Cove Mountain SOI.pdf
PDF 449 KB Posted
- Attached to
- UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
- Solicitation number
- 1240LU24R0012
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items for the Cove Mountain Reroutes and Maintenance project at Dixie National Forest in Washington, Utah. The schedule details construction work across three base items and one option item for different National Forest System Roads (NFSR).
Base Item #1 (NFSR 30343) includes mobilization, clearing and grubbing, excavation and embankment, drainage features (10 drainage dips), structure excavation and backfill, roadway obliteration, road reconditioning (4.1 miles), and installation of 40 linear feet of 36-inch culverts. Base Item #2 (NFSR 30010) requires 5 drainage dips, 675 tons of minor crushed aggregates, and 4 miles of road reconditioning. Base Item #3 (30011) calls for 1,543 tons of minor crushed aggregates and 6.6 miles of road reconditioning. Option Item #1 (NFSR 30343) includes 1,350 tons of minor crushed aggregates. The schedule provides columns for unit pricing and totals but contains no pricing information.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Number Description Method of
Measurement Unit Quantity Unit Price Total 15101-1 Mobilization LSQ LS 1 20101-1 Clearing and Grubbing LSQ LS 1
20401-1 Excavation and Embankment, Placement Method 2
LSQ LS 1
20401-2 Drainage Features, Drainage Dips AQ EA 10 20901-1 Structure Excavation and Backfill LSQ LS 1 21101-1 Roadway Obliteration LSQ LS 1 30301-1 Road Reconditioning CQ MILE 4.1 60201-1 Installation of Culverts (36" Dia.) AQ LF 40
Total
Item Number Description Method of
Measurement Unit Quantity Unit Price Total 20401-2 Drainage Features, Drainage Dips AQ EA 5
30201-2 Minor Crushed Aggregates, Grading F, Method 2, Compaction B
AQ TON 675
30301-2 Road Reconditioning CQ MILE 4
Item Number Description Method of
Measurement Unit Quantity Unit Price Total
30201-3 Minor Crushed Aggregates, Grading F, Method 2, Compaction B
AQ TON 1543
30301-3 Road Reconditioning CQ MILE 6.6
Item Number Description Method of
Measurement Unit Quantity Unit Price Total
30201-1 Minor Crushed Aggregates, Grading F, Method 2, Compaction B
AQ TON 1350
SCHEDULE OF ITEMS
Cove Mountain Reroutes and Maintenance
Dixie National Forest Washington, Utah
Base Item #1 - NFSR 30343
Option Item #1 - NFSR 30343
Grand Total
Total
Base Item #2 - NFSR 30010
Total
Base Item #3 - 30011
Total
File details come from the government source that posted it. Updated .