VAMC-WRJ Building 31 Nursing Unit Renovation Project Manual Vol-2 09302022 Final.pdf
PDF 8 MB Posted
- Attached to
- Z2DA--405-13-104 | Inpatient Ward Renovation
- Solicitation number
- 36C24122R0135
About this file
This solicitation is for an inpatient ward renovation project at the Veterans Affairs Medical Center in White River Junction, Vermont. The project involves renovations to the first floor of Building 31, excluding the MICU area. Scope of work includes design and installation of a wet-pipe sprinkler system, plumbing systems, HVAC systems, electrical systems, and low voltage systems. The solicitation number is 36C24122R0135. Offerors must be licensed contractors and follow all applicable codes and standards. The award date is not specified but the response deadline is September 30, 2022. Pricing terms and set asides are not included. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Veterans Administration Medical Center White River Junction, Vermont
Inpatient Ward Renovation VAMC Project 405-13-104
Project Manual Volume 2
Divisions 21 through 28
Issued for Bidding, Permitting & Construction
September 30, 2022
ARCHITECT:
E4H Environments for Health Architecture 185 Talcott Road, Suite 100 Williston, VT 05495 telephone 802.878.8841 facsimile 802.878.9350
E4H Project No. 201637
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
PROJECT DIRECTORY
000102 - 1 of 2
SECTION 000102
Owner
Department of Veterans Affairs
VAMC White River Junction Attn: Stephen Slaby, Contracting Officer
Architect
E4H Environments for Health Architecture 185 Talcott Road Williston, VT 05495 888.781.8441 Attn: Bob Mallette
Consultants
Structural Engineering Engineering Ventures 208 Flynn Avenue, Suite 2A Burlington, VT 05401 802-863-6225 Attn: Russell Miller Johnson
Mechanical, Plumbing & Electrical Engineering L.N. Consulting 208 Flynn Ave., Suite 2J Burlington, VT 05401
802-655-1753 Attn: M. Scott Alexander
Cost Estimating VIS Construction Consultants 595 Dorset Street, Suite #5 South Burlington, VT 05403 802-658-6100 Attn: Mark Blanchard
Hazardous Materials Atlas 51 Knight Lane Williston, VT 05495 Direct Line: 802-871-8353 Cell: 802-595-2524 Attn: Kari Paritz, Staff Scientist
Commissioning Services Cx Associates 110 Main Street Burlington, VT 05401 802-861-2715 Attn: Krystin Katterman
000102 - 2 of 2
Life Safety Consultant Jensen-Hughes 1661 Worcester Road Suite 501 Framingham, MA
END OF SECTION
TABLE OF CONTENTS
000110 - page 1 of 4
DEPARTMENT OF VETERANS AFFAIRS
SECTION 000110
DIVISION 00 - SPECIAL SECTIONS DATE
Section Number
000000 Cover Page - Volume 1
000000 Cover Page - Volume 2
000102 Project Directory
000107 Seals Page
000110 Table of Contents
VOLUME 1
DIVISION 01 - GENERAL REQUIREMENTS
010000 General Requirements, (Provided by WRJ-VA)
013216.15 Project Schedules
013323 Shop Drawings, Product Data, and Samples
013323.A VA Submittal Register, Appendix A to Section 013323
013526 Governmental Safety Requirements
013533 Infection Control Procedures
014219 Reference Standards
014339 Mock-Ups
014500 Quality Control
014502 Quality Control System (QCS)
014529 Testing Laboratory Services
015719 Temporary Environmental Controls
015816 Temporary Interior Signage
016235 Recycled-Recovered Materials
017329 Cutting and Patching
017419 Construction and Demolition Waste Management
019113 Commissioning Requirements
019999 Project Closeout
DIVISION 02 – EXISTING CONDITIONS
024100 Demolition
028211 Asbestos Abatement
DIVISION 03 – CONCRETE
030136 Resurfacing of Cast-In-Place Concrete
030513 Concrete Sealers
DIVISION 04 – MASONRY
042000 Unit Masonry
DIVISION 05 – METALS
054000 Cold-Formed Metal Framing
055000 Metal Fabrications
000110 - page 2 of 4
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
061000 Rough Carpentry
061600 Sheathing
062000 Finish Carpentry
064000 Architectural Woodwork
066116 Solid Surfacing Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
072100 Thermal Insulation
072116 Blanket Insulation
072133 Open Cell Sprayed Foam Insulation
072600 Vapor Retarders
072700 Air Vapor Barriers
078100 Applied Fireproofing
078400 Firestopping
079200 Joint Sealants
DIVISION 08 - OPENINGS
081113 Hollow Metal Doors and Frames
081400 Interior Wood Doors
083100 Access Panels
083473 Interior Sliding Wood Sound Control Doors Assemblies
