Responses to Question Set 10 for RFP W15QKN-22-R-0008 - final.pdf

PDF 129 KB Posted

Attached to
155mm XM1128 Artillery Metal Parts Assembly
Solicitation number
W15QKN-22-R-0008
Issued by

View the file

Other files

File Type Posted
W15QKN-22-R-0008 Amendment 0008 - Released for Posting 23 June 2022.pdf PDF
Attachment 0020 - ECP R22A2018 - XM1128 Metal Parts TDP Update.pdf PDF
Exhibit A - CDRL Index - XM1128 Artillery Metal Parts Assembly.docx DOCX document
W15QKN-22-R-0008 Amendment 0007 - Released for Posting 6 June 2022.pdf PDF
Amendment 0006 under RFP W15QKN-22-R-0008 - Released 24 May 2022.pdf PDF
Amendment 0005 under RFP W15QKN-22-R-0008 - 17 May 2022.pdf PDF
Question Set 9 for RFP W15QKN-22-R-0008 - final.pdf PDF
Attachment 0019 - ECP R21A2045 - 155MM Projectiles Add Additional Anti-Seize Vendors.pdf PDF
W15QKN-22-R-0008 - Amendment 0005 - Released for Posting 13 May 2022.pdf PDF
Question Set 8 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 7 for RFP W15QKN-22-R-0008 - final.pdf PDF
W15QKN-22-R-0008 Amendment 0004 - Released 13 April 2022.pdf PDF
Revised Exhibit A - CDRL Index - XM1128 Artillery Metal Parts Assembly.docx DOCX document
Question Set 6 for RFP W15QKN-22-R-0008 - final.pdf PDF
Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly - Updated.docx DOCX document
Amendment 0003 under RFP W15QKN-22-R-0008 - Released 30 Mar 2022.pdf PDF
Attachment 0004 - Low Level Process Map - updated.pdf PDF
Attachment 0003 - Quality Assurance Addendum - updated.docx DOCX document
Attachment 0018 - XM1128 Metal Parts DD1423 Block14.pdf PDF
Question Set 5 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 4 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 2 for RFP W15QKN-22-R-0008 - final 24 Mar 2022.pdf PDF
Question Set 3 for RFP W15QKN-22-R-0008 - final.pdf PDF
Updated Attachment 0002 - Data Item Description Index - Contains 27 DIDS.docx DOCX document
Updated Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly.docx DOCX document
Amendment 0002 under RFP W15QKN-22-R-0008.pdf PDF
Updated Attachment 0003 - Quality Assurance Addendum.docx DOCX document
Question Set 1 for RFP W15QKN-22-R-0008 - Final 10 March 2022.pdf PDF
Amendment 0001 to W15QKN-22-R-0008.pdf PDF
Attachment 0012 - ECP R21A2023 - 155mm Pallet Specification - Clarifying Nails.pdf PDF
Attachment 0003 - Quality Assurance Addendum.docx DOCX document
Attachment 0002 - Data Item Description Index - Contains 28 DIDS.pdf PDF
Attachment 0005 - FORM 3002 - Clearance Tech Information for Public Release.pdf PDF
Attachment 0006 - Non-Disclosure Agreement.docx DOCX document
Attachment 0010 - Past Performance Letter and Questionnaire.docx DOCX document
Attachment 0001 XM1128 Metal Parts Price Matrix.xlsx XLSX spreadsheet
Attachment 0016 - TDP 13071733 - XM1128 Metal Parts Assembly.pdf PDF
RFP W15QKN-22-R-0008 - XM1128 Metal Parts Assembly Released 26 Jan 2022.pdf PDF
Attachment 0008 - AMSTA-AR Form 1350 - Technical Data Request Questionnaire.pdf PDF
Attachment 0017 - TDP 13082834 - XM1128 Base Closure.pdf PDF
Attachment 0004 - Low Level Process Map.pptx PPTX presentation
Attachment 0011 - Proposal Adequacy Checklist.doc DOC document
Attachment 0015 - ECP R21A2038 - XM1128 Metal Parts Specification Release.pdf PDF
Attachment 0009 - Certificate of Destruction.doc DOC document
Attachment 0007 - DD2345MilitarilyCriticalTechnicalDataAgreement.pdf PDF
Attachment 0013 - RFV R20K8002 - Addtion of Mold Inibitors to Wood Pallets.pdf PDF
Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly.docx DOCX document
Attachment 0014 - ECP R21K2015 - Clarification for Pallet Nails.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16 May 2022 Question{s}

W15QKN-22-R-0008

1. Page 5 of 123, Section B, Pricing states que“The Offeror shall fill in Firm Fixed Unit Prices within

Section B CLIN structure for Initial FATs, AFATS, …..”

