Question Set 3 for RFP W15QKN-22-R-0008 - final.pdf

PDF 143 KB Posted

Attached to
155mm XM1128 Artillery Metal Parts Assembly
Solicitation number
W15QKN-22-R-0008
Issued by

View the file

Other files

File Type Posted
W15QKN-22-R-0008 Amendment 0008 - Released for Posting 23 June 2022.pdf PDF
Attachment 0020 - ECP R22A2018 - XM1128 Metal Parts TDP Update.pdf PDF
Exhibit A - CDRL Index - XM1128 Artillery Metal Parts Assembly.docx DOCX document
W15QKN-22-R-0008 Amendment 0007 - Released for Posting 6 June 2022.pdf PDF
Responses to Question Set 10 for RFP W15QKN-22-R-0008 - final.pdf PDF
Amendment 0006 under RFP W15QKN-22-R-0008 - Released 24 May 2022.pdf PDF
Amendment 0005 under RFP W15QKN-22-R-0008 - 17 May 2022.pdf PDF
Question Set 9 for RFP W15QKN-22-R-0008 - final.pdf PDF
Attachment 0019 - ECP R21A2045 - 155MM Projectiles Add Additional Anti-Seize Vendors.pdf PDF
W15QKN-22-R-0008 - Amendment 0005 - Released for Posting 13 May 2022.pdf PDF
Question Set 8 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 7 for RFP W15QKN-22-R-0008 - final.pdf PDF
W15QKN-22-R-0008 Amendment 0004 - Released 13 April 2022.pdf PDF
Revised Exhibit A - CDRL Index - XM1128 Artillery Metal Parts Assembly.docx DOCX document
Question Set 6 for RFP W15QKN-22-R-0008 - final.pdf PDF
Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly - Updated.docx DOCX document
Amendment 0003 under RFP W15QKN-22-R-0008 - Released 30 Mar 2022.pdf PDF
Attachment 0004 - Low Level Process Map - updated.pdf PDF
Attachment 0003 - Quality Assurance Addendum - updated.docx DOCX document
Attachment 0018 - XM1128 Metal Parts DD1423 Block14.pdf PDF
Question Set 5 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 4 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 2 for RFP W15QKN-22-R-0008 - final 24 Mar 2022.pdf PDF
Updated Attachment 0002 - Data Item Description Index - Contains 27 DIDS.docx DOCX document
Updated Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly.docx DOCX document
Amendment 0002 under RFP W15QKN-22-R-0008.pdf PDF
Updated Attachment 0003 - Quality Assurance Addendum.docx DOCX document
Question Set 1 for RFP W15QKN-22-R-0008 - Final 10 March 2022.pdf PDF
Amendment 0001 to W15QKN-22-R-0008.pdf PDF
Attachment 0012 - ECP R21A2023 - 155mm Pallet Specification - Clarifying Nails.pdf PDF
Attachment 0003 - Quality Assurance Addendum.docx DOCX document
Attachment 0002 - Data Item Description Index - Contains 28 DIDS.pdf PDF
Attachment 0005 - FORM 3002 - Clearance Tech Information for Public Release.pdf PDF
Attachment 0006 - Non-Disclosure Agreement.docx DOCX document
Attachment 0010 - Past Performance Letter and Questionnaire.docx DOCX document
Attachment 0001 XM1128 Metal Parts Price Matrix.xlsx XLSX spreadsheet
Attachment 0016 - TDP 13071733 - XM1128 Metal Parts Assembly.pdf PDF
RFP W15QKN-22-R-0008 - XM1128 Metal Parts Assembly Released 26 Jan 2022.pdf PDF
Attachment 0008 - AMSTA-AR Form 1350 - Technical Data Request Questionnaire.pdf PDF
Attachment 0017 - TDP 13082834 - XM1128 Base Closure.pdf PDF
Attachment 0004 - Low Level Process Map.pptx PPTX presentation
Attachment 0011 - Proposal Adequacy Checklist.doc DOC document
Attachment 0015 - ECP R21A2038 - XM1128 Metal Parts Specification Release.pdf PDF
Attachment 0009 - Certificate of Destruction.doc DOC document
Attachment 0007 - DD2345MilitarilyCriticalTechnicalDataAgreement.pdf PDF
Attachment 0013 - RFV R20K8002 - Addtion of Mold Inibitors to Wood Pallets.pdf PDF
Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly.docx DOCX document
Attachment 0014 - ECP R21K2015 - Clarification for Pallet Nails.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

17FEB2022 Questions

W15QKN-22-R-0008

1. Page 118 of 123, Section M.3.3.4(a) states “When the Government decides to exercise its right to waive First Article Sample, as to a particular offeror/quoter, that offer will be evaluated without the price submitted for First Article Sample.” Will the Government provide the basis for which it would waive the First Article Sample given that the 155XM1128 is in research and development?

Government Response: The Government does not intend to waive First Article Sample for this solicitation.

2. The following Data Item Descriptions (“DIDS”) called out in Exhibit A are not contained in

Attachment 0002: DI-MISC-80678 Tailored, DI-MGMT-81255, DI-QCIC-80736, DI-MGMT-80899, and DI-ADMN-81505 Tailored. Will the Government provide these missing DIDS?

Government Response: For DI-MISC-80678 Tailored and DI-ADMN-81505 Tailored the word “Tailored” is added to the end of the DID reference within the SOW to indicate that this DID is tailored in accordance with the details located within the associated CDRL Block 16. The DID documents themselves are not altered. DI-MISC-80678 and DI-ADMN-81505 already provided as a part of the solicitation.

The missing DID, DI-MGMT-81255, was included in the updated Attachment 0002 that was with Amendment 0002.

3. Will the Government change the Distribution Statement D designations in Exhibit A to

Distribution B in order to protect Contractor’s proprietary information? Distribution Statement B affords the Government the same limitations as Distribution Statement D and add protection for the contractor. In accordance with DoD Directive 5230.24, a reason for assigning Distribution Statement B is to protect information not owned by the U.S. Government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government.

Government Response: The Distribution Statement listed in Block 9 of the DD1423 form is the baseline requirement. It is the Contractor’s responsibility to apply proprietary markings on submitted documents such as supporting data, reports, and analysis that the Contractor determines are applicable.

4. RFP page 104, L.2.1.6: This section of the solicitation limits the Volume I: Technical Factor to a maximum of 75 pages. Will the USG consider increasing this limit to a maximum of 150 pages so the offeror can adequately describe the Manufacturing & Quality Plan to include all process maps as well as the description of two Integrated Master Schedules for (1) FAT and Minimum Delivery Rate and (2) Ramp Up?

17FEB2022 Questions

W15QKN-22-R-0008

Government Response: The Government will increase the limit to a maximum of 125 pages.

The change will be in a forthcoming amendment.

5. RFP page 104, L.2.1.6, L4.4.1.1.a, L4.4.1.1.1.b: Will the USG permit the (1) FAT/Minimum Delivery Rate IMS and (2) Ramp Up IMS to be submitted as an attachment to our response, separate from Technical Volume page limitation in both Microsoft Project and PDF formats?

Government Response: The Government will not permit the IMS’s submitted as an attachment.