UFGS4288 Submittal Register.xlsx
XLSX spreadsheet 80 KB Posted
- Attached to
- Restore Outfitting Capacity, Berth 6C Federal contract opportunity
- Solicitation number
- N4008522R2578
About this file
This document is a Request for Proposal (RFP) for the project "Restore Outfitting Capacity, Berth 6C" at the Portsmouth Naval Shipyard in Kittery, Maine. The RFP seeks design-build (DBB) services to restore outfitting capacity at Berth 6C. The Naval Facilities Engineering Command is the contracting agency. Offerors are required to submit proposals by the specified closing date. Services include restoration of outfitting capacity, which involves repairs and improvements to allow the shipyard to efficiently outfit and maintain nuclear-powered vessels. The RFP includes standard contract clauses and provides instructions to offerors on proposal requirements, evaluation criteria, and contractual terms.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFGS4288
| TITLE: | Berth 6 Repairs and Improvements | SUBMITTAL REGISTER | ||||||||||||||||
| JOB NAME: | 10635 | |||||||||||||||||
| LOCATION: | ||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| Line | Activity # | Transmittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Reviewer | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Reviewer | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 11 00 | 1 | Preconstruction Submittals | Salvage Plan | 1.7 | G | ||||||||||||||
| 2 | 01 11 00 | 1 | Preconstruction Submittals | Work Sequencing And Preparation Plan | 1.3.1 | G | ||||||||||||||
| 3 | 01 14 00.00 22 | 1 | Preconstruction Submittals | List of Contact Personnel | 1.4.1 | G | ||||||||||||||
| 4 | 01 20 00.00 22 | 1 | Preconstruction Submittals | Schedule of Prices | 1.3 | G | ||||||||||||||
| 5 | 01 30 00 | 1 | Preconstruction Submittals | NRZ Checklist | 1.8.1 | G | ||||||||||||||
| 6 | 01 30 00 | 1 | Preconstruction Submittals | NRZ Checklist | 1.8.1 | G | ||||||||||||||
| 7 | 01 30 00 | 1 | Preconstruction Submittals | NAVFAC PWD ME Internal Service List | 1.8.3 | G | ||||||||||||||
| 8 | 01 31 23.13 22 | 1 | Preconstruction Submittals | List of Personnel | 1.4.2 | G | ||||||||||||||
| 9 | 01 32 17.00 25 | 1 | Preconstruction Submittals | Qualifications | 1.6 | G | ||||||||||||||
| 10 | 01 32 17.00 25 | 1 | Preconstruction Submittals | Baseline Network Analysis Schedule | 1.3 | G | ||||||||||||||
| 11 | 01 32 17.00 25 | 1 | Preconstruction Submittals | Three-Week Look Ahead Schedule | 1.11 | G | ||||||||||||||
| 12 | 01 32 17.00 25 | 7 | Certificates | Monthly Network Analysis Schedule Update | 1.8.2 | G | ||||||||||||||
| 13 | 01 32 17.00 25 | 11 | Closeout Submittals | Training and O&M Manuals | 1.8.3 | G | ||||||||||||||
| 14 | 01 33 00 | 1 | Preconstruction Submittals | Submittal Register | 1.8 | G | ||||||||||||||
| 15 | 01 35 26.00 22 | 1 | Preconstruction Submittals | Accident Prevention Plan (APP) | 1.7 | G | ||||||||||||||
| 16 | 01 35 26.00 22 | 1 | Preconstruction Submittals | Personnel Qualifications | 1.6.1 | G | ||||||||||||||
| 17 | 01 35 26.00 22 | 6 | Test Reports | Monthly Exposure Reports | 1.4 | |||||||||||||||
| 18 | 01 35 26.00 22 | 6 | Test Reports | Notifications and Reports | 1.12 | |||||||||||||||
| 19 | 01 35 26.00 22 | 6 | Test Reports | Accident Reports | 1.12.2 | G | ||||||||||||||
| 20 | 01 35 26.00 22 | 6 | Test Reports | LHE Inspection Reports | 1.12.3 | |||||||||||||||
| 21 | 01 35 26.00 22 | 7 | Certificates | Crane Operators/Riggers | 1.6.1.4 | |||||||||||||||
| 22 | 01 35 26.00 22 | 7 | Certificates | Standard Lift Plan | 1.7.2.2 | G | ||||||||||||||
| 23 | 01 35 26.00 22 | 7 | Certificates | Critical Lift Plan | 1.7.2.3 | G | ||||||||||||||
| 24 | 01 35 26.00 22 | 7 | Certificates | Naval Architecture Analysis | 1.7.2.3 | G | ||||||||||||||
| 25 | 01 35 26.00 22 | 7 | Certificates | Activity Hazard Analysis (AHA) | 1.8 | |||||||||||||||
| 26 | 01 35 26.00 22 | 7 | Certificates | Confined Space Entry Permit | 1.9.1 | |||||||||||||||
| 27 | 01 35 26.00 22 | 7 | Certificates | Hot Work Permit | 1.9.1 | |||||||||||||||
| 28 | 01 35 26.00 22 | 7 | Certificates | Certificate of Compliance | 1.12.4 | |||||||||||||||
| 29 | 01 35 26.00 22 | 7 | Certificates | Barge Mounted Mobile Cranes | 1.7.2.3 | |||||||||||||||
| 30 | 01 35 26.00 22 | 7 | Certificates | License Certificates | 1.14 | |||||||||||||||
| 31 | 01 35 26.00 22 | 7 | Certificates | Radiography Operation Planning Work Sheet | 1.14.1 | G | ||||||||||||||
| 32 | 01 44 00.22 | 1 | Preconstruction Submittals | Archaeologist Qualifications | 1.4 | G | ||||||||||||||
| 33 | 01 44 00.22 | 6 | Test Reports | Archaeological Monitoring Reports | 3.2 | |||||||||||||||
| 34 | 01 44 00.22 | 6 | Test Reports | Resource Report | 3.1 | G | ||||||||||||||
| 35 | 01 44 00.22 | 6 | Test Reports | Executive Summary | 1.1 | G | ||||||||||||||
| 36 | 01 44 00.22 | 6 | Test Reports | Final Draft Report | 1.1 | G | ||||||||||||||
| 37 | 01 44 00.22 | 6 | Test Reports | Final Report | 1.1 | |||||||||||||||
| 38 | 01 45 00.00 20 | 1 | Preconstruction Submittals | Construction Quality Control (QC) Plan | 1.6.1 | G | ||||||||||||||
| 39 | 01 45 00.00 20 | 1 | Preconstruction Submittals | QC Manager | 1.5.1 | G | ||||||||||||||
| 40 | 01 45 00.00 20 | 1 | Preconstruction Submittals | Commissioning Authority | 1.5.2 | G | ||||||||||||||
| 41 | 01 45 00.00 20 | 1 | Preconstruction Submittals | Alternate QC Manager Duties and Qualifications | 1.5.1.4 | G | ||||||||||||||
| 42 | 01 45 00.00 20 | 1 | Preconstruction Submittals | Rework Items List | 1.16.4 | G | ||||||||||||||
| 43 | 01 45 00.00 20 | 6 | Test Reports | Punch List | 1.15.1 | G | ||||||||||||||
| 44 | 01 45 00.00 20 | 6 | Test Reports | Testing Plan And Log | 1.16.3 | G | ||||||||||||||
| 45 | 01 45 00.00 20 | 6 | Test Reports | Preparatory Phase Checklist | 1.3 | G | ||||||||||||||
| 46 | 01 45 00.00 20 | 6 | Test Reports | Initial Phase Checklist | 1.3 | G | ||||||||||||||
| 47 | 01 45 00.00 20 | 6 | Test Reports | Test Reports | 1.13.5 | G | ||||||||||||||
| 48 | 01 45 00.00 20 | 6 | Test Reports | Monthly Summary Report Of Tests | 1.13.5 | G | ||||||||||||||
| 49 | 01 45 00.00 20 | 7 | Certificates | Invoice Certification | 1.14.2 | G | ||||||||||||||
| 50 | 01 45 00.00 20 | 7 | Certificates | Completion Certification | 1.14.3 | G | ||||||||||||||
| 51 | 01 45 00.00 20 | 7 | Certificates | As-Built Drawings Certificate | 1.16.5 | G | ||||||||||||||
| 52 | 01 45 00.00 20 | 6 | Test Reports | CQC Report | 1.3 | G | ||||||||||||||
| 53 | 01 45 00.00 20 | 11 | Closeout Submittals | Contractor Production Report | 1.3 | G | ||||||||||||||
| 54 | 01 45 00.00 20 | 11 | Closeout Submittals | Minutes Of The Meeting | 1.9 | G | ||||||||||||||
| 55 | 01 50 00.00 22 | 1 | Preconstruction Submittals | Construction site plan | 1.4 | G | ||||||||||||||
| 56 | 01 50 00.00 22 | 1 | Preconstruction Submittals | Traffic control plan | 3.2.1 | G | ||||||||||||||
| 57 | 01 50 00.00 22 | 6 | Test Reports | Backflow Preventer Tests | 2.2.5 | G | ||||||||||||||
| 58 | 01 50 00.00 22 | 7 | Certificates | Backflow Tester | 1.5.1 | G | ||||||||||||||
| 59 | 01 50 00.00 22 | 7 | Certificates | Backflow Preventers | 1.5 | G | ||||||||||||||
| 60 | 01 57 19.00 22 | 1 | Preconstruction Submittals | Preconstruction Survey | 1.5.1 | G | ||||||||||||||
| 61 | 01 57 19.00 22 | 1 | Preconstruction Submittals | Solid Waste Management Plan | 3.4 | G | ||||||||||||||
| 62 | 01 57 19.00 22 | 1 | Preconstruction Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 63 | 01 57 19.00 22 | 1 | Preconstruction Submittals | Environmental Management Plan (EMP) | 3.1 | G | ||||||||||||||