Would the Government please define what is to be included within the initial and additional FAT pricing.

Government Response: Section C.3.3.2 defines a First Article Test as follows: “A First Article Test (FAT) shall consist of items and quantities cited in the specifications identified in Paragraph C.2.1, Mandatory Documents: MIL-DTL-32692, MIL-DTL-63268B w/ AMD 1 if the Lifting Plug is CFM in the delivery order, MIL-DTL-45449C w/ AMD 2. The Contractor shall be responsible for providing all materials, first article samples, test equipment, facilities and support, and conducting destructive testing for the FAT. The Contractor shall examine and test all FAT samples in accordance with all contract requirements, item specifications, Quality Assurance Provisions (QAPS), and all drawings listed in the Technical Data Packages (TDP).

The Contractor shall conduct the FAT at the manufacturing site and the Contractor shall invite the Government to conduct the final inspection of the FAT samples at the manufacturing site.

The Contractor shall be responsible for conducting the Contractor provided subcomponents FAT/LAT. The Contractor shall invite the Government to witness all Subcontractor FATs. The Contractor shall invite the Government to witness the production of any First Article samples, Contractor inspection of the FAT samples, and the Government shall be able to conduct/verify dimensional measurements of First Article Test samples during production and Contractor inspections. The Contractor shall submit a First Article Test Plan for approval in accordance with DD Form 1423 (DI-NDTI-80566A). Upon the completion of testing and inspection, the Contractor is responsible for submitting an Inspection Test Report in accordance with DD Form 1423 (DI-NDTI-80809B Tailored). The Contractor shall submit a Failure Summary and Analysis Report in accordance with DD Form 1423 (DI-SESS-80255B) for each First Article failure.”

Section C.3.3.2.1 defines the Initial First Article Test (IFAT) as follows: “The initial FAT is the first FAT awarded on the contract conducted after post award and prior to production start-up.

This FAT is in accordance with the complete FAT requirements in this RFP. The U.S.

Government plans to award an initial FAT no more than once per contract for each item.”

Section C.3.3.2.1.1 is also applicable to the IFAT and states “In addition to the required FAT quantities cited in the specifications identified in Paragraph C.2.1, Mandatory Documents, the IFAT executed in Ordering Period 1 shall include the production and delivery of a lot consisting of 2,756 155mm XM1128 Artillery Metal Parts Assemblies. The Contractor shall examine and test this quantity in accordance with all contract requirements, item specifications, Quality Assurance Provisions (QAPS), and all drawings listed in the TDP.”

Section C.3.3.2.2 defines the Additional First Article Test (AFAT) as follows: “An Additional First Article Test may be required in accordance with Section J, Attachment 0003 - Quality Assurance Addendum or upon issuance of additional delivery order(s). Conduct of an Additional FAT is sometime after delivery of production quantities. The Contractor shall utilize the mature processes and existing equipment to the maximum extent possible. Existing approved CDRL submissions from the initial FAT may be utilized provided they are unaffected by any changes and the Contracting Officer concurs.”

16 May 2022 Question{s}

W15QKN-22-R-0008

Paragraphs C.3.3.2.1 and C.3.3.2.2 are subparagraphs to Section C.3.3.2. These are types of FATs. The IFAT is a FAT and is the first FAT awarded. An AFAT is also a FAT. An AFAT may be awarded during the performance of the contract and is after delivery of production quantities. Delivery of production quantities occurs after an IFAT. Therefore, the AFAT is also after an IFAT.

The Government cannot specifically instruct an Offeror on pricing approach used for the initial FAT, AFAT, and production unit price CLINs. This is a business decision.

2. Page 62 of 123, Section I-132 (b) states “The Contractor shall submit the first article test report within 300 calendar days from the date of this contract…..”

Request that the Government extend this requirement to 650 days to allow for longer than normal material and facilitation lead-times. Current lead-times for material and equipment exceed 45 weeks ARO.

Government Response: The Government has reviewed industry impacts due to supply chain challenges. The Government will revise the solicitation in whole and release an amendment to reflect the First Article Test Report is due within 570 days from the date of contract award.