085113 Aluminum Windows
087100 Door Hardware
087100.A Access Control, Appendix A to Section 087100
088000 Glazing
DIVISION 09 – FINISHES
090506 Common Work Results for Flooring
092216 Non-Structural Metal Framing
092900 Gypsum Board
093000 Tiling
095100 Acoustical Ceilings
096513 Resilient Base and Accessories
096516 Resilient Sheet Flooring
096519 Resilient Tile Flooring
096723 Resinous Flooring
096813 Tile Carpeting
097213 High Impact Wall Coverings
098100 Acoustic Insulation
098400 Acoustic Room Components
099100 Painting
099123 Interior Painting Schedule
DIVISION 10 – SPECIALTIES
101123 Tackboards
101400 Interior Signage
101400.A Inpatient Ward Signage Message List, Appendix A to Section 101400
101400.B Room Identification Signage, Appendix B to Section 101400
101400.C Directional & Life Safety Signage, Appendix C to Section 101400
102133 Cubical Curtains and Track
000110 - page 3 of 4
102600 Wall and Door Protection
102813 Toilet Accessories
104413 Fire Extinguisher Cabinets
DIVISION 11 – EQUIPMENT
113100 Residential Appliances
117313 Patient Lifts
117313.A Structural Certification, Appendix A to Section 117313
117313.B Lift System Drawings, Appendix B to Section 117313
DIVISION 12 – FURNISHINGS
122400 Window Shades
DIVISION 13 - SPECIAL CONSTRUCTION
130541 Seismic Restraint Requirements for Non-Structural Components
END OF VOLUME 1
VOLUME 2
DIVISION 21 - FIRE SUPPRESSION
210800 Commissioning of Fire Suppression Systems
211313 Wet-Pipe Sprinkler Systems
DIVISION 22 - PLUMBING
220511 Common Work Results for Plumbing
220523 General-Duty Valves for Plumbing Piping
220711 Plumbing Insulation
220800 Commissioning of Plumbing Systems
221100 Facility Water Distribution
221300 Facility Sanitary and Vent Piping
221400 Facility Storm Drainage
224000 Plumbing Fixtures
226200 Vacuum Systems for Laboratory and Healthcare Facilities
226300 Gas Systems for Laboratory and Healthcare Facilities
DIVISION 23 — HEATING, VENTILATING AND AIR CONDITIONING
230130 HVAC Air-Distribution System Cleaning
230511 Common Work Results for HVAC
230512 General Motor Requirements for HVAC and Steam Generation Equipment
230541 Noise and Vibration Control for HVAC Piping and Equipment
230593 Testing, Adjusting, and Balancing for HVAC
230711 HVAC and Boiler Plant Insulation
230800 Commissioning of HVAC Systems
230900 Building Automation System
232113 Hydronic Piping
232500 HVAC Water Treatment
233100 HVAC Ducts and Casings
233400 HVAC Fans
000110 - page 4 of 4
233600 Air Terminal Units
233700 Air Outlets and Inlets
238216 Air Coils
DIVISION 26 – ELECTRICAL
260501 Minor Electrical Demolition
260511 Requirements for Electrical Installations
260519 Low-Voltage Electrical Power Conductors and Cables
260526 Grounding and Bonding for Electrical Systems
260533 Raceway and Boxes for Electrical Systems
260800 Commissioning of Electrical Systems
260923 Network Lighting Controls
262200 Low-Voltage Transformers
262416 Panelboards
262726 Wiring Devices
262911 Motor Controllers
262921 Enclosed Switches and Circuit Breakers
264313 Surge Protective Devices
265100 Interior Lighting
DIVISION 27 – COMMUNICATIONS
270511 Requirements for Communications Installations
270526 Grounding and Bonding for Communications Systems
270533 Raceways and Boxes for Communications Systems
270800 Commissioning of Communications Systems
271000 Control, Communications and Signal Wiring
271100 Telecommunications Room Fittings
271500 Communications Structured Cabling
275116 Public Address and Mass Notification Systems
275223 Nurse Call and Code Blue Systems
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
280500 Common Work Results for Electronic Safety and Security
280513 Conductors and Cables for Electronic Safety and Security
280526 Grounding and Bonding for Electronic Safety and Security
280528 Conduits and Backboxes for Electronic Safety and Security
280800 Commissioning of Electronic Safety and Security Systems
281300 Physical Access Control System
283100 Fire Detection and Alarm
END OF VOLUME 2
END OF SECTION
VA-WRJ 405-13-104 E4H Environments for Health Architecture
White River Junction, Vermont September 30, 2022
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 08 00-1
SECTION 21 08 00
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 21.