| 64 | 01 57 19.00 22 | 1 | Preconstruction Submittals | Dirt and Dust Control Plan | 3.14.1 | G | ||||||||||||||
| 65 | 01 57 19.00 22 | 1 | Preconstruction Submittals | Contractor Hazardous Material Inventory Log | 3.6 | G | ||||||||||||||
| 66 | 01 57 19.00 22 | 1 | Preconstruction Submittals | Storm Water Management/Erosion and Sedimentation Control Plan | 3.2.1 | G | ||||||||||||||
| 67 | 01 57 19.00 22 | 6 | Test Reports | Laboratory Analysis | 3.13.4.2 | G | ||||||||||||||
| 68 | 01 57 19.00 22 | 6 | Test Reports | Disposal Requirements | 3.15.2 | G | ||||||||||||||
| 69 | 01 57 19.00 22 | 6 | Test Reports | Erosion and Sediment Control Inspection Reports | 3.2.4 | G | ||||||||||||||
| 70 | 01 57 19.00 22 | 6 | Test Reports | Solid Waste Management Report | 3.4.1 | G | ||||||||||||||
| 71 | 01 57 19.00 22 | 11 | Closeout Submittals | Storm Water Management and Erosion Control Compliance Notebook | 3.2.1 | G | ||||||||||||||
| 72 | 01 57 19.00 22 | 11 | Closeout Submittals | Waste Determination Documentation | 3.5 | G | ||||||||||||||
| 73 | 01 57 19.00 22 | 11 | Closeout Submittals | Disposal Documentation for Hazardous and Regulated Waste | 3.13.4.4 | G | ||||||||||||||
| 74 | 01 57 19.00 22 | 11 | Closeout Submittals | Contractor 40 CFR Employee Training Records | 1.5.5 | G | ||||||||||||||
| 75 | 01 57 19.00 22 | 11 | Closeout Submittals | Solid Waste Management Report | 3.4.1 | G | ||||||||||||||
| 76 | 01 57 19.00 22 | 11 | Closeout Submittals | Contractor Hazardous Material Inventory Log | 3.6 | G | ||||||||||||||
| 77 | 01 57 19.00 22 | 11 | Closeout Submittals | Hazardous Waste/Debris Management | 3.13.4 | G | ||||||||||||||
| 78 | 01 57 19.00 22 | 11 | Closeout Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 79 | 01 57 19.00 22 | 11 | Closeout Submittals | Asbestos Free Certification Form | 3.13.4.3 | G | ||||||||||||||
| 80 | 01 74 19.00 22 | 1 | Preconstruction Submittals | Waste Management Plan | 1.3 | G | ||||||||||||||
| 81 | 01 74 19.00 22 | 11 | Closeout Submittals | Records | 1.4 | G | ||||||||||||||
| 82 | 01 78 00.00 22 | 3 | Product Data | As-Built Record of Equipment and Materials | 1.3.2 | G | ||||||||||||||
| 83 | 01 78 00.00 22 | 3 | Product Data | Warranty Management Plan | 1.7.1 | G | ||||||||||||||
| 84 | 01 78 00.00 22 | 3 | Product Data | Warranty Tags | 1.7.4 | G | ||||||||||||||
| 85 | 01 78 00.00 22 | 3 | Product Data | Spare Parts Data | 1.4 | G | ||||||||||||||
| 86 | 01 78 00.00 22 | 8 | Manufacturer's Instructions | Preventative Maintenance | 1.5 | G | ||||||||||||||
| 87 | 01 78 00.00 22 | 8 | Manufacturer's Instructions | Condition Monitoring (Predictive Testing) | 1.5 | G | ||||||||||||||
| 88 | 01 78 00.00 22 | 8 | Manufacturer's Instructions | Inspection | 1.5 | G | ||||||||||||||
| 89 | 01 78 00.00 22 | 8 | Manufacturer's Instructions | Instructions | 1.7.1 | G | ||||||||||||||
| 90 | 01 78 00.00 22 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 1.8 | G | ||||||||||||||
| 91 | 01 78 00.00 22 | 11 | Closeout Submittals | Record Drawings | 1.3.1 | G | ||||||||||||||
| 92 | 01 78 00.00 22 | 11 | Closeout Submittals | Certification of EPA Designated Items | 1.6 | G | ||||||||||||||
| 93 | 01 78 00.00 22 | 11 | Closeout Submittals | Certification of EPA Designated Items | 1.6 | G | ||||||||||||||
| 94 | 01 78 00.00 22 | 11 | Closeout Submittals | Red Zone Documents | 1.3.6 | G | ||||||||||||||
| 95 | 01 78 23 | 10 | Operation and Maintenance Data | Training Plan | 3.1.1 | G | ||||||||||||||
| 96 | 01 78 23 | 10 | Operation and Maintenance Data | Training Outline | 3.1.3 | G | ||||||||||||||
| 97 | 01 78 23 | 10 | Operation and Maintenance Data | Training Content | 3.1.2 | G | ||||||||||||||
| 98 | 01 78 23 | 11 | Closeout Submittals | Training Video Recording | 3.1.4 | G | ||||||||||||||
| 99 | 01 78 23 | 11 | Closeout Submittals | Validation of Training Completion | 3.1.6 | G | ||||||||||||||
| 100 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Progress Submittal | 1.4.1 | G | ||||||||||||||
| 101 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Prefinal Submittal | 1.4.2 | G | ||||||||||||||
| 102 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Final Submittal | 1.4.3 | G | ||||||||||||||
| 103 | 01 91 13 | 1 | Preconstruction Submittals | Commissioning Plan | 3.3 | G | ||||||||||||||
| 104 | 01 91 13 | 1 | Preconstruction Submittals | Design Review and Documentation | 3.1 | G | ||||||||||||||
| 105 | 01 91 13 | 1 | Preconstruction Submittals | Commissioning Authority | 1.6.1 | G | ||||||||||||||
| 106 | 01 91 13 | 1 | Preconstruction Submittals | CxA Resume | 1.6.1.2 | G | ||||||||||||||
| 107 | 01 91 13 | 11 | Closeout Submittals | Interim Commissioning Report | 3.8 | G | ||||||||||||||
| 108 | 01 91 13 | 11 | Closeout Submittals | Final Commissioning Report | 3.1 | G | ||||||||||||||
| 109 | 02 41 00 | 1 | Preconstruction Submittals | Demolition Plan | 1.2.2 | G | ||||||||||||||
| 110 | 02 41 00 | 1 | Preconstruction Submittals | Existing Conditions | 1.1 | G | ||||||||||||||
| 111 | 02 41 00 | 7 | Certificates | Notification | 1.7 | G | ||||||||||||||
| 112 | 02 41 00 | 11 | Closeout Submittals | Receipts | 3.3.4 | G | ||||||||||||||
| 113 | 02 83 00.00 22 | 1 | Preconstruction Submittals | Competent Person | 1.5.1.1 | G | ||||||||||||||
| 114 | 02 83 00.00 22 | 1 | Preconstruction Submittals | Training Certification | 1.5.1.2 | G | ||||||||||||||
| 115 | 02 83 00.00 22 | 1 | Preconstruction Submittals | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 116 | 02 83 00.00 22 | 1 | Preconstruction Submittals | Medical Examinations | 1.5.2.4 | G | ||||||||||||||
| 117 | 02 83 00.00 22 | 1 | Preconstruction Submittals | Lead, Cadmium, and Chromium Waste Management Plan | 1.5.2.8 | G | ||||||||||||||
| 118 | 02 83 00.00 22 | 1 | Preconstruction Submittals | Licenses, Permits and Notifications | 1.5.4 | G | ||||||||||||||
| 119 | 02 83 00.00 22 | 1 | Preconstruction Submittals | Lead, Cadmium, and Chromium Compliance Plan | 1.5.2.2 | G | ||||||||||||||
| 120 | 02 83 00.00 22 | 1 | Preconstruction Submittals | Initial Sample Results | 3.4.1.1 | G | ||||||||||||||
| 121 | 02 83 00.00 22 | 3 | Product Data | Respirators | 1.6.1 | G | ||||||||||||||
| 122 | 02 83 00.00 22 | 3 | Product Data | Vacuum Filters | 1.6.4 | G | ||||||||||||||
| 123 | 02 83 00.00 22 | 3 | Product Data | Negative Air Pressure System | 1.6.7 | G | ||||||||||||||
| 124 | 02 83 00.00 22 | 3 | Product Data | Materials and Equipment | 2.1 | G | ||||||||||||||
| 125 | 02 83 00.00 22 | 3 | Product Data | Expendable Supplies | 2.1.1 | G | ||||||||||||||
| 126 | 02 83 00.00 22 | 3 | Product Data | Pressure Differential Log | 3.1.1.2 | G | ||||||||||||||
| 127 | 02 83 00.00 22 | 6 | Test Reports | Sampling and Analysis | 1.3.3 | G | ||||||||||||||
| 128 | 02 83 00.00 22 | 6 | Test Reports | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 129 | 02 83 00.00 22 | 6 | Test Reports | Sampling Results | 1.5.2.3 | G | ||||||||||||||
| 130 | 02 83 00.00 22 | 6 | Test Reports | Pressure Differential Recordings For Local Exhaust System | 1.5.3 | G | ||||||||||||||
| 131 | 02 83 00.00 22 | 7 | Certificates | Testing Laboratory | 1.5.1.3 | G | ||||||||||||||
| 132 | 02 83 00.00 22 | 7 | Certificates | Third Party Consultant Qualifications | 1.5.1.4 | G | ||||||||||||||
| 133 | 02 83 00.00 22 | 7 | Certificates | Clearance Certification | 3.5.1.1 | G | ||||||||||||||
| 134 | 02 83 00.00 22 | 11 | Closeout Submittals | Turn-In Documents or Weight Tickets | 3.5.2.1 | G | ||||||||||||||
| 135 | 03 30 00 | 1 | Preconstruction Submittals | Concrete Curing Plan | 1.6.3.1 | G | ||||||||||||||
