This is Amendment 0002 to solicitation 1240LU24R0012 issued by the USDA Forest Service CSA Intermountain Region 9, effective January 16, 2025. The amendment makes several changes to project specifications, including updated drawings and schedules for Causey Reservoir (dated 1/10/2025), modification of the Cove Mountain Schedule of Items (changing item 30201-1 quantity to 1,500 tons), and updated drawings and schedule for Upper Green River (dated 1/07/2025).
Key changes include modifications to Causey Reservoir drawings regarding breakaway metal signs, concrete sidewalk additions, and Option 2-line item changes. For the Upper Green River project, multiple quantity changes were made to items 203.01-602.06, and culvert replacements must be completed without extended closures (maximum 3-hour scheduled delays allowed, excluding weekends and holidays). Drawing updates include modifications to typical road sections, culvert summary tables, and plan view sheets to correct culvert data discrepancies. Additionally, pictures were added for the Charleston Jarbidge project site.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Paul C Larsen
The purpose of this amendment is to:
1. Add updated drawings for Causey Reservoir dated 1/10/2025.
2. Add updated Schedule of Items for Causey Reservoir dated 1/10/2025.
3. Add updated Cove Mountain Schedule of Items changing quantity for item 30201-1 to 1,500 Tons.
4. Add updated Upper Green River Drawings dated 1/07/2025.
5. Add updated Upper Green River Schedule of Items dated 1/07/2025 ---------SEE CONTINUATION ON PAGE 2 of 2--------------------------------
USDA Forest Service CSA Intermountain 9
1240LU24R0012
1 2
01/16/2025
12/11/2024
1240LU24R0012, SF 30 Amendment 0002, Dated 1/16/2025
The following is a continuation of Block 14 of Page 1:
6. For the Upper Green River seed project the following is added:
All culvert replacements shall be completed without extended closures. Scheduled delays of approximately 3 hours will be allowed. This may not occur on any weekends or holidays. Contractor shall coordinate this schedule with the CO and COR minimum 21 days prior, to properly inform the public.
7. Pictures are added for the Charleston Jarbidge project site.
Summary for Causey changes:
Changes to drawings sheet 16 regarding breakaway metal signs
Changes to Option 2-line item 1 in the schedule of items
Changes to drawings adding sheet 21 regarding concrete sidewalk.
Summary of Upper Green River changes:
Item 203.01 – quantity change Item 301.12 – quantity change
Item 602.01 – quantity change Item 602.02 – quantity change
Item 603.03 – item removed Item 203.02 – quantity change
Item 204.01 – quantity change Item 301.13 – quantity change
Item 602.04 – quantity change Item 602.05 – quantity change
Item 602.06 – quantity change Item 204.02 – quantity change
Item 301.14 – quantity change
Upper Green River Drawings:
Sheet R1 – modification of typical road section Union Pass and Green River Lakes
Sheet R2 – culvert summary tables updated, inlet invert elevations removed
Sheets R6-R13, R17-24 – plan view sheets updated to correct culvert data discrepancies