Bldg 31 Basement Intended Route Debris Removal.pdf

PDF 284 KB Posted

Attached to
Z2DA--405-13-104 | Inpatient Ward Renovation
Solicitation number
36C24122R0135
Issued by

About this file

This document is a floor plan diagram showing the intended route for demolition debris removal from phases 2 and 3 of the Inpatient Ward Renovation project at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The diagram depicts the debris from phase 2 being removed via elevator 3 through the basement to project dumpsters. For phase 3, debris will be removed through elevator 1 through the basement also to the project dumpsters. The related federal contract opportunity is solicitation number 36C24122R0135 for the Z2DA--405-13-104 Inpatient Ward Renovation project.

View the file

Other files

File Type Posted
36C24122R0135 0016.docx DOCX document
36C24122R0135 0015.docx DOCX document
Fingerprint Request Form.pdf PDF
Sign-in Sheet 07-06-2023.pdf PDF
36C24122R0135 0014.docx DOCX document
36C24122R0135 0013.pdf PDF
Sign-in Sheet 06-01-2023.pdf PDF
Owners Equipment Schedule updated 6-20-2023.xlsx XLSX spreadsheet
36C24122R0135 0012.docx DOCX document
36C24122R0135 0011.docx DOCX document
S02 36C24122R0135 0010.pdf PDF
36C24122R0135 0009.pdf PDF
Wage Determination VT20230023 02-24-2023.pdf PDF
WRJ Campus Map Inpatient Ward Site Visit Meeting Location 03.21.2023.pdf PDF
36C24122R0135 0008.pdf PDF
36C24122R0135 0007.docx DOCX document
36C24122R0135 0006.docx DOCX document
VHA COVID-19 Operational Plan 1-27-2023.pdf PDF
Building 31 Abatement Diagrams REV-1 02072023.pdf PDF
36C24122R0135 0005.docx DOCX document
Bldg 31 Exterior Elevations _ Building Sections.pdf PDF
Pre-bid site visit sign-in 01-24-2023.pdf PDF
Revised Spec 117313 Patient Lifts 20230201.pdf PDF
36C24122R0135 0004.docx DOCX document
Original Building Ground _ 1st Floor Plan_Wall Types.pdf PDF
Pre-bid site visit sign-in 01-19-2023.pdf PDF
36C24122R0135 0003.pdf PDF
WRJ Campus Map Inpatient Ward Site Visit Meeting Location 1.24.2023.pdf PDF
Renovate Inpatient Ward Site Visit 1.12.2023.pdf PDF
36C24122R0135 0002.pdf PDF
WRJ Campus Map Inpatient Ward Site Visit Meeting Location 1.19.2023.pdf PDF
WRJ Campus Map Inpatient Ward Site Visit Meeting Location.pdf PDF
36C24122R0135 0001.docx DOCX document
36C24122R0135 Solicitation Final (1).pdf PDF
S02 Inpatient Drawings 09302022 Final Architectural Int Design.pdf PDF
S02 Inpatient Drawings 09302022 Final Plumb FirePro Mech Elec.pdf PDF
S02 EXHIBIT B Subcontractor Information and Consent Form.pdf PDF
S02 EXHIBIT A Project Information Sheet for Contractors.pdf PDF
VAMC-WRJ Building 31 Nursing Unit Renovation Project Manual Vol-1 09302022 Final.pdf PDF
VAMC-WRJ Building 31 Nursing Unit Renovation Project Manual Vol-2 09302022 Final.pdf PDF
VAAR 852.219-75 VA Notice of Limitations on Subcontracting_Certificate of Compliance for Services and Construction 02.docx DOCX document
S02 VHA Supplemental Contract Requirements for Combatting COVID-19.pdf PDF
S02 Inpatient Drawings 09302022 Final Gen LifeSafety Structural.pdf PDF
S02 EXHIBIT C Past Performance Questionnaire.pdf PDF
WD VT20220023 Building.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAWRJMckenR Polygonal Line

VHAWRJMckenR Callout INTENDED ROUTE OF DEMOLITION DEBRIS FROM PHASE 2 (VIA ELEVATOR 3 THROUGH BASEMENT)

VHAWRJMckenR Line

VHAWRJMckenR Typewritten Text

TO PROJECT DUMPSTERS

VHAWRJMckenR Polygonal Line

VHAWRJMckenR Callout INTENDED ROUTE OF DEMOLITION DEBRIS FROM PHASE 3 (VIA ELEVATOR 1 THROUGH BASEMENT)

File details come from the government source that posted it. Updated .