| 136 | 03 30 00 | 1 | Preconstruction Submittals | Quality Control Plan | 1.6.5 | G | ||||||||||||||
| 137 | 03 30 00 | 1 | Preconstruction Submittals | Quality Control Personnel Certifications | 1.6.6 | G | ||||||||||||||
| 138 | 03 30 00 | 1 | Preconstruction Submittals | Quality Control Organizational Chart | 1.6.6 | |||||||||||||||
| 139 | 03 30 00 | 1 | Preconstruction Submittals | Laboratory Accreditation | 1.6.8 | G | ||||||||||||||
| 140 | 03 30 00 | 1 | Preconstruction Submittals | Form Removal Schedule | 1.6.2.1 | G | ||||||||||||||
| 141 | 03 30 00 | 1 | Preconstruction Submittals | Maturity Method Data | 3.3.6 | |||||||||||||||
| 142 | 03 30 00 | 1 | Preconstruction Submittals | Construction And Movement Joints | 2.2.4 | G | ||||||||||||||
| 143 | 03 30 00 | 1 | Preconstruction Submittals | Remediation Plan | 3.13.3.2 | G | ||||||||||||||
| 144 | 03 30 00 | 1 | Preconstruction Submittals | Trial Batch Mixtures | 2.5.3 | G | ||||||||||||||
| 145 | 03 30 00 | 2 | Shop Drawings | Formwork | 1.6.2.1 | G | ||||||||||||||
| 146 | 03 30 00 | 2 | Shop Drawings | Reinforcing Steel | 1.6.2.2 | G | ||||||||||||||
| 147 | 03 30 00 | 3 | Product Data | Joint Sealants | 2.4.5 | G | ||||||||||||||
| 148 | 03 30 00 | 3 | Product Data | Formwork Materials | 2.1 | G | ||||||||||||||
| 149 | 03 30 00 | 3 | Product Data | Cementitious Materials | 2.3.1 | G | ||||||||||||||
| 150 | 03 30 00 | 3 | Product Data | Concrete Curing Materials | 2.4.1 | |||||||||||||||
| 151 | 03 30 00 | 3 | Product Data | Reinforcement | 2.6 | G | ||||||||||||||
| 152 | 03 30 00 | 3 | Product Data | Admixtures | 2.3.4 | G | ||||||||||||||
| 153 | 03 30 00 | 3 | Product Data | Mechanical Reinforcing Bar Connectors | 2.6.2 | G | ||||||||||||||
| 154 | 03 30 00 | 3 | Product Data | Waterstops | 2.2.2 | G | ||||||||||||||
| 155 | 03 30 00 | 3 | Product Data | Biodegradable Form Release Agent | 2.2.3 | G | ||||||||||||||
| 156 | 03 30 00 | 3 | Product Data | Pumping Concrete | 1.6.3.2 | G | ||||||||||||||
| 157 | 03 30 00 | 3 | Product Data | Nonshrink Grout | 2.4.2 | G | ||||||||||||||
| 158 | 03 30 00 | 3 | Product Data | Form Ties | 2.2.1 | G | ||||||||||||||
| 159 | 03 30 00 | 3 | Product Data | Aggregate | 2.3.3 | G | ||||||||||||||
| 160 | 03 30 00 | 3 | Product Data | Tie Down Anchors | 2.4.7 | G | ||||||||||||||
| 161 | 03 30 00 | 3 | Product Data | Backer Rods | 2.4.6 | G | ||||||||||||||
| 162 | 03 30 00 | 3 | Product Data | Epoxy Adhesive | 2.4.3 | G | ||||||||||||||
| 163 | 03 30 00 | 3 | Product Data | Expansion/Contraction/Isolation Joint Filler | 2.4.4 | G | ||||||||||||||
| 164 | 03 30 00 | 5 | Design Data | Concrete Mix Design | 1.6.1.2 | G | ||||||||||||||
| 165 | 03 30 00 | 5 | Design Data | Formwork Calculations | 1.6.1.1 | G | ||||||||||||||
| 166 | 03 30 00 | 6 | Test Reports | Concrete Mix Design | 1.6.1.2 | G | ||||||||||||||
| 167 | 03 30 00 | 6 | Test Reports | Fly Ash | 1.6.4.1 | G | ||||||||||||||
| 168 | 03 30 00 | 6 | Test Reports | Pozzolan | 1.6.4.1 | G | ||||||||||||||
| 169 | 03 30 00 | 6 | Test Reports | Slag Cement | 1.6.4.2 | G | ||||||||||||||
| 170 | 03 30 00 | 6 | Test Reports | Water | 2.3.2 | G | ||||||||||||||
| 171 | 03 30 00 | 6 | Test Reports | Strength Test Reports | 3.13.3.1 | G | ||||||||||||||
| 172 | 03 30 00 | 6 | Test Reports | Concrete Test Reports | 3.13.6.1 | G | ||||||||||||||
| 173 | 03 30 00 | 6 | Test Reports | Defect Report | 3.14 | G | ||||||||||||||
| 174 | 03 30 00 | 6 | Test Reports | Aggregate Test Results | 2.3.3.1 | G | ||||||||||||||
| 175 | 03 30 00 | 7 | Certificates | Reinforcing Bars | 2.6.1 | G | ||||||||||||||
| 176 | 03 30 00 | 7 | Certificates | VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers | 1.6.3.3 | G | ||||||||||||||
| 177 | 03 30 00 | 7 | Certificates | Safety Data Sheets | 1.6.3.4 | |||||||||||||||
| 178 | 03 30 00 | 7 | Certificates | Field Testing Technician and Testing Agency | 1.6.6.2 | G | ||||||||||||||
| 179 | 03 30 00 | 8 | Manufacturer's Instructions | Joint Sealants | 2.4.5 | G | ||||||||||||||
| 180 | 03 45 33 | 1 | Preconstruction Submittals | Manufacturer Qualifications | 1.4.1.1 | G | ||||||||||||||
| 181 | 03 45 33 | 1 | Preconstruction Submittals | Erector Certification | 1.4.1.2 | G | ||||||||||||||
| 182 | 03 45 33 | 1 | Preconstruction Submittals | Field Testing Technician And Testing Agency | 2.7.1 | G | ||||||||||||||
| 183 | 03 45 33 | 1 | Preconstruction Submittals | Laboratory Qualifications For Concrete Qualification Testing | 2.7.2 | G | ||||||||||||||
| 184 | 03 45 33 | 1 | Preconstruction Submittals | Substation Yard Coordination Plan | 2.2 | G | ||||||||||||||
| 185 | 03 45 33 | 2 | Shop Drawings | Drawings of Precast Members | 2.1.1.2 | G | ||||||||||||||
| 186 | 03 45 33 | 2 | Shop Drawings | Above Grade Utility Duct Covers | 2.3 | G | ||||||||||||||
| 187 | 03 45 33 | 2 | Shop Drawings | Vault Shop Drawings | 2.2 | G | ||||||||||||||
| 188 | 03 45 33 | 2 | Shop Drawings | Below Grade Utility Duct Covers | 2.4 | G | ||||||||||||||
| 189 | 03 45 33 | 2 | Shop Drawings | Manhole 139A Cover | 2.5 | G | ||||||||||||||
| 190 | 03 45 33 | 3 | Product Data | Inserts | 2.6.4.1 | G | ||||||||||||||
| 191 | 03 45 33 | 3 | Product Data | Bearing Pads | 2.6.5 | G | ||||||||||||||
| 192 | 03 45 33 | 3 | Product Data | Access Hatches | 2.3.1 | G | ||||||||||||||
| 193 | 03 45 33 | 4 | Samples | Surface Finish | 2.7.11 | G | ||||||||||||||
| 194 | 03 45 33 | 5 | Design Data | Design Calculations | 2.1.1.2 | G | ||||||||||||||
| 195 | 03 45 33 | 5 | Design Data | Below Grade Utility Duct Covers | 2.4 | G | ||||||||||||||
| 196 | 03 45 33 | 5 | Design Data | Manhole 139A Cover | 2.5 | G | ||||||||||||||
| 197 | 03 45 33 | 5 | Design Data | Utility Vault Calculations | 2.2 | G | ||||||||||||||
| 198 | 03 45 33 | 6 | Test Reports | Concrete and Aggregate Quality Control Testing | 1.4.1.1 | G | ||||||||||||||
| 199 | 03 45 33 | 6 | Test Reports | Concrete Test Reports | 2.9.1 | G | ||||||||||||||
| 200 | 03 45 33 | 7 | Certificates | Quality Control Procedures | 2.7 | G | ||||||||||||||
| 201 | 03 45 33 | 7 | Certificates | Construction Records | 3.9 | G | ||||||||||||||
| 202 | 03 45 33 | 7 | Certificates | Erector's Post Audit Declaration | 1.4.1.3 | G | ||||||||||||||
| 203 | 03 45 33 | 11 | Closeout Submittals | Batch Ticket | 1.4.4 | G | ||||||||||||||
| 204 | 05 05 23.16 | 1 | Preconstruction Submittals | Welding Quality Assurance Plan | 3.2 | G | ||||||||||||||
| 205 | 05 05 23.16 | 3 | Product Data | Welding Procedure Qualifications | 1.3 | G | ||||||||||||||
| 206 | 05 05 23.16 | 3 | Product Data | Welder, Welding Operator, and Tacker Qualification | 1.3.4 | |||||||||||||||
| 207 | 05 05 23.16 | 3 | Product Data | Previous Qualifications | 1.3.2 | |||||||||||||||
| 208 | 05 05 23.16 | 3 | Product Data | Pre-Qualified Procedures | 1.3.3 | G | ||||||||||||||
| 209 | 05 05 23.16 | 3 | Product Data | Welding Electrodes and Rods | 2.2 | G | ||||||||||||||
| 210 | 05 05 23.16 | 6 | Test Reports | Nondestructive Testing | 3.3 | G | ||||||||||||||
| 211 | 05 05 23.16 | 6 | Test Reports | Weld Inspection Log | 3.2 | G | ||||||||||||||
| 212 | 05 05 23.16 | 7 | Certificates | Certified Welding Procedure Specifications (WPS) | 1.3.1 | |||||||||||||||
| 213 | 05 05 23.16 | 7 | Certificates | Certified Brazing Procedure Specifications (BPS) | 1.3.1 | |||||||||||||||
| 214 | 05 05 23.16 | 7 | Certificates | Certified Procedure Qualification Records (PQR) | 1.3.1 | |||||||||||||||
| 215 | 05 05 23.16 | 7 | Certificates | Certified Welder Performance Qualifications (WPQ) | 1.3.1 | |||||||||||||||
| 216 | 05 05 23.16 | 7 | Certificates | Certified Brazer Performance Qualifications (BPQ) | 1.3.1 | |||||||||||||||
