Attachment 0004 - Low Level Process Map - updated.pdf

PDF 332 KB Posted

Attached to
155mm XM1128 Artillery Metal Parts Assembly
Solicitation number
W15QKN-22-R-0008
Issued by

View the file

Other files

File Type Posted
W15QKN-22-R-0008 Amendment 0008 - Released for Posting 23 June 2022.pdf PDF
Attachment 0020 - ECP R22A2018 - XM1128 Metal Parts TDP Update.pdf PDF
Exhibit A - CDRL Index - XM1128 Artillery Metal Parts Assembly.docx DOCX document
W15QKN-22-R-0008 Amendment 0007 - Released for Posting 6 June 2022.pdf PDF
Responses to Question Set 10 for RFP W15QKN-22-R-0008 - final.pdf PDF
Amendment 0006 under RFP W15QKN-22-R-0008 - Released 24 May 2022.pdf PDF
Amendment 0005 under RFP W15QKN-22-R-0008 - 17 May 2022.pdf PDF
Question Set 9 for RFP W15QKN-22-R-0008 - final.pdf PDF
Attachment 0019 - ECP R21A2045 - 155MM Projectiles Add Additional Anti-Seize Vendors.pdf PDF
W15QKN-22-R-0008 - Amendment 0005 - Released for Posting 13 May 2022.pdf PDF
Question Set 8 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 7 for RFP W15QKN-22-R-0008 - final.pdf PDF
W15QKN-22-R-0008 Amendment 0004 - Released 13 April 2022.pdf PDF
Revised Exhibit A - CDRL Index - XM1128 Artillery Metal Parts Assembly.docx DOCX document
Question Set 6 for RFP W15QKN-22-R-0008 - final.pdf PDF
Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly - Updated.docx DOCX document
Amendment 0003 under RFP W15QKN-22-R-0008 - Released 30 Mar 2022.pdf PDF
Attachment 0003 - Quality Assurance Addendum - updated.docx DOCX document
Attachment 0018 - XM1128 Metal Parts DD1423 Block14.pdf PDF
Question Set 5 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 4 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 2 for RFP W15QKN-22-R-0008 - final 24 Mar 2022.pdf PDF
Question Set 3 for RFP W15QKN-22-R-0008 - final.pdf PDF
Updated Attachment 0002 - Data Item Description Index - Contains 27 DIDS.docx DOCX document
Updated Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly.docx DOCX document
Amendment 0002 under RFP W15QKN-22-R-0008.pdf PDF
Updated Attachment 0003 - Quality Assurance Addendum.docx DOCX document
Question Set 1 for RFP W15QKN-22-R-0008 - Final 10 March 2022.pdf PDF
Amendment 0001 to W15QKN-22-R-0008.pdf PDF
Attachment 0012 - ECP R21A2023 - 155mm Pallet Specification - Clarifying Nails.pdf PDF
Attachment 0003 - Quality Assurance Addendum.docx DOCX document
Attachment 0002 - Data Item Description Index - Contains 28 DIDS.pdf PDF
Attachment 0005 - FORM 3002 - Clearance Tech Information for Public Release.pdf PDF
Attachment 0006 - Non-Disclosure Agreement.docx DOCX document
Attachment 0010 - Past Performance Letter and Questionnaire.docx DOCX document
Attachment 0001 XM1128 Metal Parts Price Matrix.xlsx XLSX spreadsheet
Attachment 0016 - TDP 13071733 - XM1128 Metal Parts Assembly.pdf PDF
RFP W15QKN-22-R-0008 - XM1128 Metal Parts Assembly Released 26 Jan 2022.pdf PDF
Attachment 0008 - AMSTA-AR Form 1350 - Technical Data Request Questionnaire.pdf PDF
Attachment 0017 - TDP 13082834 - XM1128 Base Closure.pdf PDF
Attachment 0004 - Low Level Process Map.pptx PPTX presentation
Attachment 0011 - Proposal Adequacy Checklist.doc DOC document
Attachment 0015 - ECP R21A2038 - XM1128 Metal Parts Specification Release.pdf PDF
Attachment 0009 - Certificate of Destruction.doc DOC document
Attachment 0007 - DD2345MilitarilyCriticalTechnicalDataAgreement.pdf PDF
Attachment 0013 - RFV R20K8002 - Addtion of Mold Inibitors to Wood Pallets.pdf PDF
Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly.docx DOCX document
Attachment 0014 - ECP R21K2015 - Clarification for Pallet Nails.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Low Level Process Map

Basics Recommended Format

Generic Example

9 September 2021

Basics

• Low Level Process Map An evolution of a production flowchart, identifying

• Inputs – What’s needed at this step

• Outputs – What’s the product/result of this step

• Key Activities – What actions yield the step’s output

Processing of inputs and previous steps’ outputs

• Safety Critical Characteristic (SCC) Notation All SCC-related information employs red color font or shapes Non-SCC information employs black color font

Recommended Format:

Critical Characteristics Process Map

Contractor format is acceptable, provided the alternate format is explained

(as in the following slides)

Critical Characteristics Process Map Format

Level “n” Process Map

Start Description Description Description

1.2 1.3 1.4

EndDescription

•Input •Input

•Output •Output •Output •Output

•Key Activities •Key Activities

1.1

Key:

Input: -----

Output: -----

Process: -----

Critical Defect -----

“1.1” means this is a 2nd Level Map of Level 1’s Step 1

Red box means there is an SCC created or detected at a lower level Map

Red Letters in Input, Output or Key Activities mean the SCC is created or detected at this very point in the Map

Black lines denote Process Flow

•Key Activities •Key Activities

•Key Activities •Key Activities

•Key Activities [SCC] •Key Activities •Gov’t Notifications [Agency-Report]

See next slide for Steps’ nomenclature

Government notifications include the Agency(ies) and reports/documents used to communicate SCC

Step Nomenclature

Description

Inputs

Outputs

1.2.1

Numbering Level Step

1 1 1

1.2 2 2

1.2.1 3 1

Previous Next

•Key Activities •Safety Critical Activity [identify SCC]

Identify SCC-related activity (creation or detection) in red font

Spell out SCC within [brackets] Place blue/green boxes as to best fit within map

Example

Representation of a Production Line for illustration and reference purposes

Safety Critical Characteristics (SCCs) Identified in this Map

Code Description A Material Structure Unsound

B Interface Thread Incorrect

C Leak Rate Over Max

D Presence of Interface Holes

E Incorrect Assembly

• Identify what SCCs are portrayed within the map Defects herein are used solely for illustration

• State “No SCCs in map” for submittals without SCCs

Topmost Level

• Steps 1 & 4 identify the creation and detection points for the Safety Criticals (red text).

A lower level map may not be necessary

• Steps 2 & 3 identify Safety Criticals are either created or detected or both in a sub-processes.

A lower level map is necessary

Receive Materials & Parts

Manufacture Components

Assemble Components

Package AssembliesStart

End

Suppliers’ parts Raw Material

Parts Received Material Received Segregated non-conforming material

Raw Material Standing Procedures Trained Personnel

Receiving Inspection Inventory Operations

Manufacturing Operations

Accepted parts Segregated non-conforming material

Suppliers’ Parts Standing Procedures Trained Personnel

Specialized Equipment

Manufacturing Operations

Accepted assemblies Segregated non-conforming material

Packaging Operation Shipping Inspection

Standing Procedures Trained Personnel

Specialized Pkg. Materials

Assemblies Ready to Ship

Segregated non-conforming material

3 4

Step 2 Detailed [1/2]

• Sub-Steps identify creation and detection of SCCs, as well as proactive measures to prevent them (e.g., in-process check)

Sometimes the process inputs can be enable creation of SCCs

• Ovals are off-page connectors Disposition off-page connector refers to SCC non-conformance process handling

Metal Treatment

Material Inspection1

2.4

Accepted parts

Rough shape parts

Inspection Process Test Standards

Standing Procedures Qualified Personnel

Heat Controls for [Material Structure Unsound]

Forge Controls for [Material Structure Unsound]

In-Process Mechanical Properties Test

Non-Destructive Inspection for [Material

Structure Unsound]

Structurally checked parts

2.1 2.2

Accept

SCC?

Disposition

No

Manufacture Components

Standing Procedures Equipment Set-ups

Special Machining Operation for [Interface

Threads Incorrect] In-Process Check for [Leak Rate Over Max] Machining Operations

2.3

Accept

SCC?

Disposition

No

Final shape parts

Yes Yes

Step 2 Detailed [2/2]

• Note not every input or activity is SCC-defect related

• Step numbering reflects lower level

All 2.x are part of Topmost Level step 2

Assemble Parts

Final Inspection2.3 3

Accepted Suppliers’ parts

Standing Process

Complete parts

Calibration Standing Procedures Qualified Personnel

Gages

Heat Controls Finish Controls

Mechanical Properties Test

Automated Gage for [Leak Rate Over Max] Automated Visual for

[Presence of Interface Holes] Manual Inspections Visual Inspections Inspected parts

2.4 2.5

Accept

SCC?

Disposition

No

Yes

Step 3 Detailed

• Note inspection can happen at latter stages of production

Final Metal

Treatment

Final Inspection2.3 3

No additional input

Complete parts

Calibration Standing Procedures Qualified Personnel

Gages

Heat Controls Finish Controls

In-Process Mechanical Properties Test

Automated Gage for [Interface Thread Incorrect]

Automated Visual for [Incorrect Assembly] Manual Inspections Visual Inspections Inspected parts

2.4 2.5

Accept

SCC?

Disposition

No

Yes

Included for illustration Not required

SCC Disposition

• Include sub-map addressing how SCC dispositions are handled

Based upon Critical Characteristic Control Plans (CCCP) and/or Critical Plans of Action (CPOA)

• Only applies to SCCs

Assess Causes

Notify Government

Continue Production

Contract Requirements Quantity

Defect(s) in question Operations involved

Malfunction facts Corrective Actions

Shutdown (if required)

Root Cause Analysis or 6 Sigma Methods or other failure resolution tools

Present facts Present Actions

Request Go-Forward approval

Gov’t addresses Go-Forward

4.1 4.2

Approval by

Gov’t?

No

Yes

Disposition

Contract Requirements

Re-Start Authorized

Production resumed

Complete Corrective Actions (as applicable)

Re-Start production

4.3

Low Level Process Map
Basics
Recommended Format:�Critical Characteristics Process Map
Slide Number 4
Step Nomenclature
Example
Safety Critical Characteristics (SCCs) Identified in this Map
Topmost Level
Step 2 Detailed [1/2]
Step 2 Detailed [2/2]
Step 3 Detailed
SCC Disposition