B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 13 GENERAL COMMISSIONING
REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 13 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning
Agent (CxA) appointed by the VA will manage the commissioning process.
1.2 RELATED WORK
A. Section 01 00 00 GENERAL REQUIREMENTS.
B. Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS.
C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.3 SUMMARY
A. This Section includes requirements for commissioning the Fire Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91
13 General Commissioning Requirements.
B. Refer to Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning
Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS for definitions.
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 13 and of
Division 21, is required in cooperation with the VA and the Commissioning Agent.
B. The Fire Suppression systems commissioning will include the systems listed in Section 01 91 13
General Commissioning Requirements:
1.6 SUBMITTALS
A. The commissioning process requires review of selected Submittals. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33
23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 08 00-2
B. The commissioning process requires Submittal review simultaneously with engineering review.
Specific submittal requirements related to the commissioning process are specified in Section 01
91 13 GENERAL COMMISSIONING REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of the building fire suppression systems will require inspection of individual elements of the fire suppression construction throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91 13 and the
Commissioning plan to schedule inspections as required to support the Commissioning Process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance
Testing. The Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The
Commissioning Agent may spot check a sample of completed checklists. If the Commissioning
Agent determines that the information provided on the checklist is not accurate, the
Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 13
GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional
Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected Contractor tests at the sole discretion of the Commissioning Agent. Contractor tests shall be completed prior to scheduling
Systems Functional Performance Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 08 00-3 changes in operating conditions, and system performance under emergency conditions. The
Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the COR. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed.
See Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS, for additional details.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the COR and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 13. The instruction shall be scheduled in coordination with the COR after submission and approval of formal training plans.
Refer to Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS and Division 21
Sections for additional Contractor training requirements.
----- END -----
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-1
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Design, installation and testing shall be in accordance with NFPA 13.
B. The design and installation of a hydraulically calculated automatic wet-pipe system complete and ready for operation, for the first floor of Building 31, with the exception of the MICU area, located north of column line 2.
C. Modification of the existing sprinkler system as indicated on the drawings and as further required by these specifications.
1. Provide two new sprinkler zones to serve the first floor project areas, originating from the existing zone control assemblies, as noted on the drawings.
2. Reduce the existing sprinkler zone so that it only serves the first floor ICU area, as noted on the drawings.
3. Sprinkler zone boundaries shall coordinate with the smoke compartment boundaries shown on the life safety drawing.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 33 10 00, WATER UTILITIES.
C. Section 07 84 00, FIRESTOPPING.
D. Section 09 91 00, PAINTING.
E. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS
E. Section 22 05 23, GENERAL-DUTY VALVES FOR PLUMBING PIPING.
F. Section 28 31 00, FIRE DETECTION AND ALARM.
1.3 DESIGN CRITERIA
A. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of NFPA 13.
1. Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section.