| 217 | 05 05 23.16 | 7 | Certificates | Certified Welding Inspector | 1.3.5 | G | ||||||||||||||
| 218 | 05 05 23.16 | 7 | Certificates | Nondestructive Testing Personnel | 1.3.5 | G | ||||||||||||||
| 219 | 05 12 00 | 1 | Preconstruction Submittals | Erection and Erection Bracing Drawings | 1.3.1.1 | G | ||||||||||||||
| 220 | 05 12 00 | 2 | Shop Drawings | Fabrication Drawings | 1.3.2 | G | ||||||||||||||
| 221 | 05 12 00 | 3 | Product Data | Direct Tension Indicator Washers | 2.3.1.3 | G | ||||||||||||||
| 222 | 05 12 00 | 5 | Design Data | Shoring and Temporary Bracing | 1.3.2 | G | ||||||||||||||
| 223 | 05 12 00 | 6 | Test Reports | Bolts, Nuts, and Washers | 2.3 | G | ||||||||||||||
| 224 | 05 12 00 | 6 | Test Reports | Direct Tension Indicator Washer Inspection Reports | 3.6.1.1 | G | ||||||||||||||
| 225 | 05 12 00 | 6 | Test Reports | Bolt Testing Reports | 3.6.2.1 | G | ||||||||||||||
| 226 | 05 12 00 | 6 | Test Reports | Embrittlement Test Reports | 3.6.3 | G | ||||||||||||||
| 227 | 05 12 00 | 7 | Certificates | Steel | 2.2 | G | ||||||||||||||
| 228 | 05 12 00 | 7 | Certificates | Bolts, Nuts, and Washers | 2.3 | G | ||||||||||||||
| 229 | 05 12 00 | 7 | Certificates | Galvanizing | 2.5 | G | ||||||||||||||
| 230 | 05 30 00.01 | 1 | Preconstruction Submittals | Installation Procedures Plan | 3.2.1 | G | ||||||||||||||
| 231 | 05 30 00.01 | 1 | Preconstruction Submittals | Anchor Installation Plan | 3.3 | G | ||||||||||||||
| 232 | 05 30 00.01 | 1 | Preconstruction Submittals | Selective Demolition Plan | 3.1 | G | ||||||||||||||
| 233 | 05 30 00.01 | 2 | Shop Drawings | Bollards | 2.1.1 | G | ||||||||||||||
| 234 | 05 30 00.01 | 2 | Shop Drawings | Cleats | 2.1.2 | G | ||||||||||||||
| 235 | 05 30 00.01 | 3 | Product Data | Bollards | 2.1.1 | G | ||||||||||||||
| 236 | 05 30 00.01 | 3 | Product Data | Cleats | 2.1.2 | G | ||||||||||||||
| 237 | 05 30 00.01 | 3 | Product Data | Anchorage Hardware | 2.2 | G | ||||||||||||||
| 238 | 05 30 00.01 | 3 | Product Data | Plates | 2.2.2 | G | ||||||||||||||
| 239 | 05 30 00.01 | 3 | Product Data | Nuts and Washers | 2.2.1 | G | ||||||||||||||
| 240 | 05 30 00.01 | 3 | Product Data | Grout | 2.3 | G | ||||||||||||||
| 241 | 05 30 00.01 | 3 | Product Data | Sealants | 2.4 | G | ||||||||||||||
| 242 | 05 30 00.01 | 3 | Product Data | Coating System Data Sheets | 2.5 | G | ||||||||||||||
| 243 | 05 30 00.01 | 6 | Test Reports | Anchorage Hardware | 2.2 | G | ||||||||||||||
| 244 | 05 30 00.01 | 6 | Test Reports | Testing Reports | 3.5 | G | ||||||||||||||
| 245 | 05 30 00.01 | 6 | Test Reports | Anchorage Hardware Assembly Tests | 2.2.3 | G | ||||||||||||||
| 246 | 05 30 00.01 | 7 | Certificates | Bollards | 2.1.1 | G | ||||||||||||||
| 247 | 05 30 00.01 | 7 | Certificates | Cleats | 2.1.2 | G | ||||||||||||||
| 248 | 05 30 00.01 | 7 | Certificates | Anchorage Hardware | 2.2 | G | ||||||||||||||
| 249 | 05 30 00.01 | 7 | Certificates | Plates | 2.2.2 | G | ||||||||||||||
| 250 | 05 30 00.01 | 7 | Certificates | Nuts and Washers | 2.2.1 | G | ||||||||||||||
| 251 | 05 30 00.01 | 7 | Certificates | Grout | 2.3 | G | ||||||||||||||
| 252 | 05 30 00.01 | 7 | Certificates | Sealants | 2.4 | G | ||||||||||||||
| 253 | 05 30 00.01 | 7 | Certificates | Anchor Testing Personnel | 3.5 | G | ||||||||||||||
| 254 | 05 30 00.01 | 7 | Certificates | Testing Laboratory | 3.5 | G | ||||||||||||||
| 255 | 05 51 00 | 2 | Shop Drawings | Steel Hardware | 2.1 | G | ||||||||||||||
| 256 | 05 51 00 | 2 | Shop Drawings | Steel Shapes, Plates, Bars, and Strips | 2.1 | G | ||||||||||||||
| 257 | 05 51 00 | 2 | Shop Drawings | Metal Stair System | 2.2.1 | G | ||||||||||||||
| 258 | 05 51 00 | 2 | Shop Drawings | Steel Grating | 2.1 | G | ||||||||||||||
| 259 | 05 51 00 | 2 | Shop Drawings | Removable Stairs Shop Drawings | 1.3.2 | G | ||||||||||||||
| 260 | 05 51 00 | 3 | Product Data | Structural-Steel Plates, Shapes, and Bars | 2.4.1 | G | ||||||||||||||
| 261 | 05 51 00 | 3 | Product Data | Protective Coating | 2.2.4 | G | ||||||||||||||
| 262 | 05 51 00 | 3 | Product Data | Stairs | 2.2.2 | G | ||||||||||||||
| 263 | 05 51 00 | 3 | Product Data | Steel Stairs | 2.3.1 | G | ||||||||||||||
| 264 | 05 51 00 | 8 | Manufacturer's Instructions | Structural-Steel Plates, Shapes, and Bars | 2.4.1 | G | ||||||||||||||
| 265 | 05 51 00 | 8 | Manufacturer's Instructions | Protective Coating | 2.2.4 | G | ||||||||||||||
| 266 | 05 52 00 | 2 | Shop Drawings | Fabrication Drawings | 1.2.1 | G | ||||||||||||||
| 267 | 05 52 00 | 2 | Shop Drawings | Iron and Steel Hardware | 3.2 | G | ||||||||||||||
| 268 | 05 52 00 | 2 | Shop Drawings | Steel Shapes, Plates, Bars and Strips | 3.2 | G | ||||||||||||||
| 269 | 05 52 00 | 3 | Product Data | Structural-Steel Plates, Shapes, and Bars | 2.2.1 | G | ||||||||||||||
| 270 | 05 52 00 | 3 | Product Data | Steel Guardrails | 2.2.4 | G | ||||||||||||||
| 271 | 05 52 00 | 3 | Product Data | Anchorage and Fastening Systems | 1.2.1 | G | ||||||||||||||
| 272 | 05 52 00 | 8 | Manufacturer's Instructions | Installation Instructions | 3.2 | |||||||||||||||
| 273 | 06 73 01 | 2 | Shop Drawings | Installation Drawings, Templates, and Directions | 1.3 | G | ||||||||||||||
| 274 | 06 73 01 | 3 | Product Data | FRP Grating | 1.3 | G | ||||||||||||||
| 275 | 06 73 01 | 3 | Product Data | Clips and Anchorage | 1.3 | G | ||||||||||||||
| 276 | 06 73 01 | 6 | Test Reports | Bearing Strength Testing | 2.1.1 | G | ||||||||||||||
| 277 | 06 73 01 | 6 | Test Reports | Flexural Properties | 2.1.1 | G | ||||||||||||||
| 278 | 06 73 01 | 6 | Test Reports | Ultraviolet Testing | 2.1.1 | G | ||||||||||||||
| 279 | 06 73 01 | 6 | Test Reports | Shear Strength | 2.1.1 | G | ||||||||||||||
| 280 | 06 73 01 | 6 | Test Reports | Tensile Properties | 2.1.1 | G | ||||||||||||||
| 281 | 06 73 01 | 6 | Test Reports | Toxicity Testing | 2.1.1 | G | ||||||||||||||
| 282 | 06 73 01 | 6 | Test Reports | Coefficient of Lineal Thermal Expansion | 2.1.1 | G | ||||||||||||||
| 283 | 06 73 01 | 6 | Test Reports | Flame Spread Testing | 2.1.1 | G | ||||||||||||||
| 284 | 06 73 01 | 7 | Certificates | Manufacturer's Sample Warranty | 1.3 | G | ||||||||||||||
| 285 | 06 73 01 | 7 | Certificates | Certification of Anchorage System compliance with ASCE 7-16 | 1.3 | G | ||||||||||||||
| 286 | 06 73 01 | 7 | Certificates | Manufacturer's Qualifications | 1.3 | G | ||||||||||||||
| 287 | 06 73 01 | 8 | Manufacturer's Instructions | Shipping, Handling, And Erection Procedures | 1.4 | G | ||||||||||||||
| 288 | 06 73 01 | 8 | Manufacturer's Instructions | Care and Maintenance Instructions | 1.4 | G | ||||||||||||||
| 289 | 06 73 01 | 11 | Closeout Submittals | Manufacturer's Warranty | 3.2.1 | G | ||||||||||||||
| 290 | 07 13 53 | 3 | Product Data | Elastomeric Waterproofing Sheet Material | 2.1 | G | ||||||||||||||
| 291 | 07 13 53 | 3 | Product Data | Protection Board | 2.3 | G | ||||||||||||||
| 292 | 07 13 53 | 3 | Product Data | Primers, Adhesives, and Mastics | 1.5 | G | ||||||||||||||
| 293 | 07 13 53 | 3 | Product Data | Primers, Adhesives, and Mastics | 2.1 | G | ||||||||||||||
| 294 | 07 13 53 | 6 | Test Reports | Elastomeric Waterproofing Sheet Material | 2.1 | |||||||||||||||
| 295 | 07 13 53 | 6 | Test Reports | Field Quality Control | 3.6 | |||||||||||||||
| 296 | 07 13 53 | 6 | Test Reports | Protective Covering | 3.7 | |||||||||||||||
| 297 | 07 13 53 | 8 | Manufacturer's Instructions | Primers, Adhesives, and Mastics | 1.5 | |||||||||||||||
| 298 | 07 13 53 | 8 | Manufacturer's Instructions | Primers, Adhesives, and Mastics | 2.1 | |||||||||||||||
| 299 | 07 84 00 | 2 | Shop Drawings | Firestopping System | 2.1 | G | ||||||||||||||
