North Fritz Culvert SOI.pdf

PDF 53 KB Posted

Attached to
UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
Solicitation number
1240LU24R0012
Issued by

About this file

This is a Schedule of Items form for the North Fritz Creek Culvert Replacement project, which appears to be part of a larger USFS road and bridge construction MATOC solicitation. The form outlines 10 line items covering the full scope of the culvert replacement work, including mobilization, construction survey and staking, soil erosion control, clearing and grubbing, culvert removal and disposal, structure excavation, riprap placement, culvert installation, and stream channel rehabilitation.

The specific quantities required include 20 cubic yards of Class 3 riprap from a commercial source and 40 cubic yards of aggregate surface course with Grading (H) and Compaction (B) specifications under Option 1. Most line items are designated as lump sum with a quantity of 1. The form includes columns for unit costs and total costs but is blank, appearing to be a template for contractors to complete with their proposed pricing.

View the file

Other files

File Type Posted
1240LU24R0012 Amendment 0003.pdf PDF
RFIs as of 27Jan2025.pdf PDF
RFIs as of 21Jan2025.pdf PDF
FSR4_RoadandBridgeMATOC_SiteVisit_Attendance_241028.pdf PDF
Upper Green River Drawings 1.7.2025 Amd 0002.pdf PDF
Causey Reservoir Drawings 01.10.2025_Part2.pdf PDF
Causey Reservoir Drawings 01.10.2025_Part1.pdf PDF
Causey Reservoir SOI 1.10.2025 Amd 0002.pdf PDF
Cove Mountain SOI Amd 0002.pdf PDF
Upper Green River SOI 1.7.2025 Amd 0002.pdf PDF
1240LU24R0012 Amendment 0002.pdf PDF
Charleston Jarbidge Site Pictures.pdf PDF
RFIs as of 16Jan2025.pdf PDF
RFIs as of 8Jan2025.pdf PDF
North Fritz Creek Images.pdf PDF
1240LU24R0012 Amendment 0001.pdf PDF
Cove Mountain Drawings.pdf PDF
Charleston Jarbidge TOPR.pdf PDF
Upper Green River TOPR.pdf PDF
Charleston Jarbidge Bridge FSSS.pdf PDF
Upper Green River Drawings.pdf PDF
North Fritz Culvert TOPR.pdf PDF
Cove Mountain FSSS final.pdf PDF
Past Performance Questionnaire.docx DOCX document
North Fritz Culvert Drawings.pdf PDF
Cove Mountain TOPR.pdf PDF
Upper Green River FSSS.pdf PDF
Causey TOPR.pdf PDF
Charleston Jarbidge SOI.pdf PDF
Causey Cover Sheet Signed.pdf PDF
North Fritz Culvert FSSS.pdf PDF
Cove Mountain SOI.pdf PDF
Causey Reservoir FSSS.pdf PDF
Causey Reservoir Drawings.pdf PDF
Causey Reservoir SOI.pdf PDF
1240LU24R0012 USFS Region 4 MATOC.pdf PDF
Upper Green River SOI.pdf PDF
Charleston Jarbidge Bridge Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North Fritz Creek Culvert Replacement

Item No.

Unit of

Measure Qty Unit Cost Total

15100 Lump Sum 1

15200 Lump Sum 1

15700 Lump Sum 1

20100 Lump Sum 1

20300 Lump Sum 1

20800 Lump Sum 1

25100 Cubic Yard 20

60300 Lump Sum 1

64800 Lump Sum 1

32200 Cubic Yard 40 Aggregate surface course, Grading (H), Compaction (B), (Commercial Source)

Project Total:

Structure Excavation and Backfill

Placed Riprap, Class 3 (Commercial Source)

Culvert Structure, Design, Fabricate, Deliver, and Install

Stream Channel rehabilitation

Option 1

Description

Mobilization

Construction Survey and Staking

Soil erosion and pollution control

Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs (k), Logs (i), and Stumps (a)

Removal of Culvert, Disposal Method (a)

Schedule of Items Project Name:

Date:

File details come from the government source that posted it. Updated .