2. Sprinkler Protection: Sprinkler hazard classifications shall be in accordance with NFPA 13.
The hazard classification examples of uses and conditions identified in the Annex of NFPA 13 shall be mandatory for areas not listed below. Request clarification from the Government for
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-2 any hazard classification not identified. To determining spacing and sizing, apply the following coverage classifications:
a. Light Hazard Occupancies: Patient care, treatment, and customary access areas.
b. Ordinary Hazard Group 1 Occupancies: Laboratories, Mechanical Equipment Rooms, Transformer Rooms, Electrical Switchgear Rooms, Electric Closets, and Repair Shops.
c. Ordinary Hazard Group 2 Occupancies: Storage rooms, trash rooms, clean and soiled linen rooms, pharmacy and associated storage, laundry, kitchens, kitchen storage areas, retail stores, retail store storage rooms, storage areas, building management storage, boiler plants, energy centers, warehouse spaces, file storage areas for the entire area of the space up to 140 square meters (1500 square feet) and Supply Processing and
Distribution (SPD).
3. Hydraulic Calculations: Calculated demand including hose stream requirements shall fall no less than 10 percent below the available water supply curve.
4. Water Supply: Base water supply on a flow test. Attached to this specification Section is the
8 page fire pump performance test report dated August 10, 2016. Wet Pipe Sprinkler System
Contractor shall contact the VA immediately prior to preparing their system design to obtain and utilize data from the most current test. This test report is included only for use of the successful contractor to complete their flow calculations and pipe sizing criteria. There is no project scope relative to the fire pump.
5. Zoning:
a. For each sprinkler zone provide a control valve, flow switch, and a test and drain assembly with pressure gauge. For buildings greater than two stories, provide a check valve at each control valve.
b. Sprinkler zones shall conform to the smoke barrier zones shown on the drawings.
6. Provide seismic protection in accordance with NFPA 13. The short period response parameter, Ss, of 0.239 for the White River Junction site, is found in the VA Handbook H-18-
8 Seismic Design Requirements. The Seismic Coefficient, Cp, of 0.35, is taken from Table
9.3.5.9.3 in NFPA 13. Contractor shall be responsible for confirming and using the correct
Seismic Coefficient. Contractor shall submit load calculations for sizing of sway bracing for systems that are required to be protected against damage from earthquakes.
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-3 the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in Paragraphs 1.4(A)1 through
1.4(A)5 electronically in pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors fire sprinkler and state contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler
Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a Registered Professional Engineer licensed in the field of Fire Protection
Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA 13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets.
Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Calculation Sheets:
a. Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and Calculations chapter of NFPA 13.
b. Submit calculations of loads for sizing of sway bracing in accordance with NFPA 13.
5. Valve Charts: Provide a valve chart that identifies the location of each control valve.
Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and
Location.
6. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in Section 01 33 23, SHOP DRAWINGS, PRODUCT
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-4
DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) printed copy.
2) One complete set in electronic pdf format.
3) One complete set in AutoCAD format or a format as directed by the COR.
b. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA 13. Certificates shall be provided to document all parts of the installation.
c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment.
d. One paper copy of the Material and Testing Certificates and the Operations and
Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the COR.
e. Provide one additional copy of the Operations and Maintenance Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid State of Vermont fire sprinkler contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-5
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-2016 ......................................Installation of Sprinkler Systems
25-2014 ......................................Inspection, Testing, and Maintenance of Water-Based Fire
Protection Systems
101-2015 ....................................Life Safety Code
170-2015 ....................................Fire Safety Symbols
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory (2011)
D. Factory Mutual Engineering Corporation (FM):
Approval Guide
PART 2 - PRODUCTS
2.1 PIPING & FITTINGS
A. Piping and fittings for private underground water mains shall be in accordance with NFPA 13.
1. Pipe and fittings from inside face of building 300 mm (12 in.) above finished floor to a distance of approximately 1500 mm (5 ft.) outside building: Ductile Iron, flanged fittings and
316 stainless steel bolting.
B. Piping and fittings for sprinkler systems shall be in accordance with NFPA 13.
1. Plain-end pipe fittings with locking lugs or shear bolts are not permitted.
2. Piping sizes 50 mm (2 inches) and smaller shall be black steel Schedule 40 with threaded end connections.
3. Piping sizes 65 mm (2 ½ inches) and larger shall be black steel Schedule 40 with grooved connections.
4. Use nonferrous piping in MRI Scanning Rooms.
5. Plastic piping shall not be permitted except for drain piping.
6. Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside diameter or 1-inch and a maximum length of 6-feet.