| 300 | 07 84 00 | 3 | Product Data | Firestopping Materials | 2.2 | G | ||||||||||||||
| 301 | 07 84 00 | 6 | Test Reports | Inspection | 3.4 | G | ||||||||||||||
| 302 | 07 84 00 | 7 | Certificates | Inspector Qualifications | 1.5.2 | G | ||||||||||||||
| 303 | 07 84 00 | 7 | Certificates | Firestopping Materials | 2.2 | G | ||||||||||||||
| 304 | 07 84 00 | 7 | Certificates | Installer Qualifications | 1.5.1 | G | ||||||||||||||
| 305 | 09 97 13.26 | 1 | Preconstruction Submittals | Quality Control Plan | 1.4.1 | G | ||||||||||||||
| 306 | 09 97 13.26 | 1 | Preconstruction Submittals | Coating Work Plan | 1.4.3 | G | ||||||||||||||
| 307 | 09 97 13.26 | 1 | Preconstruction Submittals | Inspection Plan | 1.4.2 | G | ||||||||||||||
| 308 | 09 97 13.26 | 3 | Product Data | Epoxy-Polyamide | 2.1.2 | G | ||||||||||||||
| 309 | 09 97 13.26 | 3 | Product Data | Coal Tar Epoxy-Polyamide | 2.1.2 | G | ||||||||||||||
| 310 | 09 97 13.26 | 3 | Product Data | Blast Material | 2.1.3 | G | ||||||||||||||
| 311 | 09 97 13.26 | 5 | Design Data | Containment System | 1.4.4.1 | G | ||||||||||||||
| 312 | 09 97 13.26 | 6 | Test Reports | Inspection Report | 1.4.2.1 | G | ||||||||||||||
| 313 | 09 97 13.26 | 7 | Certificates | Coating Materials | 1.4.5.3 | G | ||||||||||||||
| 314 | 09 97 13.26 | 7 | Certificates | Qualifications of Coating Inspector | 1.4.5.1 | G | ||||||||||||||
| 315 | 09 97 13.26 | 7 | Certificates | Qualifications of Coating Contractors | 1.4.5.2 | G | ||||||||||||||
| 316 | 09 97 13.26 | 8 | Manufacturer's Instructions | Coating System Instructions | 2.1.1 | G | ||||||||||||||
| 317 | 22 15 13.00 20 | 1 | Preconstruction Submittals | Quality Assurance | 1.4.1 | G | ||||||||||||||
| 318 | 22 15 13.00 20 | 1 | Preconstruction Submittals | Experience for Installation and Testing | 1.9.8 | G | ||||||||||||||
| 319 | 22 15 13.00 20 | 2 | Shop Drawings | High pressure compressed air system | 1.9.1.1 | G | ||||||||||||||
| 320 | 22 15 13.00 20 | 2 | Shop Drawings | Anchors | 2.1.7 | G | ||||||||||||||
| 321 | 22 15 13.00 20 | 2 | Shop Drawings | Expansion Loops | 2.1.1 | G | ||||||||||||||
| 322 | 22 15 13.00 20 | 3 | Product Data | Piping | 2.1.1 | G | ||||||||||||||
| 323 | 22 15 13.00 20 | 3 | Product Data | Adapters | 2.1.4 | G | ||||||||||||||
| 324 | 22 15 13.00 20 | 3 | Product Data | Valves | 2.1.2 | G | ||||||||||||||
| 325 | 22 15 13.00 20 | 3 | Product Data | Fittings | 2.1.3 | |||||||||||||||
| 326 | 22 15 13.00 20 | 3 | Product Data | Union nuts | 2.1.5 | G | ||||||||||||||
| 327 | 22 15 13.00 20 | 3 | Product Data | Mechanical Link Seals | 2.2.2 | G | ||||||||||||||
| 328 | 22 15 13.00 20 | 3 | Product Data | Expansion Loops | 2.1.1 | G | ||||||||||||||
| 329 | 22 15 13.00 20 | 3 | Product Data | Hangers and supports | 2.1.6 | G | ||||||||||||||
| 330 | 22 15 13.00 20 | 3 | Product Data | Identification labels for piping and valves | 2.3 | G | ||||||||||||||
| 331 | 22 15 13.00 20 | 3 | Product Data | Bending | 3.1.1 | G | ||||||||||||||
| 332 | 22 15 13.00 20 | 6 | Test Reports | Non-Destructive Examination (NDE) report for welding of piping | 3.1.1 | G | ||||||||||||||
| 333 | 22 15 13.00 20 | 6 | Test Reports | Leak Tightness Test | 3.3.2.2 | G | ||||||||||||||
| 334 | 22 15 13.00 20 | 6 | Test Reports | Hydrostatic Pressure Test | 3.3.2.2 | G | ||||||||||||||
| 335 | 22 15 13.00 20 | 6 | Test Reports | Cleaning and Testing | 1.9.10 | G | ||||||||||||||
| 336 | 22 15 13.00 20 | 6 | Test Reports | System Acceptance | 3.2.8.1 | G | ||||||||||||||
| 337 | 22 15 13.00 20 | 6 | Test Reports | Welds | 1.4.3 | |||||||||||||||
| 338 | 22 15 13.00 20 | 7 | Certificates | Testing Firm Certification of Compliance | 1.4.2 | G | ||||||||||||||
| 339 | 22 15 13.00 20 | 7 | Certificates | Employer's record documents | 1.9.6 | |||||||||||||||
| 340 | 22 15 13.00 20 | 7 | Certificates | Welding and brazing procedures and qualifications | 1.9.7 | G | ||||||||||||||
| 341 | 22 15 13.00 20 | 7 | Certificates | Hydrostatic Testing Safety Engineer Qualifications | 1.9.8 | G | ||||||||||||||
| 342 | 22 15 13.00 20 | 10 | Operation and Maintenance Data | Valves | 2.1.2 | G | ||||||||||||||
| 343 | 22 15 13.00 20 | 11 | Closeout Submittals | compressed air systems | 1.9 | |||||||||||||||
| 344 | 22 15 13.00 20 | 11 | Closeout Submittals | As Built Drawings | 1.9.3 | G | ||||||||||||||
| 345 | 22 15 14.00 40 | 2 | Shop Drawings | Installation Drawings | 2.1 | G | ||||||||||||||
| 346 | 22 15 14.00 40 | 3 | Product Data | Equipment and Performance Data | 2.1.1 | G | ||||||||||||||
| 347 | 22 15 14.00 40 | 3 | Product Data | Piping Materials | 2.3.1 | G | ||||||||||||||
| 348 | 22 15 14.00 40 | 3 | Product Data | Piping Specialties | 2.2.1 | G | ||||||||||||||
| 349 | 22 15 14.00 40 | 3 | Product Data | Braided Flexible Expansion Loops | 2.2.1.1 | G | ||||||||||||||
| 350 | 22 15 14.00 40 | 3 | Product Data | Supporting Elements | 2.4.2 | G | ||||||||||||||
| 351 | 22 15 14.00 40 | 3 | Product Data | Valves | 2.2.2 | G | ||||||||||||||
| 352 | 22 15 14.00 40 | 3 | Product Data | Accessories | 3.1.1.1 | G | ||||||||||||||
| 353 | 22 15 14.00 40 | 3 | Product Data | Miscellaneous Materials | 2.4.1 | G | ||||||||||||||
| 354 | 22 15 14.00 40 | 6 | Test Reports | Piping System Test Report | 3.2.1.4 | |||||||||||||||
| 355 | 22 15 14.00 40 | 7 | Certificates | Piping Materials | 2.3.1 | |||||||||||||||
| 356 | 22 15 14.00 40 | 7 | Certificates | Supporting Elements | 2.4.2 | |||||||||||||||
| 357 | 22 15 14.00 40 | 7 | Certificates | Valves | 2.2.2 | |||||||||||||||
| 358 | 22 15 14.00 40 | 7 | Certificates | Miscellaneous Materials | 2.4.1 | |||||||||||||||
| 359 | 22 15 14.00 40 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.4 | |||||||||||||||
| 360 | 22 15 43 | 2 | Shop Drawings | Detail Drawings | Part 2 | G | ||||||||||||||
| 361 | 22 15 43 | 3 | Product Data | Underground Piping | 2.2.1 | G | ||||||||||||||
| 362 | 22 15 43 | 3 | Product Data | Aboveground Piping | 2.2.2 | G | ||||||||||||||
| 363 | 22 15 43 | 3 | Product Data | Leak Detection System | 2.2.3 | G | ||||||||||||||
| 364 | 22 15 43 | 6 | Test Reports | Pressure Testing | 3.2.1 | G | ||||||||||||||
| 365 | 22 15 43 | 11 | Closeout Submittals | As Built drawings | 1.5.2 | G | ||||||||||||||
| 366 | 22 15 43 | 11 | Closeout Submittals | As Built Piping Systems Coordination Drawings | 1.5.1 | G | ||||||||||||||
| 367 | 22 15 50 | 3 | Product Data | Tubing | 2.2.1.1 | G | ||||||||||||||
| 368 | 22 15 50 | 3 | Product Data | Manual Valves | 2.1.1 | G | ||||||||||||||
| 369 | 22 15 50 | 3 | Product Data | Piping Specialties | 2.2.2.2 | G | ||||||||||||||
| 370 | 22 15 50 | 3 | Product Data | Miscellaneous Materials | 2.2.2 | G | ||||||||||||||
| 371 | 22 15 50 | 3 | Product Data | Supporting Elements | 2.1.2 | G | ||||||||||||||
| 372 | 22 15 50 | 6 | Test Reports | Hydrostatic Pressure Test Report | 3.2.3.1 | G | ||||||||||||||
| 373 | 22 15 50 | 11 | Closeout Submittals | As Built drawings | 1.4.3 | G | ||||||||||||||
| 374 | 22 15 50 | 11 | Closeout Submittals | As Built Piping Systems Coordination Drawings | 1.4.1 | G | ||||||||||||||
| 375 | 23 22 13.35 40 | 3 | Product Data | Manufacturer's Catalog Data | Part 2 | G | ||||||||||||||
| 376 | 23 22 13.35 40 | 2 | Shop Drawings | Installation Drawings | 3.1 | G | ||||||||||||||
| 377 | 23 22 13.35 40 | 7 | Certificates | List of Product Installations | 1.5 | |||||||||||||||
| 378 | 23 22 13.35 40 | 7 | Certificates | Steam Traps | 2.2 | |||||||||||||||
| 379 | 23 22 13.35 40 | 7 | Certificates | Trap Bodies and Components | 2.2 | |||||||||||||||
| 380 | 26 05 33 | 2 | Shop Drawings | 600 V Power Connection Station | 2.1 | G | ||||||||||||||
