Upper Green River SOI.pdf

PDF 28 KB Posted

Attached to
UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
Solicitation number
1240LU24R0012
Issued by

About this file

This is a Schedule of Items (SOI) for the Upper Green River Corridor Road Improvement Phase One project in the Bridger-Teton National Forest, Pinedale Ranger District in Sublette County, Wyoming. The document is divided into three base sections covering different road areas: Base 1 (Union Pass Road), Base 2 (Green River Lakes Road), and Base 3 (Additional Green River Lakes Road).

The work includes mobilization, construction staking, culvert removal and installation, aggregate surface course placement, road reconditioning, roadway embankment construction, and temporary traffic control. Specific quantities include 6,700 CY of aggregate surface course and installation of various sized culverts (18-inch, 24-inch, and 30-inch) for Base 1; 2,990 CY of aggregate surface course and 3,920 CY of roadway embankment construction for Base 2; and 3,710 CY of aggregate surface course and 4,880 CY of roadway embankment construction for Base 3. The document provides blank columns for unit prices and total costs to be filled in by bidders.

View the file

Other files

File Type Posted
1240LU24R0012 Amendment 0003.pdf PDF
RFIs as of 27Jan2025.pdf PDF
RFIs as of 21Jan2025.pdf PDF
FSR4_RoadandBridgeMATOC_SiteVisit_Attendance_241028.pdf PDF
Upper Green River Drawings 1.7.2025 Amd 0002.pdf PDF
Causey Reservoir Drawings 01.10.2025_Part2.pdf PDF
Causey Reservoir Drawings 01.10.2025_Part1.pdf PDF
Causey Reservoir SOI 1.10.2025 Amd 0002.pdf PDF
Cove Mountain SOI Amd 0002.pdf PDF
Upper Green River SOI 1.7.2025 Amd 0002.pdf PDF
1240LU24R0012 Amendment 0002.pdf PDF
Charleston Jarbidge Site Pictures.pdf PDF
RFIs as of 16Jan2025.pdf PDF
RFIs as of 8Jan2025.pdf PDF
North Fritz Creek Images.pdf PDF
1240LU24R0012 Amendment 0001.pdf PDF
Cove Mountain Drawings.pdf PDF
Charleston Jarbidge TOPR.pdf PDF
Upper Green River TOPR.pdf PDF
Charleston Jarbidge Bridge FSSS.pdf PDF
Upper Green River Drawings.pdf PDF
North Fritz Culvert TOPR.pdf PDF
Cove Mountain FSSS final.pdf PDF
Past Performance Questionnaire.docx DOCX document
North Fritz Culvert Drawings.pdf PDF
North Fritz Culvert SOI.pdf PDF
Cove Mountain TOPR.pdf PDF
Upper Green River FSSS.pdf PDF
Causey TOPR.pdf PDF
Charleston Jarbidge SOI.pdf PDF
Causey Cover Sheet Signed.pdf PDF
North Fritz Culvert FSSS.pdf PDF
Cove Mountain SOI.pdf PDF
Causey Reservoir FSSS.pdf PDF
Causey Reservoir Drawings.pdf PDF
Causey Reservoir SOI.pdf PDF
1240LU24R0012 USFS Region 4 MATOC.pdf PDF
Charleston Jarbidge Bridge Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS (SOI)

Date:

Item Number Description Method of

Measurement Unit Quantity Unit Price Total

151.01 Mobilization LSQ LS 1

152.01 Construction Staking LSQ LS 1

203.01 Removal of Existing Culvert AQ EA 11

301.12

Aggregate Surface Course

(Government Furnished, Compacted In-Place, includes hauling)

CQ CY 6700

303.01 Road Reconditioning CQ MI 2.81

602.01 18 Inch Culvert (Furnish & Install) AQ LF 360

602.02 24 Inch Culvert (Furnish & Install) AQ LF 150

603.03 30 Inch Culvert (Furnish & Install) AQ LF 60

635.01 Temporary Traffic Control LSQ LS 1

Item Number Description Method of

Measurement Unit Quantity Unit Price Total

151.02 Mobilization LSQ LS 1

152.02 Construction Staking LSQ LS 1

203.02 Removal of Existing Culverts AQ EA 15

204.01

Roadway Embankment

Construction, Placement method

2 (Commercial Source, Compacted In-Place, includes hauling)

CQ CY 3920

301.13

Aggregate Surface Course

(Government Furnished, Compacted In-Place, includes hauling)

CQ CY 2990

602.04 18 Inch Culvert (Furnish & Install) AQ LF 715

602.05 24 Inch Culvert (Furnish & Install) AQ LF 60

602.06 36 Inch Culvert (Furnish & Install) AQ LF 125

635.02 Temporary Traffic Control LSQ LS 1

Item Number Description Method of

Measurement Unit Quantity Unit Price Total

151.03 Mobilization LSQ LS 1

152.03 Construction Staking LSQ LS 1

204.02

Roadway Embankment

Construction, Placement method

2 (Commercial Source, Compacted In-Place, includes hauling)

CQ CY 4880

301.14

Aggregate Surface Course

(Government Furnished, Compacted In-Place, includes hauling)

CQ CY 3710

635.03 Temporary Traffic Control LSQ LS 1

Base 1, 2, 3 Items Total

Base 2 Items (Green River Lakes Road)

Base 2 Items Sub-Total

Base 3 Items (Additional Green River Lakes Road)

Base 3 Items Sub-Total

Upper Green River Corridor Road Improvement Phase One

Bridger-Teton National Forest

Pinedale Ranger District

Sublette County, Wyoming

Base 1 Items (Union Pass Road)

Base 1 Items Sub-Total