2.2 VALVES
A. General:
1. Valves shall be in accordance with NFPA 13.
2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.
B. Control Valve: The control valves shall be a listed indicating type. Control valves shall be UL
Listed or FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI.
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-6
C. Check Valve: Shall be of the swing type with a flanged cast iron or ductile iron body and flanged inspection plate. Grooved ends for 2-1/2” size and larger.
D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.
2.4 SPRINKLERS
A. All sprinklers shall be FM approved quick response except “institutional” type sprinklers shall be permitted to be UL Listed quick response. “Institutional” type sprinklers in Mental Health and
Behavior Units shall be UL listed or FM approved quick response type. Maximum break away strength shall be certified by the manufacturer to be no more than 39 kPa (85 pounds). Provide
FM approved quick response sprinklers in all areas, except that standard response sprinklers shall be provided in freezers, refrigerators, elevator hoistways, elevator machine rooms, and generator rooms. Recessed pendent heads and escutcheons are to be chrome plated. Furnish the larger diameter escutcheon where such option is available. Heads listed by UL or approved by FM is acceptable, as noted above.
B. Temperature Ratings: In accordance with NFPA 13 except that sprinklers in elevator shafts and elevator machine rooms shall be no less than intermediate temperature rated and sprinklers in generator rooms shall be no less than high temperature rated.
C. Provide sprinkler guards in accordance with NFPA 13 and when the elevation of the sprinkler head is less than 7 feet 6 inches above finished floor. The sprinkler guard shall be UL listed or FM approved for use with the corresponding sprinkler.
2.5 SPRINKLER CABINET
A. Provide sprinkler cabinet with the required number of sprinkler heads of all ratings and types installed, and a sprinkler wrench for each type of sprinkler in accordance with NFPA 13. Locate adjacent to the riser.
B. Provide a list of sprinklers installed in the property in the cabinet. The list shall include the following:
1. Manufacturer, model, orifice, deflector type, thermal sensitivity, and pressure for each type of sprinkler in the cabinet.
2. General description of where each sprinkler is used.
3. Quantity of each type present in the cabinet.
4. Issue or revision date of list.
2.6 SPRINKLER SYSTEM SIGNAGE
Rigid plastic, steel or aluminum signs with white lettering on a red background with holes for easy attachment. Sprinkler system signage shall be attached to the valve or piping with chain.
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-7
2.7 SWITCHES:
A. OS&Y Valve Supervisory Switches shall be in a weatherproof die cast/red baked enamel, oil resistant, aluminum housing with tamper resistant screws, 13 mm (1/2 inch) conduit entrance and necessary facilities for attachment to the valves. Provide two SPDT switches rated at 2.5 amps at
24 VDC.
B. Water flow Alarm Switches: Mechanical, non-coded, non-accumulative retard and adjustable from
0 to 60 seconds minimum. Set flow switches at an initial setting between 20 and 30 seconds.
C. Valve Supervisory Switches for Ball and Butterfly Valves: May be integral with the valve.
2.8 GAUGES
Provide gauges as required by NFPA 13. Provide gauges where the normal pressure of the system is at the midrange of the gauge.
2.9 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING
Pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 13.
2.10 WALL, FLOOR AND CEILING PLATES
Provide chrome plated steel escutcheon plates.
2.11 ANTIFREEZE SOLUTION
Antifreeze solution shall be in accordance with NFPA 13 and shall be compatible with use in a potable water supply.
2.12 VALVE TAGS
Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less than 8 mm (1/4 inch) for service designation on 19 gage, 40 mm (1-1/2 inches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.
B. Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Concealed piping in spaces that have finished ceilings. Where ceiling mounted equipment exists, such as in operating and radiology rooms, install sprinklers so as not to obstruct the movement or operation of the equipment. Sidewall heads may need to be utilized. In stairways, locate piping as near to the ceiling as possible to prevent tampering by unauthorized personnel and to provide a minimum headroom clearance of 2250 mm (seven feet six inches). Piping shall not obstruct the minimum means of egress clearances required by NFPA
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-8
101. Pipe hangers, supports, and restraint of system piping, and seismic bracing shall be installed accordance with NFPA 13.
