Joint Air-to-Ground Missile Shipping and Storage Container, Guided Missile
P/N 13556595
Special Clauses
Attachment 13
W31P4Q-17-R-0063
DATE –17 January 2017
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Attachment 0013- Special Clauses
1) WOOD PACKING MATERIALS REQUIREMENTS
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KDHT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or 1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood process verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
2) BAR CODE MARKINGS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology - Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
3) PACKAGING AND MARKING
Packaging and Marking shall be in accordance with (IAW) Attachment 0007, Pallet Unit Configuration and Attachment 0003, Technical Data Package 13556595.
4) ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR
DEVIATION, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF
REVISION, AND SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION
INSTRUCTIONS
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
2 . Format.
a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs, which meet the requirements of Class II ECPs, shall be prepared using RDMR Form 523 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)
e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV.
RFVs shall be prepared using RDMR Form 528.
f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.
g. Classification of RFDs/RFVs.
(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance;
interchangeability; reliability; survivability; maintainability; effective use or operation;
weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the Contractor and the Government.
l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.
m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) did to describe the exact change to configuration documentation specify as a data requirement in the contract. The Contractor shall describe the change using subsections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3 . Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.
4 . Distribution.
a . Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website (http://www.redstone.army.mil/amrdec/rdmr-se/tdmd/ConfigMgt.htm) by clicking on "Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting Command - Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the Technical Data Management Division (RDMR-SET) to have the forms sent to their facility.
b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs. For each Class I or II ECP, or each RFD/RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SET
Redstone Arsenal, Al 35898-5000 Telephone: 256-876-1335
c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO.
The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SEI
Redstone Arsenal, Al 35898-5000 Telephone: 256-876-8163
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
6 . Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
5) GOVERNMENT OWNED PRODUCTION AND RESEARCH PROPERTY
INFORMATION FOR EVALUATION TO ELIMINATE COMPETITIVE
ADVANTAGE
If this offer is based on the use of Government property by the offeror or his anticipated subcontractors for performing the proposed contract, the offeror shall submit with his proposal the following information:
(1) Description/identification of the item.
(2) Total cost of item, if known, including acquisition cost, improvement costs, installation cost, and freight. (Cost will be subject to verification by the appropriate accountable property officer.)
(3) Type/class of equipment in accordance with FAR 52.245-9(DOD Class Deviation O0011).
(4) Monthly rental rate in accordance with FAR 52.245-9(DOD Class Deviation O0011).
(5) Period of time during which authorization to use each is desired.
(6) A rental equivalent will be used to determine the Government cost of authorized Government furnished property for the source selection. Therefore, when offerors calculate any claimed credit against the rental equivalent (FAR 52.245-9(c)(DOD Class Deviation O0011)), they shall treat the entire time of use in performing the proposed contract as use requiring the payment of a rental fee, and all other use outside this contract as being rent-free. Separate calculations and documentation shall be furnished on each item of property for which a credit is claimed.
(7) Written permission of the contracting officer having cognizance of the property already in the possession or control of the bidder/offeror or his proposed subcontractor to use that property without charge in performance of any contract resulting from this solicitation.
(8) Copy of any existing rental agreement or rental agreement number and name and address of administering contracting officer.
6) GOVERNMENT PRODUCTION AND RESEARCH PROPERTY
a. It is not the desire of the Government to purchase or have purchased for its account any facilities, special tooling and/or special test equipment for use in performance of any contract awarded pursuant to this solicitation.
b. The bidder/offeror is expected to provide all facilities, special tooling, and special test equipment required in the performance of this proposed contract except that existing Government-owned facilities, special tooling and special test equipment (hereinafter described as Government Production and Research Property - FAR 45.301) presently in his possession or in the possession of a proposed subcontractor, which he plans to utilize and which he must identify as required below.
NOTE: FAILURE TO RESPOND TO THE FOLLOWING APPLICABLE PORTIONS
OF THIS SPECIAL PROVISION MAY CONSTITUTE BASIS FOR REJECTION OF
BID/OFFER AS NONRESPONSIVE.
c. This bid/offer precludes the use of Government production and research property in possession of contractors for which rent is not being paid, or for which rent-free use is not authorized.
d. If proposed use of Government production and research property is subject to existing rental agreement, bidder/offeror will submit with his bid/offer the contract or rental agreement number and name and address of administering contracting officer.
e. If Government production and research property will be used on a rent-free basis the bid/offer must contain, as a minimum, information in response to the following for each line item in the bid/offer:
(1) A list or description of all Government production and research property which the bidder/offeror or his anticipated subcontractors propose to use on a rent-free basis which is already in possession of the bidder/offeror and his subcontractors under other contracts. Descriptions (to include age and/or acquisition cost of each item, as appropriate) shall be included for each category of property set forth in Section M.
(2) For Government production and research property already in possession of the bidder/offeror and his proposed subcontractors, identification of the facilities contract or other instrument under which the property is held, and the written permission of the Contracting Officer having cognizance of the property for use of that property without charge.
(3) The amount of use (in months) of Government production and research property, and, with respect to any such property which will be used concurrently in performance of two or more contracts, the amounts of the respective use in sufficient detail to support the proration required for concurrent use.
(4) Maintenance of Government production and research property shall be performed by the bidder/offeror, and separate funding in support of this proposed procurement shall not be provided.
7) EVALUATION OF USE OF GOVERNMENT OWNED PRODUCTION AND
RESEARCH PROPERTY
If Government production and research property is proposed for use in performance of any contract resulting from this solicitation, each offer will be adjusted to include a rental equivalent evaluation factor for each item of such property calculated in accordance with FAR Clause 52.245-9. This adjustment will apply for the use of Government property by the offeror as well as any subcontractor thereto.