About this file

VA69D-18-B-1687 00003 S06 - Amendment 00003 - 676-322_Return of Submittal-28R4.pdf

View the file

Other files

File Type Posted
36C25218C0112-000.docx DOCX document
VA69D-18-B-1687-00006000.docx DOCX document
VA69D-18-B-1687-00005000.docx DOCX document
VA69D-18-B-1687-00005002.pdf PDF
VA69D-18-B-1687-00005004.pdf PDF
VA69D-18-B-1687-00005005.pdf PDF
VA69D-18-B-1687-00005003.pdf PDF
VA69D-18-B-1687-00005001.pdf PDF
VA69D-18-B-1687-00004003.pdf PDF
VA69D-18-B-1687-00004001.pdf PDF
VA69D-18-B-1687-00004002.pdf PDF
VA69D-18-B-1687-00004000.docx DOCX document
VA69D-18-B-1687-00003004.pdf PDF
VA69D-18-B-1687-00003001.pdf PDF
VA69D-18-B-1687-00003005.pdf PDF
VA69D-18-B-1687-00003000.docx DOCX document
VA69D-18-B-1687-00003002.pdf PDF
VA69D-18-B-1687-00003006.pdf PDF
VA69D-18-B-1687-00002001.pdf PDF
VA69D-18-B-1687-00002000.docx DOCX document
VA69D-18-B-1687-00001001.pdf PDF
VA69D-18-B-1687-00001000.docx DOCX document
VA69D-18-B-1687-006.pdf PDF
VA69D-18-B-1687-005.pdf PDF
VA69D-18-B-1687-008.pdf PDF
VA69D-18-B-1687-002.pdf PDF
VA69D-18-B-1687-009.pdf PDF
VA69D-18-B-1687-001.docx DOCX document
VA69D-18-B-1687-004.pdf PDF
VA69D-18-B-1687-011.pdf PDF
VA69D-18-B-1687-007.pdf PDF
VA69D-18-B-1687-010.pdf PDF
VA69D-18-B-1687-003.pdf PDF
VA69D-18-B-1687-000.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT of VETERANS AFFAIRS RETURN OF SUBMITTAL

11/9/15

SPEC. SECTION

03 30 00

CONTRACTOR’S NAME AND ADDRESS

SEED Joint Venture 607 Arbor Circle Lakemoor, IL 60051

STATION LOCATION

Tomah , WI.

CONTRACT NUMBER

VA69D-14-C-0190

PROJECT NUMBER.

676-322

TRANSMITTAL DATE

10/12/15

TRANSMITTAL NO.

28R4

FORM OF SUBMITTAL

LETTER OF

AFFIDAVIT OF COMPLIANCE

SHOP DRAWINGS X DATA SHEETS BROCHURE PHYSICAL SAMPLE

MANUFACTURER’S

LITERATURE

OR CATALOG CUTS

TEST REPORTS OTHER 50%

Design

DEPARTMENT OF VETERANS AFFAIRS ACTION

NUMBER OF COPIES RETURNED

Electronic AUTHORITY FOR APPROVAL/DISAPPROVAL (Check applicable box)

APPROVED APPROVED AS NOTED X REJECTED; RESUBMIT NO ACTION NO ACTION TAKEN

RESUBMIT

REASON FOR DISAPPROVAL OR REMARKS

Corrective action approved as noted along with the additional repair areas that need correcting as shown in red clouded areas on attached drawing.

Also need submittals for the bonding agent and concrete filler material prior to repairs.

SUBMITTALS ACTED UPON AND VA FILE NUMBERS ASSIGNED

(File numbers on disapproved submittals are for record purposes only.)

DESCRIPTION SUPPLIER OR MANUFACTURER VA FILE NUMBER

03 30 00 FF/FL Corrective Action Plan Seed Joint Venture 676-322-28R4

SIGNATURE AND TITLE OF AUTHORIZING OFFICIAL

James E. Plimpton

DATE

11/9/15

VA FORM 08-6225 SUPERSEDES VA FORM 08-6225, MAR 1969. (Attachment 3-N)

JAN 1991 WHICH WILL NOT BE USED

ACCOMPANYING AMENDMENT VA69D-18-B-1687 00003

SEED J.V. has conducted a cursory review of this submittal to ensure general conformance to the design and requirements of the contract documents. Final approval is the responsibility of the Architect and/or

Engineer. Subcontractor and/or Vendor must verify dimensions, quantities and field conditions to ensure complete and proper installation of this work. Approval does not relieve Contractor or

Supplier from responsibility due to installation errors, defects in workmanship or deviation from the contract documents.

Chris Wales

Submittal Cover Sheet

Project Title Construct Building for 75 Mental Health RRTP Beds

Project Number

676-322

Contract Number

VA69D-14-C-0190B

Project Location

Tomah VA Medical Center

4700 N Ravenswood Avenue, Suite B

Chicago, IL 60640

Date: 10-12-2015

Submittal No: 28R4

Description: T2- FF/FL Corrective Action

Submittal

311 Glendale Avenue – Tomah, Wisconsin 54660

Phone: 608.343.8580

Fax: 608.372.5561

Email: t2-contractingllc@hotmail.com

Website: www.t2-contracting.com

10/12/15

Construct Building 405

Tomah, VA

To whom it may concern, T2 Contracting’s method of correction for concrete floors will be using a 10” floor grinder specific for this type of work.

We will then use a ten foot straight edge as a guide to be able to feather the areas back into tolerance. Any questions or concerns please contact me.

Sincerely, Eric Stickney - President

ACCOMPANYING AMENDMENT VA69D-18-B-1687 00003

mailto:t2-contractingllc@hotmail.com http://www.t2-contracting.com/

VHATOMPlimpJ Pencil

VHATOMPlimpJ Callout Grind out hump at transition

VHATOMPlimpJ Polygon

VHATOMPlimpJ Callout Grind and fill at transition

VHATOMPlimpJ Polygon

VHATOMPlimpJ Polygon

VHATOMPlimpJ Polygon

VHATOMPlimpJ Polygon

VHATOMPlimpJ Polygon

VHATOMPlimpJ Callout Grind out hump

VHATOMPlimpJ Callout Grind out hump

VHATOMPlimpJ Callout Grind out humps

VHATOMPlimpJ Line

VHATOMPlimpJ Callout Grind out hump

VHATOMPlimpJ Polygon

VHATOMPlimpJ Callout Verify and grind out at all drain and clean out locations

VHATOMPlimpJ Polygon

VHATOMPlimpJ Line

T2- FF-FL Corrective Action Submittal.pdf
T2 Submittal Coverpage
T2 FF-FL Corrective Actions Submittal
Flooring Corrections
T2 corrective action areas