This is a Schedule of Items document for the Charleston Jarbidge Bridge Replacement project being managed by the USDA Forest Service. The document lists 13 base items required for the bridge replacement, including mobilization, construction survey and staking, soil erosion control, clearing and grubbing, removal of existing bridge, roadway excavation, ford construction, structure excavation, riprap placement, aggregate surface course, culvert installation, object markers, and stream simulation material placement.
Key technical specifications include a 128" x 83" x 50' CMP pipe arch culvert (12 gauge), 40 cubic yards of Class 3 riprap from commercial source, 40 cubic yards of aggregate surface course, and 4"-6" riprap for ford and approach roads. The document is structured as a pricing schedule with columns for line item number, description, method of measurement, unit, quantity, price, and total, though no prices are filled in. Most items are to be measured as Lump Sum Quantity (LSQ), with a few measured as Count Quantity (CQ) or Actual Quantity (AQ).
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
Charleston Jarbidge Bridge Replacement
LINE
ITEM
ITEM
NUMBER DESCRIPTION METHOD OF
MEASUREMENT UNIT QUANTITY PRICE TOTAL
BASE ITEMS
1 15101 Mobilization LSQ LS 1 $ -
2 15221 Construction Survey and Staking LSQ LS 1 $ -
3 15713 Soil Erosion and Pollution Control LSQ LS 1 $ -
4 20102 Clearing and Grubbing, Debris Disposal Methods for Tops and Limbs (g), Logs (i), and Stumps (a) LSQ LS 1 $ -
5 20301 Removal of Existing Bridge, Disposal Method (a) LSQ LS 1 $ -
6 20401 Roadway Excavation and Embankment, Placement Method 2 (Approx 150 CY Import from commercial source) LSQ LS 1 $ -
7 20402 Construct and Maintain Ford and Approach Roads; 4"-6" riprap LSQ LS 1 $ -
8 20901 Stucture Excavation and Backfill LSQ LS 1 $ -
9 25101 Placed Riprap, Class 3 (Commercial Source) CQ CY 40 $ -
10 32203 Aggregate Surface Course, Grading (S), Compaction (B), (Commerical Source) CQ CY 40 $ -
11 60201 128" x 83" x 50' CMP, 3"x1" Pipe Arch Culvert, 12 Gauge, With Bands - Fabricate, Transport, and Install LSQ LS 1 $ -
12 63306 Object Markers, Type 3 AQ EA 4 $ -
13 64801 Stream Simulated Materal Inside Pipe, On-Site Material, Placement Method C LSQ LS 1 $ -
Total