C. Welding: Conform to the requirements and recommendations of NFPA 13.
D. Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from each drain under maximum pressure. Do not provide a direct drain connection to sewer system or discharge into sinks. Install drips and drains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector.
E. Supervisory Switches: Provide supervisory switches for sprinkler control valves.
F. Waterflow Alarm Switches: Install waterflow alarm switches and valves in stairwells or other easily accessible locations.
G. Inspector's Test Connection: Install and supply in accordance with NFPA 13, locate in a secured area, and discharge to the exterior of the building.
H. Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections to the respective waterflow switch or pipe connection near to the pipe from where they were cut.
I. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings.
J. Clearances: For systems requiring seismic protection, piping that passes through floors or walls shall have penetrations sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm (1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches) nominally larger for penetrating pipe sizes 100 mm (4 inches) and larger.
K. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with Section 07 84 00, FIRESTOPPING.
L. Where dry pendent sprinklers are used for freezers or similar spaces and they are connected to the wet pipe system, provide an EPDM boot around the dry pendent sprinkler on the heated side and securely seal to the pipe and freezer to prevent condensation from entering the freezer.
M. Provide pressure gauges at each water flow alarm switch location and at each main drain connection.
N. For each fire department connection, provide the symbolic sign given in NFPA 170 and locate
2400 to 3000 mm (8 to 10 feet) above each connection location. Size the sign to 450 by 450 mm
(18 by 18 inches) with the symbol being at least 350 by 350 mm (14 by 14 inches).
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-9
O. Firestopping shall be provided for all penetrations of fire resistance rated construction.
Firestopping shall comply with Section 07 84 00, FIRESTOPPING.
P. MRI Suite: Provide no more than one penetration of the MRI shield enclosure.
Q. Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting sprinklers.
Painting of sprinkler systems above suspended ceilings and in crawl spaces is not required.
Painting shall comply with Section 09 91 00, PAINTING. Any painted sprinkler shall be replaced with a new sprinkler.
R. Sprinkler System Signage: Provide rigid sprinkler system signage in accordance with NFPA 13 and NFPA 25. Sprinkler system signage shall include, but not limited to, the following:
1. Identification Signs:
a. Provide signage for each control valve, drain valve, sprinkler cabinet, and inspector’s test.
b. Provide valve tags for each operable valve. Coordinate nomenclature and identification of operable valves with COR. Where existing nomenclature does not exist, the Tag
Identification shall include no less than the following: (FP-B-F/SZ-#) Fire Protection, Building Number, Floor Number/Smoke Zone (if applicable), and Valve Number. (E.g., FP-500-1E-001) Fire Protection, Building 500, First Floor East, Number 001.)
2. Instruction/Information Signs:
a. Provide signage for each control valve to indicate valve function and to indicate what system is being controlled.
b. Provide signage indicating the number and location of low point drains.
3. Hydraulic Placards:
a. Provide signage indicating hydraulic design information. The placard shall include location of the design area, discharge densities, required flow and residual pressure at the base of riser, occupancy classification, hose stream allowance, flow test information, and installing contractor. Locate hydraulic placard information signs at each alarm check valve.
S. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government.
T. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the Contracting Officer. Contractor shall develop an interim fire protection program where interruptions involve occupied spaces. Request in writing at least one week prior to the planned interruption.
U. Coordinate commissioning with Section 21 08 00.
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
WET-PIPE SPRINKLER SYSTEMS
21 13 13-10
V. Reference paragraphs 1.6.A and 1.6.B of Section 01 35 33, INFECTION CONTROL
PROCEDURES, for tight fitting construction required around the Airborne Infection Isolation (AII) and Ante Rooms. The requirements shall be met for the AII and Ante rooms when construction is completed.
3.2 INSPECTION AND TEST
A. Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order to remove any debris which may have been left as well as ensuring piping is unobstructed.
