This is a Task Order Proposal Request (TOPR) issued by the USFS Region 4 for reconstruction of the Causey Reservoir overflow parking lot and trail construction in Weber County, Utah. The project is located on the Uinta-Wasatch-Cache National Forest, approximately 25 miles east of Ogden, UT, accessed via State Route 39 to Causey Drive/FR 20139.

The project has an estimated price range of $100,000-$250,000 and requires completion by October 30, 2025, with work to commence within 10 days of Notice to Proceed and complete within 90 calendar days. Key requirements include: no fuel storage on site, pressure washing of equipment to prevent noxious weed transport, traffic control plan approval from UDOT, obtaining UDOT Right of Way Encroachment permits, and Utah Pollution Discharge Elimination Systems permit. Two optional items are included: Overflow Parking Lot Trail and Concrete Sidewalk, which may be exercised by April 15, 2025. Performance and payment bonds of 100% are required for contracts over $150,000, and a 20% bid bond is required for offers exceeding $150,000. The project includes minority (6.0%) and female (6.9%) participation goals for Weber County, Utah.

View the file

Other files

File Type Posted
1240LU24R0012 Amendment 0003.pdf PDF
RFIs as of 27Jan2025.pdf PDF
RFIs as of 21Jan2025.pdf PDF
FSR4_RoadandBridgeMATOC_SiteVisit_Attendance_241028.pdf PDF
Upper Green River Drawings 1.7.2025 Amd 0002.pdf PDF
Causey Reservoir Drawings 01.10.2025_Part2.pdf PDF
Causey Reservoir Drawings 01.10.2025_Part1.pdf PDF
Causey Reservoir SOI 1.10.2025 Amd 0002.pdf PDF
Cove Mountain SOI Amd 0002.pdf PDF
Upper Green River SOI 1.7.2025 Amd 0002.pdf PDF
1240LU24R0012 Amendment 0002.pdf PDF
Charleston Jarbidge Site Pictures.pdf PDF
RFIs as of 16Jan2025.pdf PDF
RFIs as of 8Jan2025.pdf PDF
North Fritz Creek Images.pdf PDF
1240LU24R0012 Amendment 0001.pdf PDF
Cove Mountain Drawings.pdf PDF
Charleston Jarbidge TOPR.pdf PDF
Upper Green River TOPR.pdf PDF
Charleston Jarbidge Bridge FSSS.pdf PDF
Upper Green River Drawings.pdf PDF
North Fritz Culvert TOPR.pdf PDF
Cove Mountain FSSS final.pdf PDF
Past Performance Questionnaire.docx DOCX document
North Fritz Culvert Drawings.pdf PDF
North Fritz Culvert SOI.pdf PDF
Cove Mountain TOPR.pdf PDF
Upper Green River FSSS.pdf PDF
Charleston Jarbidge SOI.pdf PDF
Causey Cover Sheet Signed.pdf PDF
North Fritz Culvert FSSS.pdf PDF
Cove Mountain SOI.pdf PDF
Causey Reservoir FSSS.pdf PDF
Causey Reservoir Drawings.pdf PDF
Causey Reservoir SOI.pdf PDF
1240LU24R0012 USFS Region 4 MATOC.pdf PDF
Upper Green River SOI.pdf PDF
Charleston Jarbidge Bridge Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ORDER PROPOSAL REQUEST (TOPR)

USFS, Region 4, Road and Bridge Construction MATOC

Project Name:

Causey Reservoir Overflow Parking Lot

Contracting Officer/Email: paul.larsen@usda.gov

Technical Contact/Email: Michael Bender, michael.bender@usda.gov

Project Location (include directions): The project is located on the Uinta-Wasatch-Cache National Forest on the Ogden Ranger District, Weber County, Utah. The Location is accessed via U.T. State Route 39 to Causey Drive/FR 20139 approximately 25 miles East from Ogden

UT.

Reply Due (Date/Time): See SF 1442 for 1240LU24R0012

This is a competitive request under the USFS, Region 4 IDIQ Road and Bridge Construction Services MATOC. Responses shall be emailed to paul.larsen@usda.gov. All questions regarding this request shall be submitted in writing to the Contracting Officer at the email listed.

Scope of Work: This project consists of reconstruction of the overflow parking lot by the Causey Reservoir dam, and the construction of a trail to access the Causey Reservoir.

Special Conditions:

- Construction sites will be closed to the public during construction. The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access.

- No fuel storage on site is permitted.

- Fuel trucks must be equipped with spill containment kits and portable berms that meet all state and federal requirements.

- All construction equipment shall be pressure washed before entering the Site in compliance with the specifications. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brush guards assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.

- No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Utah Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items. The contractor is responsible for obtaining a Right of Way Encroachment permit through UDOT for all work to be performed within the UDOT ROW including the removal of some trees near US-89. Coordination and any permits from Rocky Mountain Power shall be the responsibility of the contractor.

- The contractor will be responsible to obtain a Utah pollution Discharge Elimination Systems permit for the project and is responsible to adhering to best management practices throughout construction.

No work anticipated to be performed in riparian areas or wetlands.

- Staging and camping will be allowed and approved by the CO.

Price range per FAR 36.204(d): Between $100,000 and $250,000.

Bid Bond/Offer Guarantee (FAR 52.228-1): 20% required if quote/offer in excess of $150,000.

Performance and Payment Bonds: Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter or credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award.

Period of Performance (52.211-10): Commence work within 10 days following NTP, complete work within 90 calendar days, complete the entire work ready for use not later than 30 October 2025.

Site Visit: Per FAR 52.236-3 offerors are encouraged and expected to visit the site of construction prior to submitting an offer.

Wage Determination, General Decision Number: UT20240111

FAR 52.222-23 Goals: Minority 6.0%, Female 6.9%, Covered Area- Utah,Weber County.

Evaluation: Per FAR 52.217-5 evaluation will be inclusive of options.

Option for Separately Priced Line Item The Government may require the delivery of the numbered line items, Option Item 1, Overflow Parking Lot Trail and Option Item 2, Concrete Sidewalk identified in the Schedule as option items, in the quantity and at the price stated in the Schedule. The Contracting Officer may unilaterally exercise the option(s) by modification not later than 15 April 2025. Delivery of the option items will be within the base item period of performance.

(End of clause)

TASK ORDER PROPOSAL REQUEST (TOPR)
USFS, Region 4, Road and Bridge Construction MATOC
Project Location (include directions): The project is located on the Uinta-Wasatch-Cache National Forest on the Ogden Ranger District, Weber County, Utah. The Location is accessed via U.T. State Route 39 to Causey Drive/FR 20139 approximately 25 miles East from Ogden UT.

File details come from the government source that posted it. Updated .