Causey Reservoir SOI 1.10.2025 Amd 0002.pdf

PDF 66 KB Posted

Attached to
UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
Solicitation number
1240LU24R0012
Issued by

About this file

This is a Schedule of Items document for a construction project at Causey Reservoir, issued by the USDA Forest Service. The schedule outlines three main components: a base bid for an overflow parking lot, Option 1 for an overflow parking lot trail, and Option 2 for a concrete sidewalk.

The base bid includes 11 line items for parking lot construction, featuring mobilization, survey/staking, clearing/grubbing (1 acre), excavation (2,200 CY), crushed aggregate base course (1,000 CY), 80 barrier rocks, riprap installation, 16 reflective signs, traffic control plan, 2 bollards, and geotextiles. Option 1 encompasses trail construction with 5 line items including mobilization, survey work, clearing/grubbing (1 acre), excavation (675 CY), and crushed aggregate surface course (75 CY). Option 2 consists of a single line item for concrete sidewalk installation requiring approximately 7 cubic yards each of concrete and crushed aggregate. The document includes columns for unit pricing and total pricing, though no prices are filled in.

View the file

Other files

File Type Posted
1240LU24R0012 Amendment 0003.pdf PDF
RFIs as of 27Jan2025.pdf PDF
RFIs as of 21Jan2025.pdf PDF
FSR4_RoadandBridgeMATOC_SiteVisit_Attendance_241028.pdf PDF
Upper Green River Drawings 1.7.2025 Amd 0002.pdf PDF
Causey Reservoir Drawings 01.10.2025_Part2.pdf PDF
Causey Reservoir Drawings 01.10.2025_Part1.pdf PDF
Cove Mountain SOI Amd 0002.pdf PDF
Upper Green River SOI 1.7.2025 Amd 0002.pdf PDF
1240LU24R0012 Amendment 0002.pdf PDF
Charleston Jarbidge Site Pictures.pdf PDF
RFIs as of 16Jan2025.pdf PDF
RFIs as of 8Jan2025.pdf PDF
North Fritz Creek Images.pdf PDF
1240LU24R0012 Amendment 0001.pdf PDF
Cove Mountain Drawings.pdf PDF
Charleston Jarbidge TOPR.pdf PDF
Upper Green River TOPR.pdf PDF
Charleston Jarbidge Bridge FSSS.pdf PDF
Upper Green River Drawings.pdf PDF
North Fritz Culvert TOPR.pdf PDF
Cove Mountain FSSS final.pdf PDF
Past Performance Questionnaire.docx DOCX document
North Fritz Culvert Drawings.pdf PDF
North Fritz Culvert SOI.pdf PDF
Cove Mountain TOPR.pdf PDF
Upper Green River FSSS.pdf PDF
Causey TOPR.pdf PDF
Charleston Jarbidge SOI.pdf PDF
Causey Cover Sheet Signed.pdf PDF
North Fritz Culvert FSSS.pdf PDF
Cove Mountain SOI.pdf PDF
Causey Reservoir FSSS.pdf PDF
Causey Reservoir Drawings.pdf PDF
Causey Reservoir SOI.pdf PDF
1240LU24R0012 USFS Region 4 MATOC.pdf PDF
Upper Green River SOI.pdf PDF
Charleston Jarbidge Bridge Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE

ITEM

ITEM

NUMBER DESCRIPTION METHOD OF

MEASUREMENT UNIT QUANTITY UNIT PRICE TOTAL PRICE

BASE BID- OVERFLOW PARKING LOT

1 15101 Mobilization LSQ LS 1 $ -

2 15201 Construction Survey and Staking, Method I, Tolerance A LSQ LS 1 $ -

3 20102 Clearing And Grubbing, Disposal By Scattering in project site - In Area Designated by COR CQ ACRE 1 $ -

4 20401 Excavation and Embankment (Parking Lot, Includes ditchwork, includes moving wheel stops approx. up to 300ft ) - Common and Loose Rock. (F) Placement Method 6. CQ CY 2,200 $ -

5 30103 Crushed Aggregate Base course purchased Gradation Designation D , Haul and Place- 6" compacted. (F) Placement Method 6. (For Parking Lot) CQ CY 1,000 $ -

6 322205-2 Barrier Rocks: 36"+/- 6" ( Must be imbedded 1/3 of the way) Commercial Source. AQ EA 80 $ -

7 25101 Rock Disipator -Riprap (Class II) -Furnish and Place as shown on sheet 8. See Table 705-1 CQ CY 30 $ -

8 63306 Signs (See Sheet 15) Type 4 Retro Reflective with metal tube / breakable base AQ EA 16 $ -

9 63501 Traffic Control Plan and Implementation (Includes 4 Construction/Information Signs) LSQ LS 1 $ -

10 710.04 Bollard Installation- 7' Of 6" Steel Pipe filled with Concrete. AQ EA 2 $ -

11 71401 Earthwork Geotextiles - Class 1 Non-Woven Type A, Furnish and Install. (Rock Dissipater See sheet 8. ) CQ SY 200 $ -

OPTION 1 - OVERFLOW PARKING LOT TRAIL

1 15101 Mobilization LSQ LS 1 $ -

2 15201 Construction Survey and Staking, Method I, Tolerance A LSQ LS 1 $ -

3 20102 Clearing And Grubbing, Disposal By Scattering in project site - In Area Designated by COR CQ ACRE 1 $ -

4 20401 Excavation and Embankment (Trail Access) - Common and Loose Rock (F) Placement Method 6 CQ CY 675 $ -

5 30103 Crushed Aggregate Surface course purchased Gradation Designation H, Haul and Place- 6" compacted. (F) Placement Method 6 (For Trail Leading to Reservoir) CQ CY 75 $ -

OPTION 2 - CONCRETE SIDEWALK

1 60102 Concrete, Pads 4" Thick (Infront of new restrooms) ( Includes prepwork, Roadbase, Forming) -

Approx. 7 cubic yards of concrete, Approx. 7 cubic yards of 4" layer of Crushed Aggregate Gradation Designation C

LSQ LS 1 $ -

Total

Total

TOTAL BASE PLUS ALL OPTIONS

USDA Forest Service

Total

SCHEDULE OF ITEMS

Causey Reservoir Project

File details come from the government source that posted it. Updated .