| 381 | 26 05 33 | 3 | Product Data | 600 V Single Pole Connectors | 2.1.2 | G | ||||||||||||||
| 382 | 26 05 33 | 3 | Product Data | Industrial Service Auxiliary Devices | 2.1.3 | G | ||||||||||||||
| 383 | 26 05 33 | 3 | Product Data | Diesel Locomotive Cables | 2.1.2.2 | G | ||||||||||||||
| 384 | 26 05 33 | 3 | Product Data | Cable Support Grips | 2.1.2.3 | G | ||||||||||||||
| 385 | 26 05 33 | 6 | Test Reports | Paint Coating System | 2.4.1 | |||||||||||||||
| 386 | 26 05 33 | 6 | Test Reports | 600 V Single Pole Connector Compatibility Tests | 2.4.2 | |||||||||||||||
| 387 | 26 05 33 | 6 | Test Reports | 600 V Single Pole Connector Torque Test | 2.4.3 | |||||||||||||||
| 388 | 26 05 33 | 6 | Test Reports | Cable Phase Rotation Test | 3.6 | G | ||||||||||||||
| 389 | 26 05 33 | 6 | Test Reports | Acceptance Checks and Tests | 3.8.1 | G | ||||||||||||||
| 390 | 26 05 33 | 10 | Operation and Maintenance Data | 600 V Power Connection Station | 2.1 | G | ||||||||||||||
| 391 | 26 05 33 | 11 | Closeout Submittals | As Built Drawings | 1.6.2 | G | ||||||||||||||
| 392 | 26 08 00 | 3 | Product Data | Electronic Trip Units | 2.1 | G | ||||||||||||||
| 393 | 26 08 00 | 3 | Product Data | Breaker Accessories | 2.3 | G | ||||||||||||||
| 394 | 26 08 00 | 6 | Test Reports | Initial Breaker Report | 3.2 | G | ||||||||||||||
| 395 | 26 08 00 | 6 | Test Reports | Acceptance tests and inspections | 3.1 | G | ||||||||||||||
| 396 | 26 08 00 | 6 | Test Reports | Remanufacture Circuit Breaker Report | 3.2.2 | G | ||||||||||||||
| 397 | 26 08 00 | 6 | Test Reports | Metering Report | 3.4 | G | ||||||||||||||
| 398 | 26 08 00 | 7 | Certificates | Qualifications | 1.4.1 | G | ||||||||||||||
| 399 | 26 08 00 | 7 | Certificates | Acceptance test and inspections procedure | 1.4.3 | G | ||||||||||||||
| 400 | 26 11 16 | 2 | Shop Drawings | Unit Substation Drawings (Load Center) | 1.6.1.1 | G | ||||||||||||||
| 401 | 26 11 16 | 2 | Shop Drawings | Load Center Coordination Drawing | 1.6.1.1 | G | ||||||||||||||
| 402 | 26 11 16 | 2 | Shop Drawings | Transformer drawings | 1.6.1.2 | G | ||||||||||||||
| 403 | 26 11 16 | 3 | Product Data | Fuse curves | 1.6.1.1 | G | ||||||||||||||
| 404 | 26 11 16 | 3 | Product Data | Secondary unit substation (load center) | 2.2 | G | ||||||||||||||
| 405 | 26 11 16 | 3 | Product Data | transformer (liquid-filled) | 2.2.2 | G | ||||||||||||||
| 406 | 26 11 16 | 6 | Test Reports | Acceptance checks and tests | 3.6.1 | G | ||||||||||||||
| 407 | 26 11 16 | 7 | Certificates | Paint coating system | 1.6.2 | |||||||||||||||
| 408 | 26 11 16 | 7 | Certificates | Transformer Losses | 1.6.3 | G | ||||||||||||||
| 409 | 26 11 16 | 9 | Manufacturer's Field Reports | Load Interrupter Switch production tests | 2.6.2 | G | ||||||||||||||
| 410 | 26 11 16 | 9 | Manufacturer's Field Reports | transformer design tests (liquid-filled) | 2.6.3 | G | ||||||||||||||
| 411 | 26 11 16 | 9 | Manufacturer's Field Reports | transformer routine and other tests (liquid-filled) | 2.6.4 | G | ||||||||||||||
| 412 | 26 11 16 | 10 | Operation and Maintenance Data | Unit substations | 2.2 | G | ||||||||||||||
| 413 | 26 11 16 | 11 | Closeout Submittals | Assembled Operation and Maintenance Manuals | 1.7.1 | G | ||||||||||||||
| 414 | 26 11 16 | 11 | Closeout Submittals | Equipment test schedule | 2.6.1 | G | ||||||||||||||
| 415 | 26 13 00 | 2 | Shop Drawings | Switchgear Drawings | 1.6.1 | G | ||||||||||||||
| 416 | 26 13 00 | 2 | Shop Drawings | Voltage Regulator Drawings | 1.6.1 | G | ||||||||||||||
| 417 | 26 13 00 | 3 | Product Data | Electronic Overcurrent Control Curves | 1.6.3 | G | ||||||||||||||
| 418 | 26 13 00 | 3 | Product Data | SF6/High-Firepoint Fluid Insulated Pad-mounted Switchgear (VFI) | 1.7.1 | G | ||||||||||||||
| 419 | 26 13 00 | 3 | Product Data | SF6/High-Firepoint Fluid Insulated Pad-mounted Switchgear (VFI) | 2.1 | G | ||||||||||||||
| 420 | 26 13 00 | 3 | Product Data | Insulated High-Voltage Connectors | 2.1.6 | G | ||||||||||||||
| 421 | 26 13 00 | 3 | Product Data | Surge Arresters | 2.1.7 | G | ||||||||||||||
| 422 | 26 13 00 | 3 | Product Data | Pad Mounted Voltage Regulator | 1.7.1 | G | ||||||||||||||
| 423 | 26 13 00 | 3 | Product Data | Pad Mounted Voltage Regulator | 2.2 | G | ||||||||||||||
| 424 | 26 13 00 | 6 | Test Reports | Acceptance Checks and Tests | 3.4.1 | G | ||||||||||||||
| 425 | 26 13 00 | 7 | Certificates | Paint Coating System | 1.6.2 | |||||||||||||||
| 426 | 26 13 00 | 9 | Manufacturer's Field Reports | Switchgear design and production tests | 2.3.1 | G | ||||||||||||||
| 427 | 26 13 00 | 9 | Manufacturer's Field Reports | Voltage Regulator Design and Production Tests | 2.3.2 | G | ||||||||||||||
| 428 | 26 13 00 | 10 | Operation and Maintenance Data | SF6/High-Firepoint Fluid Insulated Pad-mounted Switchgear (VFI) | 1.7.1 | G | ||||||||||||||
| 429 | 26 13 00 | 10 | Operation and Maintenance Data | SF6/High-Firepoint Fluid Insulated Pad-mounted Switchgear (VFI) | 2.1 | G | ||||||||||||||
| 430 | 26 13 00 | 10 | Operation and Maintenance Data | Pad Mounted Voltage Regulator | 1.7.1 | G | ||||||||||||||
| 431 | 26 13 00 | 10 | Operation and Maintenance Data | Pad Mounted Voltage Regulator | 2.2 | G | ||||||||||||||
| 432 | 26 24 13 | 2 | Shop Drawings | Switchboard (Sheltered Aisle Switchgear) Drawings | 1.6.2 | G | ||||||||||||||
| 433 | 26 24 13 | 3 | Product Data | Switchboard (Sheltered Aisle Switchgear) | 2.2 | G | ||||||||||||||
| 434 | 26 24 13 | 6 | Test Reports | Switchboard (Sheltered Aisle Switchgear) Design Tests | 2.5.2 | G | ||||||||||||||
| 435 | 26 24 13 | 6 | Test Reports | Switchboard (Sheltered Aisle Switchgear) Production Tests | 2.5.3 | G | ||||||||||||||
| 436 | 26 24 13 | 6 | Test Reports | Acceptance Checks and Tests | 3.5.1 | G | ||||||||||||||
| 437 | 26 24 13 | 7 | Certificates | Cybersecurity Equipment Certification | 2.5.4 | G | ||||||||||||||
| 438 | 26 24 13 | 7 | Certificates | Cybersecurity Installation Certification | 3.5.1.6 | G | ||||||||||||||
| 439 | 26 24 13 | 10 | Operation and Maintenance Data | Switchboard (Sheltered Aisle Switchgear) Operation and Maintenance | 1.7.1 | G | ||||||||||||||
| 440 | 26 24 13 | 11 | Closeout Submittals | Assembled Operation and Maintenance Manuals | 1.7.2 | G | ||||||||||||||
| 441 | 26 24 13 | 11 | Closeout Submittals | Equipment Test Schedule | 2.5.1 | G | ||||||||||||||
| 442 | 26 24 13 | 11 | Closeout Submittals | Request for Settings | 3.5 | G | ||||||||||||||
| 443 | 26 24 13 | 11 | Closeout Submittals | Service Entrance Available Fault Current Label | 2.8 | |||||||||||||||
| 444 | 26 27 29 | 2 | Shop Drawings | Coordination Drawings | 1.4.3 | G | ||||||||||||||
| 445 | 26 27 29 | 2 | Shop Drawings | Panelboards | 2.1 | G | ||||||||||||||
| 446 | 26 27 29 | 2 | Shop Drawings | Transformers | 2.11 | G | ||||||||||||||
| 447 | 26 27 29 | 2 | Shop Drawings | Wireways | 2.14 | G | ||||||||||||||
| 448 | 26 27 29 | 2 | Shop Drawings | Cable Tray | 2.15 | G | ||||||||||||||
| 449 | 26 27 29 | 2 | Shop Drawings | Heat Trace System | 2.19 | G | ||||||||||||||
| 450 | 26 27 29 | 3 | Product Data | Receptacles | 2.9 | |||||||||||||||
| 451 | 26 27 29 | 3 | Product Data | Disconnect switches | 2.7 | G | ||||||||||||||
| 452 | 26 27 29 | 3 | Product Data | Conduit and fittings | 2.2 | |||||||||||||||
| 453 | 26 27 29 | 3 | Product Data | Grounding and bonding equipment | 2.13 | |||||||||||||||
| 454 | 26 27 29 | 3 | Product Data | Device plates | 2.6 | |||||||||||||||
| 455 | 26 27 29 | 3 | Product Data | Wires and cables | 2.5 | |||||||||||||||
| 456 | 26 27 29 | 3 | Product Data | Outlet boxes and covers | 2.3 | |||||||||||||||