Hydrostatically test system, including the fire department connections, as specified in NFPA 13, in the presence of the Contracting Officers Representative (COR) or his designated representative.
Test and flush underground water line prior to performing these hydrostatic tests.
B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test. Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests. Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test
3.3 INSTRUCTIONS
Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the COR.
- - - E N D - - -
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
COMMON WORK RESULTS FOR PLUMBING
22 05 11-1
SECTION 22 05 11
COMMON WORK RESULTS FOR PLUMBING
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section shall apply to all sections of Division 22.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
C. Abbreviations/Acronyms:
1. ABS: Acrylonitrile Butadiene Styrene
2. AC: Alternating Current
3. ACR: Air Conditioning and Refrigeration
4. AI: Analog Input
5. AISI: American Iron and Steel Institute
6. AO: Analog Output
7. AWG: American Wire Gauge
8. BACnet: Building Automation and Control Network
9. BAg: Silver-Copper-Zinc Brazing Alloy
10. BAS: Building Automation System
11. BCuP: Silver-Copper-Phosphorus Brazing Alloy
12. BSG: Borosilicate Glass Pipe
13. CDA: Copper Development Association
14. C: Celsius
15. CLR: Color
16. CO: Carbon Monoxide
17. COR: Contracting Officer’s Representative
18. CPVC: Chlorinated Polyvinyl Chloride
19. CR: Chloroprene
20. CRS: Corrosion Resistant Steel
21. CWP: Cold Working Pressure
22. CxA: Commissioning Agent
23. db(A): Decibels (A weighted)
24. DDC: Direct Digital Control
25. DI: Digital Input
26. DISS: Diameter Index Safety System
27. DO: Digital Output
28. DVD: Digital Video Disc
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
COMMON WORK RESULTS FOR PLUMBING
22 05 11-2
29. DN: Diameter Nominal
30. DWV: Drainage, Waste and Vent
31. ECC: Engineering Control Center
32. EPDM: Ethylene Propylene Diene Monomer
33. EPT: Ethylene Propylene Terpolymer
34. ETO: Ethylene Oxide
35. F: Fahrenheit
36. FAR: Federal Acquisition Regulations
37. FD: Floor Drain
38. FED: Federal
39. FG: Fiberglass
40. FNPT: Female National Pipe Thread
41. FPM: Fluoroelastomer Polymer
42. GPM: Gallons Per Minute
43. HDPE: High Density Polyethylene
44. Hg: Mercury
45. HOA: Hands-Off-Automatic
46. HP: Horsepower
47. HVE: High Volume Evacuation
48. ID: Inside Diameter
49. IPS: Iron Pipe Size
50. Kg: Kilogram
51. kPa: Kilopascal
52. lb: Pound
53. L/s: Liters Per Second
54. L/min: Liters Per Minute
55. MAWP: Maximum Allowable Working Pressure
56. MAX: Maximum
57. MED: Medical
58. m: Meter
59. MFG: Manufacturer
60. mg: Milligram
61. mg/L: Milligrams per Liter
62. ml: Milliliter
63. mm: Millimeter
64. MIN: Minimum
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
COMMON WORK RESULTS FOR PLUMBING
22 05 11-3
65. NF: Oil Free Dry (Nitrogen)
66. NPTF: National Pipe Thread Female
67. NPS: Nominal Pipe Size
68. NPT: Nominal Pipe Thread
69. OD: Outside Diameter
70. OSD: Open Sight Drain
71. OS&Y: Outside Stem and Yoke
72. OXY: Oxygen
73. PBPU: Prefabricated Bedside Patient Units
74. PH: Power of Hydrogen
75. PLC: Programmable Logic Controllers
76. PP: Polypropylene
77. PPM: Parts per Million
78. PSIG: Pounds per Square Inch
79. PTFE: Polytetrafluoroethylene
80. PVC: Polyvinyl Chloride
81. PVDF: Polyvinylidene Fluoride
82. RAD: Radians
83. RO: Reverse Osmosis
84. RPM: Revolutions Per Minute
85. RTRP: Reinforced Thermosetting Resin Pipe
86. SCFM: Standard Cubic Feet Per Minute
87. SDI: Silt Density Index
88. SPEC: Specification
89. SPS: Sterile Processing Services
90. STD: Standard
91. SUS: Saybolt Universal Second
92. SWP: Steam Working Pressure
93. TEFC: Totally Enclosed Fan-Cooled
94. TFE: Tetrafluoroethylene
95. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire
96. THWN: Thermoplastic Heat & Water Resistant Nylon Coated Wire
97. T/P: Temperature and Pressure
98. USDA: U.S. Department of Agriculture
99. V: Volt
100. VAC: Vacuum
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
COMMON WORK RESULTS FOR PLUMBING
22 05 11-4
101. VA: Veterans Administration
102. VAMC: Veterans Administration Medical Center
103. VAC: Voltage in Alternating Current
104. WAGD: Waste Anesthesia Gas Disposal
105. WOG: Water, Oil, Gas
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.
