About this file
This is a Schedule of Items (SOI) for road improvement work in the Upper Green River Corridor Phase One project located in the Bridger-Teton National Forest, Pinedale Ranger District in Sublette County, Wyoming. The SOI is divided into three base bid sections: Union Pass Road, Green River Lakes Road, and Additional Green River Lakes Road.
The work includes mobilization, construction staking, culvert removal and installation (18-inch, 24-inch, and 36-inch), aggregate surface course placement, road reconditioning, roadway embankment construction, and temporary traffic control. Specific quantities include 7,200 CY of aggregate surface course for Union Pass Road, 3,900 CY of roadway embankment and 2,600 CY of aggregate surface course for Green River Lakes Road, and 4,800 CY of roadway embankment and 3,200 CY of aggregate surface course for the Additional Green River Lakes Road section. The government will furnish the aggregate surface course material, with contractors responsible for hauling and compaction. All work is to be measured using either Lump Sum Quantity (LSQ), Actual Quantity (AQ), or Computed Quantity (CQ) methods.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS (SOI)
Date:
Item Number Description Method of
Measurement Unit Quantity Unit Price Total
151.01 Mobilization LSQ LS 1
152.01 Construction Staking LSQ LS 1
203.01 Removal of Existing Culvert AQ EA 12
301.12
Aggregate Surface Course
(Government Furnished, Compacted In-Place, includes hauling)
CQ CY 7200
303.01 Road Reconditioning CQ MI 2.81
602.01 18 Inch Culvert (Furnish & Install) AQ LF 175
602.02 24 Inch Culvert (Furnish & Install) AQ LF 395
635.01 Temporary Traffic Control LSQ LS 1
Item Number Description Method of
Measurement Unit Quantity Unit Price Total
151.02 Mobilization LSQ LS 1
152.02 Construction Staking LSQ LS 1
203.02 Removal of Existing Culverts AQ EA 9
204.01
Roadway Embankment
Construction, Placement method
2 (Commercial Source, Compacted In-Place, includes hauling)
CQ CY 3900
301.13
Aggregate Surface Course
(Government Furnished, Compacted In-Place, includes hauling)
CQ CY 2600
602.04 18 Inch Culvert (Furnish & Install) AQ LF 220
602.05 24 Inch Culvert (Furnish & Install) AQ LF 135
602.06 36 Inch Culvert (Furnish & Install) AQ LF 55
635.02 Temporary Traffic Control LSQ LS 1
Item Number Description Method of
Measurement Unit Quantity Unit Price Total
151.03 Mobilization LSQ LS 1
152.03 Construction Staking LSQ LS 1
204.02
Roadway Embankment
Construction, Placement method
2 (Commercial Source, Compacted In-Place, includes hauling)
CQ CY 4800
301.14
Aggregate Surface Course
(Government Furnished, Compacted In-Place, includes hauling)
CQ CY 3200
635.03 Temporary Traffic Control LSQ LS 1
Base Bid 1, 2, 3 Items Total
Base Bid 2 Items (Green River Lakes Road)
Base Bid 2 Items Sub-Total
Base Bid 3 Items (Additional Green River Lakes Road)
Base Bid 3 Items Sub-Total
Upper Green River Corridor Road Improvement Phase One
Bridger-Teton National Forest
Pinedale Ranger District
Sublette County, Wyoming
Base Bid 1 Items (Union Pass Road)
Base Bid 1 Items Sub-Total