| 457 | 26 27 29 | 3 | Product Data | Transformers | 2.11 | G | ||||||||||||||
| 458 | 26 27 29 | 3 | Product Data | Splice and termination components | 2.5.5 | |||||||||||||||
| 459 | 26 27 29 | 3 | Product Data | Wireways | 2.14 | |||||||||||||||
| 460 | 26 27 29 | 3 | Product Data | Cabinets, junction boxes, and pull boxes | 2.4 | |||||||||||||||
| 461 | 26 27 29 | 3 | Product Data | Mounting straps | 2.12 | |||||||||||||||
| 462 | 26 27 29 | 3 | Product Data | Conduit support | 3.1.3.1 | |||||||||||||||
| 463 | 26 27 29 | 3 | Product Data | Heat Trace Control Panel | 2.19.1.9 | G | ||||||||||||||
| 464 | 26 27 29 | 3 | Product Data | Surge Protective Devices | 2.21 | G | ||||||||||||||
| 465 | 26 27 29 | 6 | Test Reports | Transformer tests | 3.5.2 | G | ||||||||||||||
| 466 | 26 27 29 | 6 | Test Reports | 600-volt wiring test | 3.5.3 | G | ||||||||||||||
| 467 | 26 27 29 | 6 | Test Reports | Grounding system test | 3.5.4 | G | ||||||||||||||
| 468 | 26 27 29 | 6 | Test Reports | Heat Trace System Test | 3.5.5 | G | ||||||||||||||
| 469 | 26 27 29 | 6 | Test Reports | Surge protection device installation checks | 3.5.6 | G | ||||||||||||||
| 470 | 26 51 00 | 2 | Shop Drawings | Luminaire Drawings | 1.6.1 | G | ||||||||||||||
| 471 | 26 51 00 | 3 | Product Data | Luminaires | 2.1 | G | ||||||||||||||
| 472 | 26 51 00 | 3 | Product Data | Light Sources | 2.2 | G | ||||||||||||||
| 473 | 26 51 00 | 3 | Product Data | LED Drivers | 2.3 | G | ||||||||||||||
| 474 | 26 51 00 | 3 | Product Data | Luminaire Warranty | 1.7.1 | G | ||||||||||||||
| 475 | 26 51 00 | 3 | Product Data | Switches | 2.4.1.1 | G | ||||||||||||||
| 476 | 26 51 00 | 3 | Product Data | Emergency Drivers | 2.5.1 | G | ||||||||||||||
| 477 | 26 51 00 | 6 | Test Reports | IES LM-79 Test Report | 1.6.3 | |||||||||||||||
| 478 | 26 51 00 | 6 | Test Reports | IES LM-80 Test Report | 1.6.4 | |||||||||||||||
| 479 | 26 51 00 | 6 | Test Reports | IES TM-21 Test Report | 1.6.5 | |||||||||||||||
| 480 | 26 51 00 | 6 | Test Reports | Emergency Lighting Test | 3.2.1.2 | G | ||||||||||||||
| 481 | 26 51 00 | 9 | Manufacturer's Field Reports | Commissioning | 3.3 | G | ||||||||||||||
| 482 | 26 51 00 | 10 | Operation and Maintenance Data | Lighting Control System | 3.3.3 | G | ||||||||||||||
| 483 | 26 56 00 | 2 | Shop Drawings | Luminaire Drawings | 1.6.1.1 | G | ||||||||||||||
| 484 | 26 56 00 | 2 | Shop Drawings | Pole Drawings | 1.6.1.2 | G | ||||||||||||||
| 485 | 26 56 00 | 3 | Product Data | Luminaires | 2.1 | G | ||||||||||||||
| 486 | 26 56 00 | 3 | Product Data | Light Sources | 2.2 | G | ||||||||||||||
| 487 | 26 56 00 | 3 | Product Data | LED Drivers | 2.3 | G | ||||||||||||||
| 488 | 26 56 00 | 3 | Product Data | Luminaire Warranty | 1.8.1 | G | ||||||||||||||
| 489 | 26 56 00 | 3 | Product Data | Pole Warranty | 1.8.2 | G | ||||||||||||||
| 490 | 26 56 00 | 3 | Product Data | Photosensors | 2.4.1.1 | G | ||||||||||||||
| 491 | 26 56 00 | 3 | Product Data | Lighting Contactor | 2.4.1.2 | G | ||||||||||||||
| 492 | 26 56 00 | 3 | Product Data | Poles | 2.5 | G | ||||||||||||||
| 493 | 26 56 00 | 3 | Product Data | Brackets | 2.5.2 | G | ||||||||||||||
| 494 | 26 56 00 | 5 | Design Data | Luminaire Design Data | 1.6.2 | G | ||||||||||||||
| 495 | 26 56 00 | 5 | Design Data | Photometric Plan | 1.6.6 | G | ||||||||||||||
| 496 | 26 56 00 | 6 | Test Reports | IES LM-79 Test Report | 1.6.3 | G | ||||||||||||||
| 497 | 26 56 00 | 6 | Test Reports | IES LM-80 Test Report | 1.6.4 | G | ||||||||||||||
| 498 | 26 56 00 | 6 | Test Reports | IES TM-21 Test Report | 1.6.5 | G | ||||||||||||||
| 499 | 26 56 00 | 8 | Manufacturer's Instructions | Poles | 2.5 | |||||||||||||||
| 500 | 26 56 00 | 9 | Manufacturer's Field Reports | Commissioning | 3.4 | G | ||||||||||||||
| 501 | 26 56 00 | 10 | Operation and Maintenance Data | Exterior Lighting Control System | 1.9.2 | G | ||||||||||||||
| 502 | 26 56 00 | 10 | Operation and Maintenance Data | Exterior Lighting Control System | 3.4.2 | G | ||||||||||||||
| 503 | 27 10 00 | 2 | Shop Drawings | Telecommunications Space Drawings | 1.7.1.1 | G | ||||||||||||||
| 504 | 27 10 00 | 3 | Product Data | Telecommunications cabling | 2.3 | G | ||||||||||||||
| 505 | 27 10 00 | 3 | Product Data | Patch panels | 2.4.4 | G | ||||||||||||||
| 506 | 27 10 00 | 3 | Product Data | Telecommunications outlet/connector assemblies | 2.5 | G | ||||||||||||||
| 507 | 27 10 00 | 3 | Product Data | Equipment support frame | 2.4.1 | G | ||||||||||||||
| 508 | 27 10 00 | 3 | Product Data | Connector blocks | 2.4.2 | G | ||||||||||||||
| 509 | 27 10 00 | 6 | Test Reports | Telecommunications cabling testing | 3.4.1 | G | ||||||||||||||
| 510 | 27 10 00 | 7 | Certificates | Telecommunications Contractor | 1.7.2.1 | G | ||||||||||||||
| 511 | 27 10 00 | 7 | Certificates | Key Personnel | 1.7.2.2 | G | ||||||||||||||
| 512 | 27 10 00 | 7 | Certificates | Manufacturer Qualifications | 1.7.2.3 | |||||||||||||||
| 513 | 27 10 00 | 7 | Certificates | Test plan | 1.7.3 | G | ||||||||||||||
| 514 | 27 10 00 | 9 | Manufacturer's Field Reports | Factory reel tests | 2.11.1 | |||||||||||||||
| 515 | 27 10 00 | 10 | Operation and Maintenance Data | Telecommunications cabling and pathway system | 1.11.1 | G | ||||||||||||||
| 516 | 27 10 00 | 11 | Closeout Submittals | Record Documentation | 1.11.2 | G | ||||||||||||||
| 517 | 31 23 00.00 22 | 1 | Preconstruction Submittals | Shoring and Sheeting Plan | 3.1.1 | G | ||||||||||||||
| 518 | 31 23 00.00 22 | 1 | Preconstruction Submittals | Dewatering Work Plan | 1.7.2 | G | ||||||||||||||
| 519 | 31 23 00.00 22 | 1 | Preconstruction Submittals | Excavation and Trenching Plan | 1.7.1 | G | ||||||||||||||
| 520 | 31 23 00.00 22 | 1 | Preconstruction Submittals | Excess Soil Disposal & Soil Sampling Plan | 1.7.4 | G | ||||||||||||||
| 521 | 31 23 00.00 22 | 1 | Preconstruction Submittals | Pwd Maine Dig Safe Utility Request Form | 3.1.3 | G | ||||||||||||||
| 522 | 31 23 00.00 22 | 3 | Product Data | Filter Fabric | 2.7 | G | ||||||||||||||
| 523 | 31 23 00.00 22 | 3 | Product Data | Flowable Fill | 2.8 | G | ||||||||||||||
| 524 | 31 23 00.00 22 | 3 | Product Data | Expanded Polstyrene (Eps) Geofoam | 2.9 | G | ||||||||||||||
| 525 | 31 23 00.00 22 | 6 | Test Reports | Pervious Granular Fill | 3.12.2.3 | G | ||||||||||||||
| 526 | 31 23 00.00 22 | 6 | Test Reports | Borrow Materials | 2.4 | G | ||||||||||||||
| 527 | 31 23 00.00 22 | 6 | Test Reports | Fill and backfill | 3.12.2.1 | G | ||||||||||||||
| 528 | 31 23 00.00 22 | 6 | Test Reports | Select material | 3.12.2.2 | G | ||||||||||||||
| 529 | 31 23 00.00 22 | 6 | Test Reports | Density tests | 3.12.2.4 | G | ||||||||||||||
| 530 | 31 23 00.00 22 | 7 | Certificates | Eps Termite Treatment | 2.9.3 | G | ||||||||||||||
| 531 | 31 23 00.00 22 | 7 | Certificates | Eps Flame Retardan | 2.9.4 | G | ||||||||||||||
| 532 | 31 68 13 | 2 | Shop Drawings | Fabrication and Installation Drawings | 1.3.1 | G | ||||||||||||||
| 533 | 31 68 13 | 3 | Product Data | Equipment | 2.3 | G | ||||||||||||||
| 534 | 31 68 13 | 3 | Product Data | Fabricator Qualifications | 1.5.1 | G | ||||||||||||||
| 535 | 31 68 13 | 3 | Product Data | Installer Qualifications | 1.5.2 | G | ||||||||||||||
| 536 | 31 68 13 | 3 | Product Data | Core Logging and Soil Sampling | 1.5.3 | G | ||||||||||||||
| 537 | 31 68 13 | 3 | Product Data | Installation Plan | 1.3.1 | G | ||||||||||||||
| 538 | 31 68 13 | 3 | Product Data | Anchors | 2.1.1 | G | ||||||||||||||
| 539 | 31 68 13 | 3 | Product Data | Anchor Accessories | 2.1.1 | G | ||||||||||||||
| 540 | 31 68 13 | 5 | Design Data | Design Calculations | 1.3.2 | G | ||||||||||||||
| 541 | 31 68 13 | 6 | Test Reports | Cement Grout | 2.4.5.1 | G | ||||||||||||||
| 542 | 31 68 13 | 7 | Certificates | Anchors | 2.1.1 | G | ||||||||||||||
| 543 | 31 68 13 | 7 | Certificates | Anchor Accessories | 2.1.1 | G | ||||||||||||||
| 544 | 31 68 13 | 11 | Closeout Submittals | Driller Logs | 3.4.3 | G | ||||||||||||||
| 545 | 31 68 13 | 11 | Closeout Submittals | Anchor Records | 3.4.4 | G | ||||||||||||||
| 546 | 32 12 16 | 3 | Product Data | Mix Design | 2.9 | G | ||||||||||||||
| 547 | 32 12 16 | 3 | Product Data | Quality Control | 3.9 | G | ||||||||||||||
| 548 | 32 12 16 | 3 | Product Data | Material Acceptance | 3.1 | G | ||||||||||||||
| 549 | 32 12 16 | 3 | Product Data | Asphalt Cement Binder | 2.8 | G | ||||||||||||||
| 550 | 32 12 16 | 3 | Product Data | Aggregates | 2.2 | G | ||||||||||||||
| 551 | 32 12 16 | 6 | Test Reports | Aggregates | 2.2 | G | ||||||||||||||
| 552 | 32 12 16 | 6 | Test Reports | QC Monitoring | 3.9.3.9 | G | ||||||||||||||
| 553 | 32 12 16 | 7 | Certificates | Asphalt Cement Binder | 2.8 | G | ||||||||||||||
| 554 | 32 12 16 | 7 | Certificates | Testing Laboratory | 3.5 | G | ||||||||||||||
| 555 | 32 17 23 | 3 | Product Data | Surface Preparation Equipment List | 2.1.1.1 | G | ||||||||||||||
| 556 | 32 17 23 | 3 | Product Data | Application Equipment List | 2.1.2 | G | ||||||||||||||
| 557 | 32 17 23 | 3 | Product Data | Exterior Surface Preparation | 3.2 | G | ||||||||||||||
| 558 | 32 17 23 | 3 | Product Data | Safety Data Sheets | 1.3.1 | G | ||||||||||||||
| 559 | 32 17 23 | 3 | Product Data | Waterborne Paint | 2.2.1 | G | ||||||||||||||
| 560 | 32 17 23 | 3 | Product Data | Thermoplastic compound | 2.2.2 | G | ||||||||||||||
| 561 | 32 17 23 | 3 | Product Data | Thermoplastic compound | 3.3.2 | G | ||||||||||||||
| 562 | 32 17 23 | 6 | Test Reports | Waterborne Paint | 2.2.1 | G | ||||||||||||||
| 563 | 32 17 23 | 6 | Test Reports | Thermoplastic Compound | 2.2.2 | G | ||||||||||||||
| 564 | 32 17 23 | 6 | Test Reports | Thermoplastic Compound | 3.3.2 | G | ||||||||||||||
| 565 | 32 17 23 | 6 | Test Reports | Test Reports | 3.4.1 | G | ||||||||||||||
| 566 | 32 17 23 | 6 | Test Reports | Sampling And Testing | 3.4.1 | G | ||||||||||||||
| 567 | 32 17 23 | 7 | Certificates | Qualifications | 1.3.2 | G | ||||||||||||||
| 568 | 32 17 23 | 7 | Certificates | Waterborne Paint | 2.2.1 | G | ||||||||||||||
| 569 | 32 17 23 | 7 | Certificates | Volatile Organic Compound | 1.3.1 | G | ||||||||||||||
| 570 | 32 17 23 | 7 | Certificates | Thermoplastic Compound | 2.2.2 | G | ||||||||||||||
| 571 | 32 17 23 | 7 | Certificates | Thermoplastic Compound | 3.3.2 | G | ||||||||||||||
| 572 | 32 17 23 | 8 | Manufacturer's Instructions | Waterborne Paint | 2.2.1 | G | ||||||||||||||
| 573 | 32 17 23 | 8 | Manufacturer's Instructions | Thermoplastic Compound | 2.2.2 | G | ||||||||||||||
| 574 | 32 17 23 | 8 | Manufacturer's Instructions | Thermoplastic Compound | 3.3.2 | G | ||||||||||||||
| 575 | 32 31 13.53 | 1 | Preconstruction Submittals | Coordination Plan | 1.4 | G | ||||||||||||||
| 576 | 32 31 13.53 | 2 | Shop Drawings | Fence Installation Drawings | 3.2.1 | G | ||||||||||||||
| 577 | 32 31 13.53 | 3 | Product Data | Fabric | 2.1.1.1 | G | ||||||||||||||
| 578 | 32 31 13.53 | 3 | Product Data | Posts | 2.1.2 | G | ||||||||||||||
| 579 | 32 31 13.53 | 3 | Product Data | Post Caps | 2.1.2.2 | G | ||||||||||||||
| 580 | 32 31 13.53 | 3 | Product Data | Barbed Wire | 2.2.1.2 | G | ||||||||||||||
| 581 | 32 31 13.53 | 3 | Product Data | Latches | 2.1.4.3 | G | ||||||||||||||
| 582 | 32 31 13.53 | 3 | Product Data | Hinges | 2.1.4.3 | G | ||||||||||||||
| 583 | 32 31 13.53 | 3 | Product Data | Stops | 2.1.4.3 | G | ||||||||||||||
| 584 | 32 31 13.53 | 3 | Product Data | Keepers | 2.1.4.3 | G | ||||||||||||||
| 585 | 32 31 13.53 | 3 | Product Data | Wire Ties | 2.2.1.1 | G | ||||||||||||||
| 586 | 32 31 13.53 | 3 | Product Data | Fence Fabric Reinforcement | 2.3 | G | ||||||||||||||
| 587 | 32 31 13.53 | 3 | Product Data | Chain Link Braces And Rails | 2.1.3 | G | ||||||||||||||
| 588 | 32 31 13.53 | 7 | Certificates | Chain Link Fence | 2.1.2.1 | G | ||||||||||||||
| 589 | 32 31 13.53 | 7 | Certificates | Fabric | 2.1.1.1 | G | ||||||||||||||
| 590 | 32 31 13.53 | 7 | Certificates | Gate Hardware and Accessories | 3.2.1 | G | ||||||||||||||
| 591 | 33 11 00 | 1 | Preconstruction Submittals | Connections | 3.1.1 | G | ||||||||||||||
| 592 | 33 11 00 | 3 | Product Data | Pipe, Fittings, Joints and Couplings | 2.1.1 | G | ||||||||||||||
| 593 | 33 11 00 | 3 | Product Data | Valves | 2.1.2 | G | ||||||||||||||
| 594 | 33 11 00 | 3 | Product Data | Valve Boxes | 2.1.2.3 | G | ||||||||||||||
| 595 | 33 11 00 | 3 | Product Data | Pipe Restraint | 2.2.1 | G | ||||||||||||||
| 596 | 33 11 00 | 3 | Product Data | Sleeve-Type Mechanical Couplings | 2.2.2 | G | ||||||||||||||
| 597 | 33 11 00 | 3 | Product Data | Insulation and jacketing | 2.3 | G | ||||||||||||||
| 598 | 33 11 00 | 3 | Product Data | Backflow Preventers | 1.4.2.1.1 | G | ||||||||||||||
| 599 | 33 11 00 | 3 | Product Data | Expansion/Contraction Joint | 2.1.4 | G | ||||||||||||||
| 600 | 33 11 00 | 3 | Product Data | Pipe Saddle | 2.2.3 | G | ||||||||||||||
| 601 | 33 11 00 | 3 | Product Data | Disinfection Procedures | 3.2.5 | G | ||||||||||||||
| 602 | 33 11 00 | 6 | Test Reports | Backflow Preventer Tests | 3.3.1.4 | G | ||||||||||||||
| 603 | 33 11 00 | 6 | Test Reports | Bacteriological Samples | 3.3.1.3 | G | ||||||||||||||
| 604 | 33 11 00 | 6 | Test Reports | Leakage Test | 3.3.1.2 | G | ||||||||||||||
| 605 | 33 11 00 | 6 | Test Reports | Hydrostatic Test | 3.3.1.1 | G | ||||||||||||||
| 606 | 33 11 00 | 7 | Certificates | Pipe, Fittings, Joints and Couplings | 2.1.1 | |||||||||||||||
| 607 | 33 11 00 | 7 | Certificates | Lining | 2.1.1.1.1 | |||||||||||||||
| 608 | 33 11 00 | 7 | Certificates | Valves | 2.1.2 | |||||||||||||||
| 609 | 33 11 00 | 7 | Certificates | Backflow Prevention Training Certificate | 1.4.2.1.1.1 | |||||||||||||||
| 610 | 33 11 00 | 7 | Certificates | Backflow Certificate | 2.1.3 | |||||||||||||||
| 611 | 33 11 00 | 8 | Manufacturer's Instructions | Ductile Iron Piping | 2.1.1.1 | |||||||||||||||
| 612 | 33 20 00 | 1 | Preconstruction Submittals | Pure Water System Procedures and Qualifications | 1.3.1.1 | G | ||||||||||||||
| 613 | 33 20 00 | 1 | Preconstruction Submittals | Pure Water Service Lines System | 1.3.1.1 | G | ||||||||||||||
| 614 | 33 20 00 | 1 | Preconstruction Submittals | Pipe, Fittings, Joints and Couplings | 2.2 | G | ||||||||||||||
| 615 | 33 20 00 | 1 | Preconstruction Submittals | Pipe, Fittings, Joints and Couplings | 2.2 | G | ||||||||||||||
| 616 | 33 20 00 | 1 | Preconstruction Submittals | Valves | 2.3 | G | ||||||||||||||
| 617 | 33 20 00 | 1 | Preconstruction Submittals | Valves | 2.3 | G | ||||||||||||||
| 618 | 33 20 00 | 1 | Preconstruction Submittals | Tapping Sleeves | 2.6.1 | G | ||||||||||||||
| 619 | 33 20 00 | 1 | Preconstruction Submittals | Detrimental Material | 2.5.7 | G | ||||||||||||||
| 620 | 33 20 00 | 1 | Preconstruction Submittals | Cellular Glass Insulation | 2.9.2 | G | ||||||||||||||
| 621 | 33 20 00 | 1 | Preconstruction Submittals | Stainless Steel Insulation Jacket | 2.9.2 | G | ||||||||||||||
| 622 | 33 20 00 | 1 | Preconstruction Submittals | Insulation Bands | 2.9.4 | G | ||||||||||||||
| 623 | 33 20 00 | 1 | Preconstruction Submittals | Disinfection Procedures | 3.2.5 | |||||||||||||||
| 624 | 33 20 00 | 1 | Preconstruction Submittals | Manufacturer's Instructions | 3.2.1 | |||||||||||||||
| 625 | 33 20 00 | 1 | Preconstruction Submittals | As Built drawings | 1.4.2 | G |