D. Section 01 91 13, GENERAL COMMISSIONING REQUIREMENTS.
E. Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
F. Section 05 50 00, METAL FABRICATIONS.
G. Section 07 84 00, FIRESTOPPING.
H. Section 07 92 00, JOINT SEALANTS.
I. Section 09 91 00, PAINTING.
J. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
K. Section 22 07 11, PLUMBING INSULATION.
L. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
M. Section 23 09 00, BUILDING AUTOMATION SYSTEM.
N. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
O. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.
P. Section 26 29 11, MOTOR CONTROLLERS.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society of Mechanical Engineers (ASME):
ASME Boiler and Pressure Vessel Code -
BPVC Section IX-2019...............Welding, Brazing, and Fusing Qualifications
B31.1-2013.................................Power Piping
C. American Society for Testing and Materials (ASTM):
A36/A36M-2019 .........................Standard Specification for Carbon Structural Steel
A575-96(R2013)e1.....................Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades
E84-2013a..................................Standard Test Method for Surface Burning Characteristics of
Building Materials
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
COMMON WORK RESULTS FOR PLUMBING
22 05 11-5
E119-2012a................................Standard Test Methods for Fire Tests of Building Construction and Materials
D. International Code Council, (ICC):
IBC-2018 ....................................International Building Code
IPC-2018 ....................................International Plumbing Code
E. Manufacturers Standardization Society (MSS) of the Valve and Fittings Industry, Inc:
SP-58-2018 ................................Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application and Installation
F. Military Specifications (MIL):
P-21035B ...................................Paint High Zinc Dust Content, Galvanizing Repair (Metric)
G. National Electrical Manufacturers Association (NEMA):
MG 1-2016 .................................Motors and Generators
H. National Fire Protection Association (NFPA):
51B-2019....................................Standard for Fire Prevention During Welding, Cutting and Other
Hot Work
54-2018 ......................................National Fuel Gas Code
70-2020 ......................................National Electrical Code (NEC)
I. NSF International (NSF):
5-2019 ........................................Water Heaters, Hot Water Supply Boilers, and Heat Recovery
Equipment
14-2019 ......................................Plastic Piping System Components and Related Materials
61-2019 ......................................Drinking Water System Components – Health Effects
372-2016 ....................................Drinking Water System Components – Lead Content
J. Department of Veterans Affairs (VA):
PG-18-102014(R18)...................Plumbing Design Manual
PG-18-13-2017 (R18).................Barrier Free Design Guide
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section
01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.
B. Information and material submitted under this section shall be marked "SUBMITTED UNDER
SECTION 22 05 11, COMMON WORK RESULTS FOR PLUMBING", with applicable paragraph identification.
C. Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements and will fit the space available.
D. If equipment is submitted which differs in arrangement from that shown, provide drawings that show the rearrangement of all associated systems. Approval will be given only if all features of
VAMC-WRJ 405-13-104 E4H Environments for Health Architecture Inpatient Ward Renovation Project No. 201637 White River Junction, Vermont September 30, 2022
White River Junction, Vermont September 30, 2022
COMMON WORK RESULTS FOR PLUMBING
22 05 11-6 the equipment and associated systems, including accessibility, are equivalent to that required by the contract.
E. Prior to submitting shop drawings for approval, contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.
F. Installing Contractor shall provide lists of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .