

2. Does the Government have a preference in the material selection for the storage containers (e.g. plastic)?

Does the Government have a preference in the manufacturing methodology for the storage containers (e.g. rotomold)?

Would the Government be interested in storage containers made of composites (e.g. fiberglass, carbon, etc.)?

Government Response: The Government wants containers built IAW the TDP in the RFP. The Governmnet would not be interested in containers made of composites.

3. Are you able to grant a two week extension at this time and make the proposal due date 3-31-2017?

Government Response: Not at this time.

*** END OF NARRATIVE A0002 ***

2 2

W31P4Q-17-R-0063 0001

SECTION A