Attachment 0004 - Low Level Process Map.pptx

PPTX presentation 87 KB Posted

Attached to
155mm XM1128 Artillery Metal Parts Assembly
Solicitation number
W15QKN-22-R-0008
Issued by

View the file

Other files

File Type Posted
W15QKN-22-R-0008 Amendment 0008 - Released for Posting 23 June 2022.pdf PDF
Attachment 0020 - ECP R22A2018 - XM1128 Metal Parts TDP Update.pdf PDF
Exhibit A - CDRL Index - XM1128 Artillery Metal Parts Assembly.docx DOCX document
W15QKN-22-R-0008 Amendment 0007 - Released for Posting 6 June 2022.pdf PDF
Responses to Question Set 10 for RFP W15QKN-22-R-0008 - final.pdf PDF
Amendment 0006 under RFP W15QKN-22-R-0008 - Released 24 May 2022.pdf PDF
Amendment 0005 under RFP W15QKN-22-R-0008 - 17 May 2022.pdf PDF
Question Set 9 for RFP W15QKN-22-R-0008 - final.pdf PDF
Attachment 0019 - ECP R21A2045 - 155MM Projectiles Add Additional Anti-Seize Vendors.pdf PDF
W15QKN-22-R-0008 - Amendment 0005 - Released for Posting 13 May 2022.pdf PDF
Question Set 8 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 7 for RFP W15QKN-22-R-0008 - final.pdf PDF
W15QKN-22-R-0008 Amendment 0004 - Released 13 April 2022.pdf PDF
Revised Exhibit A - CDRL Index - XM1128 Artillery Metal Parts Assembly.docx DOCX document
Question Set 6 for RFP W15QKN-22-R-0008 - final.pdf PDF
Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly - Updated.docx DOCX document
Amendment 0003 under RFP W15QKN-22-R-0008 - Released 30 Mar 2022.pdf PDF
Attachment 0004 - Low Level Process Map - updated.pdf PDF
Attachment 0003 - Quality Assurance Addendum - updated.docx DOCX document
Attachment 0018 - XM1128 Metal Parts DD1423 Block14.pdf PDF
Question Set 5 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 4 for RFP W15QKN-22-R-0008 - final.pdf PDF
Question Set 2 for RFP W15QKN-22-R-0008 - final 24 Mar 2022.pdf PDF
Question Set 3 for RFP W15QKN-22-R-0008 - final.pdf PDF
Updated Attachment 0002 - Data Item Description Index - Contains 27 DIDS.docx DOCX document
Updated Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly.docx DOCX document
Amendment 0002 under RFP W15QKN-22-R-0008.pdf PDF
Updated Attachment 0003 - Quality Assurance Addendum.docx DOCX document
Question Set 1 for RFP W15QKN-22-R-0008 - Final 10 March 2022.pdf PDF
Amendment 0001 to W15QKN-22-R-0008.pdf PDF
Attachment 0012 - ECP R21A2023 - 155mm Pallet Specification - Clarifying Nails.pdf PDF
Attachment 0003 - Quality Assurance Addendum.docx DOCX document
Attachment 0002 - Data Item Description Index - Contains 28 DIDS.pdf PDF
Attachment 0005 - FORM 3002 - Clearance Tech Information for Public Release.pdf PDF
Attachment 0006 - Non-Disclosure Agreement.docx DOCX document
Attachment 0010 - Past Performance Letter and Questionnaire.docx DOCX document
Attachment 0001 XM1128 Metal Parts Price Matrix.xlsx XLSX spreadsheet
Attachment 0016 - TDP 13071733 - XM1128 Metal Parts Assembly.pdf PDF
RFP W15QKN-22-R-0008 - XM1128 Metal Parts Assembly Released 26 Jan 2022.pdf PDF
Attachment 0008 - AMSTA-AR Form 1350 - Technical Data Request Questionnaire.pdf PDF
Attachment 0017 - TDP 13082834 - XM1128 Base Closure.pdf PDF
Attachment 0011 - Proposal Adequacy Checklist.doc DOC document
Attachment 0015 - ECP R21A2038 - XM1128 Metal Parts Specification Release.pdf PDF
Attachment 0009 - Certificate of Destruction.doc DOC document
Attachment 0007 - DD2345MilitarilyCriticalTechnicalDataAgreement.pdf PDF
Attachment 0013 - RFV R20K8002 - Addtion of Mold Inibitors to Wood Pallets.pdf PDF
Exhibit A - CDRLs A001-A038 Index-XM1128 Artillery Metal Parts Assembly.docx DOCX document
Attachment 0014 - ECP R21K2015 - Clarification for Pallet Nails.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Low Level Process Map Basics Recommended Format Generic Example

Basics Low Level Process Map An evolution of a production flowchart, identifying Inputs – What’s needed at this step Outputs – What’s the product/result of this step Key Activities – What actions yield the step’s output Processing of inputs and previous steps’ outputs Safety Critical Characteristic (SCC) Notation All SCC-related information employs red color font or shapes Non-SCC information employs black color font

Recommended Format:

Critical Characteristics Process Map Contractor format is acceptable, provided the alternate format is explained (as in the following slides)

Critical Characteristics Process Map Format Level “n” Process Map Start Description Description Description 1.2 1.3 1.4 End Description Input Input Output Output Output Output Key Activities Key Activities 1.1 Key:

Input: -----

Output: -----

Process: -----

Critical Defect ----- “1.1” means this is a 2nd Level Map of Level 1’s Step 1 Red box means there is an SCC created or detected at a lower level Map Red Letters in Input, Output or Key Activities mean the SCC is created or detected at this very point in the Map Black lines denote Process Flow Key Activities Key Activities Key Activities Key Activities Key Activities [SCC] Key Activities Gov’t Notifications [Agency-Report] See next slide for Steps’ nomenclature Government notifications include the Agency(ies) and reports/documents used to communicate SCC

Step Nomenclature Description Inputs Outputs 1.2.1

NumberingLevelStep
111
1.222
1.2.131

Means Previous Next

Key Activities Safety Critical Activity [identify SCC] Identify SCC-related activity (creation or detection) in red font Spell out SCC within [brackets] Place blue/green boxes as to best fit within map

Example Representation of a Production Line for illustration and reference purposes

Safety Critical Characteristics (SCCs) Identified in this Map

CodeDescription
AMaterial Structure Unsound
BInterface Thread Incorrect
CLeak Rate Over Max
DPresence of Interface Holes
EIncorrect Assembly

Identify what SCCs are portrayed within the map Defects herein are used solely for illustration

State “No SCCs in map” for submittals without SCCs

Topmost Level Steps 1 & 4 identify the creation and detection points for the Safety Criticals (red text).

A lower level map may not be necessary Steps 2 & 3 identify Safety Criticals are either created or detected or both in a sub-processes.

A lower level map is necessary

Receive Materials & Parts Manufacture Components Assemble Components Package Assemblies Start End Suppliers’ parts Raw Material Parts Received Material Received Segregated non-conforming material Raw Material Standing Procedures Trained Personnel Receiving Inspection Inventory Operations Manufacturing Operations Accepted parts Segregated non-conforming material Suppliers’ Parts Standing Procedures Trained Personnel Specialized Equipment Manufacturing Operations Accepted assemblies Segregated non-conforming material Packaging Operation Shipping Inspection Standing Procedures Trained Personnel Specialized Pkg. Materials Assemblies Ready to Ship Segregated non-conforming material

Step 2 Detailed [1/2] Sub-Steps identify creation and detection of SCCs, as well as proactive measures to prevent them (e.g., in-process check) Sometimes the process inputs can be enable creation of SCCs Ovals are off-page connectors Disposition off-page connector refers to SCC non-conformance process handling Metal Treatment Material Inspection 2.4 Accepted parts Rough shape parts Inspection Process Test Standards Standing Procedures Qualified Personnel Heat Controls for [Material Structure Unsound] Forge Controls for [Material Structure Unsound] In-Process Mechanical Properties Test Non-Destructive Inspection for [Material Structure Unsound] Structurally checked parts 2.1 2.2 AcceptSCC?

Disposition No Manufacture Components Standing Procedures Equipment Set-ups Special Machining Operation for [Interface Threads Incorrect] In-Process Check for [Leak Rate Over Max] Machining Operations 2.3 AcceptSCC?

Disposition No Final shape parts Yes

Step 2 Detailed [2/2] Note not every input or activity is SCC-defect related Step numbering reflects lower level All 2.x are part of Topmost Level step 2

Assemble Parts Final Inspection 2.3 Accepted Suppliers’ parts Standing Process Complete parts Calibration Standing Procedures Qualified Personnel Gages Heat Controls Finish Controls Mechanical Properties Test Automated Gage for [Leak Rate Over Max] Automated Visual for [Presence of Interface Holes] Manual Inspections Visual Inspections Inspected parts 2.4 2.5 AcceptSCC?

Disposition No

Step 3 Detailed Note inspection can happen at latter stages of production

Final Metal Treatment Final Inspection 2.3 No additional input Complete parts Calibration Standing Procedures Qualified Personnel Gages Heat Controls Finish Controls In-Process Mechanical Properties Test Automated Gage for [Interface Thread Incorrect] Automated Visual for [Incorrect Assembly] Manual Inspections Visual Inspections Inspected parts 2.4 2.5 AcceptSCC?

Disposition No Yes Included for illustration Not required

SCC Disposition Include sub-map addressing how SCC dispositions are handled Based upon Critical Characteristic Control Plans (CCCP) and/or Critical Plans of Action (CPOA) Only applies to SCCs

Assess Causes Notify Government Continue Production Contract Requirements Quantity Defect(s) in question Operations involved Malfunction facts Corrective Actions Shutdown (if required) Root Cause Analysis or 6 Sigma Methods or other failure resolution tools Present facts Present Actions Request Go-Forward approval Gov’t addresses Go-Forward 4.1 4.2 Approval by Gov’t?

No Yes Disposition Contract Requirements Re-Start Authorized Production resumed Complete Corrective Actions (as applicable) Re-Start production 4.3